Full Length LSSGB Exam Testpaper 1 1. When a survey is conducted with the customers, what does NOT get indicated with high customer satisfaction number? Customer loyalty 2. In a full factorial experiment with 4 factors at 3 levels each, how many trials are required? 81 3. What tool is customarily used to complement the cause-and-effect diagram? Brainstorming 4. Out of the given choices which of the matrix types illustrates relationships in three planes? Y type 5. Recently, steps have been made to substantially improve the process. A p chart has been plotted for some time. One would not be surprised to find that: A larger sample size must be taken 6. A six sigma project has progressed to the point that a control plan is required. Control plan activities can be considered closed after which of the following? The control plan is a living document and is rarely closed 7. The difference between setting alpha equal to 0.05 and alpha equal to 0.01 in hypothesis testing is: With alpha equal to 0.05, one is more willing to risk a type I error 8. Typically, a team sponsor or champion: Is a liaison between the team and upper management 9. When is process FMEA generally performed? Just before the production tooling is authorized 10. Which of the following tools would NOT be part of the control plan development? Measurement scales 11. Information generated in a designed experiment: May be based on values which are not necessarily numerical 12. An in-control process has been performing satisfactorily for some time. However, an improvement is now required. The best response is to: Minimize the common causes to improve the process 13. For the small incremental changes, which is the Japanese technique which is most closely identified? Kaizen 14. To measure the effective use of resources, which of the following metrics would be the most inappropriate? Customer courtesy ratings 15. What is another name of Ishikawa diagram? Fishbone Diagram 16. A p-value is used in many statistical calculations. It can be described as: Containing extreme test statistic probability value as obtained from the sample data 17. If events are not occurring simultaneously then they are called: Mutually exclusive 18. It is found that a process requiring a capability determination is not normal, but appears to be stable. The LEAST desirable action to take, at this point, would be to: Advise the customer and request specification changes 19. Advantage of the R&R range method compared to the average and range or ANOVA methods is that it is a quick way to: Quantify the total R and R portion of measurement. 20. Effective control chart subgrouping includes all of the following actions EXCEPT: Group product so that the subgroups are as heterogeneous as possible 21. A process is checked at random by inspection of samples of four shafts after a polishing operation, and X-bar and R charts are maintained. A person making a spot check measures two shafts accurately, and plots their range on the R chart. The point falls just outside the control limit. He/she advises the department foreman to stop the process. This decision indicates that: The process dispersion is out of control 22. A six sigma team is investigating the sources of variation in fabric rolls. All rolls are different in length. The variable of interest is the number of holes per unit of length. Which control chart will work best for this situation? u chart 23. Out of the following which one is NOT a characteristic of GANTT charts: Estimates of optimistic and pessimistic times can be included 24. The implementation of a control plan in the painting department was so successful that a master black belt wants you to implement the same control plan in the final assembly line. What changes should be made before implementing the necessary control plan? Each control plan is unique, a new plan must be developed for the final assembly line 25. A process has been experiencing problems lately. The operators charting the process have identified the cause to be due to a change in incoming materials. This problem is: A special cause 26. Which of the following is accomplished by using process Map? Track products, operator actions, or administrative procedures 27. Out of the following which tool is customarily used to complement the cause-and-effect diagram? Brainstorming 28. When making inferences about a population variance based on a single sample from that population, what-distribution is used? Chi-square 29. 1,000 gamblers start rolling dice under the condition that if they roll a six they can stay in the game. After three honest rolls, approximately how many gamblers will remain? 4.629 30. The term severity in a FMEA table describes the: Possible impact to a system user of a low level failure 31. To organize facts and data about an unfamiliar subject or problem, which of the new quality management tools is used? The affinity diagram 32. Square root of variance is called: Standard Deviation 33. The control chart that is most sensitive to variations in a measurement is: X-bar and R chart 34. A six sigma green belt has run a 5-2 fractional factorial design. Only 2 of the 5 factors remained important after the factorial analysis. Escalation of this DOE to an optimization model will be best accomplished by: Performing a response surface experiment 35. In which of the following situations is the use of an X-bar and R chart likely to be most helpful as a tool to control a process: The machine capability is somewhat smaller than the specification. 36. An X-bar - R chart has been in control for sometime. If the range suddenly and significantly increases, the mean will: Occasionally show out of control of either limit 37. Identify the assumption that is NOT made when conducting an experiment: That the selected factors are the only ones of importance 38. For measuring the same quality characteristics (thickness in this case) two micrometers are used. The micrometer at headquarters has more decimal places than the one being used at the plant. Then the micrometer at headquarters is more: Sensitive 39. Out of the following graphs which is used to generate correlation coefficients: Scatter Diagrams 40. The calculation of experimental error is a fundamental analysis for determining the statistical significance of DOE factors. Which of the following elements allows for the determination of experimental error? Replicates 41. Measuring system re-analysis seems an odd improvement after the real process improvements have been implemented. What is the logic behind this step? Process variation reduction requires a re-evaluation of the measuring system 42. If a process is out of control, the theoretical probability that a single point on the X-bar chart will fall between plus one sigma and the upper control limit is: . Unknown 43. What percentage of the area under the normal curve is included within + 3 standard deviations from the mean? 99.70% 44. Which of the following names would be most clearly identified as a proponent of improvement and breakthrough projects? Juran 45. An optimized risk management process is best described in which statement? Overall cost and risk are minimized 46. In most six sigma organization, an organized and disciplined approach for solving problems is known as: DMAIC 47. Which of the following tasks is value added? An appropriate product development process 48. What would be most closely associated with the Kanban method? The control of material flow 49. When making measurements with test instruments, precision and accuracy mean: Consistency and correctness, respectively 50. Identify the improvement methodology which would be LEAST effective in validating the outcome of an improvement activity when only quantitative data is involved. Pareto diagram re-analysis 51. Which of the following tools would be of LEAST value when assessing the rests of an improvement team's activities? A brainstorming session 52. Which one of the following distributions describes ratios of two variances drawn from the same normal population? F-statistic 53. Out of the following which is a true probability statement for two events, A and B? P(A or B) = P(A) + P(B) if A and B are mutually exclusive 54. What would be included in one way communication within organization? E-mails and letters 55. Which of the following best describes the actions of a team during the team building phase? The group is uncertain of their duties 56. A number that results from the manipulation of some raw data according to certain specified procedures is called A statistic 57. Which of the following DOE strategies most resembles the Kaizen philosophy? EVOP 58. Which of the following is a valid null hypothesis? mu = 110 59. Sponsorship training is given to which group in a highly effective six sigma companies Senior Management 60. Under what conditions can the Poisson distribution be used to approximate the binomial distribution? When p is equal to or smaller than 0.1 and the sample size is large 61. An understanding of variation categories is important in the selection of rational subgroups for control charting and other purposes. Which of the following would be the LEAST likely variation source reduced by control charting and subsequent floor level follow-up action? Inherent process variation 62. When should an X - MR chart be used? For destructive testing applications 63. What is the importance of the reaction plan in a control plan? It describes what will happen if a key variable goes out of control 64. An investigation of the total product or process variability indicates that the single largest element is quite often: Dependent on the process itself 65. Process capability analysis is defined as: The determination that the process can meet the product specifications as intended 66. Identify the major area of variation classification NOT specifically addressed in multivari studies: Piece-to-piece 67. In translating customer needs into product design features, which of the following techniques is used? Quality function deployment 68. The test used for testing significance in an analysis of variance table is the: F test 69. For process capability, what is null hypothesis? None of the above 70. Out of the following statistical distributions, which can be used to compare sample means? t distribution 71. Identify the form with which Overproduction, scrap, waiting, and excess motion are associated with? Muda 72. It is often desirable to do an R&R study of a gage system and compare it to the total process variation. What must be assured about the gage being used before an R&R study can be performed? Accuracy and sensitivity 73. A student's t test can be used to determine whether or not any differences exist in: Averages 74. Out of all the choices given, Which of them is NOT a DFSS technique? SPC 75. Which new quality management tool would be used, In developing a chart to plot a course of action, with many of the events or milestones unknown Process decision program chart 76. While plotting a control chart, it is noted that two of the last three points are greater than 2 sigma, four out of the last five points are beyond 1 sigma, and eight successive points are on one side of the center line. This information suggests that one should: Investigate to determine what has changed 77. Which of the following input categories are not included in a cause-and-effect diagram: Maintenance 78. After the successful completion and implementation of the first four phases of DMAIC, the control phase should be completed by which of the following? The complete team is the most desirable option. 79. In performing an analysis of variance in a single factor experiment, a fundamental assumption which is made is that the: Column variances are equal 80. While performing an analytical study, which of the following statistical values would seldom be known? The true population parameter 81. Which of the following stakeholder groups would be LEAST affected, If a company fails to meet their quarterly projected sales and profit forecasts? Society 82. For communicating information which is the most effective method? A combination of methods 83. Which phase of IDOV method defines overall product requirements, quantifies marketing information and customer feedback, and therefore creates the first set of CTQ (critical to quality) features. Identify 84. If the specification limits are wider than the control limits, then: None of the above 85. Out of the following distributions which theoretically ties to chi-square distributions: F and t distributions 86. What is required for the use of the program evaluation and review technique (PERT) Time estimates for each activity in the network 87. Which of the following new quality tools would be used, for organizing information, facts or data into a systematic, logical manner? A tree diagram 88. In the DMAIC approach, at what step would the root causes of defects be identified? Analyze 89. If a control chart has UCL = 45.1 and USL = 45.6, and the last sample has values of 44.6, 45.7 and 44.8, one can conclude: The process is out of specification but in control 90. The term Metrics refers to: An evaluation method 91. Given a coefficient of determination of 0.9, what is the correlation coefficient? 0.9487 or -0.9487 92. What is the main motivating factor for the upper management to embrace six sigma Financial impact 93. All multi-vari charts would initially plot a measurement for which of the following categories? Positional 94. What is the approximate six sigma level of the process if the DPMO for the process is 860? 4.6 95. Out of the given choices, Which of the forms of muda is LEAST likely to result in poor product quality? Waiting 96. A process shows lack of stability but yesterday it showed 1.77 which is very good. Then the supervisor decides to use it as a benchmark for all future process capabilities. What should you advise your supervisor? Do not use the 1.77 value, first get the process to statistical stability 97. What is TPM in the lean enterprise system? Total productive maintenance to maximize equipment usage 98. Out of the following number sets which one is mutually exclusive? I. 1, 2, 3 II. 2, 4, 6 III. 1, 3, 5, 7 IV. 1, 2, 3, 4, 5, 6, 7, 8, 9 II and III 99. A six sigma project team is led by a green belt. The current activity is to develop a control plan. The ultimate responsibility for developing the initial plan would belong to: The green belt 100. The SIPOC model helps everyone in an organization to see the business from an overall process perspective. However, it does NOT: Identify the few key business customers