Gerontechnology Paper Discussion Fall 2013 Dr. Diane J. Cook Gerontechnology GT Presentation Teams Fall 2013 Dr. Diane J. Cook Process • Form teams • Select topic • Pick presentation date • Presentation format 40 minutes total (30 minutes presenting, 10 minutes posing discussion questions and facilitating discussion) • Send materials to cook@eecs.wsu.edu by 9am on presentation date • Some Topic (just a starting point) • Socially-assistive robots • Intelligent mobility assistance • Automated approaches to health assessment • • Physical Cognitive • Privacy and security of assistive technologies • Understanding and compensating for sensory changes • Automated memory-based interventions • Promoting healthy behaviors • Sleep monitoring, impact, and improvement Gerontechnology GT Project Ideas Fall 2013 Dr. Diane J. Cook GT Project Timeline • September 10 (or sooner!) • Submit list of 3 preferred projects in ranked order • September 17 (or sooner!) • Teams assigned • October 1 • Formal project proposal, feedback from Drs. Cook, SchmitterEdgecombe, and other mentors • October 15 • IRB application and literature review due • December 3 • Project presentations • December 10 • Project reports Project 1: Digital Cognitive Assessment • 1 Psychology student, 2 CS students • Past and Current studies Healthy, MCI, Dementia • Parkinson’s • Horizon House • • Assessment ***Laboratory tests*** • Self report • Informed report • Smart home • Laboratory tests • Stroop test • Inhibit overlearned response in favor of novel response Laboratory tests • Trail making test Speed of attention • Sequencing • Search and motor functions • • One we currently use Not using licensed version • Can we make this digital? • Grab extra features • Laboratory tests • Clock drawing test Temporo-spatial orientation • Attention • • GT working on digital version, not validated Laboratory tests • Freecell card game Tested by OHSU • Not clinically validated • Android app source available • Laboratory tests • Unique game choice • Draw from AI experience • 15 puzzle, Towers of Hanoi, etc. • penscreen.com Experiment Design • Part One Recruit older adults • Perform traditional version of existing test • Perform digital version (counterbalance order) • Compare performance • • Part Two Perform traditional cognitive assessment • Gather performance scores from digital version • Use ML / correlation analysis to see if assessment can be derived from digital scores • Experiment Design • And beyond • Recruit students from Psychology Subject Pool • Perform randomized versions of game every day for 14 days • Look for learning effects • Recruit participants from Horizon House • Perform randomized versions of game each month • Compare with self report and cognitive assessment Project 2: Personalized Interventions • 1 Psychology student, 1 CS student • Mentoring help from Dr. Taylor Interventions • Memory notebook • GT project • How encourage individuals to respond to intervention? • Adaptive interface • Adaptive rewards Interface • Different look and feel, layout • Alternative prompting types • Audio, text, tone, vibrate, pictures • Alternative prompt timings Rewards • Earn points • Complete picture • Download coupons, ring tones Personalization • Use Machine Learning to adapt interface and rewards to user Experiment Design • Round 1 Recruit participants from Psychology subject pool • Perform short tasks with varying interface and/or reward • Compared learned approach to random • Experiment Design • Round 2 Clinical evaluation with older adults • Using in Horizon House apartments • Project 3: Rehabilitation Monitoring • 1 BE student, 1 CS student, Dr. Meeks St. Luke’s Community • Therapy at St. Luke’s Rehabilitation Hospital in Spokane Monitor Therapy • Motion sensors • Smart phone sensors • Round 1 • Generate task performance measures • Round 2 • Correlate performance with • Patient status • Total time in therapy • Time spent on current task Other Project Ideas • Analyze Parkinson’s data TUG • Voice • ADLs • • Integrate physiological and behavior data into EHR, PHR Vladimir Borisov Chris Cain Jessamyn Dahmen Robert Fellows Shervin Hajamini Christa Simon Gina Sprint Team #1 October 8, 2013 Team #2 October 15, 2013 Team #3 November 5, 2013 Team #4 November 12, 2013