Railroad Commission of Texas Pits and Stationary Treatment Facilities: Application Information Sean Avitt Environmental Permits & Support Unit Main Line: 512.463.3840 Disclaimer / Class Overview • This is the highlights… This presentation is not intended to be, nor is it, a complete guide. There is no substitution for reading the rules, or having professional consultation. • Environmental Permits Background Info • Pits – Application Info • STF – Application Info 2 Environmental Permitting BACKGROUND INFORMATION 3 Environmental Permits & Support • Covers the management of oil and gas waste at or near the surface • Includes all disposal methods other than injection wells • Permitting and Management of: • Pits • Landfarming and Landtreatment • Recycling • Reclamation Plants • Separation Facilities • Discharges • Waste Haulers • Others 4 Environmental Permits & Support • Covers the management of oil and gas waste at or near the surface • Includes all disposal methods other than injection wells • Permitting and Management of: • Pits • Landfarming and Landtreatment • Recycling • Reclamation Plants • Separation Facilities • Discharges • Waste Haulers • Others 5 Associated Rules and Publications • • • • • Rule 8 – Water Protection Rule 57 – Reclamation Plants Rule 78 – Financial Security Rule 98 – Hazardous Waste Management Chapter 4, Subchapter B – Commercial Recycling 6 Associated Rules and Publications • • • • • Rule 8 – Water Protection Rule 57 – Reclamation Plants Rule 78 – Financial Security Rule 98 – Hazardous Waste Management Chapter 4, Subchapter B – Commercial Recycling • Surface Waste Management Manual http://www.rrc.state.tx.us/oil-gas/applications-and-permits/environmentalpermit-types-information/ 7 Rule 8 Background • Environmental Permitting’s Authority • Subsections • • (b) No Pollution (d) Pollution Control • • • • Prohibited / Authorized Disposal Prohibited / Authorized Pits Authorized Pit Backfilling requirements Prohibited / Authorized Recycling 8 Rule 8 - Permitted Pits • If a pit is not authorized by Rule 8, a Form H-11 must be filed with Environmental Permits and a permit issued before use of the pit can begin. • Examples of types of pits that require a permit: • • • • • • • • Commercial Fluid Recycling Pit Disposal Pit Collecting Pit Emergency Saltwater Storage Pit Brine Pit Washout Pit Skimming Pit Gas Plant Evaporation/Retention Pit 9 Rule 8 - Permitted Pits • Examples of types of pits that require a permit: • • • • • • • • • Commercial Fluid Recycling Pit Disposal Pit Collecting Pit Emergency Saltwater Storage Pit Brine Pit Washout Pit Skimming Pit Gas Plant Evaporation/Retention Pit ANY PIT NOT SPECIFICALLY AUTHORIZED BY RULE 8 10 Rule 8 - Permitted Pits • Examples of types of pits that require a permit: • Commercial Fluid Recycling Pit • • • • • • • • We’ll talk about this in the next presentation Disposal Pit Collecting Pit Emergency Saltwater Storage Pit Brine Pit Washout Pit Skimming Pit Gas Plant Evaporation/Retention Pit 11 Rule 8 - Permitted Pits • Examples of types of pits that require a permit: • Commercial Fluid Recycling Pit • Disposal Pit • • • • • • • Large pit created for disposal of mud & cuttings Collecting Pit Emergency Saltwater Storage Pit Brine Pit Washout Pit Skimming Pit Gas Plant Evaporation/Retention Pit 12 Rule 8 - Permitted Pits • Examples of types of pits that require a permit: • Commercial Fluid Recycling Pit • Disposal Pit • Collecting Pit • • • • • • Storage prior to disposal, typically, by injection Emergency Saltwater Storage Pit Brine Pit Washout Pit Skimming Pit Gas Plant Evaporation/Retention Pit 13 Rule 8 - Permitted Pits • Examples of types of pits that require a permit: • • • • Commercial Fluid Recycling Pit Disposal Pit Collecting Pit Emergency Saltwater Storage Pit • • • • • Used temporarily during upset or repair Brine Pit Washout Pit Skimming Pit Gas Plant Evaporation/Retention Pit 14 Rule 8 - Permitted Pits • Examples of types of pits that require a permit: • • • • • Commercial Fluid Recycling Pit Disposal Pit Collecting Pit Emergency Saltwater Storage Pit Brine Pit • Storage of brine at underground storage caverns • Washout Pit • Skimming Pit • Gas Plant Evaporation/Retention Pit 15 Rule 8 - Permitted Pits • Examples of types of pits that require a permit: • • • • • • Commercial Fluid Recycling Pit Disposal Pit Collecting Pit Emergency Saltwater Storage Pit Brine Pit Washout Pit • Washout of “empty” trucks– wash water and incidental pollutants • Skimming Pit • Gas Plant Evaporation/Retention Pit 16 Rule 8 - Permitted Pits • Examples of types of pits that require a permit: • • • • • • • Commercial Fluid Recycling Pit Disposal Pit Collecting Pit Emergency Saltwater Storage Pit Brine Pit Washout Pit Skimming Pit • Prior to discharge to remove oil & grease to acceptable level • Gas Plant Evaporation/Retention Pit 17 Rule 8 - Permitted Pits • Examples of types of pits that require a permit: • • • • • • • • Commercial Fluid Recycling Pit Disposal Pit Collecting Pit Emergency Saltwater Storage Pit Brine Pit Washout Pit Skimming Pit Gas Plant Evaporation/Retention Pit • Pit used to collect rainwater and waste water – sometimes a buried tank or sump 18 Pits APPLICATION INFORMATION 19 … You might be a Pit. • If it’s in contact with the ground, but not an aboveground storage tank • If it’s below grade (even if it’s just a little bit) • If it’s a “sump” larger than 500 gallons • If it’s a concrete structure that cannot be moved easily and quickly to be checked for leaks • If it’s a steel containment ring with a liner 20 Permitting Pits • Submit an Application for Permit to Maintain and Use a Pit (Form H-11) to Austin and District Office • And the supplemental information required by the back of the Form H-11 http://www.rrc.state.tx.us/oil-gas/forms/oil-gas-formslibrary/oil-gas-forms-in-alphabetical-order/ 21 Front of the H-11 22 Front of the H-11 23 Front of the H-11 24 Front of the H-11 No box left empty! 6. 10.b. 10.c. 13. 15.b. 15.c. 16. Lease/Project/Facility name different than Operator Artificial liner – concrete or buried tank = lined LDS must be isolated… not monitor wells Other – Description of Pit Type Type of waste or fluid Chloride concentration If existing, don’t forget the construction date Original Signature 25 Front of the H-11 Original Signature 26 Back of H-11 – Instructions to Pit Application B. C. D. G. H. I. J. K. L. Notify Surface Owner Plat County Highway Map Cross sections Liner info Soil / subsoil info Leak Detection System (LDS) Routine Inspection if no LDS ESWS size justification 27 Back of H-11 – Instructions to Pit Application B. C. D. G. H. I. J. K. L. Notify Surface Owner w/ front & back of H-11 Plat County Highway Map Cross sections Liner info Soil / subsoil info Leak Detection System (LDS) Routine Inspection if no LDS ESWS size justification 28 Back of H-11 – Instructions to Pit Application B. Notify Surface Owner w/ front & back of H-11 C. Plat • D. G. H. I. J. K. L. Perpendicular distance to lease & survey lines clearly noted in feet County Highway Map Cross sections Liner info Soil / subsoil info Leak Detection System (LDS) Routine Inspection if no LDS ESWS size justification 29 Survey Plat N Sage Brush Ranch (01234) Lease 28.3215°, -97.5689° 931 ft Pit S. AVITT A-047 931 ft 400 ft T & N.O.R.R.C.O Survey A-125 820 ft V. Lang A-126 Scale 30 Back of H-11 – Instructions to Pit Application B. Notify Surface Owner w/ front & back of H-11 C. Plat D. County Highway Map • G. H. I. J. K. L. 1 inch = 4 miles Cross sections Liner info Soil / subsoil info Leak Detection System (LDS) Routine Inspection if no LDS ESWS size justification 31 Back of H-11 – Instructions to Pit Application B. C. D. G. H. I. J. K. L. Notify Surface Owner w/ front & back of H-11 Plat County Highway Map Cross sections Liner info Soil / subsoil info Leak Detection System (LDS) Routine Inspection if no LDS ESWS size justification 32 Cross section example Top of Berms Fluid Level Natural Grade This is only one cross section— Two are required. And don’t forget the plan view (bird’s eye)! 33 Cross section example 1:3 slope 3 1 Top of Berms 2 feet freeboard Fluid Level Natural Grade This is only one cross section— Two are required. And don’t forget the plan view (bird’s eye)! 34 Cross section example 1:3 slope 3 1 Top of Berms 2 feet freeboard Scale Dimensions Fluid Level Natural Grade This is only one cross section— Two are required. And don’t forget the plan view (bird’s eye)! 35 Fluid Stored Above Grade Top of Berms 2 feet freeboard Fluid Level Natural Grade Texas P.E. seal and signature REQUIRED 36 Back of H-11 – Instructions to Pit Application B. C. D. G. H. Notify Surface Owner w/ front & back of H-11 Plat County Highway Map Cross sections Liner info • I. J. K. L. Thickness, material, and manufacturer’s info incl. hydraulic conductivity (< 1 x 10-7 cm/s) Soil / subsoil info Leak Detection System (LDS) Routine Inspection if no LDS ESWS size justification 37 Back of H-11 – Instructions to Pit Application B. C. D. G. H. I. J. K. L. Notify Surface Owner w/ front & back of H-11 Plat County Highway Map Cross sections Liner info Soil / subsoil info Leak Detection System (LDS) Routine Inspection if no LDS ESWS size justification 38 Soil Information http://websoilsurvey.nrcs.usda.gov Underlying subsoil (Geology) www.twdb.state.tx.us/groundwater/ aquifer/GAT 39 Back of H-11 – Instructions to Pit Application B. C. D. G. H. I. J. Notify Surface Owner w/ front & back of H-11 Plat County Highway Map Cross sections Liner info Soil / subsoil info Leak Detection System (LDS) • Design & liner failure determination K. Routine Inspection if no LDS • Annual emptying of pit & inspection of liner L. ESWS size justification 40 Back of H-11 – Instructions to Pit Application B. C. D. G. H. I. J. K. L. Notify Surface Owner w/ front & back of H-11 Plat County Highway Map Cross sections Liner info Soil / subsoil info Leak Detection System (LDS) Routine Inspection if no LDS ESWS size justification • Calculation that demonstrates need during repair/upset 41 Stationary Treatment Facilities (STFs) APPLICATION INFORMATION 42 Common Facilities at STFs • • • • • • • Landfarm Landtreatment Waste Separation Reclamation Recycling Disposal Pits Collecting Pits 43 General Requirements • • • • Site Information Facility Design and Construction Facility Monitoring Closure 44 General Requirements • • • • • Site Information Facility Design and Construction Facility Monitoring Closure No Discharge, No pollution 45 Site Information • Environmental • Soil, Geology, Surface Water, Groundwater, Wetlands, Floodplains • Real Property • Survey/Lease, Adjacent Owners, Receptors 46 Environmental Information USGS Topographic Map http://nationalmap.gov/ustopo/index.html Wetlands Map http://www.fws.gov/wetlands/ 47 Environmental Information Flood Maps http://msc.fema.gov Groundwater http://wiid.twdb.state.tx.us 48 Survey & Lease Plat / Copy of Lease N Facility T & N.O.R.R.C.O S. AVITT A-047 1.2 acres A-125 1 inch = 500 feet V. Lang A-126 49 Offset Landowners A Mr. & Mrs. Brown 123 Sesame Street Victoria, TX B C D E Count Chocula Facility 456 Sugar Drive Transylvania, TX F Billy Madison 911 Porsche Court Austin, TX 50 Notification • Surface owner permission • Adjacent owner notification with copy of application • Public notice in accordance with H.B. 480 of the 79th Legislature – Notice of application in a newspaper of general circulation in the county with affidavit – Once a week for two consecutive weeks 51 Receptors within 500 feet 200 feet 52 http://wiid.twdb.state.tx.us 1 inch = 500 feet 53 Facility Design and Construction • Facility Diagram • Storage • Liner info, cross sections, capacities • Processing / Treatment • Equipment • Flow Diagram of process • Chemicals & aggregates • Stormwater Management • Contact / Non-contact areas • 24-hour, 25-year rainfall event 54 Facility Diagram Dimensions Storage Pit Processing Pad 6 in. thick concrete Equipment 500 500 500 Tanks 55 Process Flow Diagram Incoming waste tested and accepted Storage Tank Chemicals/ Materials? Final testing prior to disposal or reuse Processing Equipment 56 Facility Monitoring • Waste Acceptance Plan • RCRA-exempt only, no NORM, etc. • Sampling Procedures • Product/Disposal Assurance • Disposal criteria – Paint filter / 5% TPH • Roadbase sampling – TxDOT • Fluids sampling – Determined by Reuse • Inspection • Facility deterioration • Monitor Wells • Leak Detection Systems 57 Facility Monitoring • Waste Acceptance Plan • RCRA-exempt only, no NORM, etc. • Sampling • Product/Disposal Assurance • Roadbase sampling – TxDOT • Fluids sampling – Determined by Reuse • Disposal criteria – Paint filter / 5% TPH • Inspection • Facility deterioration • Monitor Wells • Leak Detection Systems • Records 58 Closure • Financial Security • Closure Cost Estimate (CCE) – Demo, Transport, Disposal, Reclaim • Restrictive Covenant • Removal of all equipment • Empty, Backfill, Compact any pits • Final Sampling • Soil & GW • Recontour & reseed 59 STF Permitting Tips • Closure Cost Estimates (CCE) should clearly explain every assumption • Engineering and geological work products must be signed by their respective Texas-registered professionals • All oil and gas waste and products should be stored in lined permitted or authorized pits, or above-ground storage tanks until reuse or disposal 60 Thank you. Questions?! Sean Avitt Environmental Permits & Support Unit Main Line: 512-463-3840 sean.avitt@rrc.state.tx.us 61