GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Summary and Future Plans Eduardo do Couto e Silva Instrument Analysis Workshop 1 SLAC, June 7 , 2004 E. do Couto e Silva 1/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Data Constraints and Idiosyncrasies From Pat Hascall in Systems Engineering • Data Constraints and Idiosyncrasies (LAT-TD-03775) is intended to collect LAT quirks – Started by Steve Ritz – Goal is to identify, document and capture LAT features (that’s not a bug, it’s a feature), gotchas, limitations or other issues – The lists provided during the Cal and Tracker presentations from this morning will be added to the document • We need your help in documenting issues that you uncover during your test data analysis • If you find any issues that should be documented in this list, please forward them to any of the following: – Eduardo (he’s first on the list because he’s making me build this chart for his presentation) – Pat Hascall – Steve Ritz E. do Couto e Silva 2/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Sample Entry (Actually the only entry) From Pat Hascall in Systems Engineering • Item 1: ACD GARC Header Parity Bit Design Error – One of the parity bits covering a portion of the serial data stream between the ACD FREE cards and the AEM is unusable, due to a design error. The issue and implications are described in LAT-TD-03774. Alternative data integrity checks, described in LAT-TD-03774, provide equivalent coverage. These integrity checks must be performed and monitored as part of the routine data reduction pipeline processing. E. do Couto e Silva 3/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 The LOGO Tkr1Y0 Tkr1DieEdge - Distance from die (wafer) edge of initial point (0 is halfway between the dies, increases toward center of die) Oh no! Another project ! Tkr1DieEdge<5 Tkr1DieEdge>40 Tkr1X0 E. do Couto e Silva 4/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 The LOGO X : Tkr1X0 E. do Couto e Silva Y : Tkr1Y0 Z : Tkr1DieEdge 5/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 It was not easy… • 29 people signed up for the Workshop • 29 showed up in the dinner – if someone did not pay please let me know, otherwise my wife will kill me… • ~50 to 60 attended the sessions ! – I think it worked well, but time will tell… • To get all of us here was a lot of work since we had to – Convince people that this was worthwhile – Work hard to get the infrastructure needed – Annoy people with continuous requests… E. do Couto e Silva 6/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 The SVAC Musketeers C’mon Richard, this is not an unreasonable request… No mercy, Let’s get that pipeline! Warren They won’t escape from the geometry review! The calibration packages are mine ! Xin Anders Eduardo Special thanks to the three Musketeers who worked around the clock ! E. do Couto e Silva 7/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Meanwhile in the SAS kingdom… Cardinal “Richardlieu” Here they come again… The I&T Musketeers want the towers assembled upside down with a diagonal readout and in a grid with a dodecahedron configuration Of course, due yesterday… Our reasonable requests were translated into the Gaudi Framework… E. do Couto e Silva 8/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Sign up … LAT instrument Analysis list as of June 8 , 2004 Please sign up if your name is not there E. do Couto e Silva 9/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 What next ? • • • • Project lists – Discussed this afternoon we have a lot of work ahead of us User Manual – I would like to prepare a user manual with the info from the workshop to help you analyze data Instrument Analysis VRVS meetings – Weekly basis so that we can follow up – I will call you periodically (to see if you miss California…) – Biweekly reports by me in Steve’s ANA meeting – Instrument Analysis List (IA) is set up (see next slide) Working Meeting in July – Core group (mostly local) – Evaluate where we are – Evaluate what to ask people to do with the EM2 data • • Workshop 2 in September with the Collaboration Meeting – 2 day workshop (TBR) DATA TAKING starts in September/October ! – Would like to see you @ SLAC for a longer period to analyze data E. do Couto e Silva 10/19 GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Thank you for coming Thanks for the Project Management for the Support : Peter, Steve, Lowell, Dick and Elliott Without Diana, Debbie and Chris this could not have been so enjoyable ! http://www-project.slac.stanford.edu/slacpix/index.htm My personal thanks to the “brains” behind it… E. do Couto e Silva 11/19