March 2011 doc.: IEEE 802.15-11-0203-00 71st Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks March 13-18, 2011 Marina Bay Sands Hotel, Singapore Submission Slide 1 Robert F. Heile, ZigBee Alliance March 2011 doc.: IEEE 802.15-11-0203-00 802.15 Organization Chart 802.15WG Chair Bob Heile, ZigBee Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15 New Projects (WNG), Interpretations, Rules Pat Kinney, Kinney Consulting Task Groups TG4e 15.4 MAC Enhancements Pat Kinney, Kinney Consulting Chair TG4j MBAN 15.4 PHY Ray Krasinski, Philips Chair TG4f Active RFID Mike McInnis, Boeing Chair TG4k Low Energy Critical Infrastructure David Howard, OnRamp Wireless Chair TG4g Smart Utility Networks Phil Beecher, Consultant Chair TG6 Body Area Networking Art Astrin, Astrin Radio Chair TG4h 15.4 Corrigendum 1 Pat Kinney, Kinney Consulting Chair TG7 Visible Light Comm. Eun Tae Won, Samsung Chair Working Group Technical Editor James Gilb Study Groups/Interest Groups Study Groups: Personal Space Communications (PSC) Chair: Peter Murray, Independent 4TV TV White Space PHY for 15.4 Interest Groups: Host Identity Protocol (HIP) Chair: Robert Moskowitz, Verizon Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Engineering Laboratories TerraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig TG4i 15.4 Roll-up James Gilb Chair Submission Slide 2 Robert F. Heile, ZigBee Alliance March 2011 doc.: IEEE 802.15-11-0203-00 Singapore Session Objectives March 13-18, 2011 TASK GROUP4e --MAC Enhancements 1. Comment resolution on last Recirculation 2. Prepare draft for next Recirculation TASK GROUP-4f Active RFID 1. Comment resolution on last Recirculation 2. Prepare draft for next Recirculation 3. Seek Conditional Approval to start Sponsor Ballot TASK GROUP-4g Smart Utility Networks 1. Comment resolution on last Recirculation 2. Prepare draft for next Recirculation 3. Evaluate Timeline TASK GROUP-4h 15.4-2006 Corrigendum 1 1. On-Hold pending completion of 15.4i Submission Slide 3 Robert F. Heile, ZigBee Alliance March 2011 doc.: IEEE 802.15-11-0203-00 Singapore Session Objectives March 13-18, 2011 TASK GROUP-4i 15.4-Roll up of a, c, and d 1. Comment resolution on last Recirculation 2. Prepare draft for next Recirculation 3. Seek Conditional Approval to Submit to RevCom TASK GROUP-4j MBAN Phy Amendment 1. Review responses to CFA 2. Develop Project Plan/Timeline TASK GROUP-4k Low Energy Critical Infrastructure Monitoring 1. Confirm a Chair for the Group 2. Review responses to CFA 3. Develop Project Plan/Timeline Submission Slide 4 Robert F. Heile, ZigBee Alliance March 2011 doc.: IEEE 802.15-11-0203-00 Singapore Session Objectives March 13-18, 2011 TASK GROUP 6 –Body Area Networking: 1. Complete Comment resolution on last Recirculation 2. Prepare draft for next Recirculation 3. Update Project Timeline TASK GROUP 7-VISIBLE LIGHT COMMUNICATIONS 1. Comment resolution on last Recirculation 2. Prepare draft for next Recirculation 3. Seek approval of editorial PAR edits to Scope 4. Seek conditional approval for RevCom Submission Slide 5 Robert F. Heile, ZigBee Alliance March 2011 doc.: IEEE 802.15-11-0203-00 Singapore Session Objectives March 13-18, 2011 Study Group: Personal Space Communication (PSC) 1. Seek approval of PAR and 5C 2. Conduct 802 Tutorial 3. Discuss future of the Committee Study Group: TV White Space PHY for 15.4 (4TV) 1. Create draft of PAR and 5C 2. Discuss future of the Committee Submission Slide 6 Robert F. Heile, ZigBee Alliance March 2011 doc.: IEEE 802.15-11-0203-00 Singapore Session Objectives March 13-18, 2011 Host Identity Protocol (HIP) Interest Group: 1. Not Meeting in Singapore Spectrum Resource Use (SRU) Interest Group: 1. Hear Contributions 2. Discuss future of the Committee THz Interest Group: 1. Hear Contributions 2. Discuss future of the Committee Submission Slide 7 Robert F. Heile, ZigBee Alliance March 2011 doc.: IEEE 802.15-11-0203-00 Singapore Session Objectives March 13-18, 2011 NEW PROJECTS SUBCOMMITTEE 1. Report on WNG progress 2. Hear new presentations Working Group Rules Committee 1. Comment resolution on Ops Manual 2. Adopt generic WG rules Submission Slide 8 Robert F. Heile, ZigBee Alliance March 2011 Submission doc.: IEEE 802.15-11-0203-00 Slide 9 Robert F. Heile, ZigBee Alliance March 2011 doc.: IEEE 802.15-11-0203-00 Upcoming Sessions • • • • • • • • • • May 8-13, 2011, Hyatt Grand Champion, Palm Springs, California, USA, 802 Wireless Interim July 17-22, 2011, Hyatt Regency San Francisco at Embarcadero Center, San Francisco, CA, USA, 802 Plenary Session. September 18-23, 2011, Okinawa Convention Center, Okinawa, Japan, 802 Wireless Interim November 6-11, 2011, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Plenary Session. January 15-20, 2012, Hyatt Regency, Jacksonville, Florida, USA, 802 Wireless Interim March 11-16, 2012, Melbourne or Big Island-TBD, 802 Plenary Session. May 13-18, 2012, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Wireless Interim Session July 15-20, 2012, Grand Hyatt Manchester, San Diego, CA, USA, 802 Plenary Session. September 9-14, 2012, Hilton Waikoloa Village, Big Island, HI, USA, 802 Wireless Interim Session November 11-16, 2012, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session. Submission Slide 10 Robert F. Heile, ZigBee Alliance