802.15

advertisement
March 2011
doc.: IEEE 802.15-11-0203-00
71st Session of meetings of the
IEEE 802.15 Working Group for
Wireless Personal Area Networks
March 13-18, 2011
Marina Bay Sands Hotel, Singapore
Submission
Slide 1
Robert F. Heile, ZigBee Alliance
March 2011
doc.: IEEE 802.15-11-0203-00
802.15 Organization Chart
802.15WG Chair
Bob Heile, ZigBee Alliance
802.15 Vice Chairs
Rick Alfvin, VeriLAN
Pat Kinney, Kinney Consulting
Secretary
Pat Kinney, Kinney Consulting
Assistant Secretary
Mike McInnis, Boeing
To add your name
to the WG/TG/SG/IG reflectors
please go to www.ieee802.org/15
New Projects (WNG),
Interpretations, Rules
Pat Kinney, Kinney Consulting
Task Groups
TG4e 15.4 MAC Enhancements
Pat Kinney, Kinney Consulting
Chair
TG4j MBAN 15.4 PHY
Ray Krasinski, Philips
Chair
TG4f Active RFID
Mike McInnis, Boeing
Chair
TG4k Low Energy Critical Infrastructure
David Howard, OnRamp Wireless
Chair
TG4g Smart Utility Networks
Phil Beecher, Consultant
Chair
TG6 Body Area Networking
Art Astrin, Astrin Radio
Chair
TG4h 15.4 Corrigendum 1
Pat Kinney, Kinney Consulting
Chair
TG7 Visible Light Comm.
Eun Tae Won, Samsung
Chair
Working Group Technical Editor
James Gilb
Study Groups/Interest Groups
Study Groups:
Personal Space Communications (PSC)
Chair: Peter Murray, Independent
4TV TV White Space PHY for 15.4
Interest Groups:
Host Identity Protocol (HIP)
Chair: Robert Moskowitz, Verizon
Spectrum Resource Use (SRU)
Chair: Shoichi Kitazawa,
ATR Wave Engineering Laboratories
TerraHertz (THZ)
Chair: Thomas Kürner,
Technische Universität Braunschweig
TG4i 15.4 Roll-up
James Gilb
Chair
Submission
Slide 2
Robert F. Heile, ZigBee Alliance
March 2011
doc.: IEEE 802.15-11-0203-00
Singapore Session Objectives
March 13-18, 2011
TASK GROUP4e --MAC Enhancements
1. Comment resolution on last Recirculation
2. Prepare draft for next Recirculation
TASK GROUP-4f Active RFID
1. Comment resolution on last Recirculation
2. Prepare draft for next Recirculation
3. Seek Conditional Approval to start Sponsor Ballot
TASK GROUP-4g Smart Utility Networks
1. Comment resolution on last Recirculation
2. Prepare draft for next Recirculation
3. Evaluate Timeline
TASK GROUP-4h 15.4-2006 Corrigendum 1
1. On-Hold pending completion of 15.4i
Submission
Slide 3
Robert F. Heile, ZigBee Alliance
March 2011
doc.: IEEE 802.15-11-0203-00
Singapore Session Objectives
March 13-18, 2011
TASK GROUP-4i 15.4-Roll up of a, c, and d
1.
Comment resolution on last Recirculation
2.
Prepare draft for next Recirculation
3.
Seek Conditional Approval to Submit to RevCom
TASK GROUP-4j MBAN Phy Amendment
1.
Review responses to CFA
2.
Develop Project Plan/Timeline
TASK GROUP-4k Low Energy Critical Infrastructure Monitoring
1.
Confirm a Chair for the Group
2.
Review responses to CFA
3.
Develop Project Plan/Timeline
Submission
Slide 4
Robert F. Heile, ZigBee Alliance
March 2011
doc.: IEEE 802.15-11-0203-00
Singapore Session Objectives
March 13-18, 2011
TASK GROUP 6 –Body Area Networking:
1. Complete Comment resolution on last
Recirculation
2. Prepare draft for next Recirculation
3. Update Project Timeline
TASK GROUP 7-VISIBLE LIGHT COMMUNICATIONS
1. Comment resolution on last Recirculation
2. Prepare draft for next Recirculation
3. Seek approval of editorial PAR edits to Scope
4. Seek conditional approval for RevCom
Submission
Slide 5
Robert F. Heile, ZigBee Alliance
March 2011
doc.: IEEE 802.15-11-0203-00
Singapore Session Objectives
March 13-18, 2011
Study Group: Personal Space Communication (PSC)
1. Seek approval of PAR and 5C
2. Conduct 802 Tutorial
3. Discuss future of the Committee
Study Group: TV White Space PHY for 15.4 (4TV)
1. Create draft of PAR and 5C
2. Discuss future of the Committee
Submission
Slide 6
Robert F. Heile, ZigBee Alliance
March 2011
doc.: IEEE 802.15-11-0203-00
Singapore Session Objectives
March 13-18, 2011
Host Identity Protocol (HIP) Interest Group:
1. Not Meeting in Singapore
Spectrum Resource Use (SRU) Interest Group:
1. Hear Contributions
2. Discuss future of the Committee
THz Interest Group:
1. Hear Contributions
2. Discuss future of the Committee
Submission
Slide 7
Robert F. Heile, ZigBee Alliance
March 2011
doc.: IEEE 802.15-11-0203-00
Singapore Session Objectives
March 13-18, 2011
NEW PROJECTS SUBCOMMITTEE
1. Report on WNG progress
2. Hear new presentations
Working Group Rules Committee
1. Comment resolution on Ops Manual
2. Adopt generic WG rules
Submission
Slide 8
Robert F. Heile, ZigBee Alliance
March 2011
Submission
doc.: IEEE 802.15-11-0203-00
Slide 9
Robert F. Heile, ZigBee Alliance
March 2011
doc.: IEEE 802.15-11-0203-00
Upcoming Sessions
•
•
•
•
•
•
•
•
•
•
May 8-13, 2011, Hyatt Grand Champion, Palm Springs, California, USA, 802
Wireless Interim
July 17-22, 2011, Hyatt Regency San Francisco at Embarcadero Center,
San Francisco, CA, USA, 802 Plenary Session.
September 18-23, 2011, Okinawa Convention Center, Okinawa, Japan, 802
Wireless Interim
November 6-11, 2011, Hyatt Regency Atlanta, Atlanta, GA, USA, 802
Plenary Session.
January 15-20, 2012, Hyatt Regency, Jacksonville, Florida, USA, 802
Wireless Interim
March 11-16, 2012, Melbourne or Big Island-TBD, 802 Plenary Session.
May 13-18, 2012, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Wireless
Interim Session
July 15-20, 2012, Grand Hyatt Manchester, San Diego, CA, USA, 802
Plenary Session.
September 9-14, 2012, Hilton Waikoloa Village, Big Island, HI, USA, 802
Wireless Interim Session
November 11-16, 2012, Grand Hyatt San Antonio, San Antonio, TX, USA,
802 Plenary Session.
Submission
Slide 10
Robert F. Heile, ZigBee Alliance
Download