FOCUSED CONTENTS 1. Convergence of NHM with other schemes. 2. Planting Material Sub-Plan. 3. Baseline/Bench Mark Survey of Horticulture Sector. 4. Schedule of Operation-Pert-Chart. 5. Identification of Production Clusters with Marketing Linkage. 6. Training Plan and Training Calendar. 7. Organic Farming with Certification. 8. Future Vision. CONVERGENCE WITH OTHER SCHEMES - 1 I. Issues – 1. Gaps in many activities to achieve the objective of the scheme. 2. Insufficient money for optimum utilization of the scheme. II. Approach – 1. Gap filling through convergence of funds of various other schemes with NHM. 2. Technical support for planning, selection of area and execution of works especially with Forest and Agriculture Department. III. Status CONVERGENCE WITH OTHER SCHEMES - 2 Sl. No. 1 2 3. 4. 5. 6. 7. Identified activity Kind of convergence area Program under which proposed Earth work and labour oriented works for maintenance and bed Model Nurseries NREGS preparation. i. Fencing RKVY/BRGF ii. CPT NREGS iii. Soil Water Conservation work (Contour Trenching) Ground NREGS Establishment of new Water Recharge (Check Dams etc.) perennial gardens iv. Drip Irrigation MIS/BRGF (Orchards) BRGF/Tribal Development v. Electrification of Pump Authority for Tribal Blocks vi. Land leveling and shaping NREGS i. Fencing RKVY/BRGF Non-perennial plantation ii. Inputs RKVY/BRGF (Banana/Papaya) iii. Drip Irrigation MIS/BRGF i. Fencing RKVY/BRGF ii. CPT NREGS iii. Soil Water Conservation work (Contour Trenching) Ground NREGS Water Recharge (Check Dams etc.) Plantation crop (Cashew) iv. Drip Irrigation MIS/BRGF BRGF/Tribal Development v. Electrification of Pump Authority for Tribal Blocks vi. Land leveling and shaping NREGS i. Electrification of community bore-wells. State Electricity Board Creation of water resources CREDA (Chhattisgarh Renewable ii. Solar electrification of community bore-wells. Energy Development Authority) iii. Community tanks. SGSY Establishment of village refrigerators, cold chain containers, refrigerated transport vehicles, pre-cooling chambers & zero Tribal Development Authority for PHM energy cool -chamber (Low cost environment friendly cool Tribal Blocks & TSP chambers). Chhattisgarh State Marketing Marketing Construction of new markets / mandi Federation Ltd. PLANTING MATERIAL SUB-PLAN - 1 I. Issues – 1. Good quality seeds and genuine planting material biggest limiting factor in the success of plantation. 2. Timely supply and distribution of planting material / other inputs. 3. Dependence on external agencies and private suppliers. II. Approach – 1. Optimum utilization of capacity of the departmental nurseries. 2. Forehand planning. III. Status PLANTING MATERIAL SUB-PLAN - 2 REQUIREMENT OF PLANTING MATERIAL FOR AREA EXPANSION OF CROPS IN 2009-10 Sl. No. 1. 1. * Name of Crop Target (in ha.) Total requirement of planting material (Nos./Kg.) Source of Procurement 2. 3. 4. 5. 63,88,800 (Nos.) Departmental Nurseries, IGKVV, C.G. State seed & Agriculture Development Corporation, NRCC Nagpur, Narendra Dev Agriculture University Pratapgarh & Nurseries approved by Directorate of Cashew & Cocoa Dev. Govt. of India Cochin. C.G. State Seed of Agri. Development Corporation, Tarai Dev. Corporation Uttaranchal, & IGKVV, Chhattisgarh. Fruit Crops 8885 2. Spices Crops 6720 40,63,350 Kg. 3. Flowers 2250 7,36,50,000 (Nos.) 690 Kg. C.G. State & Agri. Development Corporation. 4. Aromatic Crops 2400 2,17,50,000 (Nos.) C.G. State & Agri. Development Corporation . District wise planting material production and availability in department nurseries is given for three years under planting material sub-plan . BASELINE/BENCH MARK SURVEY OF HORTICULTURE SECTOR-1 I. Issues – 1. Total cultivable land 65,52,000 ha. 2. Area under horticulture 7.39% (4,84,695 ha.) in 2007-08. 3. Within 5 years 100% increase in area. 4. Limited scope for further area expansion in future. II. Approach – 1. To increase in productivity of land and to lift up average yield of horticulture crop by genetic improvement and high application of inputs. 2. 3. To increase in crop intensity. If credit is not constraint CBR is in favor of crop diversification towards vegetables and fruits. If markets are brought closer to farm gate and postharvest losses are minimized then CBR of horticulture is become more than CBR of cereals. Production diversification and supply chain efficiency are key issues to reap the maximum benefits. 4. III. Status BASE LINE/BENCH MARK SURVEY OF HORTICULTURAL SECTOR-2 2004-05 Sl. No. Crops 1. • • 2006-07 2007-08 2. Area (in Ha.) 3. Production (Tn.) 4. Area (in Ha.) 5. Production (Tn.) 6. Area (in Ha.) 7. Production (Tn.) 8. Area (in Ha.) 9. Production (Tn.) 10. 1. Fruits 46247.23 323730.96 75401.09 643171.29 99696.20 680928.05 1,24,664.00 932025.91 2. Vegetables 123491.40 1249732.96 195617.10 2431520.60 236105.00 2339800.55 2,92,562.00 2924605.50 3. Spices 28399.00 169542.03 29054.60 168226.10 40556.90 198728.81 53,614.25 288738.44 4. Medicinal & Arometics 1910.00 10881.00 2086.00 11890.20 10274.62 58565.33 11,500.00 65550.00 5. Flowers 1508.00 2829.00 1551.00 3302.30 2030.50 4304.66 2355.40 6912.52 201555.63 1756715.95 303709.79 3258110.47 388663.22 3282327.4 484695.65 4217832.37 Total - • 2005-06 Diversification in the cropping pattern away from food grains towards horticulture and more towards vegetables and fruits. Due to huge domestic demand (because absence of pulses in food bowl), in-spite of being one of the largest producer of vegetable, does not have much of marketable volume. Besides this there are supply constraints and huge post-harvest losses, which leads to lower actual available produce. Chili, Cabbage, Kundru (Coccinia indica), Banana & Papaya are major crops of export to outside of state. CHANGE IN AREA & PRODUCTION TRENDS OF HORTICULTURE CROPS AREA & PRODUCTION SHARE IN TOTAL FRUITS / VEGETABLES Potato 22% AREA & PRODUCTION SHARE IN TOTAL SPICES / FLOWERS SCHEDULE OF OPERATION-PERT-CHART - 1 I. Issues – 1. Timely procurement and distribution of planting material and inputs. 2. Timely plating operations. 3. Timely monitoring. II. Approach – 1. Forehand planning. 2. Capacity building and up-gradation of local knowledge. III. Status SCHEDULE OF OPERATION PERT-CHART - 2 Flower Crops – Gerbera (Cut Flower) March Apr May Jun Jul Aug Sep Sl.. Scheme No. Activities 1. Target allocation 2. Cluster Selection 3. 4. 5. 6. Beneficiaries Selection Inputs demand district Input material management Input material storage at nursery level Inputs Distribution farmers 8. Area preparation 9. Plantation 10. Field inspection 11. Harvesting Marketing & Data 12. collection 7. from to Oct Nov Dec Jan Feb IDENTIFICATION OF PRODUCTION CLUSTERS WITH MARKETING LINKAGE - 1 I. Issues – 1. 2. 3. 4. 5. Intensive input regime and large labour inputs. Absence of price regulatory mechanism like agriculture crop. Absence of market information system. Poor credit facilities and exploitative traditional market system of horticulture crops. Practically no exclusive horticulture market / mandi in the state. II. Approach – 1. 2. 3. 4. III. Status Establishment of well equipped and modern markets / mandis. Introduction of parallel / in-addition market system with forward and backward linkages to the existing traditional system. Perfect market information system. Set-up of price regulatory mechanism with government intervention. IDENTIFICATION OF PRODUCTION CLUSTERS WITH MARKETING LINKAGE - 2 FRUIT AND VEGETABLE MARKETS (Rs. in Lakhs) Sl. No. Name of the project Total Sanctioned Project Cost 1. Durg 954.86 2. Rajnandgaon 705.92 3. Raigarh (Patelpali) 475.97 4. Narayanpur 408.36 5. Raipur (Tulsi) 2043.33 6. Bilaspur (Tifara) 1809.99 Total - 6398.43 Remark (Funding agencies are GOI, State Agriculture Marketing Board & Mandi Nidhi of APMC) Exclusive Fruit and Vegetable markets, Area of Convergence with NHM. (Subsidy is proposed to be given from NHM as per norms) ----- IDENTIFICATION OF PRODUCTION CLUSTERS WITH MARKETING LINKAGE - 3 FUTURE MARKET SYSTEM Growers Growers Association Competitive Market Price Backward Linkage Collection Centre Big Bazaar, Super Bazaars', Community Hostels, Educational Institutions, Hospitals, Canteens of various Organizations/Instituti ons, Factories, other Food retail chains etc Forward Linkage Terminal Market Open Auction Wholesalers No Place for middle man/commission agents TRAINING PLAN AND TRAINING CALENDAR - 1 I. Issues – 1. Lack of awareness both in the farmers and departmental frontline staff towards modern trends and new technologies in the field of horticulture. 2. Weak extension linkage in the department and highly de-motivated staff. 3. Little risk taking attitude of farmers. II. Approach – 1. 2. Skill up-gradation and improvement of local traditional knowledge. Capacity building through training especially to women to act as a group and for value addition, processing and marketing of horticulture produce. 3. 4. Training for on-farm soil testing with the help of readymade kits. Revival of local traditions and rituals in the field of IPM, INM and Organic Farming. Training for resource persons identified from farmers, local NGOs and staff both within state and outside the state. 5. III. Status TRAINING PLAN AND TRAINING CALENDAR - 2 Sl Training Activities Mar 1. 2. 3. 4. 5. 6. Apr May Jun Jul Phase - I Aug Sep Training for farmers & PRI in the state Training for farmers & PRI outside the state Training of Trainers Resource persons development program Project Management for mission staff Refreshers course for senior level officials 7. Refreshers course for extension officers Sl 1. Training Activities Training for farmers & PRI in the state. Training for farmers & PRI outside the state. Training of Trainers. Project Management for mission staff. Refreshers course for extension officers. Certificate course to develop para professionals. Phase - II Training Activities Training for farmers & PRI in the state Training for farmers & PRI outside the state Project Management for mission staff Phase - III 2. 3. 4. 5. 6. Sl 1. 2. 3. 4. 5. Refreshers course for extension officers Certificate course to develop para professionals Oct Nov Dec Jan Feb ORGANIC FARMING WITH CERTIFICATION - 1 I. Issues – 1. 2. Fruits and vegetables production activities are largest user of plant protection products per hectare (almost 10-20 kg. per ha. which accounts about 25% share of global pesticide market) and most of these products are environmentally unsafe and climatologically hazardous. Fruit and vegetables, mostly, consumed as raw. Thus biological contamination and pesticide residue are serious concern. II. Approach – 1. 2. 3. III. Status To motivate the farmers for organic farming and bring it to logical conclusion of certification. Prioritization of the area of default organic cultivation of horticulture crops to make it organic cultivation by design. Training in IPM and Composting area and free provision for safe and eco-friendly bio-inputs for demonstration purpose with access to information how to produce them. ORGANIC FARMING WITH CERTIFICATION - 2 • • • • IDENTIFICATION OF AREA & CROPS FOR ORGANIC CULTIVATION (2008-09) - Sl. No. 1. 2. 3. Districts Jagdalpur Raipur Durg 4. Bilaspur 5. 6. 7. Koriya Surguja Korba Crops Chili, Banana, Cashew Banana, Chili, Aloe vera Mango, Lime, Chili, Aloe vera Mango, Aonla, Lime, Chili, Banana, Aloe vera Mango, Lime, Chili, Banana, Aloe vera Litchi, Lime, Chili, Banana, Aloe vera Mango, Lime, Chili, Banana, Aloe vera TOTAL - Area (in Ha.) 200 200 200 200 100 200 150 1250 Setting-up of model organic private farm clusters (10 districts 500 ha. area). Farmers training programs on production and quality control of organic inputs (100 training programs, 10 days each with 20 participants per course). Field demonstration-cum-farmers fair on organic inputs (10 districts, 100 demonstrations). FUTURE VISION I. Issues – To achieve higher production with concentrated efforts to make production hub. Approach – Focus on agro–climatic zone specific selection of horticultural crops. Sl. No. 1. 1. Name of District 2. Raipur Focused Crops 3. Mango, Banana, Sapota 2. Durg Banana, Papaya, Onion, Rose, Gerbera, Gladiolus, Rajnigandha 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13 14. 15. 16. 17. 18. Rajnandgaon Mahasamund Dhamtari Kanker Bastar Dantewada Bijapur Narayanpur Bilaspur Korba Korea Sarguja Janjgir-Champa Kabirdham Jashpur Raigarh Sitaphal, Rose, Gerbera, Gladiolus, Rajnigandha Sitaphal, Aonla Mango, Banana Cashew nut, Guava, Sitaphal Cashew nut, Chili Mango, Banana Mango, Chili Cashew nut, Mango Mango, Lime, Guava, Onion Ber Banana Litchi, Jackfruit, Ginger, Potato Mango, Banana Mango, Arbi Litchi, Tomato, Potato Cashew nut, Banana, Ginger FUTURE VISION II. Issues – Fragmented land holdings and low productivity rate of horticulture crops. Approach – Introduction of hi-tech technologies (2008-09). Sl. No. 1. 1. Name of Activity Place 2. 3. Establishment of 11 modern mist chambers (area - 150 sq.mtr., capacity – 40,000 plants each) with 11 hardening yards (area - 250 sq.mtr., capacity – 40,000 plants 10 districts each) and 250 net houses (area - 50 sq.mtr., capacity – 4,000 plants each). 2. Establishment of floriculture under controlled condition. Most modern unit (4000 sq.mtr. with capacity of 50,000 plants production in one batch). 3. Establishment of Aloevera juice / gel extraction plant, Tomato pulp / puree 04 districts processing plant. 4. Distribution of hi-tech equipments / implements like professional weeder, professional chain saw, power sprayers, pit hole diggers, power operated 18 districts professional pruners, rotary tillers, power tillers etc. 5. Plug production of vegetable seedlings with the capacity of 150 lakhs seedlings 02 districts per annum – Proposed. Raipur FUTURE VISION III. Issues – • Huge gap between demand and supply of planting material / seeds. • Authenticity and quality of planting material / seeds supplied by other agencies is generally doubtful. • Timely availability and reliability is not sure. • Under and inefficient utilization of departmental nurseries. Approach – Up-gradation and modernization of departmental nurseries. • Out of 111 nurseries 61 nurseries have been proposed for technological up-gradation and modernization to bridge the gap between demand and supply. (10 nurseries have already been taken-up in 2008-09) • Establishment of 16 new nurseries in 10 districts. (04 nurseries are already in the process of establishment, 2008-09) • Capacity building of nursery staff, especially gardeners. (Training calendar has been chalked-out) FUTURE VISION IV. Issues – • • • • High post harvest losses (50-60% in tomato and leafy vegetables). No access to energy and user friendly emerging technology for PHM like hurdle technology, cold air system, hydro-cooling, pre-cooling technology etc. Technical know-how for low cost environment friendly on-farm cooling and storage technology for PHM. Huge investment is required for PHM in form of govt. assistance / grant / subsidy. Current scheme can not meet the objectives. Approach – Development of Post-Harvesting infrastructure and Management • Proposed activities for 2009-10. • 14 cold storages in 11 districts. • 860 zero energy cool chambers in 8 districts. 60unit pack- house in 4 districts. Cold• Chain entire cold chain units at 10No.major clusters as Sl. •No. Establishment ofComponents of unitsproduction Capacity follows – 1. Cold Storage 1 3000-5000 MT. 2. Refrigerated Transport Trucks 5 4-5 Ton. 3. Village Refrigerators 20 5-10 Ton. 4. Cold Chain Containers 50 0.5-1 Ton. 5. Pre-cooling chambers and cooled area of sorting 100 2-3 Ton. Summary of Project Proposal & Previous Year Activities Proposed to Taken up for 2009-10 ( Rs. In Lakhs ) S.no. Particulars Amount Proposed GOI Share (85%) State Share (15 % ) 1. Proposed Annual Action Plan of 2009-10 8224.35 6990.69 1233.65 2. Fund required for activities started in previous years but yet to be completed 3379.07 2872.20 506.86 11603.42 9862.89 1740.51 Total • State has allocated Rs. 23.25 carore as state share against N H M for 2009-10 PROPOSAL FOR ANNUAL ACTION PLAN 2009-2010 (RS. IN LAKHS) Raigarh Jashpur Sarguja Korea Jagdalpur Total 4. Korba 3. Bilaspur 2. Kabirdham 1. I. Research - Rajnandgaon Scale Subsidy Per Unit (Proposed (lakh) Assistance) Programme Durg Sl. No. Raipur Physical Target 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. GoI State Financial Share Share Target (85%) (15%) 17. 18. 19. 1 1 18 324.00 275.40 48.60 4 36.00 30.60 5.40 1 3.00 2.55 0.45 4 6.00 5.10 0.90 27 369.00 17 8.50 7.23 1.28 100 25.00 21.25 3.75 Dissemination of innovative Technology through frontline demonstration and research (SAU/KVK) A. Plantation Infrastructure & Development 1 Production of planting material (a) Model Nursery (4 Public Sector (b) Model Nursery (4 Pvt. Sector (c) Small Nursery (1 Public Sector (d) Small Nursery (1 Private Sector ha.) in ha.) in ha.) in ha.) in 18.0000 18.0000 2 4 18.0000 9.0000 1 1 3.0000 3.0000 1 3.0000 1.5000 2 Sub Total - 3 8 1 3 1 3 1 1 1 1 1 0 3 2 1 2 1 5 1 1 1 3 1 1 313.65 55.35 2 Vegetable Seed Production (in ha.) (a) Seed Production (Public 0.5000 sector) (b) Seed Production (Private 0.5000 sector) Sub Total 3 Spices Production (a) Chilli 0.1500 (b) Coriander 0.1500 (c) Turmeric 0.1500 Sub Total - 0.5000 0.2500 10 50 10 50 0.1125 0.1125 0.1125 2 50 2 300 500 200 50 100 25 200 350 600 425 1 2 0 0 0 50 300 800 400 100 100 1300 25 200 50 200 200 220 500 525 1000 600 370 100 1800 2 0 117 33.50 28.48 5.03 300 50 100 450 200 100 200 500 4500 600 1620 6720 506.25 67.50 182.25 756.00 430.31 57.38 154.91 642.60 75.94 10.13 27.34 113.40 PROPOSAL FOR ANNUAL ACTION PLAN 2009-2010 (RS. IN LAKHS) Raigarh Jashpur Sarguja Korea Jagdalpur Total 1. 2. 3. 4. 5. 6. 7. 8. 9. 4 Establishment of New Gardens (Ha) (i) Fruits (Perennials) (in ha.) (a) Mango 0.3000 0.1125 200 200 100 100 200 (b) Litchi 0.3000 0.1125 100 (c) Lime 0.3000 0.1125 100 100 (d) Anola 0.1700 0.0638 100 (e) Sitaphal 0.3000 0.1125 Sub Total 200 200 200 200 400 (ii) Demand of 2nd installment for fruit crops planted in the year 2008-09 (a) Mango 0.3000 0.0450 138 146 119 (b) Litchi 0.3000 0.0450 (c) Lime 0.3000 0.0450 35 (d) Anola 0.1700 0.0255 (e) Sitaphal 0.3000 0.0450 50 Sub Total 188 146 0 154 0 (iii) Demand of 3rd installment for fruit crops planted in 2007-08 (a) Mango 0.3000 0.0675 100 100 400 (b) Litchi 0.3000 0.0675 (c) Lime 0.3000 0.0675 (d) Anola 0.1700 0.0255 (e) Jamun 0.3000 0.0450 (f) Sitaphal 0.3000 0.0450 Sub Total 0 100 0 100 400 (iv) Fruits (Non Perennials) (a) Banana 0.3000 0.1500 50 400 50 400 Sub Total 50 400 50 0 400 10. 11. 12. 13. 14. 15. 16. Korba Bilaspur Kabirdham Rajnandgaon Programme Scale Per Subsidy Unit (Proposed (lakh) Assistance) Durg Sl. No. Raipur Physical Target 18. 19. 200 100 100 100 100 200 200 800 200 1900 980 900 400 800 4980 213.75 110.25 101.25 25.52 90.00 540.77 181.69 93.71 86.06 21.69 76.50 459.65 32.06 16.54 15.19 3.83 13.50 81.12 235 136 60 400 80 200 100 58 80 835 354 160 1300 498 435 58 230 2521 58.50 22.41 19.58 1.48 10.35 112.31 49.73 19.05 16.64 1.26 8.80 95.47 8.78 3.36 2.94 0.22 1.55 16.85 75 400 200 74.59 27.00 37.13 1.28 2.70 2.70 145.39 63.40 22.95 31.56 1.08 2.30 2.30 123.58 11.19 4.05 5.57 0.19 0.41 0.41 21.81 334.50 334.50 284.33 284.33 50.18 50.18 300 500 300 100 500 100 700 480 300 1300 80 18 100 100 350 236 98 280 150 150 200 50 30 30 430 460 0 200 330 100 200 330 100 State Share (15%) 17. 200 200 100 80 200 200 150 236 GoI Financial Share Target (85%) 30 30 735 0 0 1105 400 550 50 60 60 2225 500 500 0 200 200 2230 2230 PROPOSAL FOR ANNUAL ACTION PLAN 2009-2010 (RS. IN LAKHS) Korba Raigarh Jashpur Sarguja Korea Jagdalpur Total 1. 2. 3. 4. 5. 6. 7. 8. 5 Flowers (A) Cut flower (i) Rose 0.7000 0.3500 100 (ii) Gerbera 0.7000 0.3500 50 (B) Bulbulous flowers (i) Rajnigandha (Tuberose) 0.9000 0.4500 200 100 50 (ii) Gladiolus 0.9000 0.4500 200 100 (C) Loose flowers (in ha.) (i) Marrygold 0.2400 0.1200 50 50 50 50 (ii) Chrysanthimum 0.2400 0.1200 50 (iii) Galardia 0.2400 0.1200 50 Sub Total 450 450 100 100 6 Aromatic plants (a) Vetiver 0.1500 0.1125 200 (b) E. Citriodora 0.1500 0.1125 100 (c) Lemongrass 0.1500 0.1125 Sub Total 0 0 0 100 7 Plantation crops including coastal horticulture Cashew 0.1500 0.0563 500 Sub Total 0 500 0 0 (A) Demand of second installment for plantation crops planted in 2008-09 Cashew 0.1500 0.0255 Sub Total 0 0 0 0 (B) Demand of third installment for plantation crops planted in 2007-08 Cashew 0.1500 0.0338 Sub Total 0 0 0 0 Bilaspur Kabirdham Scale Per Subsidy Unit (Proposed (lakh) Assistance) Rajnandgaon Programme Durg Sl. No. Raipur Physical Target 9. 10. 11. 12. 13. 14. 15. 16. 200 100 100 100 100 100 100 50 50 550 50 50 17. 400 150 140.00 52.50 119.00 21.00 44.63 7.88 50 50 600 600 270.00 270.00 229.50 40.50 229.50 40.50 48.00 6.00 6.00 792.50 40.80 7.20 5.10 0.90 5.10 0.90 673.63 118.88 100 0 300 200 200 100 100 500 300 100 GoI State Financial Share Share Target (85%) (15%) 18. 19. 0 400 100 400 50 50 2250 0 100 500 200 200 100 100 600 300 200 300 1500 600 2100 33.75 168.75 67.50 236.25 28.69 5.06 143.44 25.31 57.38 10.13 200.81 35.44 0 5000 5000 281.25 281.25 239.06 42.19 239.06 42.19 0 500 2000 500 2000 0 500 2000 200 500 2000 200 0 100 900 100 900 0 50 0 0 2000 2000 0 0 0 2700 2700 68.85 68.85 58.52 58.52 10.33 10.33 0 1000 1000 33.80 33.80 28.73 28.73 5.07 5.07 0 0 PROPOSAL FOR ANNUAL ACTION PLAN 2009-2010 (RS. IN LAKHS) Kabirdham Bilaspur Korba Raigarh Jashpur Sarguja Korea Jagdalpur Total 1. 2. 3. 4. 8 Rejuvenation of old orchards (Mango, Litchi, 0.3000 0.1500 Cashew, Ber & Aonla) Sub Total 9 Creation of water resources 100% as per DMC (i) Community Borewells subsidy approval Sub Total 10 Protected Cultivation (a) Green House (Hitech) 6.5000 3.2500 (b) Mulching 0.1400 0.0700 (c) Shade Net 0.0700 0.0350 (d) Plastic tunnels 0.1000 0.0500 Sub Total 11 Promotion of INM/IPM 1.Promotion of IPM 0.0200 0.0100 2. Bio-Control Lab 80.0000 40.0000 (Private sector) 3. Plant Health Clinic 20.0000 20.0000 (Public Sector) Sub Total 12 Organic Farming (a) Adoption of organic 0.2000 0.1000 farming (in ha.) (b) Vermi-compost Units of minimum 100 running 0.6000 0.3000 m pits with with cover (1m x 100) (in Nos) Rajnandgaon Programme Scale Per Subsidy Unit (Proposed (lakh) Assistance) Durg Sl. No. Raipur Physical Target 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. GoI Financial Share Target (85%) State Share (15%) 17. 18. 19. 250 37.50 31.88 5.63 250 37.50 31.88 5.63 500 350.00 297.50 52.50 500 350.00 297.50 52.50 6.50 210.00 350.00 50.00 616.50 5.53 178.50 297.50 42.50 524.03 0.98 31.50 52.50 7.50 92.48 5500 55.00 46.75 8.25 1 1 40.00 34.00 6.00 1 1 20.00 17.00 3.00 302 400 100 100 2000 500 200 100 1000 700 100 5502 115.00 97.75 17.25 50 650 65.00 55.25 9.75 250 75.00 63.75 11.25 50 50 0 100 1000 300 1400 50 0 0 50 0 0 0 50 50 50 0 0 0 50 0 50 0 0 50 0 0 0 0 0 2 2 200 100 100 500 200 500 1250 50 3000 1500 100 200 2600 500 200 500 3000 200 200 10000 250 300 150 1000 1952 200 300 3400 700 700 500 4400 250 200 14002 300 400 100 100 2000 500 200 100 1000 700 100 50 50 50 100 50 50 50 50 50 100 50 50 50 100 PROPOSAL FOR ANNUAL ACTION PLAN 2009-2010 (RS. IN LAKHS) Jagdalpur Total 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 0.3000 200 300 100 100 600 300 300 100 300 200 100 2600 780.00 663.00 117.00 0.1000 50 50 50 650 65.00 55.25 300 450 200 100 850 400 450 200 550 350 300 4150 985.00 837.25 147.75 0.0150 1000 1000 800 800 2000 500 200 200 1000 500 1000 9000 135.00 114.75 20.25 0.0150 500 200 100 300 500 200 200 500 500 500 500 4000 60.00 51.00 9.00 0.0250 500 500 500 100 300 150 150 200 300 100 200 3000 75.00 63.75 11.25 0.5000 15 15 15 75.00 63.75 11.25 345.00 293.25 51.75 6 11 14 7.50 27.50 700.00 6.38 1.13 23.38 4.13 595.00 105.00 11 27.50 23.38 4.13 20 2.50 2.13 0.38 100 50 10 25 10 50 15 Korea Korba 5. Sarguja Bilaspur 1. 2. 3. 12 (c) Vermi compost units 0.6000 portable HDPE bags. (d) Certification (Cluster of 0.10 50 Ha.each district) per ha. Sub Total 13 HRD including Horticulture institute (i) Training of farmers (a) Within State (training on plantation and production of different horticultural crops) (b) Specific training of farmers on MIS and PHM (c) Training and visits out side state (ii) Training of officers which will in turn train & guide the farmers. Sub Total C I. Post Harvest Management 1 Estb. of Oil Extraction unit 5.0000 2 Aloevera Gel Ex. Plant 10.0000 3 Cold Storage 200.0000 Leaf/Root collection center 4 10.0000 for aromatic plants. Cashew low cost processing 5 0.5000 units Jashpur Kabirdham 4. Scale Subsidy Per Unit (Proposed (lakh) Assistance) Raigarh Rajnandgaon Programme Durg Sl. No. Raipur Physical Target 50 100 50 100 10 15 10 10 150 2015 1715 1415 1210 2825 860 565 910 1815 1110 1710 14002 1.2500 2.5000 50.0000 1 1 2 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 2.5000 0.1250 1 1 1 1 1 1 1 1 1 2 1 2 10 8 GoI State Financial Share Share Target (85%) (15%) 17. 18. 19. 9.75 PROPOSAL FOR ANNUAL ACTION PLAN 2009-2010 (RS. IN LAKHS) 1 2 3 4 5 9. 10 3.7500 2 2 1 1 2 1 1 II. Proposal under Innovative Technology Turmeric polishing 0.2300 0.0058 drums Turmeric cooking pans 0.0900 0.0225 Banana fiber extractor 0.6100 0.1525 Walk-in type solar dryer for chilies (1.5 1.1000 0.2750 tons). Zero energy cool chamber (25% assistance for new technology). 0.0400 0.0100 10. 11. 12. 13. 10 14. 15. 16. 60 17. 37.50 18. 31.88 19. 5.63 1 2 17 63.75 54.19 9.56 3 799.75 679.79 119.96 1 2 Jashpur Financial Target Raigarh Total 8. Jagdalpur 7. Korea 6. 20 Sarguja Korba 5. 20 10000.0000 2500.0000 Sub Total - E 1 4. 0.6250 Subsidy Scale Per (Proposed Unit (lakh) Assistance) 2. 3. Pack house. 0.1000 Rural Market Apni 15.0000 Mandi Direct Market. Whole sale market Bilaspur 8 Kabirdham 7 Rajnandgaon 1. 6 Programme Durg Sl. No. Raipur Physical Target 1 2 1 5 5 5 5 5 200 200 50 227 232 63 13 Total Project Cost - 5 GoI Share (85%) State Share (15%) 5 5 20 0.12 0.10 0.02 5 10 5 20 20 0.45 3.05 0.38 2.59 0.07 0.46 4 1 5 1.38 1.17 0.21 100 100 100 100 10 860 8.60 7.31 1.29 21 105 149 3 105 115 24 1057 1679.59 7832.71 1427.65 6657.80 251.94 1174.91 311.64 264.89 46.75 80.00 68.00 12.00 391.64 8224.35 332.89 6990.69 58.75 1233.65 Mission Management State & District Mission structure including additional manpower and project preparation cost. a) Institutional Strengthening, Hire/Purchase of vehicles b) Printing of literature publicity material making of films & video CDs. Sub Total Grand Total - ISSUES IN SUPPLY CHAIN EFFICIENCY • Non availability of good quality of seeds and other inputs. • Inadequate irrigation. • Lack of soil testing facility. • Inefficiency in pest management. • Capital and credit availability constraint. • Lack of information about modern technical know-how. • Huge post-harvest losses. • Poor market intelligence and market infrastructure. • Poor cold chain. • High transportation cost. • Non-standardization of weights and measures. • Little attention towards grading, value-addition and packaging. EFFICIENT INTEGRATION OF ENTIRE SUPPLY CHAIN YEAR WISE BUDGET PROVISION SANCTION, RECEIVED AMOUNT & EXPENDITURE UNDER NHM (RS. IN LAKHS) Proposed outlay Total Amount Released GOI Share State share Total GOI Share State share Total Total Expenditure 1. 2. 3. 4. 5. 6. 7. 8. 9. 2005-06 50.29 0.00 50.29 2367.84 0.00 2367.84 342.510 14 2006-07 11132.34 0.00 11132.34 5500.00 0.00 5500.00 4733.261 86 2007-08 9102.95 1606.40 10709.35 6252.41 750.00 7002.41 3357.330 48 2008-09 10748.72 1896.83 12645.55 3000.00 882.75 3882.75 8478.500 --- Total - 31034.30 3503.23 34537.53 17120.25 1632.75 18753.00 16911.60 90.18 Year %age Expenditure PROCESSING AND VALUE ADDITION UNITS ESTABLISHED IN THE STATE Sl. No. Unit established No. of unit Name of district Capacity 1. Tomato Grading Machine 02 Jashpur & Durg 500 Kg./Hr. 2. Potato Grading Machine 02 Sarguja & Raipur (State Vegetable Seed Production Farm, Bana) 500 Kg./Hr. 3. Fruit & Vegetable Grading Plant 01 Raipur 500 Kg./Hr. 4. Banana Grading & Waxing Plant 01 Raipur 400-500 Kg./Hr. 5. Cashew-nut Processing Machine 04 Bastar (03), Raigarh (01) 2.5 Tn./Day 6. Lemon Grass & E.citridora Distillation Plant 12 Durg (03), Raipur (02), Raigarh (02), Bastar (02), Sarguja (02), Korba (01) 1.5 Ton. per batch 7. Aloevera Juice/Gel Extraction Unit 03 Dhamtari (02), Kanker (01) 200 Kg./Hr. 8. Tomato grading cum juice/puree processing plant 02 Janjgir-Champa 500 Kg./Hr. M.O.U. FOR DIFFERENT HORTICULTURAL CROPS Sl. No. Crop Area (in Acres) Years Rate (in Rs.) Name of organization 1. Khus – Roots 1000 3 yrs. 30.00 per kg. M/s. C.G.Herbals 2. Patcholi – Dry leaves 1000 3 yrs. 15.00 per kg. M/s. C.G.Herbals 3. Gherkin – Fruits 50 3 yrs. 6.00 per kg. M/s. Map Agro Foods 4. Lemon Grass – Oil 500 3 yrs. 225.00 per kg. M/s. Aromatic Farms & SAI Herbal Jagdalpur 5. Jama rosa – Oil 1000 4 yrs. 250.00 per kg. M/s. Nishant Aromas 6. E.citridora – Oil 2000 3 yrs. 300.00 per kg. M/s. Suresh Aromatic, Bangalore - Proposed 7. Aloevera – Green Leaves 2000 3 yrs. 2.00 per kg. M/s. Venkateshwara Project Consultancy, Nagpur Proposed 7550 --- --- Total - PROCESSING AND VALUE ADDITION POSSIBILITIES OF PROCESSING UNITS TO BE ESTABLISHED IN CHHATTISGARH Sl. No. Name of the crop 1. Cashew nut Location Area of the crop (Ha.) Production (MT.) Jagdalpur 7386 4000 Raigarh 7070 3345 14456 7345 Raipur 1500 82500 Durg 1043 76139 2543 158639 ----- Raipur 1480 66600 Durg 869 52140 Papain extraction unit & Gem processing unit. 2349 118740 ----- Durg 6208 93120 Jashpur 3350 67000 Tomato pulp & puree processing unit. 9558 160120 ----- Raigarh 959 19180 Ginger paste processing unit. Jagdalpur 1120 5600 Rajnandgaon 1055 5275 2175 10875 Cashew processing unit. Total 2. Banana Papaya Total - 4. Tomato Total - 5. Ginger 6. Chili Total - ----Banana fiber extraction unit. Total 3. Proposed unit Chili powder processing unit. ----- YEAR WISE AREA & NO. OF PLANTS PLANTED UNDER NHM No. of Plants / Area Planted 2007-08 2008-09 Sl. No. Name of Species 1. A. 1 2 3 4 5 6 7 B. 8 9 10 11 12 13 14 C. 15 2. FRUITS Mango Plants Litchi Plants Lime Plants Banana Plants Sitafal Plants Aonla Plants Cashewnut Plants SPICES Chilli Seed Onion Seed Coriander Seed Methi Seed Garlic Bulbs Ginger Rhizome Turmeric Rhizome FLOWER Marrygold Seed 16 17 18 D. 19 20 Chrysanthemum Seed Kg. Gerbera Plants Nos. Rajnigandha Bulbs Nos. MEDICINAL & AROMETICS Patcholi Plants Nos. E.Citriodora Plants Nos. 4412800 2400000 1400 1600 21 Jamaroja Slips Nos. 10000000 500 22 khus Slips Nos. 15000000 600 22500000 900 16250000 23 Lemongrass Slips Nos. 30000000 1500 22000000 1100 24 25 Aloevera Suckers Palmaroja Seed Nos. Kg. 5000000 14375 1000 2300 6000000 11875 1200 1900 2006-07 Unit Total No. of Plants Area in Ha. No. of Plants Area in Ha. No. of Plants Area in Ha. No. of Plants Area in Ha. 3. 4. 5. 6. 7. 8. 9. 10. 11. Nos. Nos. Nos. Nos. Nos. Nos. Nos. 410000 70000 277000 285600 4100 700 1000 200 300000 3000 550000 135000 249300 900000 152350 50000 320000 5500 900 900 600 550 500 3200 555000 162000 373950 594000 124650 50000 500000 5550 1080 1350 396 450 500 5000 1515000 367000 900250 1779600 277000 100000 1120000 15150 2680 3250 1196 1000 1000 11200 Kg. Kg. Qt. Qt. Qt. Qt. Qt. 1545 5150 1800 6000 2700 4500 9000 500 50 250 30 30 150 100 1395 3500 1200 2000 3150 2700 1800 900 4200 1400 6045 4500 80 30 1395 6650 6900 20150 500 400 100 1200 3800 2300 Packet of 100 seeds 11530 198 10 100 41250 550 52790 848 48 34392 60 31 19200000 400 48 34392 19200000 60 31 400 625000 3900000 200 2600 6912800 12300000 2200 8200 10000000 500 650 53750000 2150 36000000 1800 88000000 4400 4000000 8437.5 800 1350 15000000 34687.5 3000 5550 1875000 6000000 600 4000 PHYSICAL & FINANCIAL PROGRESS UNDER NHM FOR THE YEAR 2008-2009 Sl. No. Components Schemes Target 1. 1 A. Financial (Rs. in lakhs) Physical Unit 2. 3. 4. Plantation infrastructure and development Production of planting material - No. of Beneficiaries Achievement Target Achievement SC. ST. Other Total Female 5. 6. 7. 8. 9. 10. 11. 12. 14 252.00 453.66 453.66 1468.52 1565 3471 2310 7346 668 322.00 52 152 186 390 16 a) Public Sector (i) Model Nursery (4 ha.) No. 14 (i) Model Nursery (4 ha.) No. Sub Total Vegetable seed production a) Public Sector. Ha. 10 24 14 90.00 342.00 94 40 47.00 26.00 b) Private Sector Sub Total Seed Infrastructure - Ha. 80 174 40 20.00 67.00 26.00 a) Public Sector No. b) Private Sector - B. C. 2 A. Sub Total Establishment of New Garden - 20 100.00 20 0 100.00 4396 980.27 i. Fruits Perennial. Ha. 8930 Maintenance of 2nd year. Ha. 5100 223.65 Maintenance of 3rd year. Ha. 3500 236.25 ii. Fruits Non-Perennial. Ha. 3800 342 510.45 PHYSICAL & FINANCIAL PROGRESS UNDER NHM FOR THE YEAR 2008-2009 Sl. No. 1. B. C. D. 3 4 5 6 Physical Components Schemes Unit 2. 3. Ha. Ha. Ha. Flowers Spices Production Aromatic & Medicinal Plants. Plantation crop including coastal Ha. Horticulture-Cashew. Maintenance of 2nd year. Ha. Maintenance of 3rd year. Ha. Sub Total Rejuvenation of old Orchards. Ha Creation of Water Resource i. Community Bore-well. No. ii. Community tanks on farm water reservoir - (No) with use of No. plastics. Sub Total Protected Cultivation (Shade No. net) i) Promotion of I P M Ha ii) Bio-Control Labs * Private Sector. Unit iii) Plant Health Clinic * Public Sector Unit * Private Sector. Unit Sub Total - Financial (Rs. In lakh) Target Achievement Target Achievement 4. 1455 11000 7200 5. 950 10800 1254 6. 403.25 1237.50 810.00 7. 254.09 1162.01 748.00 5000 1457 281.25 243.71 3000 1500 50485 950 17741 950 67.50 50.63 4800.75 142.50 3000 182 2100.00 38 No. of Beneficiaries Sc. ST. 8. 9. 47 146 2067 8277 809 1833 Other Total Female 10. 390 6748 982 11. 583 17092 3624 12. 82 1141 367 290 2241 169 0.00 0.00 4198.33 142.50 4565 15805 10906 31276 47 146 292 485 2443 87 1106.26 1107 2116 1775 4998 292 25 1926 380.00 3988 1132 2622.50 1248.76 1154 2262 2067 5483 379 6900 6900 241.50 234.00 173 326 933 1432 123 9500 9500 95.00 92.01 576 1871 2048 4495 402 326.01 749 2197 2981 5927 525 1 40.00 11 5 16417 220.00 50.00 646.50 16400 PHYSICAL & FINANCIAL PROGRESS UNDER NHM FOR THE YEAR 2008-2009 Sl. Components Schemes No. 1. 2. 7 Organic Farming i. Adoption of Organic Farming. ii. Vermi Compost Unit. iii. Certification (No. of clusters). Sub Total 8 HRD including horticulture institute 9 Pollination support through beekeeping Mushroom production centre with training, Span production and during facilities. **10 Technology Dissemination C. Post Harvest Management 1. Pack House 2. Cold Storage Unit 3. Establishment of marketing infrastructure to horticulture produce in Govt./Private/Corporate Sector. a) Wholesale market. b) Rural markets / Apni Mandis /Direct Markets. Sub Total - Unit 3. Ha No. No. No. Physical Financial (Rs. In lakh) Target Achievement Target Achievement 4. 5. 6. 7. 1250 5000 25 6275 3000 3000 1 125.00 1500.00 125.00 1750.00 144.65 1266.39 0.00 1411.04 886.25 415.70 Sc. 8. No. of Beneficiaries ST. Other Total Female 9. 10. 11. 12. 634 1137 1523 3894 458 634 1137 1523 3894 458 0 0 0 0 0 100.00 No. 200.00 No. No. 20 2 50.00 100.00 No. 1 25.00 No. 22 82.50 46 0 1443.75 415.70 PHYSICAL & FINANCIAL PROGRESS UNDER NHM FOR THE YEAR 2008-2009 Sl. No. 1. 1 2 Components Schemes Unit 2. 3. Additional Proposals PHM components i. Establishment of extraction unit No. ii. Aloevera Gel Extraction unit. No. iii. Leaf / Root collection center for No. aromatic plant. iv. Turmeric polishing drums. No. v. Turmeric cooking pans. No. vi. Cashew low cost processing unit. No. vii. Banana fiber extractor. No. viii. Walk-in type solar dryer for No. chilies (1.5 tones). ix. Plastic Crates No. x. Zero energy cool chamber (100% No. assistance for new technology). Sub Total Distribution of equipment on 25% assistance 1. Taiwan/Power operated sprayer No. (no.). 2. Mango Harvester. No. 3. Secateurs No. 4. Power Weeder (with accessories) No. 5. Germination trays for hybrid No. vegetables and chilies. Physical Financial (Rs. In lakh) Target Achievement Target Achievement 4. 5. 6 7. 120 20 150.00 50.00 5 12.50 45 45 12 30 2.59 1.01 1.50 4.58 22 6.05 12200 9.76 1600 64.00 14099 301.99 900 11.25 500 5500 275 0.70 5.50 24.06 4100 0.41 Sc. 8. No. of Beneficiaries ST. Other Total Female 9. 10. 11. 12. PHYSICAL & FINANCIAL PROGRESS UNDER NHM FOR THE YEAR 2008-2009 Physical Sl. No. Components Schemes 1. 2. 2 Financial (Rs. In lakh) No. of Beneficiaries Unit Target Achievement Target Achievement Sc. ST. Other Total Female 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 6. Power operated tree pruner. No. 225 32.06 7. Power operated chain saw. No. 230 21.85 8. Soil auger. No. 230 27.03 9. Power operated cultivator cum weeder. No. 230 31.05 12190 153.91 7102 21401 17477 46580 3805 Sub total E Mission management (i) State & Districts missions structure including additional manpower & project preparation cost. Grand total - No. 103718 38326.50 642.63 304.54 12871.03 8384.04