First UNDAF Annual Review Report UNDAF Action Plan 2012-2015 0 Consolidated Draft April 2013 First UNDAF Annual Review Report Contents A. Executive Summary - Progress against the UNDAF Action Plan ......................................................... 2 B. Progress under each UNDAF Action Plan Outcomes........................................................................... 8 C. Overview of Progress against Outcome and Output Indicators ....................................................... 89 D. Progress against UNDAF Resource Mobilization Targets ................................................................ 140 E. Recommended revised M&E Framework for UNCT Endorsement ................................................. 190 1 A. Executive Summary - Progress against the UNDAF Action Plan The UN Development Assistance Framework (UNDAF) Action Plan 2012-2015 was signed between the UN and the Government of Lao PDR on 4 July 2012. The UNDAF Action Plan constitutes the commitment of the UN to support Lao PDR in achieving its national development goals and in ensuring a development process where all Laotians are able to equally and equitably prosper from the countries development gains. The timeframe and focus of the UNDAF is therefore closely aligned with the 7 th National SocioEconomic Development Plan (7th NSEDP) and the Millennium Development Goals (MDGs). To ensure accountability the UNDAF Action Plan is underpinned by a strong Monitoring and Evaluation (M&E) mechanism whereby outcome groups have been established for each of the ten outcomes to coordinate implementation and ensure strong and coherent monitoring and evaluation of progress, including trough annual reviews. The present report presents the outcome of the first UNDAF Annual Review for 2012, the first year of the UNDAF cycle 2012-2015. It is the result of the completion by each of the outcome groups of online reporting against outcome indicators on the UNDAF Action Plan online monitoring platform, the UNDAF-info, and consultations within the outcome groups and with government partners. As part of the first Annual Review, a comprehensive review of the initial indicators and targets set for the ten outcomes has also been completed by the outcome groups, to ensure that these remain relevant and realistic. The revised monitoring framework, presented to the UN Country Team for its review and endorsement as part of the review process, is expected to support outcome groups to better monitor and report on progress, challenges and opportunities over the four years implementation cycle. This review report includes a brief Executive Summary of the key areas of progress, as well as the key challenges, opportunities and recommendations identified by the outcome groups. In addition, the report includes detailed reports from each outcome group, as well as an overview of progress against indicators across the UNDAF Action Plan, progress against resource mobilization targets and the revised indicators and targets for the endorsement of the UN Country Team. 2 Brief Overview of Progress across UNDAF Action Plan Outcomes A large number of important surveys were concluded in 2012 with the support of the UN, including the Lao Social Indicator survey, the Agricultural Census, and the Labour Force and Child Labour surveys that are disaggregated by sex, gender, age and geographical areas. Together with the MDG Report and the Mid Term Review of the 7th NSEDP, these have provided critical data to inform onwards policy making and better target development initiatives. The Round Table Implementation Meeting in 2012, gathering together partners from across Government ministries and development partners to discuss progress and continued challenges, was seen as a broad success. The surveys, report and review and the discussions held at the Round Table Implementation Meeting have been critical in informing the current status of the key development issues, ensuring a constructive dialogue on promoting an equitable growth, and paving the way forward for the post MDG discussion and the formulation of the 8th NSEDP (2016-2020). The capacity of the National Assembly to fulfill its mandate as the highest organ of the State is gradually increasing and the entity is beginning to assume a more assertive and critical role in debating laws and policies, scrutinizing government budgets and representing constituency interests, with more critical debates taking place on issues of national concern. Some positive strides were made in terms of civil society participation as seen in the participation of NPAs in the Roundtable process, a first in Lao PDR, as well as the increased number of NPAs having registered in 2012. The governance reform agenda has gained new impetus despite the lack of endorsement of the Strategic Plan of Governance for 2012-2020. UN support continued to improving coordination and harmonization of development partner assistance in the education sector, with agencies participating in the review of the Education Sector Working Group structure. Notable achievements also include the endorsement of national Quality Education Standards for primary and secondary schools and the development of the first ever national skills standards. Preventive and curative care services have improved, including in terms of immunization coverage, access to clean water and improved sanitation. Also, the free maternal and children under 5 health services were scaled up. In December the National Health Congress held a workshop, at which more than 500 delegations from all provinces and development partners endorsed the National Health Sector Reform Strategy. A joint MCH and HMIS technical working group meeting also facilitated agreement on the need to ensure more effective coordination and harmonization if Laos is to reach MDG4 and MDG5. Modest but tangible progress has been made in supporting the Government to improve food security and nutrition, aiming to address the immediate, underlying and basic causes of the problem in line with the 3 Government’s framework. Provision of Vitamin A supplements and ready-to-use supplementary food focused on the immediate cause of undernutrition related to inadequate food intake, while an exclusive breastfeeding campaign and nutrition education dealt with the underlying cause associated with poor mother and child care practices. Less progress was made on improving the underlying cause related to food insecurity and the basic cause associated with poor institutional coordination. Within the framework of the “Getting to Zero Strategy in the Lao PDR” the UN worked with national HIV actors to support the HIV response in 2012. Close consultations and planning with National AIDS Authorities and their national and international HIV partners resulted in the design and implementation of a comprehensive set of interventions organized around three UNDAF outputs and aligned with the National Strategic and Action Plan on HIV/AIDS 2011-15. Good progress has been achieved towards improving natural resource management, including through technical and specialized trainings for decision makers and technical officers at the national and local levels. Such activities also provided a platform for local community and farmer participation in decision making and networking, and promoted increased engagement of local actors in the management of their natural surroundings. Support to the development of policies on land use planning, development of userfriendly guidelines on community forestry projects, and forestry management and natural resource guidelines helped increase the implementation capacity of the Government through more transparent and participatory approaches to natural resources management. There is an increased acknowledgement that climate change adaptation (CCA) is a long-term process. CCA capacity building is moving ahead across agriculture and other sectors, and a variety of community-based CCA technologies and projects were introduced, but remain sporadic and geographically specific and have yet to be mainstreamed. In 2012 the National Disaster Management Office completed the draft National Disaster Management Plan and continued to strengthen capacities for effective disaster risk management and coordination, including by promoting the endorsement by the Inter Agency Standing Committee for Emergency Response (IASC) of an Inter Agency Contingency Plan, through the support of the UN Resident Coordinator Office and in collaboration with a large amount of UN agencies. UN continued to provide support to build institutional capacity of two key government institutions in the UXO sector – the National Regulatory Authority (NRA) and the Lao National UXO Programme (UXO Lao). In 2012, good progress was made in the area of sector coordination and policy development. The Government approved the “The Safe Path Forward II”, which will govern all activities in the sector until 4 2020. NRA continued to advocate for increased financial support from the international community, as well as from the Lao Government. A significant reduction in UXO casualties has been achieved, from about 300 in 2008 to 56 in 2012, and operators cleared and destroyed more than 81,862 items in 2012. The second National Strategy for the Advancement of Women 2011-2015 was adopted in 2012 by the Government, and includes key priorities advocated by the UN based on the CEDAW. The Government’s commitment to achieving the objectives of the CEDAW has provided UN with the opportunity to strengthen its work on Violence Against Women (VAW), including initiatives to revise VAW laws and develop specific legislation on DV/GBV. Also, a national prevalence study is currently being prepared with field work due to start in 2013. Key Challenges and Opportunities identified by Outcome Groups Among the challenges to implementation across several of the outcomes has been the need to strengthen the capacity of Government partners to ensure timely implementation. In addition, the funding constraints felt by most agencies have made it difficult to ensure adequate funding to meet targets set at the outset of the UNDAF cycle. Concrete challenges facing implementation under particular outcomes include the slow progress in finalizing some key Government strategic documents, as well as the changes in mandates of some implementing partner ministries and the slow progress in ensuring clarity from the Government on new mandates. Examples include the establishment of the Ministry of Natural Resources and Environment and the continued need for clarity on its mandates vis a vis other ministries, as well as the decentralization process and the need for further clarity on responsibilities and functions at the local level. Moreover, the cross cutting nature of work under several of the outcome issue areas has made it necessary to identify Government coordination mechanisms, some of which have yet to be defined and established, the area of food security being a case in point. The current political climate has also made collaboration with and inclusion of a number of key national and international partners more challenging. The lack of accurate and disaggregated data, mitigated to some extend by the finalization of new surveys, has made strategic planning more difficult. In terms of challenges to ensure strong coordination and M&E of implementation and progress under the UNDAF Action Plan, these have included the difficulty on part of the outcome group co-conveners to 5 ensure the input and active contributions from outcome group member agencies. In addition, the timeframe of the UNDAF Annual Review has presented some agencies and outcome groups with difficulties in terms of providing relevant up to date information on progress, as some data will become available only later in the annual cycle pending Government review under various sectors. This has in particular been a problem for outcome 3 and 4 on education and health. The different mandates, work modalities and geographic focus of various agencies under each outcome, while also presenting opportunities if utilized appropriately, have made coordination somewhat challenging. The UNDAF Action Plan and its coordination mechanisms have not so far been adequately utilized as a mechanism for strategic collaboration and coordination to support more coherent UN support to Lao PDR. For several outcomes, not enough information is shared and discussed among agencies, allowing for continued duplications and fragmentation of development support. Opportunities in terms of improving and fast tracking planning and implementation has included the availability of new surveys and reports, including the LSIS, the Agriculture census, and the Labour Force and Child Labour surveys, as well as the Mid Term Review of the 7th NSEDP and the MDG Report due to be finalized in mid-2013. The decentralization process has provided opportunities for UN agencies to explore new and stronger partnerships with local level Government structures, enhancing their engagement at the local level and moving programming and implementation closer to the people. Likewise, new national strategies and policy documents, as well as new Government coordination mechanisms, have provided entry points for strengthened programming and engagement with Government partners. Enhanced support to data collection, analysis and management also holds the potential to improve programming, not least of Government partners, and should be a focus area for UN support. The growing role of the National Assembly constitutes an opportunity for further engagement with this entity and support to more inclusive and critical dialogue on a number of strategic issues. The National Land Policy, finalized in March 2013 and awaiting government approval, will also provide an opportunity for UN to refine its support to land management and land use planning. In addition, funding constraints has forced agencies to explore new approaches to attracting funding, which may yield some new opportunities in terms of resource mobilization, despite the overall challenge in ensuring adequate funds in an environment of budget cuts. Moreover, the review of UNDAF indicators 6 has allowed outcome groups to set more realistic, sound and measurable indicators hoped to strengthen planning and monitoring across outcomes. Recommendations Moving Forward In terms of engagement with the Government, it is recommended that UN agencies continue to advocate for cross-sectoral coordination mechanisms where relevant. UN should also explore ways to promote improved synchronization of surveys with national programming, allowing these to better inform both UN and Government decision making and policy development. More strategic and pragmatic approaches to transfering capacity and knowledge to national counterparts should also be explored and experience shared across outcome groups, e.g. through the outcome co-conveners mechanism. UN agencies will need to strengthen further the use of national systems, moving away from short term and limited project-based initiatives in line with the principles of the Vientiane Declaration. In terms of funding, more focus needs to be on identifying new and alternative funding sources and resource mobilization approaches. In addition, UN agencies should continue to work with Government counterparts to ensure more domestic resources for key areas of intervention, as external funding remain to a large extend the primary source of financing for several sectors. On the part of UN agencies, outcome groups may wish to look at scaling up successful projects and approaches and choose at least one geographic area where the interventions of the various agencies can work together in a complementary manner. Continued work to ensure the indicators, targets and plans of the outcome groups and individual agencies remain relevant also needs to take place, and the outcome groups and co-convener mechanisms will be important engines in this regard. Improved coordination will require outcome groups to meet more regularly and explore and collaborate on issues across their roles as assigned in the ToR, including strengthened collaboration on issues pertaining to monitoring, resource mobilization and joint communication and advocacy. Focusing of UN interventions around the same areas could help limit funding constraints, ensure more focused interventions overall and help built stronger partnerships with national partners. This would also help further project UN as a strategic partner able to foster positive and sustainable impact. The outcome group and co-conveners mechanisms should be used to disseminate best practices and as a platform to consolidate and communicate achievements and success stories to an external audience the 7 B. Progress under each UNDAF Action Plan Outcomes Below follows a detailed narrative of the progress achieved towards each of the UNDAF outcomes, focusing on achievements, as well as on challenges and opportunities, and providing recommendations on how implementation and coordination may be improved. UNDAF Outcome 1: By 2015, more equitable and sustainable growth promoted for poor people in Lao PDR 1. Chapeau Poverty reduction remains a high priority for the Government of Lao PDR and is acknowledged to be required to ensure a balanced economic and social development benefitting all segments of society. The objectives of outcome 1 of the UNDAF Action Plan are closely aligned with this Government set objective, and UN agencies work closely with the Government to promote inclusive and equitable growth. At the policy level, achievements in 2012 by UN agencies have been significant. The status of seriously off track MDGs were clearly highlighted in recent social data and analysis, such as the first ever Lao Social Indicator Survey (LSIS) and the Labour Force and Child Labour Surveys. These and other surveys also provided fundamental statistics for the 3rd MDG progress report, the Mid Term Review of the 7th National Socio Economic Plan (NSEDP 2011-2015), expected to be available by mid-2013. Moreover, the dialogue at policy forums, such as the Annual Round Table Implementation Meeting held in November 2012, were informed by survey outcomes allowing for a more structured discussion on areas in need of attention and collective efforts to address the off track MDGs and other key development issues, such as land management issues, sustainable development, and the need for convergence between planning and budgeting processes. At the programmatic level, UN support has also yielded positive results in improving the lives of the poorest segments of society, including by improving their access to financial services, promoting 8 alternative livelihood, increasing opportunities for quality and skilled labour, enhancing SME development and promoting the creative sector. The finalization of the Government’s the Monitoring and Evaluation Framework for the 7th NSEDP and the national Social and Environmental Safeguard Guidelines is ongoing and is expected to be completed in 2013 with the support of the UN. A number of UN programmes are currently in the pipeline, including initiatives to establish a national urban forum and support the finalization of a decree on employment promotion. 2. Progress The year 2012 marked an important milestone for various improvements and changes. A number of UN supported surveys, including the Lao Social Indicator Survey (LSIS), Agriculture Census, Labour Force and Child Labour survey and the Study on Child Well-Being and Disparities, were released and provided valuable data for policy makers in defining national strategies and action plans. These surveys also provided data for the 3rd MDG progress report and the Mid Term Review of the 7th National SocioEconomic Development Plan (NSEDP 2011-2015). The UN continued to advocate for more strategic and sustainable use and management of foreign direct investment (FDI), as well as for more participatory and consultative processes to formulating key policies, including in terms of land management. A concrete result has been the introduction of the National and Provincial Strategy for Private Investment Promotion and Management (2020), which aims to promote investment in specific sectors and suggests fiscal and non-fiscal incentives to attract and guide quality investment for different sectors, taking into account both social and environment impacts from the investment projects, especially for concessional investments. The UN supports strengthening the effectiveness of development cooperation between the Government and development partners through the Round Table Process. The 2012 Round Table Implementation Meeting (RTIM) placed a high emphasis on ensuring collective efforts to address the off track MDGs and the need to ensure sufficient resource for the 7th NSEDP implementation through enhancing the link between the planning and budgeting process. The follow up actions from the meeting include various recommendations to ensure inter-agency coordination to tackle cross cutting issues such as malnutrition 9 and food security, as well as land management, and a greater and more meaningful involvement of the private sector and civil society in a development discussion process. A number of other initiatives, currently underway, can still not be fully assessed. These include the delayed finalization of 7th NSEDP Monitoring and Evaluation Framework. The draft M&E indicators are expected to be available within 2013 and ready to be integrated into the LaoInfo database. However, as the framework is under finalization, the current Mid-Term Review of the 7th NSEDP has not been able to take advantage of a systematic monitoring. Moreover, the National Environment and Social Safeguard guidelines are currently available only in English. The Lao version is expected to be available for dissemination only by mid-2013. Similarly, while the National Investment Plan has been drafted it is expected to be finalized only during 2013. Through the support of the UNDP-UNCDF joint programme under output 1.1, by the end of 2012 a total of 52,111 additional active savings clients from low income households and micro entrepreneurs have access to financial services and 21,018 additional active loans clients from income households and micro entrepreneurs have access to financial services. In comparison to the target set in 2015, the progress made is significant. The results of the Lao Social Indicator Survey (LSIS) were released in 2012 and showed progresses in a number of areas, including education, child health and reproductive and maternal health (Output 1.3). It further emphasized the status of off track MDGs, especially malnutrition, maternal mortality, child mortality and school drop-out rate, which will require greater attention. In addition, the UN provided support for the preparation of the Population and Housing Census. The result from these data collection activities is expected to inform the preparation of the next five year development plan. In relation to generating data and evidence, the UN has also provided support to the Lao Youth Union in carrying out the Adolescent and Youth Situation Analysis, which aims to provide evidence for interventions and programmes on youth, including the UN programme, the 8th NSEDP and the youth strategy. The analysis will also address gender issues and is expected to be completed in 2013. Assessment on civil / birth registration (jointly supported by UNICEF, UNFPA, ESCAP, WHO, IOM and Plan International and included under Output 1.5) was also completed in advance of Lao PDR’s participation in the Asia Pacific High Level Meeting on Improvement of Civil Registration and Vital Statistics, in which Vice Ministers from Lao Statistics Bureau and Ministry of Home Affairs participated. The study on the causes 10 of internal migration and its impact on children was disseminated widely. The Study on Child Well-Being and Disparities was formally endorsed and contributed to a wide range of policy dialogue around equity. On social protection, in close collaboration with the health and education sectors, advocacy and technical inputs was provided into the discussion around Poverty Reduction Support Operation, especially in terms of equity focused policy triggers in the health and education sectors related to Mother and Child Healthcare free waiver policy and school grants. The promotion of alternatively livelihood for the ex-poppy cultivating communities in the target areas of Phongsaly, Oudomxay and Huaphanh has been slightly improved (Output 1.6). The overall total household poverty in these pilot provinces declined from 89% in early 2011 to 66% by November 2012, which supports the effective shift to a more sustainable living condition for these people. The UN support to the farmer groups to improve their access to food security and production included support to establish 2,802 farmer organizations. The figure shows a dramatic increase compared to the 2011 baseline and exceeded the target for 2012. The farmer organizations consist of Livestock and Agronomy, Micro Finance, Handicraft and Weaving groups and this concept is currently being implemented in 5 provinces in the north and 5 provinces in the south (Output 1.8). The work on increasing quality labour force and employment has also made considerable progress. The decree on employment promotion, which is the principle legislation for regulating the recruitment practices, has been drafted and is expected to be submitted to the Government for approval in 2013. In addition, to increase access to decent job positions and opportunities, job seekers have increasingly made use of the employment service center. In 2012, more than 4,000 jobs seekers registered with 9 centers. 1,408 out of these job seekers, 628 of whom were women, were successful in receiving job placement. The first ever National Plan of Action on the elimination of the worst form of child labour in Lao PDR was successfully drafted and awaits endorsement, and a series of capacity buildings have been organized in different sectors (Output 1.9 and 1.10). In support of local authorities to be better able to deal with challenges and opportunities of urbanization (Output 1.11), the UN is supporting the Government to establish an urban forum. An Urban Inequities Survey (UIS) is being conducted in 25 small towns in partnership with the Lao Statistics Bureau (former Department of Statistics). 11 As part of the preparation for the Policy and Action Plan for realizing the Convention on Intangible Culture Heritage (Output 1.12), the Ministry of Information, Culture and Tourism has created the Intangible Cultural Section to be a leading institution for drafting an action plan. To build capacity and awareness among the Government stakeholders, the UN organised training workshops. Preparation for development of a sectoral roadmap has been undergoing through a national consultation. The achievement from the Round Table Process also includes the increasingly effective functioning of the ODA database - the Aid Management Platform (AMP). With support from the data focal agents from participating development partners, in 2012 the AMP was able to generate a foreign aid report, which provides an overview picture of ODA support to Lao PDR and helps to increase the transparency and accessibility of the aid information (Output 1.13). The work under Output 1.14 and 1.15 has seen good progress as well. A concrete achievement has been the establishment of the quality management system, testing facilities, and production certification to help ensure the quality of production and increase capacity of the government to perform its quality and safety assurance role. The testing center allowed the low income groups of the population to expose safe and fair trade products. Some activities are still ongoing, such as the development of quality investment criteria and the social and environment impact assessment safeguard guidelines (Output 1.4). 3. Challenges and Opportunities Throughout the 2012 review, some challenges were identified in ensuring full and timely implementation of interventions under Outcome. Despite the above achievements, many activities were not able to reach expected targets and/or results are yet to be seen The active involvement of relevant stakeholders, such as the private sector and provincial government is a key factor contributing to the success. Overcoming the challenge to the promotion of standards and good quality of products will require strong leadership and capacity of the Government to regulate, but equally important will be the strong and constructive participation of private companies. 12 Another challenge has been the turnover rate and the limited capacity of the Government counterparts in implementing agreed activities. This has shown the need to continue strengthening their capacity in order to sustain the result of the UN interventions. Apart from technical challenges, the process of reviewing progress towards the UNDAF outcome has provided an opportunity to revise many of existing indicators. With the timeline and expected results in mind, many activities or outputs need to be adjusted to allow for coherent monitoring and reporting. For example, many of the existing indicators did not adequately allow for UN agencies to evaluate their specific contributions vis a vis that of other development partners. The coordination of inputs from all the participating agencies has also proved challenging. This reporting task is a labour intensive process and without adequate and timely input from all outcome agencies, it is less likely that the report will be produced in a timely and coherent manner. Due to the limited information available from agencies, it is also difficult to assess progress in relation to resource mobilization targets. The review timeframe does not allow all agencies to provide an update on their resources and disbursements at the time of reporting. In addition to the information deficiency, the ability of the UN to attract required funding is also a challenge. The impact of the recent European financial recession has been felt at the global level across agencies. As a result of core resource reduction, the UN will have to identify more innovative approach to attract donors and development financing. Despite the above challenges, the year 2013 offers a number of opportunities. The Mid Term Review of the 7th NSEDP, expected to be available by 2013, will provide opportunity to re-assess programmes and future implementation in order to ensure that the UN remains focused on addressing the core development issues, producing effective and tangible results and maintaining the UN position as a trusted partner. The availability of the 3rd MDG progress report by mid-year will allow the UN to reaffirm its position and to work on designing and reemphasizing programme and project activities that are effectively and efficiently meeting the current needs of the country in achieving the MDGs by 2015. 13 Since some important tools and policies will become mostly available only in 2013, this will create an opportunity for the UN to track the progress of this UNDAF outcome implementation more distinctively by 2013. 4. Recommendations To address the above challenges, it is important that UN agencies use capacity development as a key driver for success. The transfer of know how to national counterparts needs to be more strategic and practical. The UN should also advocate for a synchronization of the survey and data collection systems with planning processes so that the results of surveys are able to feed into the policy and decision making processes. With regard to the UNDAF indicators, it is recommended that participating members meet more regularly to exchange their progress, e.g. quarterly. Given that some indicators are no longer applicable or relevant, it is suggested that changes made to the indicators be presented to the UN Country Team for its endorsement. UNDAF Outcome 2: By 2015, the poor and vulnerable benefit from the improved delivery of public services, an effective protection of their rights and greater participation in transparent decision making 1. Chapeau Progress towards UNDAF AP Outcome 2 has been made to varying degrees in 2012. A high-level interministerial committee (the National Leading Committee on Governance), chaired by the Deputy Prime Minister, was established in February 2012 to provide leadership and oversight in coordinating and monitoring the implementation of the Governance reform in the country. The Governance Sector Working Group and two sub-groups (legal and institutional oversight & public service delivery improvement) have given the governance reform agenda new impetus despite the lack of endorsement of the new Strategic Plan of Governance (2012-2020). 14 The support to effective and efficient service delivery and governance reform is gaining pace and results are being produced. Legal reform has again gained momentum through support provided to the Government for the implementation of the Legal Sector Master Plan and UN’s support to international and regional integration and progressive realization of human rights has continued to yield results. The capacity of the National Assembly (NA) to fulfill its constitutional mandate as the highest organ of the State, vested with representative, legislative and oversight functions, is gradually increasing. The NA is beginning to assume a more assertive and critical role in debating laws and policies, scrutinizing government budgets and representing constituency interests, with more critical debates taking place on issues of national concern such as land, corruption, HIV/AIDS, gender, youth, MDGs, and lack of transparency amongst other issues. With respect to civil society participation, some positive strides were made as seen in the participation of NPAs in the round table process, for the first time since it was initiated, and with an increased number of NPAs being registered in 2012. However there are significant challenges that still exist in making the environment for NPAs conducive for them to contribute to poverty reduction whether as part of policy or programme initiatives. 2. Progress The following results have been achieved thanks to the support of UNICEF, UNODC, UNDP, UN-Habitat, UN Women, UNIAP and OHCHR. Improved delivery of public services District capacity to support the local planning and budgeting process and submit prioritized development plans for District Development Fund (DDF) funding has improved. The DDF system uses government systems and officials and is fully aligned with existing government processes. Previously, government systems were not utilized at the district level. Based on this model the Government is using the DDF modality in other districts. This not only helps improve capacity but ensures innovations can be more cost effective and scalable in the future by working through existing governance systems. Under output 2.2, the MoHA, UNICEF and UNCDF joint causality analysis and Operational Expenditure Block Grants (OEBG) workshop conducted for Luangnamtha Province (focus on one district (Sing)) led to discussions and follow-up on issues affecting the integrated planning and budgeting to facilitate the 15 communication and accountability relationship between the central and sub-national levels. A work plan with programme sections is currently being developed to link district planning processes in the health and education sectors and OEBG, with a view to improve the overall quality of district plans and maximize the use of various funding allocated to the districts. Progress under output 2.2 is fully in line with the national goals of Sam Sang. Thanks to the work undertaken under output 2.11, the central Government is in the process of developing the Water Supply Sector Strategy. Adaptation of decentralization guidelines to the Lao context, for provision of basic services, in support of the Government’s ‘Sam Sang’ (the three Builds), is another ongoing initiative. More effective protection of the rights of the poor and vulnerable In the legal sector, 2012 saw a significant change in the environment that all relevant stakeholders are engaged in. The Government of Lao PDR established a national framework for implementation of the Legal Sector Master Plan (LSMP), which also constitutes an intrinsic part of its commitment to Governance within the 7th NSEDP. The National Leading Committee on the Governance mandate includes support to Legal Sector Master Plan implementation. The Inter-Agency Working Committee established in 2011 is to be integrated into the LSMP Programme Board (outcome indicator 2.5), which includes development partners, and the LSMP Secretariat, which is the national coordination and implementation mechanism for LSMP implementation, have both been further strengthened through the increased number of Government officials involved. In terms of progress towards a functioning Government led joint coordination mechanism for juvenile justice at national and sub-national levels (output 2.4), key results in 2012 included the drafting of the Law on Juvenile Procedures. The process included the direct input of adolescents and young people through participatory and consultative activities and an assessment of child mediation and restorative justice practices, initiated with the Ministry of Justice. Preparation are ongoing for a comprehensive assessment of the child justice system to provide an overview and structure of the existing (formal and informal) child justice system in the Lao PDR, providing the basis on which to identify gaps and bottlenecks. 16 To foster greater access to justice, support was provided to Lao Bar Association to send mobile legal aid teams to two provinces – Oudomxay and Champasak – thus reaching 2,556 villagers (1,164 males; 1,392 females) in a total of 30 villages to raise awareness and provide legal advice on human trafficking related issues at the local level (outcome indicator 2.8). The Government of Lao PDR remains very active in the international arena and participated in the 2012 UN Treaty Event in New York where it ratified the Convention against Torture and Other Cruel, Inhuman or Degrading Treatment or Punishment [UPR recommendations 96.1,2]. Lao PDR is now a party to 7 of the 9 international human rights instruments providing protection for all human rights in the civil, cultural, economic, political, governance and social spheres). The Government also ratified the Multilateral Agreement for the Establishment of an International Think Tank for Landlocked Developing Countries and the Protocol on Access to Genetic Resources and the Fair and Equitable Sharing of Benefits arising from their Utilisation to the Convention on Biological Diversity. In 2012, Lao PDR has successfully participated in the examination by the UN Committee on the Elimination of Racial Discrimination of its national periodic combined 16th-18th report. Through this process Lao officials realized the gap in the implementation of ICERD at the national level and the need to address the gap by implementing the Committee recommendations. This ICERD reporting process helped develop capacities of Lao officials to widely appreciate the country’s obligations and the benefits from the participation and implementation of ICERD, which contributes to effectively ensure non-discrimination and equality among all the 49 ethnic groups in Laos. In 2012, the National Commission on Mothers and Children (NCMC) took significant steps to disseminate and follow-up on the Concluding Observations from the UN Committee on the Rights of the Child to the Lao PDR Government. A National Plan of Action (NPA) to monitor the implementation of the Concluding Observations has been drafted and high-level national and regional inter-ministerial consultations were conducted (May-July 2012) to disseminate the recommendations from the Committee. The NPA will serve as the road map and a basis for monitoring progress on CRC implementation in preparation for the next State Party report on the implementation of the UN Convention on the Rights of the Child due in December 2016. NCMC also drafted the first national report on the implementation of two Optional Protocols to the CRC on a) the Involvement of Children in Armed Conflict and, b) Sale of Children, Child Prostitution and Child Pornography. Extensive consultations were conducted with national and regional inter-ministerial counterparts, development partners, INGOs and students to finalize the report. The report is now pending 17 final approval by MoFA and the Prime Minister before submission to the UN Committee on the Rights of the Child. In terms of implementation of Lao PDR UPR Recommendations (Output 2.4), the Lao PDR UPR Recommendations National Action Plan and Costing is being drafted and expected to be finalized in 2013. The Plan is to be submitted to the newly established National Steering Committee on Human Rights. The Government also held a briefing on the Human Rights Council Special Procedures mechanism to familiarize the officials with the mechanism in preparation for the expected invitation of at least one Special rapporteur in 2013 [UPR recommendation 96.9]. The establishment of the National Steering Committee on the Human Rights under the Prime Minister’s Office is a step forward to achieve output 2.4, indicator 3. However, making it in line with the Paris Principles would require further efforts by all stakeholders, as well as the political will to establish an independent human rights body. In March 2012, the second National Strategy for the Advancement of Women (NSAW) 2011-2015 was adopted by Government and included key priorities in the country on CEDAW implementation, women’s economic rights and women migrant workers. The development of a gender disaggregated knowledge base of data on labor migration is underway as part of the work undertaken with MOLSW staff and government institutions under output 2.3. In 2012, the NA Social & Cultural Affairs Committee conducted a legal assessment of existing Lao PDR legislation associated with the proposed new legislation on Gender Based Violence & Domestic Violence in Lao PDR. This is the first step towards helping the National Assembly to develop its capacities and establishing a formal mechanism to assess new and amended laws to ensure compliance with gender equality and women’s human rights standards enshrined in the CEDAW to which the Lao PDR Government is signatory (outputs 2.1 and 2.13). The UN also helped the Government Inspection Authority to undertake the review process under the UN Convention Against Corruption (UNCAC), which is still underway and expected to be completed within 2013. Seminars, workshops and consultations on the UNCAC were organized, which raised awareness and enhanced capacity of Lao officials on the fight against corruption with reference to the UNCAC provisions. Such support, together with efforts of other development partners, has led to the realization by the Lao Government of the need to improve the Anti -Corruption Law. Furthermore, a National Anti-Corruption Strategy and the draft Decree on Assets Declaration have been proposed by the Government Inspection 18 Authority to the Government for consideration and approval. Such interventions directly contribute to the Government’s fight against corruption, which the 7th NSEDP describes as a critical measure to enhance the public administration roles (p. 193). In terms of assistance to the Government in criminal-related matters (Output 2.5, 2.6 and 2.10), great results have been achieved in 2012 in terms of the adoption or review of key pieces of legislation. National legislation on international cooperation in criminal matters has been drafted. The Law on Extradition entered into force in August 2012 and by December 2012, the Law on Mutual Legal Assistance had been drafted. The Government is also planning to draft the law on human trafficking by 2014 and in the meantime is undertaking capacity development initiatives to train officials on human trafficking issues. By the end of 2012, 523 officials had been trained against the target of 800 by 2015 (output 2.6 Indicator 2). The Amendment to the Law on Drugs, reflecting earlier discussion between UNODC experts and national experts on the difficulty in applying law to real cases, was passed by the National Assembly in 2012. The UN continues to raise awareness of Lao institutions, such as the NA, on key issues related to international law and domestication of international obligations. This has included a presentation to 100 NA members on gaps between national legislation and the UN Convention against Transnational Organized Crime made in 2012. Such interventions directly contribute to goals stated under the Labour and Social Welfare Section (p. 121 of the 7th NSEDP) and the Justice Sector (p.129 of 7th the NASEP), and goals stated for the Public Sector (pp. 173-177 of 7th NSEDP; legislation organization, public administration organizations and judicial organizations). Police and Public Security Officers have also increased their knowledge and understanding of international legal principles and norms concerning the Lao PDR through various capacity development initiatives on international law and human rights obligations of the Lao PDR. Greater participation in transparent decision making It is acknowledged that the NA (as detailed in the final evaluation of SELNA conducted in 2012) has benefited from donor funding and technical support, particularly UN Joint Programme Support to an Effective Lao National Assembly (SELNA), which has helped to improve internal management and constituency linkages, provided exposure to comparative models of assembly functioning, funded a series of capacity development activities, and organized more productive inter-session activities – which is 19 recognized to have contributed to a qualitative change in the debate and the scrutiny of the Government (see 2012 SDC Report on Governance Trends in Lao PDR). The NA has developed a 5-year plan for making and amending laws 2011-2015, and a more transparent new lawmaking procedure (the Law on Law-making) was adopted in July 2012, which expressly provides for public consultations during the lawmaking process (outcome indicator 2.6). This has institutionalized the involvement of the NA far earlier in the law making process and fosters greater interaction and clarity about the respective roles and responsibilities between the Ministries, the NA and other partners. The NA is also working hard to improve the public’s understanding of its roles and activities, through NA meetings and activities being featured prominently in major newspapers, some sessions being open to the public and NA sessions and debates broadcasted live on TV and the NA radio in order to reach a wider audience. As part of the support provided by UN agencies under output 2.1, the NA has also ensured public access to laws and legal information through publications on the NA website and wide dissemination to line ministries, provinces, districts and NA constituency offices. More public consultations with constituencies are conducted by Members responsible for the law drafting and review and there is a growing awareness and effort by the Members to get feedback from the public on the draft laws. The NA also regularly organizes outreach missions to rural areas in order to raise public awareness on hotly debated topics such as HIV/AIDS, youth, human trafficking, land issues, etc. The NA is also currently discussing a range of outreach tools and ideas to more systematically promote and foster greater people’s participation in Lao PDR. In 2012, the NA has continued to improve its petition system by improving its handling mechanisms, capacities and structure and a Resolution about People’s Petitions to include the recommendations about how to compile, monitor, report and address complaints and Hotline issues received by the NA from the public all year round was agreed upon (a total of 380 petitions were received, while a total of 588 calls were received through the hotline system during NA sessions). This continues to show an upward trend as the public becomes more familiar with the means of bringing their issues to the attention of the Assembly. The work undertaken under output 2.8 has also contributed to an increased number of communities being better informed about available public services, e.g. in health and education, through 3 community radios. Community radios, which are set up in Lao’s poorest districts, are broadcasted in the ethnic languages of 20 its audience and volunteers working with the community radio are balanced in terms of gender (50% men and 50 % women). Volunteers are from a diverse ethnic origin and include young people, elderly people and people with disabilities. The work undertaken under output 2.8 in partnership with the Ministry of Home Affairs has expedited the registration process and increased the number of registered Non Profit Associations (NPAs) by strengthening the capacity of CSO responsible offices at the national and provincial level. The number of registered NPAs has increased from 30 organizations in 2011 to 102 registered NPAs, 32 operating nationally and 70 operating at the provincial level. There are, however, several aspects to be improved in the registration process and participation of NPAs in policy fora. Gender equality and/or women’s empowerment In 2012, gender and gender related interventions and the integration of gender dimensions into project and programme implementation under Outcome 2 received significant support, including through workshops and seminars. Awareness-raising and capacity-development interventions on gender related issues As part of the work undertaken under output 2.6 on the prevention and fight against human trafficking, Government officials were trained to appropriately respond to the sensitive nature of impacts of the crime on female children victims. Interventions under output 2.8 supported the wider civil society in Lao PDR through supporting community organizations and helping to scale up community media, strengthening the understanding of the equality of women and men and enhancing a positive and nondiscriminatory portrayal of women. Such results were achieved by ensuring that public awareness and capacity development initiatives involved both women and men; ensuring that increasing amount of women are trained as community radio broadcasters (in 2012, 50% of the community radio volunteers are women compared to 40% in 2011); and allocating a women-specific time slot in community radio to promote gender equality and discuss gender-related issues. Women’s participation 21 In terms of women’s participation, while only 33 out of the 47 women parliamentarians were elected in April 2011 (25 % of the total NA membership which is still one of the highest in the Region), the highest position in the NA (NA President) is now held by a women, and 8 female parliamentarians are holding positions either as President or Vice-president of Committees and other senior level positions in Committees and departments. In 2012, targeted capacity development with the legislature’s women’s caucus have led to having women Members of the NA increasingly asking questions and providing comments in Intersession programmes and other learning opportunities – which indicates a growing confidence amongst the Women Members to contribute to public debates. The ultimate goal of interventions under output 2.8 is to contribute to greater people’s participation in local development and nation-building efforts. In 2012, thanks to the support provided, which has facilitated the development of a legal and regulatory framework supporting the setting up of a coherent and effective government registration and monitoring structure at national, provincial and district levels, more than 10 NPAs (7 at national level and 3 at provincial level) out of 102 which mandates are to directly to work on genderrelated issues have been officially registered as NPAs. Any training given in the framework of the community radio programme ensures a 50-50 balance for women and men and at least 50 % of volunteers working at the community radio stations are women. Development of national systems With the support of the SELNA UN Joint Programme, the NA is developing its capacities and is in the process of establishing a formal mechanism to assess new and amended laws to ensure compliance with gender equality and women’s human rights standards enshrined in the CEDAW, to which the Government is a signatory. In 2012, the drafting of the proposed law on Gender/Domestic Based Violence constituted the first step towards helping the NA establish such systematic mechanism to make a legal assessment of the draft new and amended laws with a gender lens. 3. Challenges and Opportunities Challenges The draft Strategic Plan on Governance (2011-20), which is supposed to set the direction for all support in the governance sector, was presented to the Government for consideration in 2012 but is unlikely to be adopted. The nature of the governance sector is such that it involves many different government 22 offices and institutions that belong to different parts of the State and have different reporting lines; hence the concept of having one overall framework is subject to further Government consideration. The governance sector, however, is supported by individual sub-sector strategies such as the draft Public Administration Improvement Strategy, the Legal Sector Master Plan and the National Assembly Strategic Five Year Plan, which provide a framework for setting targets for stakeholders and development partners to report achievements and status related to the relevant governance pillars (Public Service Improvement, People’s Participation, Rule of Law, and Public Financial Management). Continued lack of accurate, disaggregated data, also represents a challenge Improved delivery of public services The criteria for selection of pilot districts and villages in the decentralization process differ across the sectors and throughout the ‘three-builds’ approach, causing challenges in integrated planning and budgeting processes. Roles and responsibilities of functions at the central and sub-national levels are not always in line with the national law on public administration and guidance on job descriptions. Limited options and services are available for children in contact with or conflict with the law and insufficient coordination exists between ministries and sectors, particularly at differing administrative and zonal levels nationally. More effective protection of the rights of the poor and vulnerable While the establishment of the National Steering Committee on the Human Rights under the Prime Minister’s Office is a step forward to achieving output 2.4, indicator 3, making it in line with the Paris Principles would require further efforts by all stakeholders as well as the political will to establish an independent human rights body. Technical assistance in the criminal justice sector has to deal with the issue of stigmatization of the victims of crime and this usually requires special assessment at the time of planning and proper consideration at the time of implementing interventions. Resource mobilization to support criminal-justice related interventions is challenging given that it is usually difficult to show results in this area in a short timeframe and since activities are often linked to the sensitive issue of human rights violations. Greater participation in transparent decision making 23 The current political climate may impair or delay the implementation certain human-rights related interventions or initiatives to support to civil society. Opportunities The establishment of the National Leading Committee on Governance as the high-level body to guide and oversee implementation of governance sector programmes, will help provide the necessary political direction and monitoring of the sector programmes. The governance sector is now moving towards a programme based approach, utilizing the national systems and reducing project-based initiatives, thereby honouring the Vientiane Declaration principles, as well as ensuring greater synergies of all development partner initiatives in the governance sector. The Ministry of Home Affairs and UNICEF signed a work plan in August 2012, opening up opportunities for UNICEF to engage in a broader decentralization process accelerated by the Government of Lao PDR. This is the first work plan that is synchronized to the Government fiscal year, in order to promote ownership and alignment with Government processes. In late August 2012, the strategy on gender in governance prepared by MoHA was presented to the monthly meeting of the Government. It is expected that the strategy will be officially adopted and promulgated shortly. The gender in governance strategy will be a strategic tool for mainstreaming gender in the civil service sector. A framework for future support to the National Assembly post 2013 is being developed under the leadership of the NA President, embedded into NA’s own strategic priorities and thus truly owned by the NA. Core agencies of LSMP implementation (Ministry of Justice, Ministry of Public Security, Office of Supreme Public Prosecutor, People’s Supreme Court, Ministry of Foreign Affairs, National Assembly) are more and more actively engaged and committed to support jointly the implementation of the LSMP and there is strong willingness from development partners to coordinate in a more strategic manner in the legal sector and use the national coordination and implementation mechanism. South-South international exchanges constitute another opportunity. 24 4. Recommendations A number of recommendations have been identified by Outcome Group 2 members. These include the need to ensure that decentralized fiscal transfers are aligned with fiscal year. Also, there is a need to advocate for the establishment of an effective and efficient data collection system between key stakeholders to track children in conflict with and in contact with the justice system and support prevention activities through strengthened cooperation between sectors, particularly child justice and the child and family welfare sector, INGO and local child protection partners. Mobilization of resources for assistance in strengthening the rule of law, especially for strengthening the criminal justice sector, should be encouraged. A long term strategy might be necessary for the conversion of the National Steering Committee on Human Rights into a national human rights institution that meets the Paris Principles, including capacity building/awareness raising of relevant political players and resource mobilization for the Committee’s secretariat. The Outcome Group members furthermore have the following observations and suggestions/ recommendations in terms of revisions to outcome indicators and targets: - Outcome indicator 2.2: given the costs and time associated with the citizen reports cards (CRCs) survey and current prioritization of the interventions linked to three-builds approach, it will not be possible for the government to carry-out 5 or more CRCs surveys and the indicator should be more focusing on the use of survey results to trigger changes at the local level. - Outcome indicator 2.3: proposal to monitor the capacity development interventions of civil servants at the local level rather than at the national level - Outcome indicator 2.5: while the indicator should remain, the point system stated to track changes should be amended since 2 of the targets were already achieved at the time of signing the UNDAF Action Plan in July 2012 and the 3rd target is irrelevant - Outcome indicator 2.6: all targets were already reached by the time of signature of the UNDAF Action Plan in July 2012 - Outcome indicator 2.9: At this point, given that the discussions relating to establishment of local councils have been put on hold and it is unlikely that the law on local councils will be passed by the NA during the current UNDAF timeframe, it is proposed to remove such indicator. 25 Given such contextual changes and in order to be better able to measure changes more directly linked to the Outcome 2 statement, the Outcome Group 2 members would like to recommend to revise the following outcome indicators as follows: (1) Indicators on improved delivery of public services: New Outcome indicator 2.1: “Progress towards a legal and policy framework for improved delivery of public services (2012: 0 point; 2015: 4 points; MOHA Annual Reports)1” Keep Outcome indicator now numbered 2.2: “No. of towns that implement pro-poor water governance (2011: 0, 2015: 8, MoV: Annual Sector Investment Plan-DHUP/MPWT)” (2) Indicators on effective protection of rights New Outcome indicator 2.3: Progress towards implementation of Legal Sector Master Plan2 (2010: 0 points, 2015: 4 points, MoV: LSMP Secretariat Annual Report) Rewording of the Outcome indicator initially numbered 2.8 (now numbered 2.4) into: “No. of villages benefitting from legal advice through legal aid clinics at the local level (2011: TBC by UNODC shortly; 2015: TBC MoV: LBA reports)” (3) Indicators on greater participation in transparent decision making New Outcome indicator 2.5: “Progress towards better access to information for civil society leading to greater participation in national and local development processes (2010: 0 points, 2015: 4 points, MoV: GSWG Annual Reports) 3 ” 1 Scale of progress from 0 to 4 points: a) 1 point: Law on local administration revised; b) 1 point: Civil Service Code of Conduct approved; c) 1 point: during 2015, 750 district participants are trained as part of the District Development Fund; d) 1 point: a database mapping available public services in at least 3 pilot districts 2 Scale of progress from 0 to 4 points: a) 1 point = LSMP Programme Board established; b) 1 point = National leading board on governance established; c) 1 point = Law-making manual drafted; d) 1 point = Law-making manual used to develop at least 4 priority laws 3 Scale of progress from 0 to 4 points: a) 1 point = More than 300,000 community members in 6 districts and villages benefiting from information broadcasted by community radios in 8 different ethnic languages; b) 1 point = one-stop legal website accessible to the public; c) 1 point = more than 150 NPAs registered at the national and local level; d) 1 point = NPAs participate in annual Round Table Meetings; 26 Keep Outcome indicator now numbered 2.6: “% of senior level (level 5 upwards) civil servants who are women (2008: 16%, 2015: 25%, MoV: National Statistics on Civil Servants)” UNDAF Outcome 3: Government has the capacity to effectively coordinate, plan, implement and monitor education sector development 1. Chapeau The education sector has seen continued progress towards its national goals over the past year, with an increase in basic education enrolment rates and in the numbers of children surviving through to the end of primary education. It is also evident, however, from the latest data projections that the country will not meet the MDG target of Universal Primary Education in light of the number of children dropping out of primary education and not completing the full primary education cycle. UN support to improved coordination and harmonization of Development Partner assistance in the sector remained over 2012, with agencies participating in the Education Sector Working Group mechanism and a review of its structure. There were a number of achievements for UN agencies against planned results in primary education, notably the endorsement of national Quality Education Standards for Primary and Secondary schools. Further, the first ever national skills standards for Lao PDR were developed with UN assistance. Challenges remained in the delivery of results within the Early Childhood Education sub-sector due to the limited progress of formalizing a national ECD Policy, whilst opportunities arose for UN support to decentralized levels of education services through the Government’s piloting of the ‘3 Builds’ approach. Following a review of the initial outcome indicators, changes have been recommended to ensure that baseline data is available and that indicators reflect national sector targets. 2. Progress During 2011/12, participation rates for primary education improved and survival rate to grade 5 (officially the end of the primary education cycle in Lao PDR) reversed the recent decline of 2010/11. The Net 27 Enrolment Rate4 (NER) increased from 92.7% in 2010-11 to 95.2% in 2011-12, whereas the survival rate to grade 5 decreased by 1.1% to 70%, with both showing notable provincial and district level disparities. The province with the lowest NER stands at 86% (Phongsaly Province) - a full 13.4% below that of the highest province (Vientiane Municipality). Even more startling are provincial disparities in primary education survival rates - with only 46.6 % of children in Saravane Province making it through a full 5 years of primary schooling, as compared to 90% of their counterparts in Vientiane Municipality. Repetition and dropout rates continue to be a problem nation-wide, with limited attention from Government and Development Partners towards interventions for addressing these. Repetition rates are particularly high across the early years of primary school, with 4 provinces having year 1 repetition rates greater than 30%. Factors which contribute to student drop-out include the need of families to prioritise agricultural work in the peak harvest season, as well as the poor quality of teaching, which results in parents’ perception that there is minimal value in supporting their children’s school attendance. Dropout is made worse by the large percentage of incomplete primary schools across the country - schools which only offer a few years of primary school but not the full 5 years. Children and their families in these communities have limited options in terms of completing their primary education, as they must then be willing to travel far distances in order to attend the last years of primary school. Over 60% of primary schools in Lao PDR are multi-grade, with many teachers unfamiliar with the best means by which to teach students from different grades simultaneously. The 2011/2012 data noted in the graph below indicates that, whilst there continues to be progress against primary education enrolment rates, the significantly low survival rates to grade 5 mean that Lao PDR will not achieve MDG 2 by 2015. In order to achieve a survival rate in line with the MDG 2 target, 95% of children enrolled in year one for the school year 2010/2011 would have to be enrolled in year 5 during the school year 2015/16. As 2011/12 data shows however that almost 12% of children have already dropped out from year one, the 2015 target of 95% survival rate is already out of reach. At current rates of improvement, the survival rate to grade 5 will only improve to 72%, below the target of 95% by 2015. 4 Enrolment of the official age group for a given level of education expressed as a percentage of the corresponding population 28 Note: Values for 2012/13 to 2015/16 are statistical projections, based on performance of the 5 previous years Whilst not an MDG target, the Government of Laos has set the ambitious target of a 75% participation rate in lower secondary education, in order to achieve the exit from Least Developed Country Status by 2020. Secondary education is one of the indicators used to determine the Human Asset Index, one of four criteria5 used to assess a country's development status. Based on current levels of improvement, it is projected that participation in lower secondary education will only reach 68% by 2015. As can be seen in the table below, improvements in gender parity continue to be achieved in basic education, although improvement has stalled or reversed in post-basic education. Gender parity has improved significantly for lower secondary education in the last school year while gender parity for university level education has declined over the last year. Table: Gender Parity Early Childhood Education Primary Lower Secondary Upper secondary TVET University 2005/06 2008/09 2010/11 2011/12 1.02 1.01 1.01 1.00 0.86 0.88 0.94 0.96 0.77 0.80 0.83 0.89 0.73 0.78 0.82 0.83 0.64 0.62 0.62 0.61 0.62 0.74 0.76 0.74 5 Together with gross national income per-capita, economic vulnerability index, and population size 29 Output 1 - A data presentation tool (entitled Lao EduInfo) was integrated within the Ministry of Education and Sports’ Education Management Information System (EMIS) over 2012. This tool allows for the production of simple, visually compelling maps and graphs for use in policy briefs, annual reports, programme reviews etc. A draft dashboard has been created and is available to the public through the internet, the structure/format of which is currently being reviewed by the MoES (available to view on http://devinfolive.info/dashboard/laoeduinfo). A teacher projection model has been developed for the better alignment of teacher demand with supply. MoES officials were trained to utilize disaggregated data from the Education Management Information System (EMIS), Teacher Education Management Information System (TEMIS), and Personnel Management Information System (PMIS) to engage in informed planning for teacher recruitment, deployment and preparation for primary and secondary schools. In partnership with bilateral donors and other Development Partners, UN agencies supported improved coordination in the delivery of the national Education Sector Development Plan’s 2015 targets. A substantive review of the sector’s key coordination mechanism - the Education Sector Working Group was undertaken in 2012, resulting in improvements to the efficiency of the current structure and greater attention to more inclusive, technical level coordination. The second Joint Sector Review Mission was successfully conducted in March 2012, under the leadership of the Ministry of Education and Sports, with UN agencies’ engagement. The Joint Education Sector Revision Mission Aide Memoire outlines progress of key reform strategies and alignment of investment from government and Development Partners to the Education Sector Development Plan. This also outlines the continued challenges in the provision of effective, quality education for all. A full review of the Education Sector Working Group structure and function was also completed over 2012, in line with a request by the Government of Laos to review all sector working group structures. An outcome of this review has been a greater formalization of the sub-sector Focal Groups, in which UN agencies are represented. Terms of Reference for each of the Focal Groups have been drafted and will be presented for ESWG executive endorsement by May 2013. Output 2 - A community-based school readiness pilot programme was introduced in 2012, with equityfocused criteria utilized in the selection of 27 target communities in 4 Districts of Luangnamtha and Saravane provinces. The facilitators’ modules, which support this nine-month programme, have been completed as was the training of community facilitators - essential in light of their limited knowledge of 30 holistic, child-centred learning and development. 12 trainers from both project Provinces were trained on how to in turn train the community facilitators on how to conduct these classes and activities. Further, supporting materials for parents and care-givers have been drafted, which integrate key messaging from the Ministry of Health’s Maternal Neonatal and Child Health Services. The development of a Monitoring and Evaluation framework for this pilot initiative remains a priority in order to ensure that lessons learned are adequately documented. This pilot is being undertaken in partnership with the World Bank and AusAID, who are supporting piloting to joint pooled education sector programme. The Education and Sports Research Centre (ESRC) of the Department of Planning, in consultation with the Department of Primary and Pre-school Education, has developed a research proposal for analysis of existing policies relating to early childhood and early childhood care and development (ECCD) practices in order to identify concrete policy options to improve the quality of ECCD in Lao PDR. The research will focus more specifically on policy, training and practices related to ECCD professionals. The scope of research will reflect availability of existing data, policy documents, studies and other resources related to ECCD practitioners. Data will be collected from samplings of public and private nurseries or crèches, kindergartens and pre-primary classes, and teacher training colleges, as well as from technical staff and managers working for MOES at the central, provincial, district, and village levels. The research requires additional funding to be carried out in its full scope and is currently on hold. Output 3 - In June 2012, the national Quality Standards for primary and secondary schools were endorsed by MoES. The standards outline what is expected by the Ministry of every school and therein promote equitable access and student achievement across all school settings. As an initial step in the dissemination of these standards, a draft set of materials for schools has been produced and training of key provincial and district officials in six target districts were conducted. The alignment of the Ministry’s planning processes and management tools currently utilized at different levels at central and sub-national levels against the Quality Standards is also in progress. Output 4 - A process was agreed with the MoES for the development of teaching and learning materials for children of non-Lao mother tongue, the initiative was delayed whilst awaiting the availability of technical assistance to be provided by Mahidol University. The second year of a 3 year kindergarten curriculum was drafted in 2012 and low-cost, adaptable teaching/learning materials for ECE teachers were developed. 31 Lao PDR participated in the regional review of teacher education systems, which was designed to assess the extent to which pre-service teacher education systems have integrated the principles and values of inclusion and promotion of gender, ethnic, linguistic and cultural diversity. The review indicated that preservice teacher education systems have done little in terms of addressing inclusion and diversity issues. Advocacy programmes are planned in 2013 to advocate for inclusive teacher education through appropriate interventions in key areas of teacher education, such as policy, curriculum, methodology and materials. The Inclusive Education Center will lead the advocacy programme to sensitize education policymakers, administrators, teacher educators, teachers and other stakeholders. Promoting gender equality in education calls for increased capacity on the part of policymakers, educators, experts and teachers in the use of evidence in educational planning and other key aspects of education. With a view to building the capacity of the Lao Inclusive Education Center and other stakeholders, a capacity building workshop was organized. The workshop gave an opportunity to learn about various gender analysis tools in educational settings. More capacity building activities are planned for 2013. In addition, a number of MoES officials and teacher educators were sensitized on inclusive education concepts and practices in regards to the provision of education that is responsive to gender, ethnic, linguistic and cultural diversity. Cascade training on inclusive education funded by MoES was organized for every teacher educator in eight teacher training colleges. It is expected that when student teachers graduate and become teachers, they will produce their own teaching and learning materials that are gender-sensitive and inclusive. Output 5 - The first ever national skills standards for Lao PDR were officially launched on 15 March 2013. The National Skills Standards were developed, tested, validated and approved. In-depth analysis of occupational needs structure, job analysis and competence unit design were conducted, including the development of an assessment and certification process and the training of trainers and assessors. Ten skills standards for the construction sector were developed in the key areas of electrical installation, plastering, plumbing, tiling, welding, and handling concrete and cabinet making. The seven skills standards for the automotive sector include electrical, heating and air-conditioning systems, engines, painting and repair work. Standards for the ICT (information and communications technology) sector and tourism sector will be developed in 2013-2014. 3. Challenges and Opportunities 32 The restructuring of the MoES over the first quarter of 2012 resulted in some delays to the implementation of Ministry’s programme. Moreover, a significant constraint for UN engagement in the ECE sub-sector is the ongoing delays in the formal endorsement of the national ECD Policy- drafted in 2010. Without a policy framework, the Action Plan will be extremely challenging to implement. The lack of a design framework for the pilot community based school readiness project has hindered progress and has made it challenging to design an evaluation on this initiative. The MoES have therefore agreed to contract a technical specialist who will design the framework for the pilot as well as the evaluation design, over the first quarter of 2013. Whilst the endorsement of the national quality primary school standards was a significant success for the education sector in 2012, there have been challenges in the coordination of the roll-out of these to schools across the country. Through to December 2012, it was not clear which Department had the mandate to lead in the development of communication materials on the standards or who would be responsible for running the introductory workshops to provincial and district authorities as well as schools. A new government pilot initiative on decentralization (Sam Sang) provides a significant opportunity to strengthen decentralised level support for the achievement of the MDG and EFA targets. Whilst this has come with a lack of clarity on the specific roles and responsibilities of the various Ministry levels (central, provincial, district, school), Development Partners see this as a means of improving the efficiency of many of the interventions which are targeting schools. 4. Recommendations The scheduling of the UNDAF Annual Review should be better aligned to the Ministry of Education and Sports review/planning process. As such, it is recommended that the Annual Review for outcome 3 be completed in May in order to be informed by the Joint Annual Sector review which takes place in April every year. The outcome group for outcome 3 should present a consolidated report on “UN support to the education sector in 2012” to senior MoES management (notably the Minister), as a means of raising the profile of UN engagement in this sector. 33 UNDAF Outcome 4: By 2015, people in Lao PDR benefit from more equitable promotive, preventive, curative and rehabilitative health and social welfare services 1. Chapeau Progress towards UNDAF Outcome 4 has been made in most of the areas related to preventive and curative care services, namely the immunization coverage; access to clean water and improved sanitation. More efforts are still needed in the areas of maternal health; health financing and control of communicable diseases. A highlight of the year was the National Health Congress organized in December 2012, in which more than 500 delegations from all provinces and development partners endorsed the National Health Sector Reform Strategy, with a priority to improve better outcome for MDG 5. The four main components of the reform would focus on human resource development, health financing, health services and information, monitoring and evaluation. This reform process was initiated by the Ministry of Health (MoH) with technical and financial support from WHO and other development partners. The National Assembly has now endorsed the strategy. Other highlight includes the scale up of the implementation of the free maternal and children under 5 health services. In January 2013, a joint MCH and HMIS technical working group meeting was organized under the framework of the sector wide working group to present and distribute the second national health statistic report for the fiscal year 2010/2011. Participants were from related departments within MoH, the provincial health offices and development partners, including the UN, NGOs and bilateral organisations. The meeting also discussed the various approaches to implementation of the free MCH and children under 5 services. It was agreed that effective coordination and harmonization is crucial for the country to reach MDG 4 and 5. 2. Progress As it is showed in the M&E matrix, most of 2012 data for outputs is not yet available at the time of reporting, though some trends can be identified through the national reports and surveys conducted in the last five years. Progress made is not significant through the outcome and output indicators. These trends show some progress in the immunization coverage, in access to clean water and improved 34 sanitation. Latest survey showed decrease in the maternal mortality ratio between 2005 and 2012 (from 405 to 357/100,000 live births respectively). In 2012, great effort by the ministry of health and development partners has been put in improving the status of maternal and child health. Institutional strengthening included strengthening capacities of teachers and training institutions, developing and implementing an accreditation mechanism for licensing midwives, capacity building of MOH at all levels to support and supervise midwives, including the development of a supportive supervision system for new graduates and providing direct support such as scholarships, uniforms, midwifery kits and transport assistance through provision of motorbikes. Technical inputs were provided to drafting a standard plan for District Hospitals and Health centres to ensure that quality Maternal newborn health services can be delivered, including quality Family Planning and EmOC services. The implementations of the national policy on free maternal and children under 5 services has reached to most of the districts in all 17 provinces. Other progresses include increase in immunization coverage with joint effort from UNICEF and WHO to support the government through the vertical expanded programme on immunization. Another area that show progress and is on track to the 2015 target is access to clean water and improved sanitation, with access to clean water already reach 78% (88% in urban and 64% in rural area – LSIS 2012); 55% of the population has had access to facilities that hygienically separate human excreta from human, animal and insect contact. Health expenditure in Lao has been among the lowest in the region. Recently, the MOH has announced that the national health expenditure has been 4.2% for 2012/13 of its domestic funds for health, in to total of 9% committed (costing estimate for the health sector reform, WHO 2012). Out-of-pocket expenditure reflects the status of health financing and though efforts have been made to cut down this category of expenditure through various social health protection schemes and free maternal and child health service, out-of-pocket expenditure was 46.1% in 2009/2010 according to the MOH and there will be no new data until 2014 when LECS is finalized. In January 2013, the ministry of health launched the second National Health Statistic Report for the Fiscal Year 2010/2011. Though improvement has been made in data analysis and in the efforts of putting all available data from the routine reporting system together, further work will be needed to improve the reporting systems so that information to monitor output 4.2; 4.3 as well as information on non35 communicable diseases; on adolescent and young people’s health; and other preventive indicators that will monitor output 4.6 to 4.11. Progress was made in strengthening the equity focus of MOH policies and decision makers. UNICEF worked through the health sector coordination mechanisms and the Joint UN programme to engage in policy dialogue and action planning relevant for child survival agenda. As result of this support all the target districts of LNT and PSL developed integrated MNCH costed plans at the district and provincial level. The quality of provincial and district annual integrated MCH plans has improved with interventions being prioritized based on provincial need and evidence of high impact interventions. Both development partners and domestic contributions have been reflected in the plans and gaps in priority services have been filled for 2012/2013 fiscal year. During 2012, UNFPA and UNICEF collaborated on provision of technical support to the Lao Bureau of Statistics and MOH in data collection, analysis and report writing for Lao Social Indicator Survey 20112012 (LSIS). LSIS completion and endorsement is of great significance, as for the first time in the last decade it generated such a comprehensive array of data disaggregated down to the provincial level. The survey enabled the Government of Lao and its partners to update the situation of women, children and their families and to measure progress towards the MDGs. During 2012, the Lao Bureau of Statistics with support from UNICEF, UNFPA, WHO, IOM and Plan International conducted a 'Situation assessment of civil registration system in Lao PDR' that was finalized in December 2012. Informed by this report and consultations with line ministries, the Ministry of Home Affairs agreed to draft a plan of action that is currently in discussion that will guide future interventions in this area. During 2012, WHO and UNICEF, who both play a role in supporting the National Immunization Programme, identified that existing guidelines for micro-planning, implementing and monitoring of both fixed site and outreach services needed revision to accommodate a broader range of MNCH services and actors to deliver integrated outreach. WHO and UNICEF have worked together to support the MOH revise the micro-planning guidelines for integrated MNCH services. It is expected that this guide will be field tested and rolled out during 2013, further strengthening the quality and consistency of an essential package of MNCH services that can reach the most remote communities. 36 During 2012 the country maintained its polio free status. Joint WHO-UNICEF efforts resulted in the introduction of the rubella vaccine in the routine immunization schedule from 2012. While national immunization coverage rates received a boost in 2011 from a very successful national Measles/Rubella immunization campaign, 2012 data reveal that measles vaccination has improved from 68 per cent in 2011 to 72 per cent in 2012, while DPT3 coverage remain same at 78 per cent. (MOH/EPI). Protection against tetanus has improved. Overall, 66% (LSIS- 2011/12) of women with a live birth in the previous two years were protected against tetanus, compared to 56% in the 2006 MICS survey. UNFPA and UNICEF partnered in support of the Medical Products and Supply Centre of the MOH implementing the 2012 annual stock availability survey which aimed to assess the availability of essential reproductive, maternal and child health supplies at service delivery points. While the data analysis for this study is still ongoing, UN agencies made extensive use of data from the previous year’s commodity survey led by UNFPA for advocacy and programming purposes. Inadequate availability of some essential commodities – contraceptives, antibiotics, vaccines – at service delivery points was used as an argument for strengthening the supply side of service delivery, clarifying accountabilities for forecasting, procurement, distribution etc. at the central level and for greater investment into integrated logistics management system People in Lao PDR have increased awareness of drug prevention and better access to treatment, rehabilitation and reintegration services Progress towards expected Outputs: OUTPUT 4.4. Ministry of Health and other relevant institutions improve information, coverage and quality of sexual and reproductive health information and services6 ï‚· National ANC1 data from health management information systems reported annually (2010: 71%, 2015: 85%, HMIS7 Annual Report) 2012 – 77 6 Including integrated packages of services on maternal, neonatal and child health6 SW, MS 7 Health Management Information System 37 ï‚· Number of Midwives accredited (2010: 134, 2015: 1,500, MOV: MOH HRH records) Accumulative up to 2012 – 358 By the end of 2012 with assistance from UNFPA and others, MOH graduated and accredited 358 community-based midwives, most of who will be deployed to remote areas across Lao PDR. These midwives have undergone a competency-based training based on ICM competencies. UNFPA provided the major technical and financial support for this work which included, strengthening capacities of teachers and training institutions, developing and implementing an accreditation mechanism for licensing midwives, , capacity building of MOH at all levels to support and supervise midwives, including the development of a supportive supervision system for new graduates and providing direct support such as scholarships, uniforms, midwifery kits and transport assistance through provision of motorbikes. Data from the Districts where midwives are deployed show that an increasing number of women are using the services of these midwives and more births are taking place with skilled attendance. Antenatal care is also increasing but postnatal care remains an issue as many families do not wish the newly birthed women and newborn to leave the home for cultural reasons. UNFPA is working with mass organizations, community groups and community leaders to address all the barriers for access to services, including cultural issues. More than 40% of Heath Centres in 9 out of the 17 Provinces will have at least 1 community midwife posted there. From a baseline of zero at the end of 2011, approximately 19 % of facilities in the UNFPA target province Savannakhet now have an accredited SBA, plus essential supplies and equipment to deliver quality MNH services, including FP counselling and services. As part of the institutional strengthening three northern schools of health sciences and 2 schools in the central part of the country were supported. UNFPA has supported seven new Midwife teachers to complete the Midwifery Training for Teachers (MTOT). All seven are now back in their training Institutions supporting the increasing numbers of midwifery students in training. UNFPA have provided technical inputs to drafting a standard plan for District Hospitals and Health centres to ensure that quality Maternal newborn health services can be delivered, including quality Family Planning and EmOC services. UNFPA supported MOH to conduct an EmOC Needs Assessment in 12 of the 17 provinces, in order to develop a national EmOC Action Plan. The results of the assessment showed a severe lack of basic emergency obstetric care facilities. Given that about 16.7% of provincial hospitals missed three or more 7 38 signal functions; while 66.7% of district hospitals type A missed three or more signal functions. All district hospitals type B missed 3 or more signal functions. About 68.6% of surveyed facilities did not perform 3 or more signal functions, while 13.7% and 11.8% did not performed one and two signal functions respectively. Reasons for why facilities were not performing varied lack of essential equipment and staff being the major ones. The results from the EmOC Needs Assessment have been instrumental in highlighting the need for concerted action across many departments in MOH, in order to address the deficiencies noted. As a result there has been a number of cross departmental meetings to develop a zero draft Action Plan. WHO and UNFPA took the technical lead in developing the process and tools for maternal deaths audit in Lao PDR, which is essential in identifying the causes and factors contributing to maternal deaths and in developing action plans to tackle those. Experiences of both, developed and developing countries, have shown that maternal death review (MDR) can contribute to maternal mortality reduction. The initial implementation of MDR in Lao PDR was carried out in Saravane, Xiengkhuang, Khammuan, and Louangnamtha provinces, and Vientiane Capital City. To kick up the process, in October 2011, WHO and UNFPA provided technical and financial support to MDR training for target provinces and supported the establishment of MDR committees at central and local level. The established system called for reporting by health or non-health staff of all known maternal deaths within 24 hours. The provincial MDR committees were supposed to conduct the case review within 15 days after receiving the report. Then, the result of death case review was supposed to be sent to the national MDR technical committee for summarizing and presenting the findings national MDR steering committee. OUTPUT 4.5. Individuals, families and communities in priority areas have access to an integrated package of services on maternal, neonatal and child health ï‚· % of fixed site service delivery points with no stock out of family planning commodities and at least five life-saving maternal/reproductive health drugs in six months prior to survey (2010: 43%, 2015: 65%, MOV: MOH Annual Stock Availability Survey) For 2012 – 71.7% ï‚· Measles immunization coverage (2010: 64%, 2015 95% [MICS 2006/DHS 2001]) 39 In collaboration with the Medical Products Supply Centre (MPSC) the integrated logistics management system has been strengthened. This year 91 staff received refresher training to improve capacity, including M & E. Field monitoring showed that the system functions satisfactorily, with some further improvements required in terms of stock cards at district level. The survey conducted in 2012 found that all four tertiary or national hospitals had all products available with few exceptions. The majority of stock availability observations, issues and constraints occur at the district and sub-district level. Provincial availability of contraceptives showed 69% at the time of survey and 66% for the six months period. The Family Planning module is integrated into the Community Midwifery training currently being supported by UNFPA and other development partners. Capacity of staff in target districts of Savannakhet, Luang Namtha and Phongsaly provinces have been strengthened through skill-based training on the use of the decision making tool for FP. Similarly, capacity of CBDs has been strengthened through refresher training in target provinces. With technical assistance from UNFPA, demand was generated through community mobilization interventions based on Participatory Community Assessment (PCA) methodology adapted from the IFC (Individual, Family and Community) framework of WHO. Communities in four target districts of Savannakhet province participated in this process led by the Centre for Information and Education on Health (CIEH) of MOH. Discussion guides used by facilitators during community group discussions were adapted to fit with the local MNCH issues. Also issues related to young people were included with a view to bring young people's voices into the plans. Once the plans were endorsed by the districts and provincial authorities, it was implemented under the coordination of the IFC team (a sub group of the District Commission for Mother and Child). The plan involved close coordination between different sectors and their engagement in taking actions to improve MNCH and adjustment of service delivery patterns. Interventions such as strengthening Village Health Committees (who went on to mobilise communities to organise transportation, funds etc. as part of the birth and emergency preparedness plan), training of community motivators and local school teachers on MNCH issues. Linkages had also been forged between providers and communities through having regular monthly meeting, organising health days in communities and open days in facilities. As a result, village health committees (VHC) were established in 44 villages. VHCs are responsible for community mobilization work in their villages and following the training they now have: (1) clear understanding about their role and responsibility to support IFC activities in the Village (2) increased knowledge and understanding on MNCH, FP, ANC, safe delivery in hospital, 40 PNC and SRH, including health education technique, and gender (2) clear understanding on reporting and how to work with district team on IFC work. OUTPUT 4.6: Vulnerable and most-at-risk young people in priority urban areas have better access to quality youthfriendly, gender-sensitive, socially-inclusive sexual and reproductive health information and services ï‚· % of young people aged 15-24 in target areas that received adolescent sexual and reproductive health life-skills education (2011: 27%, 2015: 60%, MOV: MOES Annual report) Still waiting for the MOES Annual Report ï‚· % of target areas that are have at least two youth-friendly sexual and reproductive health service delivery points (2010: 0%, 2015: 100%), MOV: Provincial Reports) For 2012 – 6% In 2012, UNFPA expanded support for the adolescent and youth programme. One of the key objectives of this programme was to increase the participation of young people from youth networks in national forums and dialogues. UNFPA supported the Parliamentarian and Youth Forum which for the first time brought together young people and parliamentarians to engage in a dialogue. This process enhanced the capacity of young people in leadership and presentation skills and provided an opportunity for young people to discuss and voice their concerns. Participants in this Forum included adolescents from the lower and upper secondary schools. UNFPA also ensured young people's participation in the ICPD global questionnaire process through specific sessions for members of youth network, which enhanced their understanding of ICPD issues. In addition, UNFPA is also supporting the active participation of young people in the on-going discussions and dialogue on the conduct of a Youth Situation Analysis by the Lao Youth Union and MPI. During the year UNFPA also supported the Ministry of Education and Sports (MOES)/Department of Teacher Training (DTT) to develop a comprehensive SRH teachers' guide book. The consultative process through which the guide book was developed with the active participation of 3 key technical staff from the Department of Teacher Training (DTT) and 24 teachers from 8 Teacher Training Institutes (TTIs) across the country have contributed to strengthening their capacity in responding to young people's SRH needs. These technical staff and teachers have been consulted and involved in designing and determining the contents and methodology of the guide book. These teachers are now competent in ASRH issues and are 41 able to train other teachers on the use of the SRH teachers' guide book that has been developed. UNFPA supported a workshop on ASRH sensitization for government implementing partners, including MOES, MOH, the Lao Commission for the Advancement of Women, the Lao Women Union, Lao Youth Union and members of the civil society. As a result, the implementing partners have a better understanding of SRH needs for young people and have responded positively in initiating essential sexual reproductive health services and information to young people, especially the unmarried. As part of national capacity development, UNFPA supported Lao Youth Union (LYU) facilitated a forum for dialogue between Parliamentarians and young people of Lao. The forum provided an opportunity for young people to discuss and advocate for youth related issues with the parliamentarians /policy makers as well as provide parliamentarians with firsthand knowledge on the realities faced by young people in the country. Following this dialogue 15 parliamentarians are now aware of youth issues related to sexuality education and health and are able to advocate for youth issues among other policy makers. In addition, as a result of UNFPA advocacy with the LYU, the draft Youth Strategy 2012-2020 of the LYU has been opened for comments and input by partners, including NGOs and development partners. UNFPA is also supporting an Adolescent and Young Peoples Situational Analysis which will provide the basis for an overall National Youth Strategy for Lao. In addition, as mentioned above, a comprehensive SRH teachers' guide book has been developed by MoES for use by 8 Teacher Training Institutes across the country. In terms of outreach, UNFPA is supporting the Ministry of Education and sports (MoES)/Department of Non-formal Education (NFE) in collaboration with Vientiane Youth Centre Health and Development (VYCHD) to provide information on ASRH to young people through outreach activities in selected rural communities of 4 districts of Nong, Vilabouly, Thaphangthong, and Sepon districts, in Savannakhet Province. As a result, Non-Formal Education Department indicated that the 300 young people who participated in the outreach sessions have a better understanding of ASRH issues and access to information and services. In addition, the telephone hotline of Vientiane Youth Centre is also providing information on ASRH to young people nationally, free of charge. Moreover, out of school young people also gain information on SRH through UNFPA supported advocacy events such as the International Youth Day, World Population Day, World AIDS Day, etc., as well as through special Radio and TV programmes of the Vientiane Youth Centre. OUTPUT 4.9: People in Lao PDR have increased awareness of drug prevention and better access to, treatment, rehabilitation and reintegration services 42 ï‚· Indicator 1. o UNODC provided support to Lao Commission for Drugs Control to conduct the civic awareness campaign to all provinces across the country to the people especially the young generation who are most at risk to using drugs across the country including students and teachers in different schools, government officials, traders, soldiers, policemen, service providers in different drinking bars and discothèques, and workers in different factories, among other to understand harms associated with illicit drugs A total of 6,478 people participated in the event. o UNODC provided support to the government to commemorate International Day Against Drugs. More than 600 participants including youth participated in a “walk for health” against drugs and trafficking. o UNODC project provided support to the LCDC and Vientiane Capital Committee for Drug Control to organize the National Day Against Drug Abuse and Trafficking at the National Cultural Hall on the 12 October 2012. Some 1,000 people, including students from different schools, participated in the event. o On the occasion of the official visit to the Lao PDR on 4-5 December 2012 Mr. Yury Fedotov, the Executive Director of UNODC and accompanying Senior Directors from UNODC Vienna took a photo with 50 university students in front of the billboard at the National University (Dong Dok). ï‚· Indicator 2. o UNODC provided support to LCDC to produce IEC materials. A total 1,739 drug related posters, 360 drug law books and 540 VCDs on harm associated with drugs were distributed to all provinces across the country and produce Anti-drugs awareness 4 billboards to be set up in public sites in Vientiane Capital. o UNODC supported the government to compile and distribute a total of 100 copies of “Guidelines to establish a drug free environment. The guidelines enable the provincial authorities to gain knowledge in the establishment of a drug free environment. 43 ï‚· Indicator 3. o UNODC supported Lao government to set up the first community based treatment for ATS drug dependence in the Lao PDR started operating in August 2012 at two sites in Vientiane capital. Some 40 patients are being treated with 70 to 80% reporting abstinence following the treatment. o UNODC also supported nine mobile-teams of treatment staff to provide home based or community based drug counselling. The programme is in its initial phase, at present some 180 ATS drug dependences are being treated. ï‚· Indicator 4. UNODC provided support vocational training programme to drug treatment center Somsanga A total of 225 drug rehabilitation workers were trained in drug counselling and treatment in 2012. It is expected that the trained participants will use the knowledge and experiences gained from the training in their daily work resulting in provision of more effective drug dependence treatment. OUTPUT 4.10: Progress in Output 4.10 is on track. In 2012, a cabinet led-coordination mechanism was formally established in the Ministry of Labour and Social Welfare for child protection. This coordination mechanism achieved the following in 2012: ï‚· Commissioned an assessment of the child and family welfare system to describe how the existing formal and informal child and family welfare system works, with a detailed analysis of roles and responsibilities. ï‚· Negotiated and signed a Memorandum of Understanding between the National University of Laos and the Ministry of Labour and Social Welfare to equip, graduate and employ (with Government funds) qualified social workers in the child and family welfare sector by 2015. ï‚· Led inter-ministerial field visits to monitor Child Protection Networks and fact-finding and observation visits to alternative care settings (including orphanages and dormitory schools) in target provinces. These field visits have generated key recommendations to foster greater collaboration and coordination across sectors, strengthening existing child protection mechanisms. 44 3. Challenges and Opportunities To date, reaching the MDG targets for maternal mortality has been the main concern of the Government of Lao and of development partners. The maternal mortality estimated in the LSIS was 357/100,000 live births, a long way from meeting the target of 260/100,000 live births in 2015. The Government has made a number of efforts to accelerate interventions on maternal and child health through a policy on free maternal and child health services and development partners have invested in numerous projects to implement this policy in all 17 provinces in the country. Some preliminary project reports show an increase in institutional delivery but it is still too early to determine the impact of this on the overall maternal mortality. More effort is much needed to coordinate and harmonize the current fragmented, project based implementation of the policy for better monitoring and management of the programme. Another area that also makes slow progress is on health financing. The national health strategy has been finalized and pending approval since the end of 2011, despite the call from development partners and MoH to increase the domestic health expenditure from the current very low level of 1% of the GDP. The Prime Minister decree on the national health insurance has been in effect from October 2012 with the goal of merging the four current social health protection schemes (SASS, SSO, CBHI and HEF) into the national health insurance scheme. Current coverage of all schemes is at 20% (MOH, 2012) while the target for 2015 is 50%. This has been one of the contributing factors for the out-of-pocket expenditure being at 46.6% of the total health expenditure for the fiscal year of 2009/2010. Except for the SASS – the state-run compulsory social security scheme for Government staff - all other schemes experienced low coverage, and a high turnover of membership for the community-based health insurance schemes (CBHI) under MoH was also seen. The main reason for this slow progress is the unsatisfactory quality of service, in the users’ opinions, weak management, and no subsidies for the nearpoor, who are excluded from coverage under the fully-subsidized Health Equity Funds. In addition, the current health information system does not capture all the information needed to monitor the progress of the health sector and of this UNDAF monitoring framework. Much more work needs to be done to ensure a complete, timely and accurate health information system. 45 One final challenge is the limited capacity of the Government counterparts in implementing the agreed activities. This has shown the need to continue strengthening their capacity in order to sustain the result of the UN interventions. In addition to the government capacity limited, the resource mobilization – It is not consistent of potential donors who provide the update on their resources and disbursement during the timeframe. Specific Challenges for Outputs 4.1, 4.2, 4.5 ï‚· Very low government expenditures on health (~ 0.5% of GDP; < 5-6% of total government spending) and overreliance on external (, unpredictable and fragmented) support for core service delivery inputs (eg vaccines, contraceptive commodities, Vitamin A capsules, deworming tablets, iron folic acid tablets, operating costs for health outreach services); ï‚· Inadequate availability and quality of MNCH services, especially in remote rural areas without roads where the levels of maternal and child mortality and under-nutrition are the highest due to: o mal-distribution of human resources with acute shortage of staff, especially skilled birth attendants and highly qualified staff (e.g. doctors), in remote rural areas; primary health centres have on average 1.9 health workers (the national target is 3), and some health centres have no health workers present. These staff are responsible for the delivery of all health services including fixed site services and outreach activities o limited clinical and managerial capacity of health staff; o inadequate supply and logistics management for public health programmes, including poor cold chain management; ï‚· Limited access to and utilization of health facilities due to geographic, financial and social barriers. ï‚· Widespread traditional practices and beliefs with negative health and nutrition effects on women and children. Output 4.10 ï‚· Limited coordination between the child justice and child and family welfare sectors hampering a more efficient child protection system. ï‚· Lingering resistance to address sensitive issues, such as violence against children. 46 Opportunities Outputs 4.1, 4.2, 4.5 The national and health sector policies of the Government of Lao PDR are supportive of MNCH and nutrition agendas. They aim to expand maternal, newborn and child health and nutrition interventions and reduce inequities in health and nutrition outcomes and health services utilization among different groups , through several strategies including the SBA plan that increased a critical mass of skilled birth attendants; institutional preparedness through health system strengthening that included improvement of emergency obstetric care (EmONC); and provision of family planning as part of the integrated service package. Lao PDR is aiming to achieve universal health services coverage by 2020, a goal set by the National Growth and Poverty Eradication Strategy and the seventh National Health Sector Development Plan (NHSDP) 2011-2015 guides health policies and programmes. The NHSDP aims to strengthen the existing health system, with a focus on ensuring access to good quality health services for the poor and for vulnerable populations in remote areas. The NHSDP also aims to establish health infrastructure, contribute to the country’s goal of graduating from Least Developed Country status by 2020, and contribute to poverty eradication and the achievement of the five health-related MDGs. A series of sub-sector plans and strategies accompany this overall plan. The Free MCH Policy (2011) aiming to accelerate coverage with life-saving interventions for women and children and the Health Reforms launched by the Government in 2012 created some new opportunities for addressing the above-mentioned bottlenecks. Nevertheless, it seems that the current approach to Free MCH implementation is being focused on developing and implementing fairly sophisticated demandside financial schemes, performance-based pay mechanisms and fixed-site service delivery, while less attention is being paid to addressing some core supply side issues, such as strengthening of health outreach and community-based delivery of information and basic services. On the one side, the implementation of innovative demand-oriented financial schemes overstretch the already limited capacities at the central and services delivery levels and somewhat neglect the existing social and cultural barriers to care. On the other side, it risks promoting services that are not available or of poor quality. 47 Another downside of fixed site delivery of services is that preventative care is not being prioritized by families and individuals due to high opportunity cost in relation to perceived value, as well as existing cultural and geographical barriers to health facilities. 4. Recommendations The UNDAF Action Plan plays an important role to organize a collective response of the Government of Laos and the United Nation system to tackle the development challenges of the Lao PDR, establishing baselines and a tracking progress on targets related to MDGs. Currently, data available is not sufficient to monitor and evaluate the results achieved during 2012. For output 4.4 “Ministry of Health and other relevant institutions improve information, coverage and quality of sexual and reproductive health information and services”, approved indicator should be completed with new appropriate indicator(s) to measure the quality of ANC services provided. Information analysis proves it important to maintain updated health information to monitor progress of MDGs indicators. In fact, major efforts should be addressed to data collection and consolidation. The coverage of social health protection is not uniform across provinces or within provinces. More efforts are needed to harmonize service delivery, especially of maternal and child health care services. The development of Health sector reform could accelerate the progress towards achieving more equitable, promotive, preventive, curative and rehabilitative health and social welfare services by 2015 and Universal Coverage by 2020. UNFPA investment in strengthening the policy framework for reproductive health, particularly its support for the SBA Plan, including the training and accreditation of midwives proved to be a quick win for both UNFPA and the government/MOH. Support to institutionalized midwifery training as an integral part of the national Human Resources Plan for Maternal Health has been a cost effective investment that has demonstrated how with limited, but strategic resources and technical input long-term, positive results can be achieved, in this case, a decline in maternal mortality. The recent LSIS indicates that MMR has declined from 405 to 357 per 100,000 and births with SBA have increased from 21 to 42%. In addition to this significant impact, this initiative illustrates how UNFPA, with strategic technical assistance can play a leadership and catalytic role in influencing sectoral plans in a sustainable manner. 48 Mobilization of resources for assistance in strengthening the drug prevention, drug treatment rehabilitation and reintegration services, should be encouraged. Output 4.1, 4.2, 4.5 - the need to increase and prioritize Government resources to evidence-based interventions (in particular preventive services) and core service delivery inputs (ie vaccines, outreach) - the need to address social, behavioral and geographic barriers to health services utilization (not just financial), including through greater attention to community-based programmes, health outreach and network of primary health care facilities - the potential of linking health reforms with decentralization, public finances and administration reforms to clarify accountabilities of the various tiers of the government and increase resource allocation to health and nutrition at subnational level. Output 4.10 In 2013 the assessment of the child and family welfare system will be completed defining the child and family welfare system in the Lao PDR. The assessment will make recommendations on how the child and family welfare system can be further strengthened, diversified and delivered to the most vulnerable over time,. In turn these recommendations will contribute to implementing a government led- social welfare system. UNDAF Outcome 5: By 2015, vulnerable people are more food secure and have better nutrition. 1. Chapeau The Outcome Group 5 agencies (FAO, UNICEF, WFP, WHO and IFAD) have made modest but tangible progress in supporting the government to improve food security and nutrition in Lao PDR. Interventions have attempted to address the immediate, underlying and basic causes of the problem in line with the Government’s framework. Vitamin A supplementation and the provision of ready-to-use supplementary 49 food focused on the immediate cause of undernutrition related to inadequate food intake, while an exclusive breastfeeding campaign and nutrition education dealt with the underlying cause associated with poor mother and child care practices. Less progress was made on improving the underlying cause related to food insecurity and the basic cause associated with poor institutional coordination. Some of the challenges included slower than expected implementation, different geographic focuses of agencies, and the need for a final decision on the establishment of a Government coordination structure for food and nutrition security. There were, however, also real opportunities as a result of high-level forum discussions, Government staff commitment and greater donor interest in the issue. Looking towards 2013, it is recommended that the outcome group scale up successful activities, continue to advocate for a crosssectoral Government coordination mechanism, and choose at least one geographic area, where the interventions of the various agencies can work together in a complementary manner. 2. Progress This outcome group focuses on the challenging issue of improving food security and nutrition in the country. Recent baseline data indicates that the problem of undernutrition is widespread in Lao PDR. For example, according to the Lao Social Indicator Survey, 44 % of children under five years of age nationwide are stunted, a situation classified as ‘critical’ by WHO standards. Recognizing the seriousness of this issue, the outputs for the outcome were designed to address the different elements of the conceptual framework for reducing undernutrition. The framework identifies immediate, underlying and basic causes. Immediate causes. Three agencies (UNICEF, WHO and WFP) contributed to addressing inadequate dietary intake, one of the immediate causes of undernutrition in Lao PDR. The agencies made significant progress in this area, but were not always able to fully meet their targets. UNICEF (under output 5.1) supported the Government to reach 86 % of children with vitamin A supplements in the last six months, which came close to achieving initial targets. WFP (under output 5.1) scaled up its provision of ready-to-use supplementary food (RUSF) for the prevention of stunting to 17.4% of the targeted children. Monitoring trips have indicated (anecdotally) that the children are more active and taller as a result of the intervention, yet progress still fell short of the initial target of 30% coverage in 2012. 50 Underlying causes. The framework identifies two main underlying causes that can be addressed by the outcome group: household food insecurity and poor mother and child care practices. In regard to household food insecurity, the agencies (FAO and WFP) made modest progress overall. FAO (output 5.6) was able to exceed its target for training farmers in integrated pest management, a key skill to ensure greater food production. WFP (output 5.4) reached almost half of the households planned for expanded and diversified home food production. However, in other key areas, such as aquaculture (output 5.5) and linking farmers to markets (output 5.7), achievements have been limited to date. By contrast, the agencies (UNICEF, WHO, and WFP) involved in trying to improve poor mother and child care practices reported strong progress towards their goals. For instance, WFP was able to reach more than 100% of the 700 villages it targeted. UNICEF began its exclusive breastfeeding campaign in three provinces in the south of the country, and the national Infant and Young Child Feeding (IYCF) Guidelines were completed. Basic causes. FAO, UNICEF, WFP and WHO also planned to support the Government to address the basic causes of undernutrition in Laos, particularly insufficient institutional capacity and coordination (output 5.3). Led by the Resident Coordinator and supported by the agencies involved in the outcome group (including IFAD), the UN made interventions at the Round Table Implementation Meeting Consultation in Xiengkhuang and at the Round Table Implementation Meeting in Vientiane advocating for a cross-sectoral Government mechanism to coordinate efforts to reduce undernutrition. A series of meetings were held with senior government officials, and support was given to the Scaling Up Nutrition effort. Although a mechanism has not been formally established, the UN team has provided significant support towards the achievement of this output. Gender considerations have featured prominently in the design of these activities. For instance, under immediate causes, the prevention and treatment of malnutrition (output 5.1) provides ready-to-usefoods, in part because they do not require cooking and as a result do not place an extra burden on women. The messages for nutrition education (output 5.2) are tailored to the needs of women in their particular context and specifically address food taboos. The agricultural activities make a special effort to involve women (outputs 5.4-5.7) by for example aiming to ensure that females make up 50% of project management committees. The agencies worked hard to mobilize resources to support these efforts. There are shortfalls across most of the activity areas, but the ones facing particular difficulties relate to food security, such as aquaculture (output 5.5) and indigenous food production (output 5.4). 51 So far, these efforts have realistically only made a modest contribution to the achievement of the Hunger Target for Millennium Development Goal 1 and the relevant NSEDP objectives. However, some of the activities (such as the exclusive breastfeeding campaign, provision of ready-to-use supplementary foods for stunting, and integrated pest management) show real promise, and if they can be scaled up, have the potential to make a substantial contribution to addressing these problems in the coming years. 3. Challenges and Opportunities The agencies faced three major challenges in implementing activities during 2012. First, some activities could not start on time or at the scale planned. The reasons varied, but included a lack of donor funding, longer than anticipated preparation time, bottlenecks in service delivery and utilization, and the need to strategically review the activities of some agencies. Second, the interventions were not always implemented in the same geographic areas, as a result of agreements and plans that predate the development of the UNDAF. Third, without the Government coordination mechanism in place, it was difficult for the interventions of agencies to address the problem as effectively as possible. Yet at the same time, there were real opportunities. The issue of nutrition continues to feature prominently in high-level forums, including the Round Table Implementation Meetings. There are committed Government staff in the Ministries of Health, Agriculture and Forestry, and Education and Sports, who have signaled their strong interest in tackling this issue. The Government applied for and was accepted to be an ‘early riser’ in the Scaling Up Nutrition movement. Donors continue to recognize nutrition as a key problem in Lao PDR. This high-profile focus on food security and nutrition represents an important opportunity for ensuring appropriate action on this critical issue. 4. Recommendations Based on the challenges and opportunities, the outcome group has identified three principal recommendations for the activities of the group in 2013: 1. Scale up the implementation of successful activities and initiate remaining planned activities. The exclusive breastfeeding campaign, the work on IYCF, the prevention of stunting through RUSF, and the integrated pest management show strong potential. These activities should be expanded, 52 even as some other key areas, especially related to indigenous foods and aquaculture, should be started. 2. Continue to advocate for nutrition as a priority issue and provide support for the formation of a Government-led, cross-sectoral coordination mechanism. The dialogue should continue at formal meetings such as the Round Table consultations, but it should also be pursued through more informal gatherings. The group may also consider working on a national nutrition awareness campaign. 3. Identify a geographic area for joint implementation. Interventions from a number of agencies and Government ministries can combine to reduce undernutrition in a comprehensive manner if they are targeted in the same location. An area where the agencies already have overlapping programmes can be chosen. A baseline should be established, and progress closely monitored UNDAF Outcome 6: By 2015, key populations at higher risk of HIV infection benefit from increased coverage and quality of integrated prevention and treatment, care and support services 1. Chapeau The “Getting to Zero Strategy in the Lao PDR” was the framework within which the UN worked with national HIV Actors to support the HIV response in 2012. Close consultations and careful planning with National AIDS Authorities and their national and international HIV Partners have resulted in the design and successful implementation of a comprehensive set of interventions organized around three main UNDAF outputs and aligned with the National Strategic and Action Plan on HIV/AIDS 2011/15. The first of these three outputs related to “Zero new infections” and included activities, which contributed significantly to reduce sexual transmission of HIV among young people by (1) building the capacity on HIV prevention program for most-at-risk populations, (2) strengthening the HIV Mother to Child transmission demonstration intervention, (3) and expanding the harm reduction program in 4 demonstration sites in 2 provinces. 53 The second output related to “ Zero AIDS related death” and ensured that more people living with HIV have equitable access to and use of effective, gender sensitive HIV treatment, care and support services with a focus on (1) the implementation of an adapted version of the five pillars of Treatment 2.0, (2) the optimization of the drug regimens, (3) the strengthening of the procurement system, (4) the increased access to treatment of key affected population, (5) the strengthening of the coordination between the HIV/ TB program and (6) the review of the VCT program for both HIV and TB. The third output related to the “Zero Stigma and discrimination” and aimed to support the National AIDS Authorities and their HIV partners to better plan and implement evidence and rights-based gendersensitive and resource HIV policies with a particular emphasis on (1) a comprehensive use of the HIV Law, (2) the availability of evidenced based information on Stigma and discrimination, (3) social movement for HIV specific needs of women and girls, (4) a better understanding of GBV and HIV linkages, (5) enhanced links between the HIV response and the broader MDG agenda, (6) the review of the national M&E strategy and the mutual accountability framework. Because of its multi-sectoral nature, most of these outputs were implemented jointly by the Joint UN Team on HIV/AIDS, which in Lao PDR is chaired by UNAIDS and brings together expertise and resources from UNICEF, WFP, UNDP, UNFPA, UNODC, ILO, UNESCO, WHO, World Bank, ADB, IOM and UN Women. A total of USD 2,004,763 was invested by the JUNT to further strengthen the HIV Response in Lao PDR in 2012. The consultations of the joint UN Team on AIDS with the National AIDS Authorities and their HIV Partners for 2013 resulted in an Action Plan Matrix, which builds on previous collective achievements, where the paramount priority is to ensure that essential national programmes are delivering efficient and effective services to the key affected population. In turn, those services will contribute to reduce the number of new infections and increase access to a comprehensive continuum of care, while advancing human rights and gender equality for the HIV response means ending the HIV-related stigma, discrimination, gender inequality and violence against women and girls that drive the risk of, and vulnerability to, HIV infection. In 2012, the identification of priority outcomes and outputs that most reflected the strategic needs of the national HIV response and that could be addressed by the comparative advantages of the various UN organizations has allowed the Joint UN Team on AIDS to contribute to advance HIV prevention programming for key affected populations, increase access to a comprehensive continuum of care, 54 support TB/HIV program integration, pilot PMTCT and Harm Reduction demonstration interventions, promote meaning full participation of AIDS services Associations and the NA, mobilize resources for HIV services and strengthen the national HIV surveillance system, including monitoring and evaluation and operational research. 2. Progress Detailed narrative reports per intervention were reported for in the Joint Program Monitoring report 2012 and includes: Output 1 – Zero new infections 1. Building capacity on HIV prevention programme for young people 2. PMTCT policies and programme expanded, including SRH and ART 3. National legislation on HIV and drugs review 4. HIV programme for people who use drugs and in prison and closed setting Output 2 – Zero AIDS related-death 1. Global guidance adapted and implemented to achieve the five pillars of Treatment 2.0 2. Drug regimens optimized, with minimal toxicities and high barriers to resistance 3. National drug and procurement systems strengthened (Treatment 2.0 Pillar 3) 4. Equitable access to treatment for key population 5. Access to ART for TB patients and isoniazid preventive therapy for PLHIV 6. HIV testing and counseling for TB patients Output 3 – Zero Stigma and discrimination 1. Movements for HIV-related law reform 2. Evidence on stigma and discrimination in support of legal reform 3. Social movements for HIV-specific needs of women and girls 4. Evidence on GBV and HIV linkages for action 5. Links between HIV responses and the broader MDG agenda are visible 6. Strategic information tools for decision making 7. Mutual accountability frameworks 55 In 2012, to measure the collective achievement of the HIV response within the framework of the UNDAF four key national impact indicators were monitored. The table below indicates that HIV interventions for Sex Workers have contributed to reduce the HIV prevalence amongst that very population, while additional efforts are required to reduce the HIV prevalence within the MSM population and the drug users. Access to Antiretroviral therapy has made some progress in addressing the needs of those requiring a comprehensive treatment but significant scaling up of the programme is urgently needed to reach the 2015 target. UNDAF Outcome 6 National Impact Indicators 2011 2012 % of sex workers who are HIV infected 1.38 1.20 % of men having sex with men who are HIV infected 2.12 2.44 % of intravenous drug users (IDU) who are HIV infected 6.59 7.66 % of eligible adults and children currently receiving antiretroviral therapy 52.27 55.36 The 2012 Round table meeting was the opportunity for the UNDAF Outcome 6 group – or the JUNT - to ensure that collective efforts to address MDG 6 would be adequately reflected in relevant fora and reports. The joint financial investment in MDG 6 related interventions was estimated to constitute more than 5% of the overall MDG budget for 2012. It was acknowledged that reaching MDG 6 on HIV/AIDS within the next 3 years requires a multi-sectoral response with national stakeholders and development partners working together to adapt to this changing environment. A recent external review of the AIDS response suggests that the focus of further collaboration between state agencies and development partners should be on the following: (i) Revamping the HIV prevention and treatment models with a view to increase quality and coverage of its outreach services for key affected populations; and (ii) prioritizing cost effective interventions, while considering financial sustainability with increased domestic contributions and diversification of sponsors. To guide this important and pressing process, the Government recently endorsed the new political declaration on AIDS and the “Getting to Zero” strategy, which aims to lay out an effective framework for sectors to actively engage key stakeholders to accelerate progress towards the MDGs. 3. Challenges and Opportunities The review of the Joint UN Team on AIDS Action Plan Matrix 2012 was the opportunity to reflect on achievements, as well as challenges faced during implementation. Experience from lessons learned have 56 been analyzed and reported in the UNAIDS Joint Program monitoring report 2012 and, through consultations with relevant partners, recommendations have been captured in the Joint UN Team on AIDS Action Plan Matrix 2013. It includes the following set of 9 recommendations: 1. To build on the Health Reform Momentum - The reform of the health sector is a unique opportunity to reposition the HIV response, and efforts should be made to ascertain that HIV related concerns and needs are adequately captured during the reform process. 2. To strategically address the needs related to mother and child transmission - The demonstration interventions related to the prevention of mother to child transmission link response needs to be revisited and new options need to be identified to address to complex issues related to integration of services, coordination, role and responsibility. 3. To expand the Harm Reduction Program - A public health approach to drug use must be further promoted within the Ministry of Public Security to strengthen the role of the public security to further increase the impact and scale up the HIV harm reduction demonstration project. Further efforts are required to increase the benefits of south/south collaboration and to secure a regional approach to challenging issues related to HIV and drug use. 4. To secure access to treatment of all - Access to treatment for all who need it can come about through simpler, more affordable and more effective drug regimens and delivery systems. Greater links between antiretroviral therapy services and primary health, maternal and child health, TB and sexual and reproductive health services will further reduce costs and contribute to greater efficiency. 5. To support the M&E System - The national HIV monitoring and evaluation system needs to be further supported. Definition of target population and size estimation are recurrent challenges faced by the HIV Program when conducting formative researches. HIV integration into national development tools has made some good progress but further efforts are required to keep AIDS in the Development Agenda. Efforts should be made to better understand HIV in the context of Mobile populations and program should be piloted accordingly. 57 6. To further address stigma - The AIDS Service Associations recently established the need for further support to acquire a level of expertise to engage in complex stigma advocacy activities and in comprehensive service delivery. In the media sector, quality and relevance of reporting on HIV and AIDS articles can still be improved to achieve a greater level of awareness. 7. To harness new partnership - The new NA legislature has to be involved in so many pressing issues that there is a need to strategically position the HIV response as an issue that requires sustained attention from the Lao Parliamentarians. 8. To address the HIV-specific needs of women and girls - The result of the Lao Social Indicator Survey indicates a high level of negative attitude toward people living with HIV. The legislative review towards comprehensive anti-GBV legislation indicated that although there are laws and legal provisions to combat gender-based violence, enforcement is a significant concern, while the IBBS indicated a high level of sexual violence within key affected populations. 9. To increase domestic financial contribution - Efforts to increase domestic financial contributions need to be further supported as external funding remain to a very large extent the main source of financial resources for the national HIV response. 4. Recommendations The joint UN Team on AIDS consultations with the National AIDS Authorities and their HIV Partners resulted in the development an Action Plan Matrix 2013, which build on the 2012 UNDAF Outcome 6 collective achievements, where the paramount priority is to ensure that essential national HIV interventions and related programme are delivering efficient and effective services to the key affected population. With less than 1000 days to achieve the MDG targets, priority will be given to services which have demonstrated significant impact in reducing the number of new infections, increasing access to a comprehensive continuum of care, while mitigating the effect of the HIV epidemic for the most at risk population. 58 UNDAF Outcome 7: By 2015, the government ensures sustainable natural resources management through improved governance and community participation 1. Chapeau The Government’s current 5 year plan, the 7th NSEDP, calls for sustainable development by emphasizing economic growth with cultural and social progress, preservation of natural resources and protection of the environment. The UN contribution under Outcome 7 is fully aligned with the priorities of MDG 7 and the Government’s policy on ensuring the protection, development, management and use of land, while ensuring the protection of natural resources and environment in a sustainable manner. By targeting not only the central level but the provincial/district level, the support of the UN aims to strengthen the Government’s capacity to deal with natural resources, environment and land related issues. The UN’s targeted support focuses on putting local users at the center of the Government’s focus and engaging the local communities in natural resources management and planning. Overall, there has been good progress towards expected results and targets under Outcome 7. Much has been achieved in terms of both raising awareness and strengthening capacity, including by providing technical and specialized trainings for policy decision makers and technical officers at the national level, the provincial/district officers, and the local communities. Trainings were given specifically on forestry management, conservation, sustainable tourism, clean production, export capacity, organic agriculture and social responsibility, best techniques and environmental practices, and management of Persistent Organic Pollutants (POPs). The trainings and hands-on learning sessions also provided a platform for the local community and farmers to participate in decision making and networking. The capacity building activities also promoted increased engagement of the local actors in the management of their natural surroundings. Support to the development of policies related to land use planning, development of userfriendly guidelines on community forestry projects, and forestry management and natural resource guidelines provided an opportunity to increase the implementation capacity of the government through more transparent and participatory approaches to sustainable natural resources management. With respect to Lao PDR’s fulfillment of its international obligations, trainings were delivered on law enforcement relating to the Rio Convention, the National Implementation Plan to the Stockholm Convention on POPs, and the Pollution Control Law Revised (currently in the process of approval). 59 There were some challenges encountered in supporting the Government to achieve the national priorities and targets under Outcome 7. In some of the planned outputs, the progress has been slow due mainly to the delay in the implementation of the planned activities. Other constraints were associated with the delay in the allocation of funds and inadequate funding or resource gaps. Lengthy recruitment processes for project staff and consultants also inhibited the timely delivery of the programmes and projects. Also, delay in the appointment of Government project counterparts, retention issues of project staff and lack of local expertise to support the projects slowed the implementation of the planned activities. Finally, access to reliable and updated data/information limited the delivery of the planned outputs, as well as the reporting on the progress achieved. 2. Progress Output 7.1. Government has comprehensive participatory development plans for urban wetlands and is able to implement them. The wetlands in Lao PDR are vital to the lives of Lao people. Wetlands provide a range of ecosystem services and resources such as flood control, wastewater treatment and sanitation, water for irrigation, food sources and livelihood. There has been slow progress towards the development of the Master Plan for individual urban wetlands and management plans. The planned Joint UN Programme is yet to be developed. Nonetheless, preliminary work has been undertaken and discussions are on-going between the UN (FAO) and the Government on the issue of wetland management. FAO, in close collaboration with the Ministry of Natural Resources and Environment (MONRE), and provincial level stakeholders (MONRE) carried out the following work relevant to the achievement of Output 7.1.: i) the preparation of a Project Identification Form (PIF) on the Development of Xe Champone Ramsar Wetlands; ii) formulation of a Project Preparation Grant (PPG) Proposal to be submitted together with the PIF. The Draft PIF and PPG documents have already been completed and submitted for endorsement by the GEF Operation Focal Point (MONRE). FAO, together with MONRE, went for a field visit to the proposed project site in Savannakhet Province and carried out consultations with the provincial stakeholders. Initial discussion has also taken place between FAO and the Government on the development of the That Luang Wetland Master Plan. A draft document has been written in collaboration with local stakeholders 60 in Vientiane and Government ministries intend to provide the vision on the future development of the That Luang marsh for the next 20 years. While other ministries have yet to be fully engaged, the Ministry of Information and Culture has taken interest in the proposed “Beun That Luang Master Plan Project” due not only to the historical, socio-economic and ecological assets of the area, but also its unique cultural value. An awareness raising workshop on the “Beun That Luang Wetland” was held chaired by the Ministry of Information and Culture and co-chaired by FAO. Output 7.2. Communities and government are better able to manage forests sustainably At the time of reporting the area managed by communities remains at 20%. Data for 2012 is not yet available. There has been some significant progress in developing the capacity of rural communities, NGOs and Government staff working directly with communities on forestry management in the target areas, such as: i) increased knowledge and experience of the technical staff and policy decision makers in the ministry and local authorities on how to integrate resource-efficient practices in forest management, especially the protected areas, and biodiversity conservation; ii) strengthened capacity of the communitybased organizations and NGOs in supporting communities; and iii) strengthened capacity of local people in the management of natural resources, which includes integrating local knowledge, direct involvement in the Assisted Natural Regeneration (ANR) activities and marketing fruit and non-wood forest products. FAO worked closely with the Ministry of Agriculture and Forestry - Department of Forestry, the local authorities at the provincial and level, and the community-based organizations/associations and NGOs active around the selected model sites. Lessons learned workshops (regional and national) and exchange visits in other countries resulted in: i) increased awareness in community forestry management, in particular the inclusion of rural communities in management decisions and supporting livelihood activities with conservation objectives; and ii) opportunities for learning current developments in forestry management, forest-related carbon markets, climate change mitigation and exchange of information on on-going initiatives in the South East Asian region. FAO has supported initiatives in improving the skills of Government and local communities. Hands-on learning sessions provided an opportunity for the forestry officials and participating local communities not only to exchange information on forest management issues but also to design a detailed work plan on the selected model sites and develop a management plan, including a post-project maintenance strategy. Also, 16 training events were organized on participatory forestry management and conservation in which forestry officials at the central and local level, community-based organizations/associations, NGOs and community representatives participated. 61 Training materials were developed as well as user-friendly guidelines to assist communities and smallholders to develop community forestry projects. The training materials and guidelines were adapted in accordance with the local conditions. 62 Output 7.3. Communities are more engaged in the management of natural resources There are now two participatory co-management models for biodiversity and natural resource management as a result of the sub-project activities of the Agro-Biodiversity Project. The NCSAFU developed a forestry management and natural resource guidelines to be used in the pilot sites. As of end 2012, a detailed work plan has been developed to test the guidelines in project sites. The work undertaken under Output 7.3 suggests that the target for 2015 on the number of existing participatory comanagement models for natural resource with corresponding programmes will be achieved. Output 7.4. National and sub-national authorities are better able to manage the environment in line with Forestry and Fishery Laws Significant progress was made in the delivery of training packages to provincial and district authorities. At the time of reporting three trainings had already been delivered. NCSAFU developed training packages for Government officials at national and provincial levels, including law enforcement handbooks related to promoting the implementation of Rio Conventions. More than 100 Government officials (national, provincial, district, and community levels) were trained and participated in a training of trainers, training on basic legal framework of selected laws and training on the formation of community forest management. Output 7.5. National and sub-national authorities are better able to manage bio-safety risks in line with the National Socio-Economic Development Plan and the Cartagena Protocol on Bio-safety No update provided by UNEP Output 7.6. National and sub-national authorities develop policies and pilots individual land titling, land use zoning and land recording All activities relating to the development of policies and tools on individual land titling, land use zoning and land recording are being implemented as planned by UN Habitat, including the piloting of individual land titling, land use zoning and recording in selected provinces. 63 Output 7.7. Improved resource productivity, environmental performance of competitive and sustainable tourism industry, building up efficient backward linkages with the handicraft and silk industries Through the Inter-Agency Cluster Program funded by SECO and executed by UNCTAD, UNIDO, ITC and ILO, considerable progress has been achieved in terms of sustainable tourism, clean production, export capacity, organic agriculture and social responsibility in the tourism, handicraft and silk sectors in the target districts. Successful strategic partnerships between the four UN agencies, the Government and local authorities contributed towards the achievement of the following: i) Clean Production (CP) Center fully operational; ii) CP clinic, helpdesk and demo have been set up with workshops and trainings delivered to both Government and private participants, and regular CP helpdesk activities organized; iii) capacity is being built for the provincial center to become a center of excellence; iv) awareness material, Resource Efficiency and CP brochure of Clean Production Center developed and distributed; and v) CP and Energy Efficiency Audits carried out. The support from the four UN agencies was also important in building the capacity of government and local authorities. In particular, UNIDO provided trainings on Food Hygiene and Safety and Health and Safety, delivered accreditation courses along with two basic training modules, and localized training materials into Lao. Partner institutions, such as the Souphanouvong University and PICO, were actively involved in the delivery of trainings. Output 7.8. Government supported in adopting best techniques and environmental practices and is better able to manage Persistent Organic Pollutants The support from UNIDO towards the adoption of best techniques and environmental practices and management of Persistent Organic Pollutants (POPs) resulted in the following: i) National Implementation Plan in responding to Stockholm Convention on POPs adopted and prepared; ii) in close collaboration with the Department of Environmental Pollution Control, the Revised Pollution Control Law drafted and in the process of approval; iii) PCDD/PCDFs sampling and monitoring conducted; and iv) Feasibility studies on Spent Oil conducted and coal availability in Vientiane capital investigated for the pilot project. Good progress has been achieved in the area of awareness raising and capacity strengthening, i.e. through an awareness raising workshop on Combating POPs through Application of BAT/BEP organized, training on Boiler Operator, training on Dioxin Sampling and Analysis, a technical coordination meeting in Austria, the annual ESEA BAT/BEP Forum Board Meeting and a technical workshop on ESEA Priority Sectors in Vietnam, a study visit on Operations of Combustion Facilities and BAT/BEP Facilities Orientation in Rome, training of trainers on Green Boiler Technology in Bangkok, and training on pollution control methods for line 64 agencies at the central and provincial levels. Awareness raising and training have also been extended to high school teachers and students in Vientiane with the support from the Department of Pollution Control in MONRE. The private sector was also invited to join the boiler demonstration. Output 7.9. Communities actively participate in fair, equitable and rational territorial development plans facilitated negotiation with relevant government authorities and private sector stakeholders Progress has been slow towards the achievement of output 7.9 due to the delay in the implementation of the planned activities under this output. FAO has developed a proposal in close collaboration with MONRE on introducing participatory development planning in selected districts. By targeting the district level, the project aims to strengthen the Government’s capacity to deal with land resource development and redirect central planning approaches that have been adhered to for the last 35 years to methods that are more in-line with the present economic environment. The intend will also be to ensure local users are in the centre of the Government’s focus, with special attention to gender issues, through the use of simple, low-cost planning techniques to foster active participation and consensus. 3. Challenges and Opportunities Challenges The major problems and challenges included delay in the implementation of the planned activities due to the late approval of the project, late nomination and engagement of government project counterparts/focal points, lengthy recruitment process and engagement of international consultants/experts, including the lack of or limited local expertise. In addition, restructuring within the Government and changes to the institutional set up of the Natural Resources and Environment Sector, which included unclear division of responsibilities i.e. MAF’s Department of Forestry vis-à-vis MONRE, also presented challenges. Delays were also seen in the allocation of funds, inadequate funding to effectively implement the planned interventions/activities, and the inability to mobilize additional resources due to external factors i.e. EU economic recession. Challenges also included capacity constraints, institutional and human resources, of government counterparts, which affected the effective and timely implementation of project activities, as well as lengthy procurement procedures and unavailability of 65 equipment. Finally, access to reliable and updated data/information presented constraints to implementation. Opportunities There have been recent developments which would guide the UN support towards the attainment of Lao PDR’s national priorities and development goals and the achievement of the MDGs. The Government’s decentralization policy and currently adopted “Sam Sang Policy” (“Three Builds”) allows the UN to focus its interventions in targeting the provincial and district level and the engagement of the local community. The interventions and activities already undertaken by Outcome 7 targets provincial and district level officials, community-based organizations, NGOs, farmers’ groups/associations, and the local communities, and this could be further rolled-out. Activities yet to be implemented or at the early stages of implementation can be re-designed or adjusted in accordance with the current policy of the government through capacity building initiatives, which enhance decision making capacities of the responsible institutions at the national, provincial and district level. The National Land Policy has been drafted and finalized in March 2013. It will be submitted to the Government for approval and will be a priority issue in the June 2013 Session of the NA. This will provide a good opportunity for the UN to further refine its support to ensure transparent and participatory approaches to land management and land-use planning and contribute to the national dialogue on land policy and related legislation. The UN agencies providing support under Outcome 7 have targeted both the national and local level beneficiaries. The results from field experiences can feed into the national debate on the land issues. 4. Recommendations The UNDAF matrix is considered to be a coordination tool. Unfortunately, this has not been effectively utilized. Most of the planned outputs targeted the provincial and district level. However, not enough information is shared among the UN agencies resulting, in some cases, in duplication of activities or fragmented support from the UN. Also, in the absence of a joint UN Programme, it would have been more cost effective if the different agencies where able to coordinate their activities, focusing on each agencies’ comparative advantage, by focusing their support in the same area. This could address the funding gap 66 encountered by some agencies and allow for more focused interventions and opportunities for partnerships. Given the upcoming Mid Term Review of the 7th NSEDP and the MDG Report, there is a need to review the capacity building and training needs of the Government and other target beneficiaries and evaluate the effectiveness of capacity transfer, as well as the methods of interaction and support to project counterparts and target beneficiaries. Capacity building activities should recognize the prevailing constraints and level of capacity within the Government, and adapt indigenous/traditional knowledge. Increased focus on institutional capacity building should be through the use of or partnerships with local institutions in carrying out certain project activities, e.g. baseline and case studies and Training of Trainers. Finally, support should seek to strengthen the partnership between the Government and civil society (i.e. NPAs, farmers’ organization/production groups and private sector) on environment issues through improved transparency and governance processes for decision making, given their increasing role in the national planning process. The opportunity for dissemination of best practices should be utilized given the good progress achieved in some of the outputs. The UNDAF is a good platform to consolidate achievements and success stories. Initiatives could include common awareness raising activities to highlight the support of different agencies to the achievement of planned outputs and the production of joint information and/or analytical products for evidenced decision making. This would also create an alternative channel for mobilizing additional resources. UNDAF Outcome 8: By 2015, the government and communities better adapt to and mitigate climate change and reduce natural disaster vulnerabilities in priority sectors 1. Chapeau The knowledge base on climate change adaptation (CCA) and mitigation is wider and deeper than in previous years. In the agriculture sector, many projects have climate change related activities and produce meaningful ideas, data, technical recommendations and possible solutions for CCA. The establishment of a specific on-line database for resources countrywide is under consideration. Climate Change is 67 increasingly understood as a long-term challenge to the country in terms of its potential impacts on infrastructure, agriculture, the economy and livelihoods. Beyond the agriculture sector, the Second National Communications on Climate Change project (SNC) has worked to mainstream CC into the national sustainable development agenda, including greenhouse gas mitigation and adaptation activities. They are also working to raise awareness of CC issues among policy-makers and other relevant stakeholders. Importantly, shifts in CCA monitoring and learning have started through acknowledgement that CCA is a long-term process where both immediate solutions and long-term perspectives have to be developed. Capacity building for CCA is moving ahead across agriculture and other sectors. For example, based on the IRAS baseline study which examined the training requirements for Government officials, the number of Government personnel exposed to relevant training, technical workshops, and local, regional and international conferences is increasing gradually. A Training Needs Assessment (TNA) undertaken by IRAS provides useful guidance for the development of further training programmes aimed at enabling civil servants to accommodate CC in future plans and policies. A variety of community-based CCA technologies and projects have been introduced on the ground in various sectors, but they remain sporadic, geographically specific and are not yet mainstreamed. On the disaster management side, in 2012 the National Disaster Management Office, which serves as secretariat for disaster response coordination, completed the draft National Disaster Management Plan and continued to undertake steps to strengthen coordination and capacities for effective disaster risk management at national, provincial and district levels. Among these steps, over the past year, NDMO, supported by the UN Resident Coordinator Office and in collaboration with UN agencies and other humanitarian and development partners finalized the first ever inter-agency contingency plan (IACP) for disaster response, endorsed in February 2013 by the Inter Agency Standing Committee for Emergency Response (IASC). The IACP activities have resulted in the revitalization of sector cluster groups dealing with e.g. shelter, WASH, food security, health, early recovery, communications, education, to better coordinate preparedness and response activities, laying the groundwork for strengthened inter-agency coordination in future disasters. In addition, a numbers of agencies are also supporting the development of community-based disaster risk reduction and preparedness efforts. These activities are just getting off the ground and more work needs to be done to coordinate across the efforts so as to ensure synergy and to build on best-practices. 68 Various Government, international and local agencies are also in the process of initiating or mobilizing resources for more district and community-based disaster risk reduction work. Disaster preparedness and early warning were two key gaps identified following Typhoon Haima. These are expected to be growing areas of activities in the next year. Structural changes in disaster management responsibilities have dampened progress on some activities. In 2012 the Department of Natural Disaster Management and Climate Change was established under the new Ministry for Natural Resources and Environment (MoNRE). This restructuring was undertaken in an attempt to link climate change and disaster management. The restructuring of disaster management responsibilities under MoNRE has the potential to consolidate the climate change and disaster management objectives in the long term. However, in this transition period, it has led to some confusion on roles and responsibilities, particularly around the future function and location of the National Disaster Management Office (currently under the Ministry of Labour and Social Welfare), which has historically served as the disaster management secretariat. The resulting lack of structural clarity has, in turn, delayed the approval of the National Disaster Management Plan and postponed the next phase of Government led disaster management work, for the Government as well as for a number of partner projects. 2. Progress Improving Disaster Risk Preparedness and Response UNDAF Outcome 8 includes various actions aimed at increasing disaster risk preparedness and management at both the national and sub-national level by supporting establishment of appropriate governance and coordination frameworks, setting up early warning systems, developing and training disaster management committees and setting up proper communications and information systems at various levels. Among the accomplishments to date, at the national level UNDP recently completed its first Disaster Risk Management project with the National Disaster Management Office (NDMO). This initial project supported the establishment of the National Disaster Management Committee (NDMC) and the development of the National Disaster Management Plan, which is currently being reviewed for final approval by the Government of Lao PDR (GoL). A National Risk Profile and Hazard Risk Assessment and Vulnerability Mapping were completed at the county-level, along with provincial-level risk profiles for three high risk provinces. NDMO also began implementing actions aimed at building capacity in disaster 69 management preparedness, response and rehabilitation at the provincial and district levels with an aim of expanding on this work in Phase 2. As a next step in its disaster management support, UNDP has been working to initiate Phase 2 activities with the Ministry of Natural Resources and Environment (MoNRE) to align with the new government organizational structure. This phase 2 project will aim to implement the National Disaster Management Plan at various levels of government. Among activities, the project will support development of the Disaster Management Law, establish DRM communication and information management systems and procedures at national and sub-national levels, complete local Hazard Risk and Adaptation Assessments pilots in target districts, initiate early warning pilots to learn from and build upon, and develop modules and strategies for community-based disaster preparedness that can be mainstreamed in the next phase. The launch of Phase 2 activities was significantly delayed due to the current government restructuring, and the need to clarify where the project should be housed. The project is now preparing to move forward under the auspices of MoNRE and should begin implementation in mid-2013. At the sub-national level, UN agencies are undertaking various projects aimed at supporting provincial, district and community-based disaster risk reduction (DRR). For example, as part of its DRR efforts, UNICEF has supported 165 villages in developing Disaster Risk Reduction Plans, including 65 villages in Attapeu, 71 villages in Saravan, and 29 villages in Sekong provinces. In addition, World Food Programme recently secured funding to implement the first phase of a disaster preparedness capacity building project in Luang Prabang and Oudomxay. The project will support capacity building of disaster management focal points in key line ministries. It will also build DRR capacity of two provincial disaster management committees, four district level committees and selected communities. At the local level, UN-Habitat, UNDP and UN-Women are also seeking funding for a joint community-based DRR project aimed at building Community Based Disaster Preparedness (CBDP). The project would support implementation of community vulnerability assessments and disaster planning in 11 target districts, including establishing district and community-level early warning systems, forming and training village disaster management teams and volunteers, providing direct support, guidance and training for construction of pro-poor water, sanitation, and shelter improvements using Building Back Better (BBB) principles, and ensuring the active engagement of women and vulnerable groups in all elements of delivery. 70 Finally, on the disaster response side, the UN Resident Coordinator’s Office (UNRCO), in conjunction with NDMO, have been working with other United Nation agencies, and national and international organizations to develop the Inter-Agency Contingency Plan (IACP) for disaster response. The IACP development has led to the establishment of sector cluster groups to coordinate response activities. It has also set the frameworks for strengthened inter-agency coordination in future disasters. Among the cluster groups, UNICEF has led development of the inter-agency coordination mechanism for the WASH cluster. This cluster group is now in place and operating. Other cluster groups dealing with shelter, food security and nutrition, health, early recovery, protection, communications, education have also been formed or are in process being established. Increasing Resilience through Sector-Based Improvements and Adaptations In tandem with disaster preparedness and response efforts, UN agencies are also undertaking actions to increase local resilience to climate and disaster risks so as to minimize impacts before they happen. At a national level, UNDP has been working with the GoL to integrate climate and disaster risk considerations into the National Social and Economic Development Plan (NSEDP) process. Climate resilient development recommendations were integrated into the 7th NSEDP. They will also be mainstreamed into the 8th NSEDP as it is development. On the delivery side, UN agencies are also working to support and build climate and disaster resilience in target sectors such as water and sanitation, housing, agriculture, waste management and small infrastructure. Below are some of the activities to date. ï‚· Small Infrastructure and Shelter: Among accomplishments on the infrastructure side, UN-Habitat completed one pilot on provision of water and sanitation facilities and rehabilitation of housing through build-back-better mechanism. In the process 21,778 beneficiaries have improved access to water, sanitation and shelter facilities. UN-Habitat – in partnership with local governments, communities and members of Lao Women’s Union – also completed two projects that piloted and completed community-based solid waste management and decentralized waste water treatment in two towns. These pilots benefitted 6,464 beneficiaries through improved solid waste management. Garbage committees have been established and delegated to take over the responsibility and to provide solid waste collection services. Waste collection and disposal mechanisms were also introduced in both pilot villages. In addition to the UN-Habitat interventions, in 2013 UNDP will be launching a new infrastructure and climate change adaptation project in partnership with MoNRE, MOHA and UNCDF. The project is intended to build capacity among provincial, district and local 71 governments to integrate climate and disaster risk considerations into their existing development planning and to support their ability to then plan and execute small infrastructure and ecosystem management projects that they have identified as priorities to increase their local resilience. ï‚· Agriculture and Forestry: Among accomplishments in the agriculture and forestry sectors, FAO completed its first series of farmer trainings on aquaculture practices. They also plan to provide trainings in other areas such as animal husbandry and agriculture production in the future. In addition, FAO and UNDP are partnering with MAF on an agro biodiversity project. This project, launched in 2011, seeks to mainstream agro biodiversity through policy recommendations, participatory land use planning with farmers, implementation of on-ground agro biodiversity projects and pilots, and farmer extension and training. The project was slow to get off the ground in its first year, but it is finally gaining traction and should begin showing practical results in 2013. Finally, UNDP is also partnering with the National Agriculture and Forestry Research Institute (NAFRI) under MAF on a project that seeks to improve resilience of the agriculture sector to climate change impacts (or IRAS project). After a long process of development, the IRAS project moved to implementation in 2012. Among early actions, it has been assembling, coordinating and analyzing data to inform local climate change forecasting and agricultural planning. It has assessed government training needs and, from this information, has begun developing and implementing various climate change related training sessions for line ministry staff. The project is also developing Community Climate Adaptation modules to help local farmers better prepare for and respond to climate change impacts including modules aimed at piloting resilient crop varieties, supporting the diversification of local farming systems, and improving water management systems. Finally the project is also reviewing and inputting on various government policies related to land management and agricultural development with an aim of enhancing overall agricultural resilience. 3. Challenges and Opportunities Institutional Restructuring Over the past year, structural changes within the GoL temporarily slowed progress in the disaster management sector. As previously mentioned, traditionally the National Disaster Management Office (under MoLSW) has been responsible for managing disaster management efforts in Lao PDR. However, in 2011, the GoL established MoNRE as a new ministry and, among other functions, assigned it 72 responsibilities for Climate Change and Disaster Management programmes. The government decreed at the end of 2011 that NDMO should move to MoNRE, but this move has not yet occurred. In the interim, there has been significant confusion on the division of roles and responsibilities between the two ministries. This lack of clarity has impeded smooth implementation of existing projects and delayed the endorsement and implementation of the National Disaster Management Plan. It has also slowed the development, approval and launch of the next phase of disaster management projects. Resource Mobilization In general resource mobilization has been a common challenge for all agencies. A lack of coordination and communication (both internally among UN agencies, and externally with other international organizations) has on occasion resulted in the submission of competing proposals, in some cases with overlapping project elements. Many UN partners have had difficulties in meeting their resource mobilization targets under Outcome 8, particularly for disaster management related projects. As a result, certain projects have been slower to launch that originally anticipated, and some projects have been phased or adjusted to fit with the available funding. In the case of climate change adaptation, however, resource mobilization has been more successful than planned resulting in higher activity in this area than originally presented in the UNDAF 2012-2015 plan. Monitoring and Evaluation Some projects are having difficulty identifying indicators that are meaningful and are easily collected within the project timeframe, structure and budget. This challenge also carries through to the UNDAF results matrix. During this UNDAF review process, some of the original Outcome 8 indicators were deemed inappropriate as they did not provide data in usable timeframes for reporting purposes, or were too high level and thus performance could not be easily attributed to the UN agency interventions. While we have attempted to identify more appropriate indicators for Outcome 8 (based on the current portfolio of projects), these new indicators still need to be tested to ensure effectiveness. 73 Coordination of UNDAF Outcome Group The previous Outcome 8 co-leads both left in October 2012. Following their departure there was a gap of several months before the new co-leads came on board. This gap resulted in some loss of organizational and reporting history. 4. Recommendations There is a need for more strategic dialogue and information sharing among the UNDAF Outcome 8 partners to ensure that projects are synergistic and non-duplicative and that strategic gaps are properly identified and acted upon. Over the past year, a great deal of the Outcome 8 group discussion centered on the UNDAF reporting requirements and matrix changes, with less attention to basic project coordination. As a result, agencies have occasionally proposed or launched disaster management and climate change interventions of similar nature without fully coordinating across actions. In addition, we are increasingly encountering situations where we are learning about external projects that overlap with the UNDAF Outcome 8 goal, outputs and actions. There is therefore also a need to better coordinate strategies with other government and international agencies (including the World Bank and Asia Development Bank) to avoid duplication and competition, and to ensure we build on existing structures and best practices rather than recreate the wheel. To this end, as we move forward the Outcome 8 coleads will work with the participating UN agencies, government and international partners to determine the best venue for this higher level exchange and to ensure the relevant groups are involved. UNDAF Outcome 9: By 2015, national and local governments and communities have reduced the impact of unexploded ordnance on people in Lao PDR 1. Chapeau The 7th NSEDP seeks to address the “problem of UXO” to ensure that communities can live and earn their livelihoods without the threat of UXO. The clearance of UXO affected lands for agriculture and other development purposes will contribute to poverty reduction and rural development. 74 The Government, the UN and development partners signed a Millennium Development Goal Compact at the 2010 Round Table Meeting, announcing that they are fully committed to attaining the Lao PDR specific MDG 9 on the reduction of the UXO impact by 2020. Achievement of the national MDG 9 will further function as a multiplier to achieving other MDGs by providing increased access to assets and services for improved livelihood. Thus, the UNDAF identified UXO action as one of the priority areas and a specific outcome. UNDP has been a key partner of the Government in the UXO sector from the mid-90s. UNDP’s support to the sector is in line with the UNDAF Outcome. UNDP provides ongoing support in building institutional capacity of two key government institutions in the UXO sector – the National Regulatory Authority (NRA) and the Lao National UXO Programme (UXO Lao), through the provision of policy advice, aid coordination and provision of technical advisory support and the mobilization of financial resources. The key objective is to enhance national ownership and results in order to fulfill the legal obligations contained in the Convention on Cluster Munitions (CCM) and other relevant treaties, to achieve Lao PDR national objectives for the UXO sector as set out in Safe Path Forward II (SPF II), and to accelerate efforts to attain the MDGs. In 2012, good progress was made in the area of sector coordination and policy development. The government approved the sector National Strategic Plan, “The Safe Path Forward II”, which will govern all activities in the sector until 2020. SPF II includes strategic objectives and indicators by which to measure progress for the entire UXO Sector. SPF II is also aligned very closely with the 7th NSEDP and directs that the UXO Sector should focus clearance activities on areas that have been identified as development priorities. This will help achieve the MDGs and contribute to another national aspiration, to graduate from Least Developed Country (LDC) status by 2020. On 27 November 2012, the roles and responsibilities of the NRA were elaborated and approved by the NRA Board Chairman. This will foster better communication and coordination with the provinces and at the sub-provincial level and will provide all involved in the sector with a clearer understanding of the mandate, role, structure, scope and objectives of the NRA. The NRA continued to advocate for increased financial support from the international community, as well as from the Government, which was agreed in principle. Funding levels will depend on the availability of funds and quality of the funding requests made to Government by the sector. 75 The most notable sector outcome result achieved in 2012 has been a significant reduction in the number of UXO casualties, from approximately 300 per year as recently as 2008 to fewer than 100 in 2011 and 56 in 2012. Another important development in 2012 was a pilot project on a District Focused Approach (DFA) to technical and non-technical surveys, in order to experiment with different approaches and methods. The pilot is yielding detailed and accurate data with respect to contamination. The various approaches are being assessed and the best elements of each will be incorporated into a standard methodology for UXO survey. UNDP assisted in developing the capacity of the Government to clear contaminated areas, to provide effective risk education and to assist UXO accident survivors and affected members of the families and communities of victims. UXO Lao, the national clearance and risk education operator, continues to conduct most clearance operations in the country. As of October 2012, a total of 5,603 ha of land had been cleared; of which 796 ha were development land and 4,806 agricultural land. During 2012, operators in Lao PDR have cleared and destroyed more than 81,862 items, of which 373 were bombs, 46,091 were bombies, 346 were mines, and 35,052 were other UXO items. In order to improve the Victim Assistance component of the UXO Sector, a Survivor Tracking System has been established to facilitate the collection of detailed information on survivors’ injuries and needs, to direct survivors to appropriate service providers, and to track their progress. UNDP also supported the Government to undertake constructive dialogue between operators and policy makers in three key areas: clearance, risk education and victim assistance. A key venue to undertake such discussions has been three Technical Working Groups, which meet every quarter. UNDP also contributed to policy dialogue in the UXO sector, through 1) the comprehensive programme evaluation for the UNDP UXO programme covering two programme cycles (since 2003); 2) establishment of an informal donors meeting on UXO; and 3) support to the revitalized Sector Working Group discussion on the UXO sector which is chaired by the Minister responsible for the UXO sector and co-chaired by UNDP and the Ambassador of the United States of America. UNDP assisted the Government to be an active player in the international community in the areas of UXO/Mine Action. With support from UNDP, the Delegation for Lao PDR to the State Parties Meeting of 76 the Convention on Cluster Munitions was able to increase their effectiveness in formal meetings by drafting and presenting strong and coherent official statements in plenary sessions on key areas (clearance, victim assistance, risk education), as well as on issues related to national implementation measures, compliance and cooperation and assistance during the MSP meeting in Oslo in September 2012. The Delegation was also able to host a side event during which they outlined the new Vision and Strategy for the UXO sector in Lao PDR. UNDP also supported the efforts of the Government in 2012 to further engage the Lao Army in humanitarian mine action. Fifteen army personnel were trained to national standards in the area of survey and clearance. The army will operate under NRA oversight when engaged in humanitarian mine action. UNDP is currently working with the NRA to raise resources in support of further training, equipping and deployment of army personnel in this area. 2. Progress Under the leadership of the NRA, the UXO sector has increased the number of hectares released for productive development use. In 2011, 6,034 ha were released (compared to a baseline of 2010: 4,050 ha). One factor is the increase in the number of clearance operators, both humanitarian and commercial companies. At end of December 2012, six humanitarian operators were accredited, as well as eleven commercial clearance operators. Currently, there is extremely limited capacity to measure the development impact of UXO clearance in Lao PDR, but there is a high level of interest within Government to do so. There is interest, in particular, in the degree to which UXO sector activity can contribute to the goals contained in the 7th NSEDP. There is also an interest from various stakeholders, including development partners, to provide evidence of the development impact of work in the UXO sector. Initial contact has been made with the Geneva International Centre for Humanitarian Demining (GICHD), to assist in the development of such capacity within the NRA and possibly UXO Lao. The National Strategic Plan ‘Safe Path Forward II” was approved by the Prime Minister on 22 June 2012. To date, the UXO sector has operated under Annual Work Plans. NRA is currently developing a multi-year work plan, to facilitate planning and implementation of the National Strategic Plan through to 2020. 77 Output 1 - UXO Lao The removal or destruction of UXO increases the security of people living in UXO impacted communities and increases the amount of safe land available for food production and other socio-economic development activities. Between 2010 and 2012, UXO Lao expanded its operations and increased its efficiency through the adoption of new technologies, which can be evidenced by an increase of land released through clearance and technical survey operations by 20%. In 2012, UXO Lao released more than 3,100 hectares of land through area clearance and technical survey operations according to a set criterion and are fully aligned with national standards and the CCM. The methodology used for prioritizing land for clearance is in accordance with the SPF II endorsed by the Government in June 2012. Besides areas cleared for agricultural land, UXO Lao also contributes to the Government’s development projects, as well as those of other international organisations and NGOs, to allow infrastructure development to happen. Between 2010 and 2012 UXO Lao cleared over 514 hectares of UXO contaminated land for development agency projects at no cost to these agencies. UXO Lao works in alignment with the Government’s strategy on rural development and poverty eradication in accordance with the 7th NSEDP. Another focus of UXO Lao’s work is organizing community awareness (CA) programmes in the nine most contaminated provinces of Lao PDR. Risk education activities are designed to increase awareness of people living in UXO affected area of the dangers of UXO and to change the behaviour of high risk target groups. In 2012, UXO Lao organized 614 CA events reaching over 155,000 beneficiaries, including 69,081 children. More than 50% of recipients of CA sessions are female; 78% of village volunteers are female. Overall, the UXO clearance, survey and roving activity results are above the targets set in 2012. Between 2013 and 2015, UXO Lao has set its target to clear an additional 9,000 ha of land, destroy 200,000 UXO items and support 800,000 individuals. UXO Lao is well on its way to achieve this target. UNDP supported Government efforts to build the institutional capacity of UXO Lao. In this regard, UXO Lao benefitted from the support provided by two UNDP international technical advisors: One Chief Technical Advisor (CTA) and One Programme/Finance Technical Advisor (TA). The quality of the technical advice and guidance is designed to lead to enhanced national ownership and results. The CTA provided technical advice to senior management and assisted the project management to examine/review new 78 technologies and operational methods, in donor liaison and resource mobilization, and participated in international studies and workshops. UXO Lao has further increased its capacity to mobilize resources and work directly with donor organizations which has been made possible through the ongoing assistance and support of the CTA and the TA for Programme/Finance. The Programme Unit Chief, who among other tasks is responsible for resource mobilization and donor reporting has received extensive support from both the CTA as well as the TA on developing skills to write proposals and donor reports for UXO Lao. In 2013, further training will be provided to the UXO Programme Unit on Results-Based Management and Reporting. The TA focused on improvements within the financial management of the organization through coaching and mentoring in terms of strategic financial management, budget preparation and monitoring, fund management, internal monitoring and audit compliance. The Finance Unit in coordination with the TA has further started developing a capacity plan for improving financial management and reporting in the nine provinces that is expected to take places in Q1/Q2 of 2013. In addition, there is a plan to conduct institutional capacity assessment. Overall, UXO Lao has made progress towards a sustainable programme particularly on building capacity for UXO Lao national staff to develop proposals as well as having the institutional capacity assessment and development strategy in place. Output 2 – NRA There is good progress on the outputs of the NRA. Among the five indicators of the Output 9.2, four indicators are on-track, and one is off track. In 2012, the NRA Victim Assistance Unit collected 9,325 Survivor tracking forms. NRA should reach the target during the year 2013, but much work remains to be done in terms of analysis and dissemination of the information. This indicator is on-track. District clearance plans based on district survey have not yet been completed. In 2012, a district focused approach pilot project was undertaken in three districts, under the coordination of the NRA. In 2013, the NRA will take stock of the three methodologies experimented with, will analyze the results of each and will integrate the best elements of each pilot into future survey methodology. This indicator is somewhat off track, due to the delay in concluding the DFA pilot phase. The NRA will assess the situation and may adjust the plan for the coming year. 79 100% of the operators working in Lao PDR are accredited. As of the end of December 2012, six humanitarian operators have been accredited, as have eleven commercial clearance operators. This number may change early 2013, as some operators did not submit their request for extension. The NRA continuously monitors the operators via its QA/QC Unit. This indicator is on-track. In 2012, 44% of the operators reported electronically to the NRA. There is good progress on this indicator. In 2013, efforts will be led by the NRA to train and promote the electronic reporting from the commercial clearance operators, as well as the humanitarian operators. This indicator is on-track. The NRA Victim Assistance strategy has been drafted by the NRA Victim Assistance Unit. It has been presented and discussed at the Victim Assistance Technical Working Group. In 2013, after some modifications to the document and translation into Lao, it will be submitted to the NRA Board for approval. This indicator is on-track. Output 3 Lao PDR submitted its Article 7 CCM Transparency Report, prepared by the NRA. At the inter-sessional meetings of the Convention on Cluster Munitions, Lao PDR received congratulations for being one of the first countries to submit its Article 7 Report in advance of the deadline. This indicator is on-track. The Government has participated in two CCM meetings in 2012, the Inter-sessional in April 2012 in Geneva and the 3rd MSP in September 2012 in Oslo. The Lao Government is planning to attend both events in 2013 as well. This indicator is on-track. National cash contributions have been limited, however, the Government contributed more than LAK 4 billion to cover the cost of construction of a new UXO Lao Building in Attapeu province. There is a clear commitment to greater financial support from the Government for UXO sector activities in the future. Of note, the NRA is currently being trained on how to submit budget request to the central government. This indicator is on-track. 3. Challenges and Opportunities 80 While significant progress has been made, there remain some challenges in the sector. According to the UXO programme evaluation. There remains a critical lack of reliable baseline information concerning the level and location of UXO contamination in the country as a result of inadequate technical and nontechnical survey. In addition, there needs to be better annual and multi-year planning and priority setting, improved communication with key stakeholders, further integration of UXO sector planning into broader national planning and budgeting processes and greater financial investment in the sector by the Gvoernment. The NRA must improve its capacity to coordinate and regulate activities in the sector and to undertake quality management and there is a need in UXO Lao for more active and analytical recording of lessons learned and priority setting, as well as a greater capacity for self-monitoring, evaluation and quality assurance. During the new project cycle 2013 - 2015, this project has the potential to further strengthen the institutional capacity to forge stronger linkages between the UXO sector and other sectors, resulting in a better aligned and coordinated national response to poverty and longer-term sustainable development. Further developments that will be important in this regard: the Chair of the NRA Board is the Minister to the Prime Minister's Office and President of the National Committee for Rural Development and Poverty Eradication; therefore, capacity development of NRA will almost certainly be conducive to enhancing the linkage between UXO sector work and broader national efforts in the area of poverty reduction. UNDP will remain focused on developing national capacity to undertake all aspects of planning, implementation, quality assurance and financial management, in order to address the long-term humanitarian and development challenges posed by the presence of UXO. 4. Recommendations UNDP will continue to support the two national institutions NRA and UXO Lao in developing national capacity to address the long-term humanitarian and development challenges caused by the threat of UXO. A capacity development assessment will be undertaken to assess the changing needs of the sector and to ensure that the two institutions remain well positioned to respond to these needs. A corresponding strategy will be elaborated jointly by the partnership. To ensure a comprehensive assessment and subsequent strategy it will be imperative to gain the support and cooperation of all NRA and UXO Lao partners to ensure that the total future capacity of the two institutions are considered. In its capacity as 81 co-chair of the UXO sector working group, UNDP will seek the coordinated support of donors contributing to the sector. UNDP will continue to support the Lao Government’s efforts through the UXO Sector Trust Fund, which was established in March 2010 within the Framework of the Vientiane Declaration on Aid Effectiveness. Providing donor support to the two national institutions through the Trust Fund is expected to contribute to the national capacity building for multi-year planning, coordination, resource allocation, effectiveness and efficiency of the UXO sector as a whole. It will also lead to enhanced national ownership and strengthened linkages between the Trust Fund Steering Committee that can strategically engage in the planning and allocation of investments and of national/local planning mechanisms led by the Ministry of Planning and Investment, the Ministry of Finance and the Poverty Eradication and Rural development unit established by the Office of the Prime Minister. In the coming programming period, the UXO Trust Fund will continue to support the operations of the NRA and UXO Lao. UNDP will also support the NRA to engage and develop non-governmental organizations and community based organizations active in the sector. UNDP will ensure the proper and effective management of the Trust Fund, through the UNDP UXO Portfolio Manager. UNDP will also support the Government to develop a long term resource mobilization strategy to support the transition strategy outlining cost recovery schemes for admin expenditures, future potentials for external funding support and access to national budget allocations for clearance, risk reduction education and VA. Various fundraising opportunities will be explored, including further private sector cooperation. As was suggested in the programme evaluation, there is a need for greater financial investment in the sector by the Government. This resource mobilization strategy aims to respond to this recommendation. The programme evaluation pointed out that there is a need to further strengthen communication with key stakeholders. UNDP will continue to play a key role in facilitating communication and cooperation between the Government and development partners, as co-chair of the Sector Working Group (SWG). UNDP also plans to assist the NRA to convene a series of events and policy forums to allow donors, operators, private sector and government to engage in open dialogue on a wide range of issues concerning UXO sector and to address matters of concern. The planned topics for the Policy Forum includes 1) Sector Policy and priorities related to work plans, survey and clearance, 2) resource mobilization, 3) UXO 82 clearance for socio-economic development projects in the Lao PDR and 4) innovative clearance technology, R&D, among others. Finally, but also as one of the largest components, UNDP will continue to support the two national institutions - NRA and UXO Lao - through the provision of technical advisors to advise on all aspects of planning, implementation, quality and financial management. UNDP will also provide external expertise to assist NRA and UXO Lao to conduct a capacity development assessment to map out current capacity baselines within the NRA and UXO Lao, and to formulate a 3 year capacity development strategy for the two institutions. UNDAF Outcome 10: By 2015, people in Lao PDR benefit from policies and programmes which more effectively promote gender equality and increased participation and representation of women in formal and informal decision making 1. Chapeau Progress towards UNDAF Outcome 10 has been significant during 2012. High-level commitment from the Government, including the National Commission for the Advancement of Women within the Government Office, the Minister of Finance, the NA and the Lao’s People Revolutionary Party is in place. Commitment is translated into an enabling national strategy and framework. In March 2012, the second National Strategy for the Advancement of Women (NSAW) 2011-2015 was adopted by the Government, and included key priorities as advocated by UN in the country on the CEDAW. The Government’s commitment to achieving the objectives of the CEDAW has provided UN Women and UNFPA with the opportunity to strengthen its work on Violence Against Women (VAW) through the revision of related laws on VAW toward the development of a specific law on DV/GBV, as well as the implementation of a national prevalence study that is currently in the preparation stages with field work due to start in OctoberNovember 2013. In addition, the UN supported an increased awareness of Government officials and the general public on VAW. Different activities were carried in 2012, including campaigning, ascientific workshop on VAW and seminars targeting students and the justice sector. 83 There are opportunities for the UN to support the Government’s work through the NSEDP, RTM and SWGs, however, in order to ensure that gender is incorporated into the process, the UN needs to restrategize how they incorporate the gender component into the support to the Government. Challenges still remain to ensure strong gender equality and women empowerment programmes in the country, including limited capacities of Government counterparts and particularly of national women’s organizations with regards to gender issues and their role in collaboration and implementation of NSAW. UN Women and UNPFA, along with other UN agencies, are the main players to support the Government to implement the NSAW. The limited in country capacity of UN Women and UNFPA makes it difficult to adequately support gender mainstreaming activities within other UN agencies and the Government. In order to obtain real impact in gender programming activities with the Government, it is critical to invest resources in building the capacities of national partners as part of programmes and agreements. Revitalization of the Gender Theme Group and active participation of all UN agencies will be needed to ensure proper gender mainstreaming throughout the work of the UN. 2. Progress Output 10.1 - Institutions at central and sub-national level are better able to enhance gender equality and follow up CEDAW recommendations In total 10 SubCAWs have submitted reports to the Lao National Commission on the Advancement of Women (LaoNCAW) on the implementation of the NSAW; 9 SubCAWs submitted the report of the last 6 month implementation of 2011-2012 and one SubCAW (MoFA) submitted the annual report for 20112012. More systematic monitoring and reporting requires the M&E Framework for the NSAW, currently being drafted, to be completed. To strengthen the capacity of LaoNCAW to advocate and follow up on the CEDAW recommendations, UNFPA in Lao PDR has been supporting LaoNCAW to build their capacity through the development of a communications and advocacy strategy to help guide their advocacy activities, which have not been very systematic and often without monitoring, evaluation and follow-up. This activity started in 2012 and has been ongoing. Its objectives are to: 84 1) Articulate the ways by which effective communication and advocacy can promote understanding and awareness on key gender issues among different target groups including policy and decision makers, who can foster changes and responses to address gender issues. 2) Enhance communication within LaoNCAW and outside LaoNCAW to facilitate and foster the delivery of LaoNCAW’s mandate of coordination, resource mobilization and policy advice. 3) Increase the visibility of the LaoNCAW and its SubCAWs and their contribution towards achieving the MDGs within the CEDAW and NSAW context. UN in Lao PDR is supporting the national study on VAW, which is one of the efforts in implementing the CEDAW recommendations, and is included in the NSAW (2011-2015). The field work of the study is planned for October 2013. The study on VAW aims to provide evidence to guide a coordinated national action plan to end violence against women, the CEDAW periodic report in 2014 as well as the development of the legislative reform process for a strengthened legal framework on VAW, which has been initiated thanks to the UN supported legislative review on provisions related to GBV/VAW. Tools for conducting the survey on VAW have been identified and agreed and build on WHO multi-country study tools. A roadmap has been developed to guide the implementation of the study from early 2013. In addition, the UN supported an increased awareness of Government officials and the general public on violence against women, including through a workshop on VAW and seminars targeting students and the justice sector. The Ministry of Labor and Social Welfare, with the support from UN Women, developed a roadmap and work plan, including an M&E framework for capacity building for MOLSW staff and Government institutions, to continue the development of a gender disaggregated knowledge base of data on labor migration. OUTPUT 10.2: Civil society organizations are better able to advocate for gender responsive policies and demand accountability in line with CEDAW commitments The data and result of the media professionals training on GBV will be available in the first quarter of 2013. 85 A formal established Gender and Student Group at the Faculty of Law took part in the EVAW Campaign 2012. They conducted a one day event at the University discussing VAW in Lao PDR. In March 2012, the second NSAW 2011-2015 was adopted by the Government and supported by the UN and civil society organizations. The LWU has demonstrated its commitment at the highest levels to ensure achievements under Gender and HIV programmes are scaled up and embedded into the ongoing work of the LWU and the project partners. During 24-25 September 2012, the LWU, on behalf of the ASEAN Committee on Women (ACW), hosted a regional consultative meeting in Luang Prabang with a focus on reducing intimate partner transmission of HIV and meeting the HIV-related needs of affected women and girls in ASEAN. This meeting brought together representatives from the ASEAN Task Force on AIDS with the ASEAN Committee on Women, including representatives from every ASEAN Member State and NGOs/CSOs for the first time to discuss these complex gender issues. Under the leadership of the LWU, representatives of ministries in charge of health, HIV/AIDS, and women’s rights and gender equality, as well as civil society organizations from ASEAN Member States, UN agencies and the ASEAN Secretariat, discussed effective strategies and options for enhanced cooperation and coordination at the regional and country level. OUTPUT 10.3. Women groups have enhanced capacity and opportunities to engage in decision making and planning process In June 2012, 25 members of the Women’s Caucus and 13 male members of the NA have been trained on the role of Parliamentarians in terms of CEDAW implementation and oversight. The secretariat to support networks of women living with HIV was established in March 2012 under the Association of People Living with HIV with the support of UN. 32 HIV positive women HIV, who are member of HIV network in Laos, were trained and supported to mobilize other HIV positive women for advocacy and policy work related to the CEDAW. The secretariat will continue to develop the long term strategy to support women’s networks to empower women living with HIV and promote HIV positive women’s leadership under the CEDAW principal. In addition to the above but also contributing to the overall achievement of Outcome 10, the UN supported the LSIS, which was useful in providing much needed sex disaggregated data highlighting gender disparities that may further guide the work of the UN. 86 In the area of women’s health, there are a number of highlights.There are still some harmful practices to women in Lao PDR, a number of them associated with practices around childbirth, such as placing women over fire for periods of time up to 40 days after the birth. This practice has a number of harmful effects including serious and sometimes fatal burns. The potential danger of this practice and solutions for how this practice can be ameliorated has been included and integrated into various trainings and advocacy events wherever it has been feasible. There is a growing awareness of how to make such practices safer, but it is still a common practice even in educated urban areas. Work to strengthen policy frameworks to protect women remains a focus. Promoting male involvement in reproductive health issues, including support during pregnancy and childbirth and for the care of mothers and child after birth, has been well integrated into work with communities. Through Participatory Community Assessments (PCA), information was obtained from men's groups on assistance they provided to their partner during pregnancy, birth and after birth. Advocacy on this issue has been undertaken through Village Health Committees. As an example, during a recent field visit to Sepone district of Savannakhet province a woman who gave birth ten days before told the mission team that her husband had taken over the chores to allow her time to rest after given birth as directed by the village chief. Where the Village Health Committee is active and supportive of village health volunteers, maternal health has seen significant progress. In addition, political commitment on part of the District Commission for Mother and Child has helped to push village chiefs to ensure that men provide support to women during pregnancy and child birth. 3. Challenges and Opportunities Opportunities include the high-level commitment shown by the Government has been translated into enabling national strategies and frameworks. The Government’s commitment to achieving the objectives of the CEDAW has provided UN Women and UNFPA with the opportunity to strengthen its work on VAW through the implementation of a national prevalence study that is currently in the preparation stages with field work due to start in October-November 2013. Moreover, the informal gender network of NGOs has provided opportunities for the UN to increase partnership and collaboration. The NSEDP mid-term review and MDG report will provide opportunities to take stock and identify gaps and opportunities going forward. 87 Challenges have included the limited capacities of Government counterparts and particularly of national women’s organization with regards to gender issues. The NCAW secretariat is very small and currently relies on a few senior officials plus a few very junior support staff. The disconnect between the high-level commitment and support to gender equality and the limited understanding and commitment from Government technical level staff also represents a challenge and has an impact on the effective implementation of agreements and programmes. The nature of gender work makes it difficult to measure impact, as it refers to long-term political processes, or slow social changes. The lack of a strong civil society network makes it difficult to ensure proper checks and balances on Government initiatives and ensuring transparency, accountability, and inclusiveness of different voices on gender issues. The lack of clear gender focal points within UN organisations also makes it challenging to coordinate the mainstreaming of gender within their activities. Lastly, the limited capacity of UN Women and UNFPA makes it difficult to adequately support gender mainstreaming activities within other UN agencies and the government. 4. Recommendations In order to obtain a real impact in gender programming activities with both the Government and civil society, it is critical to invest resources in building the capacities of national partners as part of programmes and agreements. Revitalization of the Gender Theme Group and active participation of all UN Agencies will be needed for proper gender mainstreaming throughout the work of the UN. Increased coordination with CSOs through the Informal Gender Group will also be needed There are opportunities for the UN to support the Government’s work through the NSEDP, RTM and SWGs, however, in order to ensure that gender is incorporated into the process, the UN needs to restrategize how it incorporates the gender component into its support for Government initiatives. 88 C. Overview of Progress against Outcome and Output Indicators The below constitutes an overview of progress against outcome and output indicators reported on by the Outcome Groups for the 2013 UNDAF Annual Review. Indicators for which no reporting is available have not been included in the overview. Outcome 1 - By 2015, more equitable and sustainable growth promoted for poor people in Lao PDR Indicator I II III IV V Proportion of NSEDP indicators in the annual report disaggregated by sex, age, wealth quintile and geography (Percent) Percentage RTM action points are related to equitable and sustainable growth (Percent) Monitoring and Evaluation Framework for NSDEP established and implemented that measures equitable and sustainable growth (Percent) Number of concessional projects applying natinal environmental and social safegard guidelines (Number) % of activities in support of the National Investment Strategy related to concessionary investment (Percent) Reporting Entity Status Outcome Group 1 Baseline(2011) 2012 Target(2016) Planned Actual 50 0 12.5 0 Planned Actual 70 70 100 60 Planned Actual 0.25 0 1 0 Planned Actual 15 0 60 0 50 0 12.5 0 Baseline(2011) 2012 Target(2016) Planned Actual Output 1.1 - Low-income households and micro-entrepreneurs have better access to financial services Indicator Reporting Entity Status 89 1.1.1 1.1.2 No of additional active saving s clients from low income households and micro enterepreneurs that have access to financial services (Number) No of additional active loan clients from low income households and micro entrepreneurs that have access to financial services (Number) UNCDF,UNDP UNCDF,UNDP Planned Actual Planned Actual 140000 0 35000 52111 70000 0 17500 21018 Output 1.2 - Government and national institutions are better able to enhance sustainable tourism, clean production and export capacity Indicator 1.2.1 1.2.2 Management practices, workplace cooperation, as well as skills and productivity of workers in the tourism sector are improved (Point system) Structure for backward linkages between organic agriculture products, handicraft and the tourism industry strengthened (Yes/No, UNCTAD) Reporting Entity Status ILO,ITC,UNCTAD,UNIDO Planned Actual ILO,ITC,UNCTAD,UNIDO Planned Actual Baseline(2011) 2012 Target(2016) 5 0 1.25 0 3 0 0.75 0 Output 1.3 - Ministry of Planning and Investment, sectors and provinces are better able to develop, implement, monitor and evaluate plans and policies based on up-to-date data and analysis Indicator 1.3.1 Reporting Entity Status UNDP,UNFPA,UNICEF Planned Baseline(2011) 2012 Target(2016) 1 1 90 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 LSIS, LECS and Census provide data disaggregated by wealth quintiles, location (urban/rural with road and without road), sex, age and ethnicity (Point system) % of selected sectors and provinces using data disaggregated by wealth quintiles, location, sex, age and ethnicity in their development plans, monitoring and evaluation (Percent) NSEDP M&E indicators monitored through LaoInfo (Yes/No) At least one National Human Development Report produced (Yes/No) Social protection issues integrated in the social welfare decree ( (Yes/No) No of analysis and studies on socioeconomic development and children in Lao PDR published (Number) Actual UNDP,UNFPA,UNICEF UNDP,UNFPA,UNICEF UNDP,UNFPA,UNICEF 0 Planned Actual 0 Planned Actual 1 0 50 1 0 1 0 Planned Actual 1 0 1 0 Planned Actual 0.25 0 1 0 Planned Actual 4 10 2 Output 1.4 - Central and local governments have capacity to better screen, plan and monitor Foreign Direct Investments to ensure sustainable economic development Indicator 1.4.1 1.4.2 % of investment screen preapproval process for quality attributed (Percent) Number of national and provincial staff with capacity to review Reporting Entity Status UNDP,UNEP Planned Actual Planned Actual Baseline(2011) 2012 Target(2016) 1 0 0 0 40 100 0 91 1.4.3 1.4.4 investment projects by applying DESIA's technical environmental and social safeguard guidelines (Number) % of new agriculture concession approved using model contract templated (Percent) Number of provinces conduct monitoring on the quality of selected investments (Number) UNDP,UNEP UNDP,UNEP Planned Actual Planned Actual 90 0 0 0 6 2 4 4 Output 1.5 - National training and research institutions are better able to contribute to analysis of demographic changes and social development 1.5.1 Indicator Reporting Entity Status No. of analysis and studies published (Number) UNFPA Planned Actual Baseline(2011) 2012 Target(2016) 10 2 2 2 Baseline(2011) 2012 Target(2016) 50 100 Output 1.6 - Ex-poppy cultivating communities have increased household productivity and improved infrastructure Indicator 1.6.1 1.6.2 At least 50% of the project target areas in Phongsaly, Oudomxay and Huaphanh provinces that have increased food and agricultural production by the end of the project (Percent) At least 100 small farmer enterprises and local entrepreneurship in Phongsaly, Reporting Entity Status UNODC Planned Actual 19 26.75 38 Planned Actual 0 25 235 UNODC 92 1.6.3 Oudomxay and Huaphanh provinces newly developed by the end of the project (Number) At least newly 40 basic infrastructur of the project target areas in Phongsaly, Oudomxay and Huaphanh provinces constructed by the end of the project (Number) UNODC Planned Actual 0 10 38 40 Output 1.7 - The National Drug Control Master Plan, which is part of the 7th National Socio-Economic Development Plan, is implemented Indicator 1.7.1 1.7.2 1.7.3 1.7.4 No of police officers, prosecutors, judges and drug control officers trained on the applicaton of the Law on Drugs (Number) Cash income of the project target areas in Phongsaly, Oudomxay and Huaphanh provinces increased by 30% by the end of the project (Percent) At least 80% of the total addicts in target areas in Phongsaly, Oudomxay and Houaphanh treated (Percent) Implementation of the National Drug Control Master Plan is assessed as part of the 7th NSEDP (Yes/No) Reporting Entity Status Baseline(2011) 2012 Target(2016) Planned Actual 125 133 350 50 7.5 30 20 80 0.25 1 Planned Actual 0 UNODC Planned Actual 0 Planned Actual 0 93 Output 1.8 - Farmers have better access to markets and more sustainable integrated farming systems Indicator 1.8.1 No of farmers organisation formed (Number) 1.8.2 No of fair contract farming agreement made (Number) 1.8.3 No of households with improved food security (Number) Reporting Entity IFAD Status Baseline(2011) 2012 Target(2016) Planned Actual 1686 2802 2112 1544 Planned Actual 29 8 95 7 40869 13986 20706.75 9300 Baseline(2011) 2012 Target(2016) Planned Actual 10 0 2.5 3 Planned Actual 0.25 1 1 0 Planned Actual 0.25 1 1 0 60000 30 15022.5 4000 Planned Actual Output 1.9 - Government supported to develop capacity for labour market information systems and policies Indicator 1.9.1 1.9.2 1.9.3 1.9.4 No. of districts implementing strategy or components of it to generate jobs and income in rural areas (Number) Information from Labour force survey used for the policy planning (Yes/No) Decree on employment promotion drafted, revised and finalized (Yes/No) No. of job seekers and employers using employment services per year (Number) Reporting Entity Status ILO Planned Actual Output 1.10 - Government officials have knowledge on and national policy to eliminate hazardous forms of child labour 94 Indicator 1.10.1 1.10.2 Department of Statisics publishes data on child labour incidences on hazardous work (Point system) Long-term national action plan on ending the worst form of child labour in Lao PDR drafted (Yes/No) Reporting Entity ILO Status Baseline(2011) 2012 Target(2016) Planned Actual 1 1 1 0 1 0 1 0 Baseline(2011) 2012 Target(2016) 1 0 0.25 0 1 0 0.25 1 35 0 8.75 17 Planned Actual Output 1.11 - Local authorities better able to deal with challenges and opportunities of urbanization Indicator 1.11.1 1.11.2 1.11.3 Reporting Entity Status National Urban Forum established (Yes/No, UN-Habitat) Planned Actual Pilot on decentralization of basic services and urgan rural linkages (Yes/No, UN-Habitat) No of small towns where a Urban Inequalities Survy (UIS) was conducted (Number) Planned Actual UN-HABITAT Planned Actual Output 1.12 - Opportunities for new livelihoods linked to culture and development, the creative sector, and intangible cultural heritage explored Indicator 1.12.1 Policy and action plan for the Convention of Intangible Cultural Heritage drafted (Yes/No) Reporting Entity Status Baseline(2011) 2012 Target(2016) UNESCO Planned Actual 0.25 1 1 0 95 Output 1.13 - Government at central and provincial level increase aid and development effectiveness through the Round Table Process Indicator 1.13.1 1.13.2 1.13.3 No of successful Round Table Meetings and Implementation Meetings supported by UNDP (Number) Availability of funtioning ODA database (Yes/No) Reporting Entity UNDP RTP forums better aligned to support achievements of the 7th Plan goals (Yes/No) Status Baseline(2011) 2012 Target(2016) Planned Actual 4 1 1.75 2 Planned Actual 0.25 1 1 0 Planned Actual 0.25 1 1 0 Output 1.14 - Strengthening institutional and national capacities related to standard, metrology, testing and quality Indicator 1.14.1 1.14.2 1.14.3 No of regulations, standard, quality, methodology developed (Number) No. of laboratories have been internationally accredited (Number) No of standard and qualties that are issued to producers (Number) Reporting Entity UNIDO Status Baseline(2011) 2012 Target(2016) Planned Actual 7.5 10 30 0 Planned Actual 0.5 0 2 0 15 0 3.75 6 Planned Actual Output 1.15 - Enhancing SME development through integrated local economic development 96 Indicator 1.15.1 1.15.2 1.15.3 No of trained IT speciliast and statisticians of NSC and MoIC (Number) 2008 International Recommendations for Industrial Statistics (IRIS 2008) introduced to Department of Industry and Handicraft (Yes/No) Setting up of Database system , Prototype software system, Methodological framework developed (Yes/No) Reporting Entity Status Baseline(2011) 2012 Target(2016) Planned Actual 3 0 12 0 Planned Actual 0.25 0 1 0 Planned Actual 0.25 0 1 0 UNIDO Outcome 2 - By 2015, the poor and vulnerable benefit from the improved delivery of public services, an effective protection of their rights and greater participation in transparent decision making Indicator I II III IV V Law on local administration revised to empower local administration to manage service delivery (Point system) Progress towards use of citizens report cards surveys on accessibility, affordability, and quality of services (Point system) No. of civil servants trained by the National Civil Service Training Centre per year (Number) No. of towns that implement propoor water governance (Number) Reporting Entity Status Planned Actual Baseline(2011) 2012 Target(2016) 1 0 Planned Actual 1 Planned Actual 237 Planned Actual 0 0 4 1 Outcome Group 2 Planned 750 8 3 97 VI VII VIII IX X XI Progress towards implementation of Legal Sector Master Plan strategic directions (Point system) Progress towards “Law on laws” on unified standards to draft laws (Point system) Civil Service Code of Conduct approved (Point system) No. of provinces with at least one legal aid clinic providing for poor and vulnerable (Number) Progress towards a legal framework for establishment of local councils (Point system) % of new laws and bills accompanied by technical analysis, fact finding reports, or legislative studies on impact on poor and vulnerable groups per year (Percent) % of senior level (level 5 upwards) civil servants who are women (Percent) Actual 0 2 Planned Actual 0 2 2 Planned Actual 0 1 0 Planned Actual 1 5 Planned Actual 0 0 Planned Actual Planned Actual 2 17 2 15 0 25 16 Output 2.1 - The National Assembly is able to better perform its oversight, legislative and representational roles Indicator 2.1.1 2.1.2 % of National Assembly (NA) members with improved skills in legislative drafting and review (Percent) Reporting Entity UN Women,UNAIDS,UNDP,UNFPA,U NICEF,UNODC Status Planned Actual Planned Baseline(2011) 2012 Target(2016) 80 52 8 98 2.1.3 2.1.4 2.1.5 2.1.6 No. of NA fact finding missions undertaken (Number) No. of new laws adopted or revised in line with international treaty obligations which are available to the public (Number) % of complaints and petitions per year processed and documented at the NA (Point system) No. of new or revised legislation on gender based violence adopted in line with CEDAW and CRC recommendation (civil and penal law; law on protection and promotion of women) (Number) No. of new legislation reviewed from a gender perspective in compliance with CEDAW and CRC (Number) Actual 1 Planned Actual 89 Planned Actual 0 Planned Actual 115 3 5 3 Planned Actual 8 Output 2.2 - Improved capacity of the civil Service at national and sub-national level to better manage and deliver services to the poor Indicator 2.2.1 2.2.2 2.2.3 Reporting Entity No. of One-Door-Service Centres operational (Number) No. of districts benefiting from decentralized fiscal transfers (Number) No. of Local Governments implementing their plan and UNCDF,UNDP,UNICEF Status Baseline(2011) Planned Actual 13 Planned Actual 35 Planned Actual 35 2012 Target(2016) 50 70 70 99 2.2.4 2.2.5 2.2.6 2.2.7 budget according to approved annual plan per year (Number) National and sub-national capacity development initiatives (GPAR Fund) (Number) No. of Local Governments implementing integrated planning and budgeting in coordination with sectoral departments (especially health and education) to remove bottlenecks to service delivery (Number) No. of sectors applying the decree on remuneration of civil servants in remote areas (Number) No. of sectors that are applying roles and responsibilities of functions at the central and subnational levels, in line with the national law on public administration and guidance on job descriptions (Number) Planned Actual 10 Planned Actual 0 Planned Actual Planned Actual 30 2 2 0 2 0 Output 2.3 - Labour migration policy and mechanisms developed and adopted to protect Laotian migrant workers from exploitation and abuse during recruitment and employment Indicator 2.3.1 Availability of the draft Emigration Operations Manual (Point system) 2.3.2 No. of fully functioning Migration Resource centres (MRCs) with trained staff (Number) Reporting Entity Status ILO ILO,UN Women Baseline(2011) 2012 Target(2016) Planned Actual 1 0 1 0 Planned Actual 2 3 3 0 100 2.3.3 Sex-disaggregated data system in place in MOLSW (Point system) Planned Actual 1 0 Output 2.4 - The Legal Sector Master Plan is effectively implemented advancing the Rule of Law and accelerated realization and protection of human rights Indicator 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.4.7 % of accepted 74 Universal Periodic Review Recommendations which are fully implemented (Percent) % of new laws drafted/existing laws revised in line with international treaty obligations (Percent) National Committee or Agency for the Protection of Human Rights established in line with the Paris principles relating to the national human rights institutions (Point system) Progress towards a functioning monitoring system for enforcement of laws (Point system) Fully functioning National Database on legislation and legal resource (Point system) Progress towards a functioning Government led joint coordination mechanism for juvenile justice at national and sub-national levels (Point system) Reporting Entity OHCHR,UN Women,UNDP,UNICEF,UNICRI,U NODC Status Baseline(2011) Planned Actual 0 Planned Actual 0 Planned Actual 0 Planned Actual 0 Planned Actual Planned Actual Planned 2012 Target(2016) 100 100 1 2 2 0 5 0 0 10 101 No. of CRC recommendations including observations addressed by government (Number) Actual 0 Reporting Entity Status Baseline(2011) 2012 Target(2016) UNDP,UNODC Planned Actual 1 0 1 0 Planned Actual 1 1 3 0 Output 2.5 - The Government is able to effectively fight corruption Indicator 2.5.1 2.5.2 2.5.3 2.5.4 UNCAC implementation review completed (Point system) Progress towards amending national anti-corruption legislation in line with UNCAC's requirement (Point system) % of officers of the Government Inspection Authority having received training on UNCAC and the national anti-corruption law (Percent) % of prosecutors, judges and police officers having received training on UNCAC and the national anticorruption law (Percent) UNODC Planned Actual 20 0 0 Planned Actual 0 0 Reporting Entity Status Baseline(2011) 2012 UNIAP Planned Actual 0 1 UNDP,UNODC 10 Output 2.6 - Government is better able to prevent and combat human trafficking Indicator 2.6.1 Prime Minister's Office approved National Plan of Action on Human Trafficking (Point system) Target(2016) 1 102 2.6.2 Anti-Human Trafficking Law drafted (Point system) 2.6.3 No. of legal and law enforcement officials trained (Number) UNIAP,UNODC UNODC Planned Actual Planned Actual 1 0 0 800 300 523 Output 2.7 - Government officers are better able to apply the existing criminal and civil law from arrest to prosecution Indicator 2.7.1 2.7.2 2.7.3 2.7.4 Progress towards lawyers, judges, investigators, prosecutors and policemen equipped with the knowledge and skills to apply existing criminal and civil law from arrest to prosecution in line with international human rights standard (Point system) Progress towards lawyers, judges, investigators, prosecutors and policemen equipped with the knowledge and skills to apply international juvenile justice standards in the application of national laws (Point system) Progress towards judges, prosecutors, policemen and drug control officers equipped with the knowledge and skills to apply the Law on Drugs and related criminal law (Point system) Network of legal professionals equipped with the knowledge to Reporting Entity Status UNICEF,UNICRI,UNODC Planned Actual UNICEF UNODC UNICEF,UNICRI,UNODC Baseline(2011) 2012 Target(2016) 5 0 1 1 Planned Actual 5 0 0 Planned Actual 1 1 3 0 Planned Actual 1 0 3 0 103 apply national laws and influence change meet to share best practices and lessons learnt (Point system) Output 2.8 - People in Lao PDR have greater access to information and more opportunities to participate in planning and decision-making as well as monitoring and implementation of national and sub-national development plans Indicator Reporting Entity Status Baseline(2011) 2.8.1 No. of registered Not-for-Profit Associations -NPAs (Number) Planned Actual 1 2.8.2 No. of community radios on air (Number) Planned Actual 4 Planned Actual 0 Planned Actual 0 2.8.3 2.8.4 Participatory local planning policy and guideline in place (Point system) NA hotline permanently open (Point system) UNDP 2012 Target(2016) 100 15 1 1 Output 2.9 - Support to Macro-reforms for improved efficiency, accountability and transparency in public administration Indicator 2.9.1 2.9.2 Regulations to implement Civil Service Code of Conduct exist (Point system) Competence and merit-based civil service performance management system in place (performance appraisals and promotions of civil Reporting Entity UNDP Status Baseline(2011) Planned Actual 0 Planned Actual 0 2012 Target(2016) 1 1 104 2.9.3 servants based on new civil service performance management system) (Point system) Revision of Law on Local Government (Point system) Planned Actual 2 0 Output 2.10 - National law on drugs and crime is updated and implemented according to ratified international treaties Indicator 2.10.1 2.10.2 Interpretation guidelines or draft amendment to existing drug control law, criminal law and/or criminal procedure law (Point system) No. of new NA members participating in awareness raising sessions on gaps between national law and ratified treaties on drugs and crime (Number) Reporting Entity UNODC Status Baseline(2011) 2012 Target(2016) Planned Actual 0 1 2 0 Planned Actual 50 0 100 Baseline(2011) 2012 Output 2.11 - Sector reforms supported for more pro-poor water and sanitation governance Indicator 2.11.1 2.11.2 Strategy on pro-poor water governance drafted (Point system) No. of utilities that operationalize a gender action plan (Number) Reporting Entity UN-HABITAT,UNICEF Status Planned Actual Planned Actual Target(2016) 1 0 12 0 105 Output 2.12 - New Labour Legislation adopted with social dialogue mechanisms to ensure industrial peace and institutionalized Indicator 2.12.1 2.12.2 2.12.3 2.12.4 New Labour Legislation adopted with the provision on labor disputes mechanism and procedures (Point system) Formal mechanisms to settle labour disputes established and functional (Point system) Formal mechanism to determine the minimum wage established (Point system) % of labour dispute cases per year which were pre-adjudicated (Percent) Reporting Entity Status Baseline(2011) Planned Actual 0 2012 Target(2016) 1 Planned Actual 1 0 Planned Actual 0 Planned Actual 26 ILO 1 50 Output 2.13 - The justice sector strengthened to respond to the needs of women and promote and protect women's human rights Indicator 2.13.1 2.13.2 2.13.3 Curricular established in law school that incorporate CEDAW principles (Point system) CEDAW compliant strategy and guidelines within justice sector exist (Point system) No. of judges and legal aid providers equipped with skills to respond to needs of women and Reporting Entity Status Planned Actual UN Women Planned Actual Baseline(2011) 2012 Target(2016) 1 0 1 0 Planned Actual 106 protect women's human rights (Number) Outcome 3 - By 2015, under serviced communities and people in education priority areas benefit from equitable quality education and training that is relevant to the labour market Indicator Reporting Entity Status Baseline(2011) 2012 I Gross pre-school enrolment rate for girls and boys (Percent, Boys) Planned Actual 22.0 28.6 II Gross pre-school enrolment rate for girls and boys (Percent, Girls) Planned Actual 22.3 28.5 III Gross pre-school enrolment rate for girls and boys (Percent) Planned Actual 22.1 25 28.6 IV Net primary enrolment rate for girls and boys (Percent, Boys) Planned Actual 93.7 96 V Net primary enrolment rate for girls and boys (Percent, Girls) Planned Actual 91.7 94.3 VI Net primary enrolment rate for girls and boys (Percent) Planned Actual 92.7 94 95.2 Planned Actual 64.6 68.2 Planned Actual 55.5 61 IX Gross lower secondary enrolment rate for girls and boys (Percent, Boys) Gross lower secondary enrolment rate for girls and boys (Percent, Girls) Gross lower secondary enrolment rate for girls and boys (Percent) Planned Actual 60.2 63.9 64.7 XII % of girls and boys starting grade 1 who reach grade 5 (Percent, Boys) Planned Actual 71.0 68.9 VII VIII XII Outcome Group 3 Target(2016) 39 98 75 Planned 107 72.0 71.2 Planned Actual 71.1 77.82 70 Planned Actual 82.6 90.6 Planned Actual 78.7 85.1 Planned Actual 80.7 81.78 88 XVI Transition rate from primary to lower secondary for girls and boys (Percent, Boys) Transition rate from primary to lower secondary for girls and boys (Percent, Girls) Transition rate from primary to lower secondary for girls and boys (Percent) Literacy rate in age group 15-24 years (Percent, Female) Planned Actual 56 68.7 XVII Literacy rate in age group 15-24 years (Percent, Male) Planned Actual 72 77.4 XVIII Literacy rate in age group 15-24 years (Percent) Planned Actual 64 72.75 73 XII XIII XIV XV % of girls and boys starting grade 1 who reach grade 5 (Percent, Girls) % of girls and boys starting grade 1 who reach grade 5 (Percent) Actual 98 85 99 Output 3.1 - Government has the capacity to effectively coordinate, plan, implement and monitor education sector development Indicator 3.1.1 MoES services at central, provincial and district levels utilize disaggregated education sector data from the Education Reporting Entity Status Planned Baseline(2011) 2012 Target(2016) Presentation platform in place 108 Management Information System for planning, budgeting, monitoring and strengthening policies Increased coordination (under leadership of the MoES) in the delivery of the Education Sector Development Plan, consistent with Aid Effectiveness Principles Actual No data presentation platform in place Lao EDUINFO data presentation tool available at central level UNESCO,UNICEF 3.1.2 Planned Actual Revised ESWG Structure with TOR for each level elaborated ESWG Executive TOR only available Draft TOR for ESWG structures are available Output 3.2 - Pre-school aged children, especially girls in educationally disadvantaged communities, are better prepared for school Indicator Reporting Entity Status Baseline(2011) 2012 Target(2016) 109 Availability of a robust, communitybased ECE service model for national application 3.2.1 Planned Actual Evaluated Pilot Available No Pilot Not Available Documented assessment of ECE policy areas inform ECE sector reform Planned Actual 3.2.2 3.2.3 % of pre-school students receiving mid-morning snacks in targeted provinces (Percent) ECE Sub-Sector Assessment available No assessment available No subsector assessment available Planned Actual Output 3.3 - Primary and secondary school-aged children, especially girls in educationally disadvantaged communities, are enrolled in and complete primary and secondary education that uses a life-skills approach Indicator 3.3.1 3.3.2 % of primary schools with functioning water and sanitation facilities (Percent) % secondary schools with functioning water and sanitation facilities (Percent) Reporting Entity Status Baseline(2011) 2012 UN-HABITAT,UNICEF Planned Actual 29.4 42.1 Target(2016) 50 Planned Actual 110 3.3.3 3.3.4 3.3.5 3.3.6 % of primary schools meeting the national Quality Education Standards (Percent) % of secondary schools meeting the national Quality Education Standards (Percent) % of students participating in nonformal equivalency programmes who pass the primary completion exam (Percent) % of primary and secondary students receiving mid-morning snacks and/or take-home rations in targeted provinces (Percent) UNESCO,UNICEF Planned Actual 75 Planned Actual 75 Planned Actual 80 Planned Actual Output 3.4 - The needs of disadvantaged children are addressed through curricula revisions in pre-primary, primary and secondary and teacher education Indicator 3.4.1 Progress towards pre-school, primary and secondary pre-service and classroom teaching and learning materials developed with attention to gender and ethnic, linguistic and cultural diversity (Point system) Reporting Entity Status UNICEF Planned Actual Baseline(2011) 2012 Target(2016) 3 0 Output 3.5 - Government and concerned industries have the capacity to develop and approve Skill Standards and Testing modules and certify the upgraded skills of workers Indicator Reporting Entity Status Baseline(2011) 2012 Target(2016) 111 3.5.1 3.5.2 No. of Skill Standards and Testing Modules approved (Number) Institution functioning to certify the upgraded skills of workers (Point system) Planned Actual ILO Planned Actual 20 10 1 0 Outcome 4 - By 2015, people in Lao PDR benefit from more equitable promotive, preventive, curative and rehabilitative health and social welfare services Indicator I II III DPT3 coverage (Percent) Out of pocket expenditure as % of private expenditure on health (Percent) Tobacco use in adults (Percent) VII % of women who desire to delay or prevent pregnancy who are not currently using contraceptive methods (Percent) % of births attended by trained health worker (excl. TBAs) (Percent) Progress towards availability of disaggregated health data (Point system) % of people using improved drinking water (Percent) VIII % of people using improved sanitation facilities (Percent) IV V VI Reporting Entity Status Baseline(2011) 2012 Target(2016) Planned Actual 46.35 78 90 31.8 42.08 30 16.5 29.4 9 19.5 18 44 50 0.75 3 80 60 Planned Actual Planned Actual 46.1 19 Planned Actual 20 Planned Actual 42 Planned Actual 0 Outcome Group 4 Planned Actual 57 62.75 67 Planned Actual 53 54.75 63 112 IX X No. of provinces that have indicator-based and events-based surveillance systems with reports reaching National level (Number) Progress towards a National Social Welfare Development Strategy (Point system) Planned Actual Planned Actual 10.25 17 1.5 6 8 0 Output 4.1 - Health systems are better governed, financed, staffed and have better management, data, products and technology* Indicator 4.1.1 Outpatient visits per person per year (Number) Reporting Entity Status Baseline(2011) UNICEF,WHO Planned Actual 0.38 2012 Target(2016) 0.51 0.89 2012 Target(2016) 1.25 5 Output 4.2 - Policies and programmes in place that address underlying social and economic determinants of health Indicator 4.2.1 % increase in national indicators disaggregated by sex and age and at least two other determinants (ethnicity, place of residence, and/or socioeconomic status) (Percent) Reporting Entity Status Baseline(2011) UNICEF,WHO Planned Actual 0 Output 4.3 - Non-communicable conditions, mental disorders, violence, injuries and visual impairment prevented and reduced and risk factors for health conditions* prevented or reduced 113 Output 4.4 - Ministry of Health and other relevant institutions improve information, coverage and quality of sexual and reproductive health information and services* Indicator 4.1.1 Number of Midwives accredited (Number) 4.1.2 National ANC1 data from health management information systems reported annually (Percent) Reporting Entity UNFPA,WHO Status Baseline(2011) 2012 Target(2016) Planned Actual 475.5 497 1500 139 Planned Actual 74.5 77 85 71 Output 4.5 - Individuals, families and communities in priority areas have access to an integrated package of services on maternal, neonatal and child health Indicator 4.5.1 4.5.2 % of fixed site service delivery points with no stock out of family planning commodities and at least five life-saving maternal/reproductive health drugs in six months prior to survey (Percent) % measles immunization coverage (Percent) Reporting Entity Status Baseline(2011) 2012 Target(2016) Planned Actual 48.5 71.70 65 43 95 64 71.75 71 UNFPA,UNICEF,WHO Planned Actual Output 4.6 - Vulnerable and most-at-risk young people in priority urban areas have better access to quality youth-friendly, gender-sensitive, sociallyinclusive sexual and reproductive health information and services Indicator 4.6.1 % of young people aged 15-24 in target areas that received Reporting Entity Status UNFPA,WHO Planned Actual Baseline(2011) 2012 Target(2016) 35 60 27 114 adolescent sexual and reproductive health life-skills education (Percent) Output 4.7 - Communities in small towns and vulnerable children and women in rural areas have improved access to water and sanitation services Indicator 4.7.1 4.7.2 4.7.3 4.7.4 No. of small towns with water supply and sanitation services [a minimum of a) water treatment plant, b) pipe networks, c) household metered connections, d) 24/7 water supply] (Number) % of rural villages in poorest 21 districts having access to and using improved water sources (Percent) % of rural villages in poorest 21 districts having access to sanitation services (Percent) No. of provinces accessing water supply and sanitation services (Number) Reporting Entity UN-HABITAT,UNICEF,WHO Status Baseline(2011) Planned Actual 10 Planned Actual 51 Planned Actual Planned Actual 2012 Target(2016) 11.25 15 58.25 80 43.5 60 11.25 15 38 10 Output 4.8 - International Health Regulations core capacity requirements achieved (including for emerging, neglected tropical and other communicable diseases) Indicator 4.8.1 4.8.2 Laboratory services available to test for priority health threats Reporting Entity Status Planned Actual Planned Baseline(2011) 2012 Target(2016) 2 2 2 115 4.8.3 4.8.4 Infection prevention and control is established and functioning at national and hospital level Multi-hazard National Public Health Emergency Preparedness and Response Plan is developed and implemented General obligations at points of entry are fulfilled Actual 1 Planned Actual 1 Planned Actual 2 1 Output 4.9 - People in Lao PDR have increased awareness of drug prevention and better access to treatment, rehabilitation and reintegration services Indicator 4.9.1 4.9.2 4.9.3 4.9.4 Number of students/youth reached by awareness rallies and direct activities (Number) No. of drug awareness and prevention material distributed nationwide (Number) No. of youth participated in improved recreational and occupational/vocational training activitie (Number) No. of health workers, social workers and police officers trained on drug counselling (Number) Reporting Entity Status Baseline(2011) Planned Actual Planned Actual UNODC 2012 Target(2016) 50000 0 8128 120000 9000 11743 Planned Actual 9000 1400 1620 Planned Actual 80 305 550 Output 4.10 - National and subnational government is better able to implement a social welfare system 116 Indicator 4.10.1 4.10.2 Progress towards a functioning coordinating mechanism led by the Ministry of Labour and Social Welfare for child protection (Point system) Progress towards establishment of a functioning Government-led joint coordination mechanism for social welfare (Point system) Reporting Entity Status Baseline(2011) Planned Actual 0 Planned Actual 0 2012 Target(2016) 1.5 6 1 4 ILO,UNICEF,WHO Output 4.11 - National Health Insurance scheme is established and piloted, and coverage under social health protection schemes has been extended in target areas Indicator 4.11.1 Reporting Entity % of population covered under social health protection schemes in target areas (Percent) Status Planned Actual Baseline(2011) 2012 Target(2016) 29.75 50 2012 Target(2016) 23 Outcome 5 - By 2015, vulnerable people are more food secure and have better nutrition Indicator I Prevalence of stunting in children under 5 years of age (Percent) II Prevalence of wasting in children under 5 years of age (Percent) III Prevalence of underweight in children under 5 years of age (Percent) Reporting Entity Outcome Group 5 Status Baseline(2011) Planned Actual 44 Planned Actual Planned Actual 34 4 6 22 27 117 IV Prevalence of anaemia in children under 5 years of age (Percent) Planned Actual V Prevelance of anaemia in WRA (Percent) Planned Actual 36 VI % of households consuming iodized salt (Percent) Planned Actual 80 Food consumption score (Percent) Planned Actual 12.7 VII 30 41 25 90 5 Output 5.1 - Prevention and appropriate management of malnutrition promoted (including micro-nutrient deficiencies) resulting in improved nutritional status (e.g. stunting, wasting, micronutrient deficiencies prevalence) of targeted girls and boys under 5 years of age Indicator 5.1.1 5.1.2 5.1.3 % of children receiving Ready-toUse Supplementary food to prevent chronic malnutrition in targeted areas (Percent) Countrywide treatment protocol for acute malnutrition in place (Point system) Proportion of children 6-59 months who received at least 1 high dose Vitamin A supplement in the past 6 months (Percent) Reporting Entity Status Baseline(2011) Planned Actual UNICEF,WFP,WHO 2012 Target(2016) 30 17.4 80 Planned Actual 1 0 1 0 Planned Actual 90 90 90 92 2012 Target(2016) 77 80 Output 5.2 - Individuals, families and communities have improved food and nutrition security knowledge and practices Indicator 5.2.1 Reporting Entity Status FAO,UNICEF,WFP,WHO Planned Baseline(2011) 118 5.2.2 5.2.3 5.2.4 5.2.5 % of targeted villages where nutrition training was delivered (Percent) No. of VHVs and civil society members trained to support counselling on IYCF, maternal nutrition, micronutrient supplementation, hand washing, hygiene and care practices in targeted areas (Number) % of children under 6 months exclusively breastfed (Percent) Actual Planned Actual Planned Actual % of children 6 – 8 months receiving solid, semi-solid or soft foods (Percent) National IYCF guidelines in place (Point system) Planned Actual Planned Actual 100 125 250 50 70 75 90 1 1 0 40 52 0 Output 5.3 - Government is better able to implement an integrated and coordinated approach to food and nutrition security and to translate it into appropriate programmes Indicator 5.3.1 5.3.2 5.3.3 Inter-sectoral coordination mechanism for food security and nutrition established (Point system) Nutrition and food security stakeholder mapping completed (Point system) Strengthened nutrition monitoring and reporting mechanisms through Reporting Entity FAO,UNICEF,WFP,WHO Status Baseline(2011) 2012 Target(2016) Planned Actual 4 0 1 0 Planned Actual 1 2 0 Planned Actual 0 0 2 0 119 linking with HMIS and surveillance system (Point system) Output 5.4 - Consumption and production of edible insects and indigenous foods supported Indicator 5.4.1 5.4.2 No. of households that consider indigenous food farming mechanisms have increased their Food and Nutrition Security in target areas (Number) No. of households with expanded and diversified home food production or greater access to markets (Number) Reporting Entity Status Planned Actual Baseline(2011) 2012 Target(2016) 100 500 2500 1039 30000 2012 Target(2016) 0 1 0 FAO,WFP Planned Actual Output 5.5 - Sustainable fisheries arrangements and aquaculture under local management developed Indicator 5.5.1 Fisheries management regulations developed (Point system) 5.5.2 Fisheries mangement regualations established in 30 districts covering conservation of broodstock & nursing grounds; restrictions on destructive gears, access controls, closed seasons (Number) 5.5.3 Reporting Entity Status Baseline(2011) FAO Planned Actual 0 Planned Actual 30 100 Planned 120 5.5.4 5.5.5 5.5.6 Increase in fisheries management groups by 2015 (Percent, Rivers) Increase in fisheries management groups by 2015 (Percent, Water bodies) % of respondents in target communities that agree that local management of fisheries is sustainable (Percent) Aquaculture provides 25% increase in supply to rural and peri urban areas (Number) Actual Planned Actual FAO Planned Actual Planned Actual 75 0 50000 40000 Output 5.6 - Farmers are better able to implement integrated pest management, good agricultural practices and pesticide risk reduction Indicator 5.6.1 5.6.2 5.6.3 No. of farmers trained (at least 2 weeks training) in Pesticide Risk Reduction or season-long IPM Farmers Field School (Number) % of IPM/FFS trained farmers that use 50% less pesticide (Percent) Reporting Entity FAO % of trained farmers that have increased use of non-chemical pest management approaches (Percent) Status Baseline(2011) Planned Actual 2000 Planned Actual 10 Planned Actual 15 2012 Target(2016) 600 5000 70 90 90 Output 5.7 - Small holder farmers are better linked to the market and agencies procuring food commodities are increasingly buying from them Indicator Reporting Entity Status Baseline(2011) 2012 Target(2016) 121 5.7.1 5.7.2 % of WFP's food purchased locally from small millers participating in the P4P initiative (Percent) No. of smallholders participating in trainings to increase productivity and improve nutritional knowledge (Number) WFP Planned Actual 5 0 30 Planned Actual 1000 0 6000 Outcome 6 - By 2015, key populations at higher risk of HIV infection benefit from increased coverage and quality of integrated prevention and treatment, care and support services Indicator I % of sex workers who are HIV infected (Percent) II % of men having sex with men who are HIV infected (Percent) III % of eligible adults and children currently receiving antiretroviral therapy (Percent) Reporting Entity Status Planned Actual Outcome Group 6 / JUNT Baseline(2011) 2012 Target(2016) 5 1.28 1.20 Planned Actual 5 2.28 2.44 Planned Actual 52.27 55.36 90 Output 6.1 - More most-at-risk populations* have access to quality HIV/STI prevention information and services Indicator 6.1.1 6.1.2 Injecting Drug Users - No. of provincial groups of local harm reduction service providers established (Point system) Men with multiple sex partners - % of targeted mobile men (including civil servants, uniformed men, Reporting Entity Status Baseline(2011) 2012 UNODC Planned Actual 0 2 ILO Planned Actual Target(2016) 2 70 0 0 122 6.1.3 6.1.4 6.1.5 6.1.6 migrants, transport workers, business men, others) that report consistent condom use with casual partners (Percent) STI Services - % of 94 priority districts (94 priority districts of 143 listed I National Strategic and Action Plan on HIV/ADIS/STI 20112015, Annex 6B) that have at least one quality-assured site for STI treatment (Percent) PMTCT - % of antenatal clinic attendants that received Provider Initiated Counselling and Testing (Percent) General Population - A minority has access to HIV-AIDS prevention in their language (Point system) General Population - % of young women and men aged 15–24 both correctly identify ways of preventing the sexual transmission of HIV and who reject major misconceptions about HIV transmission (Percent) WHO UNICEF UNESCO UNFPA Planned Actual 100 Planned Actual 1 Planned Actual Planned Actual 100 100 50 1 0 0 80 18.4 25.13 Output 6.2 - More People living with HIV and AIDS have equitable access to and use of effective, gender-sensitive HIV treatment, care and support services Indicator 6.2.1 % of adults age 15+ who have advanced HIV infection receive antiretroviral treatment (Percent) Reporting Entity Status Baseline(2011) 2012 Planned WHO Actual Target(2016) 90 54.75 57.63 123 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 % of adults and children with HIV known to be on treatment 12 months after initiation of antiretroviral therapy (Percent) % of HIV patients tested for TB and vice-versa by using PICT approach (Percent) % of identified HIV-positive pregnant women received antiretroviral medicines to reduce the risk of mother-to-child transmission (Percent) % of children diagnosed with HIV can equitably access home and community based care and support services (Percent) % of children age 0-14 who have advanced HIV infection receive antiretroviral treatment (Percent) Planned Actual 87.3 85.5 Planned Actual 100 18 Planned Actual 90 14 16.44 UNICEF Planned Actual 90 0 Planned Actual 90 32.13 36.06 Output 6.3 - National AIDS Authorities and their HIV partners are better able to plan, implement evidence and rights-based, gender-sensitive and resourced HIV policies Indicator 6.3.1 6.3.2 6.3.3 No. of provinces that have sentinel surveillance data integrated into GIS system (Number) National estimates and projection endorsed and disseminated at national and global level (Point system) Reporting Entity Status Baseline(2011) 2012 Target(2016) UNESCO Planned Actual 0 0 6 1 1 1 1 1 1 4 Planned Actual UNAIDS Planned 124 6.3.4 6.3.5 6.3.6 6.3.7 6.3.8 6.3.9 No. of GAPR & NASA produced and officially submitted to UNAIDS and disseminated (Number) No. and percentage of CBO involved in national joint programme review (Number) No. of JUNT technical support provided to address bottlenecks in GF grant implementation (Number) HIV related indicators included in the 7th HSDP and monitored on a quarterly basis (Point system) National guidelines and standard operating procedures exist for key HIV services (including testing & counseling, medical management of HIV, PMTCT, targeted prevention interventions and home/community-based care) (Point system) Progress towards national harm reduction policies and plans (Point system) Progress towards a functioning national task force on harm reduction (Point system) Actual 1 1 Planned Actual 3 3 6 3 Planned Actual 6 6 12 2 1 0 1 1 1 0 9 9 2 0 2 2 2 0 2 2 Planned Actual WHO Planned Actual Planned Actual UNODC Planned Actual Outcome 7 - By 2015, the government ensures sustainable natural resources management through improved governance and community participation Indicator I Reporting Entity Status Outcome Group 7 Planned Baseline(2011) 2012 Target(2016) 65 125 II III IV V VI Proportion of land area covered by forest (%) per year (Percent) No. of participatory natural resource management agreements developed (2010:0, 2015:30, MoV: Review of provincial and central records) (Number) Average timber revenue received by village clusters in targeted districts per village per year (2010: USD262, 2015: USD350, MoV: DoF Annual Report) (USD) National Bio-Safety Framework adopted by Government (2010: No; 2015: Yes; MoV: Framework Document) (Point system) Bio-safety law passed by National Assembly (2010: No; 2015: Yes; MoV: Bio-Safety Law) (Point system) No. of provincial or district governments with agro-biodiversity conservation plans (2010: 0, 2015: 8, MoV: MAF sectoral annual progress reports) (Number) Actual Planned Actual 42 30 0 2 Planned Actual Planned Actual 0 0.25 Planned Actual 0 0.25 Planned Actual 1 1 8 0 Output 7.1 - Government has comprehensive participatory development plans for urban wetlands and is able to implement them Indicator 7.1.1 7.1.2 Master plan for individual urban wetlands developed (Point system) Reporting Entity FAO,UNDP,UNEP,UNESCO,UNHABITAT Status Baseline(2011) 2012 Planned Actual 0 0 Planned Target(2016) 1 15000 126 No. of hectares of urban wetlands brought under management plan (Number) Actual 0 0 Output 7.2 - Communities and government are better able to manage forests sustainably Indicator 7.2.1 Area managed jointly by communities in targeted (to be defined prior to start of UNDAF cycle) districts (Percent) Reporting Entity Status Baseline(2011) 2012 FAO Planned Actual 20 20 Reporting Entity Status Baseline(2011) 2012 UNDP Planned Actual Target(2016) 40 Output 7.3 - Communities are more engaged in the management of natural resources Indicator 7.3.1 No of existing participatory natural resource management and biodiversity management model with corresponding programmes (Number) (Number) Target(2016) 3 1 2 Output 7.4 - National and sub-national authorities are better able to manage the environment in line with Forestry and Fishery Laws Indicator 7.4.1 No. of training packages for government officer at central and Reporting Entity Status UNDP Planned Actual Baseline(2011) 2012 Target(2016) 3 0 3 127 local levels, and communities on national legal framework and issues related to 3 Rio Conventions (Number) Output 7.5 - National and sub-national authorities are better able to manage bio-safety risks in line with the National Socio-economic Development Plan and the Cartagena Protocol on Bio-safety Indicator 7.5.1 National Bio-safety Framework drafted (Point system) 7.5.2 Bio-safety law drafted (Point system) Reporting Entity UNEP Status Baseline(2011) 2012 Planned Actual 0 0 Planned Actual 0 0 Target(2016) 1 1 Output 7.6 - National and sub-national authorities develop policies and pilots individual land titling, land use zoning and land recording Indicator 7.6.1 7.6.2 Policies and tools on individual land titling, land use zoning and land recording exist (Point system) No. of provinces which pilot individual land titling, land use zoning and land recording (Number) Reporting Entity UN-HABITAT Status Baseline(2011) 2012 Planned Actual 0 0.25 Planned Actual 0 0 Target(2016) 1 3 Output 7.7 - Improved resource productivity, environmental performance of competitive and sustainable tourism industry, building up efficient backward linkages with the handicraft and silk industries 128 Indicator 7..7.1 7..7.2 7..7.3 Increased availability of environmentally sound goods (in particular clean and organic food products) and services (e.g. sustainable tourism) (Point system) Increased exports of environmentally sound goods and services (Point system) Compliance with food safety, service quality and environmental standard, improved within the tourism sector through the introduction of a voluntary national quality certification mark (Point System) (Point system, UNIDO) Reporting Entity Status Baseline(2011) 2012 Planned Actual 0 1 Planned Actual 0 1 Planned Actual 0 2.5 Target(2016) 2 2 ILO,ITC,UNCTAD,UNIDO 4 Output 7.8 - Government supported in adopting best techniques and environmental practices and is better able to manage Persistent Organic Pollutants Indicator 7.8.1 7.8.2 Government policies and regulations adopted to facilitate BAT/BEP implementation (Point system) Enforcement mechanism in place (Point system) Reporting Entity Status Baseline(2011) 2012 Planned Actual 0 0.25 Target(2016) 1 UNIDO Planned Actual 1 0 0.25 Output 7.9 - Communities actively participate in fair, equitable and rational territorial development plans in facilitated negotiation with relevant government authorities and private sector stakeholders 129 Indicator 7.9 No. of District Participatory Territorial Development Plans approved by government (Number) Reporting Entity Status Baseline(2011) 2012 FAO Planned Actual 0 0 Target(2016) 2 Outcome 8 - By 2015, the government and communities better adapt to and mitigate climate change and reduce natural disaster vulnerabilities in priority sectors Indicator I II III IV V No. of priority sectors (Such as forestry, agriculture and water resources, as identified in 2nd National Communication, NAMA, NAPA and National CC strategy) that have a sectoral plan that explicitly include climate change mitigation and adaptation No. of key ministries (i.e. ministries with a sector working group) that have approved Disaster Risk Management Plans Number of national and local level authorities and community members trained on disaster preparedness Number of hazard or climate risk “Vulnerability and Adaptation Assessments” conducted at the subnational level % of households across 16 target districts benefiting from climate change resilient agriculture and/or Reporting Entity Status Baseline(2011) 2012 Planned Actual &lt;1 0 Planned Actual 0 0 0 Planned Actual 0 0 Target(2016) 2 4 Outcome Group 8 1950 Planned Actual 14 0 0 Planned Actual 0 0 15 130 infrastructure improvements (Percent) Output 8.1 - Long-term recovery of natural disaster victims is supported and their vulnerabilities to future natural disasters are reduced Indicator 8.1.1 Progress towards risk preparedness and reduction mechanisms in target communities (Point system) Reporting Entity Status FAO,UNDP,UN-HABITAT Planned Actual Baseline(2011) 2012 Target(2016) 5 0 Output 8.2 - Climate Change Adaption/Disaster Risk Reduction measures linked to water, sanitation, hygiene and shelter improved Indicator 8.2.1 8.2.2 8.2.3 8.2.4 No. of villages that have the capacity for community based risk management action plans (Number) Inter-agency coordination mechanism in place for WASH cluster (Point system) No. of pilots on water and sanitation and build-back better housing and designing conducted (Number) No. of people benefiting from pilots (Number) Reporting Entity Status Baseline(2011) 2012 Planned Actual 100 165 Planned Actual 1 Yes Target(2016) 300 Yes UN-HABITAT,UNICEF Planned Actual 3 0 Planned Actual 0 1 15000 131 Output 8.3 - Government at national and sub-national level has developed and piloted programmes for climate change adaptation and mitigation Indicator 8.3.1 Extent to which climate-resilient development is integrated into national development plans (Point system) Reporting Entity Status UNDP Planned Actual Baseline(2011) 2012 Target(2016) 2 1 1 Output 8.4 - Government* and vulnerable communities can more effectively respond to emergencies, adapt to climate change and prepare for disasters Indicator 8.4.1 Disaster Management Law drafted (Point system) 8.4.2 Indicator on emergency operation centre to be defined (Point system) 8.4.3 Progress towards NDMO's greater coordination capacity (Point system) Reporting Entity UNDP Status Baseline(2011) 2012 Planned Actual 0 No Target(2016) Yes Planned Actual Planned Actual 5 0 2 Reporting Entity Status Baseline(2011) 2012 FAO Planned Actual 0 Output 8.5 - Rural communities develop agroforestry climate change resilience Indicator 8.5.1 No. of households in target districts that have adopted agroforestry (According to International Centre of Research on Agroforestry Target(2016) 100 132 Forestry) farming systems (Number) Output 8.6 - Rural communities are better prepared for disaster risk and climate change in indigenous livestock, fisheries, agricultural production and NTFPs Indicator 8.6.1 % of trained households that practice disaster-prepared animal husbandry aquaculture and agriculture (Percent) Reporting Entity Status FAO Planned Actual Baseline(2011) 2012 Target(2016) 40 0 0 Output 8.7 - Community-based solid waste management and decentralized waste water treatment piloted Indicator 8.7.1 No. of towns with communitybased solid waste management and waste water treatment (Number) Reporting Entity Status Baseline(2011) 2012 UN-HABITAT Planned Actual 0 2 Target(2016) 6 Output 8.8 - National and local authorities are able to effectively prepare for and respond to food shortages and hunger emergencies caused by natural disasters Indicator 8.8.1 No. of National, Provincial and District Disaster Management Committees on Disaster Reporting Entity Status Baseline(2011) 2012 WFP Planned Actual 0 0 Target(2016) 65 133 8.8.2 Preparedness & Response that have been trained (Number) • No. of national and local level authorities and community members trained to effectively prepare for and respond to hunger emergencies caused by natural disasters (Number) WFP Planned Actual 1950 0 0 Outcome 9 - By 2015, national and local governments and communities have reduced the impact of unexploded ordnance on people in Lao PDR Indicator I II III IV V Reporting Entity Status Baseline(2011) 2012 Target(2016) No. of UXO casualties in Lao PDR per year (Number) Planned Actual 243.75 52 75 300 Hectares released for productive use by all UXO operators per year (Number) No. of UXO destroyed per year (Number) Planned Actual 68190 81862 60000 70920 No. of affected districts where clearance operation is based on District Clearance Plans [Note: Districts are considered ‘affected' by UXOs if they are identified as such by district authorities] (Number) Methods developed, training undertaken to create a capacity in NRA and UXO Lao Planned Actual 20 0 5 0 Initial contact made with GICHD to assist in development A basic capacity to both the NRA and UXO Lao to ensure and Planned Actual Outcome Group 9 Planned 134 of capacity to measure the development impact of UXO clearance Actual extremely limited capacity UXO sector-wide multiyear work plan developed (UNDP) NRA is currently developing plan VI Planned Actual measure development impact of work in the UXO sector by 2015 work plan developed and implemented by 2014 for period to 2020 No plan Output 9.1 - UXO Lao is better able to manage clearance and risk education programmes for the needs of communities at risk Indicator 9.1.1 9.1.2 No. of hectares of priority land released in accordance with National Standards and the Convention on Cluster Munitions per year (Number) Progress towards a sustainable programme management capacity for UXO (Point system) Reporting Entity Status Planned Actual Baseline(2011) 2012 Target(2016) 2600 2600 2600 3199 4 1 1.75 1 UNDP Planned Actual Output 9.2 - The National Regulatory Authority for the UXO/Mine Action Sector is better able to coordinate and regulate the UXO sector 135 Indicator Status Baseline(2011) No. of UXO survivors whose needs are tracked (Number) Planned Actual 0 Planned Actual 9.2.3 No. of districts with district clearance plan based on district survey (Number) % of operators accredited (Percent) Planned Actual 9.2.4 % of operators reporting electronically to the NRA (Percent) Planned Actual 9.2.5 % of population in UXO affected areas with improved knowledge, attitudes and practices related to UXO risk reduction (Percent) Planned Actual 9.2.1 9.2.2 Reporting Entity UNDP 2012 Target(2016) 2500 10000 20 0 5 0 49.75 100 100 33 80 13 29.75 44 90 82 84 82 Output 9.3 - National institutions are better able to implement the Convention on Cluster Munitions obligations Indicator 9.3.1 9.3.2 9.3.3 9.3.4 Reporting Entity Status Baseline(2011) 2012 Target(2016) Article 7 CCM Reports submitted by Jan 27th per year (Point system) Planned Actual 1 1 1 1 No. of global CCM meetings (1 Intersession Meeting and 1 State Party Meeting per year) attended by the Lao PDR Government from 2012-2015 (Number) National contribution to the UXO sector in million kips per year (Million kips) Planned Actual 3.5 2 8 2 8000 250 2187.5 250 27500000 50,000,000 UNDP Planned Actual Planned 136 Actual Total UXO sector expenditure per year (USD) 20,000,000 32000000 Outcome 10 - By 2015, People in Lao PDR benefit from policies and programmes which more effectively promote gender equality and increased participation and representation of women in formal and informal decision making Indicator Reporting Entity Status Baseline(2011) 2012 Target(2016) 2.3 10.1.1 Gender differentials in hours spent in domestic labor (hrs/day, Female) Planned Actual 2.4 2.38 0 10.1.2 Gender differentials in hours spent in domestic labor (hrs/day, Male) Planned Actual 0.48 0 0.4 0.5 10.1.3 Age at first birth (Years old, Female) Planned Actual 19.25 21 20 19 10.1.4 No. of CEDAW recommendations acted upon by sector (Number) 20 2 14 0 3 3 1 5 10.1.5 Number of policy framework which promote gender equality based on human rights standard developed (Number) Outcome Group 10 / Gender Theme Group Planned Actual Planned Actual Output 10.1 - Institutions at central and sub-national level are better able to enhance gender equality and follow up CEDAW recommendations Indicator 10.1.1 No. of sectoral and provincial SubCommissions for the Advancement of Women systematically monitoring and reporting on implementation of National Strategy for the Advancement of Women (Number) Reporting Entity Status Outcome Group 10 / Gender Theme Group,UN Women,UNFPA Planned Actual Baseline(2011) 2012 Target(2016) 15 0 3.75 1 137 Output 10.2 - Civil society organizations are better able to advocate for gender responsive policies and demand accountability in line with CEDAW commitments Indicator 10.2.1 10.2.2 10.2.3 10.2.4 10.2.5 10.2.6 10.2.7 Reporting Entity Status Baseline(2011) 2012 Target(2016) Data available to influence government response to GBV/VAW (Number) No. of work plan including M&E framework developed to implement the National Strategy for the Advancement of Women 2011-2015 (Number) No of media professionals with enhanced understanding on GBV (Number) No. of youth groups participating in EVAW Campaign (Number) Planned Actual 0.25 1 1 0 Planned Actual 13.75 0 55 0 Planned Actual 5 0 20 0 Planned Actual 3.5 1 8 2 No. of policy consultations that participated by members of the CEDAW Watch Group to advocate for gender responsive policies (Number) No. of civil society organizations engaged in the CEDAW reporting process and/or implementation of CEDAW Concluding Comments (Number) No. Of nationally representative studies providing evidence on VAW prevalence (Number) Planned Actual 2.75 2 8 1 Planned Actual 16 0 25 13 1 0 0.25 0 Planned Actual 138 Output 10.3 - Women groups have enhanced capacity and opportunities to engage in decision making and planning process Indicator 10.3.1 No. of women groups trained on political participation, leadership and participation in decision making (Number) Reporting Entity Status Baseline(2011) 2012 Target(2016) Outcome Group 10 / Gender Theme Group,UN Women Planned Actual 0.5 2 2 0 139 D. Progress against UNDAF Resource Mobilization Targets The below constitutes an overview of progress against the resource mobilization targets outlined in the UNDAF Action Plan reported on by the Outcome Groups for the 2013 UNDAF Annual Review. Gaps in reporting and baseline and target setting are outline in red capital letters. FD1.1 - Financial Data Output 1.1 Indicator 1.1.1 1.1.2 1.1.3 1.1.4 Adequate resources Reporting Entity Status Actual Adequate Planned mobilized towards output 1.1 (USD, UNDP) Adequate resources disbursed Actual UNCDF,UNDP 2012 Target(2016) 2025780 8103120 0 25000 Actual Adequate Planned disbursed towards output 1.1 (USD, UNDP) Actual 100,000 0 Planned towards output 1.1 (USD, UNCDF) resources ) Planned mobilized towards output 1.1 (USD, UNCDF) resources Baseline(2011 0 0 0 0 FD1.2. - Financial Data Output 1.2 - ITC, ILO, UNCTAD, UNIDO Indicator 1.2.1 Reporting Entity Status ILO,ITC,UNCTAD, Planned 140 Baseline(2011) 2012 708600 Target(2016) 2834400 Adequate resources mobilized UNIDO towards output 1.2 (USD) 1.2.2 Adequate resources Actual 0 Planned disbursed towards output 1.2 (USD) 0 Actual 0 Actual 0 0 FD1.3. - Financial Data Output 1.3 1.3.1 Indicator Adequate resources mobilized towards output 1.3 (USD, UNDP) Reporting Entity Status Baseline(2011) Planned Actual 1,500,000 1.3.2 Adequate resources mobilized towards output 1.3 (USD, UNFPA) Planned Actual 1,300,000 1.3.3 Adequate resources mobilized towards output 1.3 (USD, UNICEF) Planned Actual 0 1.3.4 Adequate resources disbursed towards output 1.3 (USD, UNDP) 1.3.5 Adequate resources disbursed towards output 1.3 (USD, UNFPA) Planned Actual 0 1.3.6 Adequate resources disbursed towards output 1.3 (USD, UNICEF) Planned Actual 0 UNDP,UNFPA,UNICEF Planned Actual 2012 Target(2016) 2125000 4,000,000 2050000 1300000 4,300,000 250000 1,000,000 4,000,000 0 0 330531 4,300,000 1,000,000 FD1.4. - Financial Data Output 1.4 141 Indicator 1.4.1 1.4.2 Adequate resources Reporting Entity resources Actual disbursed Baseline(2011) Planned mobilized towards output 1.4 (USD) Adequate Status UNDP,UNEP towards output 1.4 (USD) 2012 Target(2016) 1150000 1,600,000 0 1,600,000 1,000,000 Planned Actual 0 527782.54 Status Baseline(2011) 2012 Target(2016) 500000 500,000 FD1.5. - Financial Data Output 1.5 Indicator 1.5.1 1.5.2 Reporting Entity Planned Adequate resources mobilized towards output 1.5 (USD, UNFPA) Adequate resources disbursed UNFPA towards output 1.5 (USD, UNFPA) Actual 500,000 Planned 500000 0 500,000 Actual 0 270644 Status Baseline(2011) 2012 Target(2016) 1766764.5 6467058 0 8,942,000 FD1.6. - Financial Data Output 1.6 Indicator 1.6.1 1.6.2 Adequate resources Reporting Entity towards output 1.6 (USD, UNODC) Adequate resources Planned mobilized disbursed towards output 1.6 (USD, UNODC) UNODC Actual 200000 Planned Actual 0 3,604,044 142 FD1.7. - Financial Data Output 1.7 Indicator 1.7.1 1.7.2 Adequate resources Reporting Entity Adequate resources Baseline(2011) 2012 Target(2016) Planned mobilized towards (OP 1.7) (USD, UNODC) Status UNODC 1,800,000 Actual 265,000 Planned disbursed towards (OP 1.7) (USD, UNODC) 0 Actual 0 373,953 FD1.8. - Financial Data Output 1.8 Indicator 1.8.1 1.8.2 Adequate resources Reporting Entity Adequate resources Baseline(2011) Planned mobilized towards (OP 1.8) (USD, IFAD) Status IFAD Actual 1250000 0 Planned disbursed towards (OP 1.8) (USD, IFAD) Actual 2012 5,000,000 0 0 0 Target(2016) 0 1146145 FD1.9. - Financial Data Output 1.9 Indicator 1.9.1 1.9.2 Adequate resources Reporting Entity Baseline(2011) Planned mobilized towards (OP 1.9) (USD, ILO) Status ILO Actual 220,000 2012 Target(2016) 450000 1,140,000 220000 Planned 143 Adequate resources disbursed Actual towards (OP 1.9) (USD, ILO) 190000 FD1.10. - Financial Data Output 1.10 Indicator 1.10.1 1.10.2 Adequate Reporting Entity resources Adequate resources disbursed Baseline(2011) Planned mobilized towards OP 1.10 (USD, ILO) Status ILO towards OP 1.10 (USD, ILO) Actual 0 2012 Target(2016) 275000 1100000 100000 Planned Actual 100000 FD1.11. - Financial Data Output 1.11 Indicator 1.11.1 Reporting Entity Adequate resources towards OP mobilized 1.11 1.11.2 towards resources (USD, OP 1.11 mobilized (USD, Non core/Extra Mobilized/Committed) 1.11.3 Baseline(2011) Planned Actual Core/Regular) Adequate Status UN-HABITAT 2012 Target(2016) 488750 1430000 175,000 Planned Actual 0 Planned 144 Adequate resources mobilized Actual towards OP 1.11 (USD, UN-Habitat) 1.11.4 Adequate resources 270000 Planned disbursed towards OP 1.11 (USD, UN-Habitat) Actual FD1.12. - Financial Data Output 1.12 Indicator 1.12.1 1.12.2 Adequate resources Reporting Entity Adequate resources disbursed Baseline(2011) Planned mobilized towards OP 1.12 (USD, UNESCO) Status UNESCO towards OP 1.12 (USD, UNESCO) Actual 2012 Target(2016) 125000 500000 2012 Target(2016) 711712.5 2846850 0 Planned Actual FD1.13. - Financial Data Output 1.13 Indicator 1.13.1 1.13.2 Adequate resources Reporting Entity Adequate resources disbursed towards OP 1.13 (USD, UNDP) Baseline(2011) Planned mobilized towards OP 1.13 (USD, UNDP) Status UNDP Actual 0 0 Planned Actual 854796 145 FD1.14. - Financial Data Output 1.14 Indicator 1.14.1 1.14.2 Adequate resources Reporting Entity Adequate resources disbursed Baseline(2011) Planned mobilized towards OP 1.14 (USD, UNIDO) Status UNIDO towards OP 1.14 (USD, UNIDO) Actual 2012 218605.5 0 Target(2016) 874422 0 Planned Actual 760,664 FD1.15. - Financial Data Output 1.15 Indicator 1.15.1 1.15.2 Adequate resources Reporting Entity Adequate resources disbursed towards OP 1.15 (USD, UNIDO) Baseline(2011) Planned mobilized towards OP 1.15 (USD, UNIDO) Status UNIDO Actual 2012 Target(2016) 203250 0 813000 0 Planned Actual 0 FD2.1. - Financial Data Output 2.1 146 Indicator Resources 2.1.1 Reporting Entity Mobilized towards Output (OP 2.1) (Point system, Core/Regular) Resources 2.1.2 Mobilized towards Output (OP 2.1) (Point system, Joint Programme) Resources 2.1.3 Mobilized towards Output (OP 2.1) (Point system, Non core/Extra Mobilized/Committed) 2.1.4 Resources towards UNWomen,UNAIDS Output (OP 2.1) (USD, Core/Regular) ,UNDP,UNFPA,UNICEF, Resources 2.1.5 Mobilized Output (OP Mobilized 2.1) towards UNODC (USD, Joint Programme) Resources 2.1.6 Output (OP Mobilized 2.1) towards (USD, Non core/Extra Mobilized/Committed) Resources 2.1.7 Output (OP Programme) 2.1.8 Disbursed 2.1) towards (USD, Joint Status Baseline(2011) 2012 Target(2016) Planned Actual 435,000 Planned Actual Planned Actual 375,000 Planned Actual Planned Actual Planned Actual Planned Actual Planned 2,435,000 147 Resources Disbursed towards Actual Output (OP 2.1) (USD) 0 FD2.2. - Financial Data Output 2.2 Indicator 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 Resources Mobilized Reporting Entity Mobilized Resources Planned towards Output (OP 2.2) (USD, UNICEF) Actual Resources Planned towards Output (OP 2.2) (USD, UNCDF) Resources Disbursed towards UNCDF,UNDP,UNICEF Actual Planned Output (OP 2.2) (USD, UNDP) Actual Resources Planned Disbursed towards Output (OP 2.2) (USD, UNICEF) Target(2016) Planned towards Actual Disbursed 2012 Actual Output (OP 2.2) (USD, UNDP) Mobilized Baseline(2011) Planned towards Output (OP 2.2) (USD, UNCDF) Resources Status Actual FD2.3. - Financial Data Output 2.3 148 Indicator 2.3.1 2.3.2 2.3.3 2.3.4 Resources Mobilized Reporting Entity Mobilized Disbursed Planned towards towards ILO Output (OP 2.3) (USD, ILO) Resources Disbursed 2012 Target(2016) Actual Output (OP 2.3) (USD, UN Women) Resources Baseline(2011) Planned towards Output (OP 2.3) (USD, ILO) Resources Status Actual 200000 0 20000 Baseline(2011) 2012 Planned Actual Planned towards Output (OP 2.3) (USD, UN Women) Actual FD2.4. - Financial Data Output 2.4 Indicator 2.4.1 2.4.2 2.4.3 2.4.4 Resources Mobilized Reporting Entity Planned towards Output (OP 2.4) (USD, OHCHR) Resources Mobilized towards Output (OP 2.4) (USD, UN Women) Resources Mobilized towards Output (OP 2.4) (USD, UNDP) Resources Mobilized towards Output (OP 2.4) (USD, UNICEF) Status Actual OHCHR,UN Women,UNDP,UNICEF,UNIC RI,UNODC Target(2016) 100000 0 Planned Actual Planned Actual Planned Actual 149 2.4.5 2.4.6 2.4.7 2.4.8 2.4.9 2.4.10 2.4.11 2.4.12 Resources Mobilized Planned towards Output (OP 2.4) (USD, UNICRI) Resources Mobilized Actual Planned towards Output (OP 2.4) (USD, UNODC) Resources Disbursed Actual Disbursed Disbursed Planned towards Actual Planned towards Output (OP 2.4) (USD, UNDP) Resources Disbursed Actual Planned towards Output (OP 2.4) (USD, UNICEF) Resources Disbursed Actual Planned towards Output (OP 2.4) (USD, UNICRI) Resources Disbursed 0 Actual Output (OP 2.4) (USD, UN Women) Resources 0 50000 Planned towards Output (OP 2.4) (USD, OHCHR) Resources 5000 Actual Planned towards Output (OP 2.4) (USD, UNODC) 0 Actual 0 0 Status Baseline(2011) 2012 50000 FD2.5. - Financial Data Output 2.5 Indicator 2.5.1 Reporting Entity UNDP,UNODC Target(2016) Planned 150 Resources Mobilized towards Actual Output (OP 2.5) (USD, UNDP) 2.5.2 2.5.3 2.5.4 Planned 250000 Output (OP 2.5) (USD, UNODC) Actual 80000 Resources Planned Resources Mobilized Disbursed towards towards Output (OP 2.5) (USD, UNDP) Actual Resources Planned 51000 Actual 46000 Disbursed towards Output (OP 2.5) (USD, UNODC) FD2.6. - Financial Data Output 2.6 Indicator 2.6.1 2.6.2 2.6.3 2.6.4 Resources Mobilized Reporting Entity towards Output (OP 2.6) (USD, UNIAP) Resources Mobilized towards Output (OP 2.6) (USD, UNODC) Resources Disbursed towards Output (OP 2.6) (USD, UNIAP) Resources Disbursed towards Output (OP 2.6) (USD, UNODC) UNIAP,UNODC Status Baseline(2011) 2012 Target(2016) Planned 120000 420000 Actual 110000 Planned 250000 Actual 0 Planned 100000 Actual 120000 Planned 301000 Actual 172000 250000 151 FD2.7. - Financial Data Output 2.7 Indicator 2.7.1 2.7.2 2.7.3 2.7.4 2.7.5 2.7.6 2.7.7 2.7.8 Resources Mobilized Reporting Entity Status Actual Resources Planned towards Output (OP 2.7) (USD, UNICEF) Actual Resources Planned Mobilized towards Output (OP 2.7) (USD, UNICRI) Actual Resources Planned Mobilized towards Output (OP 2.7) (USD, UNODC) Resources Disbursed toward Output 2012 Target(2016) Planned towards Output (OP 2.7) (USD, OHCHR) Mobilized Baseline(2011) OHCHR,UNICEF,UNICRI,UNO DC Actual 1000000 200000 2000000 0 458750 184000 1283000 334000 Planned (OP 2.7) (USD, OHCHR) Actual Resources Disbursed toward Output Planned (OP 2.7) (USD, UNICEF) Actual Resources Disbursed toward Output Planned (OP 2.7) (USD, UNICRI) Actual Resources Disbursed toward Output Planned (OP 2.7) (USD, UNODC) Actual 1000000 0 2000000 0 116000 0 1283000 78000 FD2.8. - Financial Data Output 2.8 152 Indicator 2.8.1 2.8.2 Resources Mobilized Reporting Entity Disbursed towards Baseline(2011) 2012 Target(2016) Baseline(2011) 2012 Target(2016) Baseline(2011) 2012 Target(2016) Planned towards Output (OP 2.8) (USD, UNDP) Resources Status Actual UNDP Output (OP 2.8) (USD, UNDP) Planned Actual FD2.9. - Financial Data Output 2.9 Indicator 2.9.1 2.9.2 Resources Mobilized Reporting Entity Resources Disbursed Planned towards Output (OP 2.9) (USD, UNDP) towards Status UNDP Output (OP 2.9) (USD, UNDP) Actual Planned Actual FD2.10. - Financial Data Output 2.10 Indicator 2.10.1 2.10.2 Resources Mobilized Reporting Entity towards Output (OP 2.10) (USD, UNODC) Resources Disbursed towards Output (OP 2.10) (USD, UNODC) UNODC Status Planned 250000 Actual 0 Planned 0 Actual 0 153 FD2.11. - Financial Data Output 2.11 Indicator 2.11.1 2.11.2 2.11.3 2.11.4 Reporting Entity Resources Mobilized Status Actual Resources Planned towards Output (OP 2.11) (USD, UNICEF) Resources Disbursed towards UN-HABITAT,UNICEF Target(2016) Actual Planned Output (OP 2.11) (USD, UN-Habitat) Actual Resources Planned Disbursed 2012 Planned towards Output (OP 2.11) (USD, UN-Habitat) Mobilized Baseline(2011) towards Output (OP 2.11) (USD, UNICEF) Actual FD2.12. - Financial Data Output 2.12 Indicator 2.12.1 2.12.2 Resources Mobilized Reporting Entity Resources Disbursed Output (OP 2.12) (USD, ILO) towards Baseline(2011) 2012 Target(2016) Planned towards Output (OP 2.12) (USD, ILO) Status ILO Actual Planned Actual 154 FD2.13. - Financial Data Output 2.13 Indicator 2.13.1 2.13.2 Resources Mobilized Reporting Entity Resources Disbursed towards Baseline(2011) 2012 Planned towards Output (OP 2.13) (USD, UN Women) Status UN Women Output (OP 2.13) (USD, UN Women) Actual Target(2016) 300000 300000 318500 Planned Actual FD3.1. - Financial Data Output 3.1 Indicator Adequate 3.1.1 resources Reporting Entity mobilized Actual UNESCO) 3.1.2 resources mobilized towards output (OP 3.1) (USD, UNICEF) 3.1.3 3.1.4 Adequate resources mobilized towards output (OP 3.1) (USD, WFP) Baseline(2011) Planned towards output (OP 3.1) (USD, Adequate Status Actual 1500000 2744878 600000 Planned Actual Planned Target(2016) 1500000 Planned UNESCO,UNICEF,WFP 2012 1600000 1000000 1500000 155 Adequate resources disbursed towards output (OP 3.1) (USD, Actual 0 UNESCO) Adequate 3.1.5 resources disbursed Planned towards output (OP 3.1) (USD, Actual UNICEF) 3.1.6 Adequate resources 2744878 0 Planned disbursed towards output (OP 3.1) (USD, WFP) 1600000 Actual 0 Status Baseline(2011) FD3.2. - Financial Data Output 3.2 Indicator Adequate 3.2.1 resources Reporting Entity mobilized Planned towards output (OP 3.2) (USD, Actual UNESCO) Adequate 3.2.2 resources mobilized UNESCO,UNICEF,WFP towards output (OP 3.2) (USD, 3.2.3 3.2.4 Adequate resources 15000 2394878 140000 Planned mobilized towards output (OP 3.2) (USD, WFP) Actual WFP Planned Target(2016) 55000 Planned Actual UNICEF) 2012 4337000 1449000 55000 156 Adequate resources disbursed towards output (OP 3.2) (USD, Actual 0 UNESCO) Adequate 3.2.5 resources disbursed Planned towards output (OP 3.2) (USD, Actual UNICEF) 3.2.6 Adequate resources 2394878 0 Planned disbursed towards output (OP 3.2) (USD, WFP) Actual 4337000 0 FD3.3. - Financial Data Output 3.3 Indicator Adequate 3.3.1 resources Reporting Entity mobilized Actual UNESCO) 3.3.2 resources mobilized towards output (OP 3.3) (USD, UNHabitat) Adequate 3.3.3 resources mobilized towards output (OP 3.3) (USD, UNICEF) Baseline(2011) Planned towards output (OP 3.3) (USD, Adequate Status UNESCO,UNHABITAT,UNICEF,WFP 350000 1500000 60000 Planned Actual Target(2016) 1650000 Planned Actual 2012 6300244 1740000 157 3.3.4 Adequate resources Planned mobilized towards output (OP 3.3) (USD, WFP) Actual Adequate 3.3.5 22602000 resources disbursed 7551000 Planned towards output (OP 3.3) (USD, 1650000 UNESCO) Actual Adequate 3.3.6 resources disbursed Planned towards output (OP 3.3) (USD, UN- Actual Habitat) Adequate 3.3.7 resources disbursed towards output (OP 3.3) (USD, Adequate resources 1500000 0 Planned Actual UNICEF) 3.3.8 0 6300244 0 Planned disbursed towards output (OP 3.3) (USD, WFP) Actual 22602000 0 FD3.4. - Financial Data Output 3.4 Indicator Reporting Entity Status Baseline(2011) 2012 Target(2016) 158 Adequate 3.4.1 resources mobilized Planned towards output (OP 3.4) (USD, Actual UNESCO) Adequate 3.4.2 resources mobilized UNESCO,UNICEF Adequate 3.4.3 resources disbursed Actual UNESCO) 3.4.4 resources Actual 700000 200000 Planned towards output (OP 3.4) (USD, Adequate 50000 Planned towards output (OP 3.4) (USD, UNICEF) 200000 disbursed 200000 0 Planned towards output (OP 3.4) (USD, Actual UNICEF) 700000 0 3.5. - Financial Data Output 3.5 Indicator 3.5.1 3.5.2 Adequate resources Reporting Entity Adequate resources disbursed towards output (OP 3.5) (USD, ILO) Baseline(2011) Planned mobilized towards output (OP 3.5) (USD, ILO) Status ILO Actual Target(2016) 500000 70000 Planned Actual 2012 500000 0 159 FD4.1. - Financial Data Output 4.1 Indicator 4.1.1 4.1.2 4.1.3 4.1.4 Adequate resources Reporting Entity resources Adequate resources Actual disbursed UNICEF,WHO towards (OP 4.1) (USD, UNICEF) Adequate resources 2012 Actual Target(2016) 0 0 Planned mobilized towards (OP 4.1) (USD, WHO) Baseline(2011) Planned mobilized towards (OP 4.1) (USD, UNICEF) Adequate Status 497000 1988000 2012 Target(2016) 3000 12000 0 Planned Actual Planned disbursed towards (OP 4.1) (USD, WHO) Actual FD4.2. - Financial Data Output 4.2 Indicator 4.2.1 4.2.2 4.2.3 Adequate resources Reporting Entity resources mobilized towards (OP 4.2) (USD, WHO) Baseline(2011) Planned mobilized towards (OP 4.2) (USD, UNICEF) Adequate Status Actual UNICEF,WHO Planned Actual 0 Planned 160 Adequate resources distured Actual towards (OP 4.2) (USD, UNICEF) 4.2.4 Adequate resources Planned distured towards (OP 4.2) (USD, WHO) Actual FD4.3. - Financial Data Output 4.3 Indicator 4.3.1 4.3.2 4.3.3 4.3.4 Adequate resources Reporting Entity resources Adequate resources disbursed Planned UNICEF,WHO towards (OP 4.3) (USD, UNICEF) Adequate resources 2012 Target(2016) Actual mobilized towards (OP 4.3) (USD, WHO) Baseline(2011) Planned mobilized towards (OP 4.3) (USD, UNICEF) Adequate Status Actual 106750 427000 0 Planned Actual Planned disbursed towards (OP 4.3) (USD, WHO) Actual FD4.4. - Financial Data Output 4.4 Indicator 4.4.1 Adequate Resources mobilized towards OP 4.4 (USD, UNFPA) Reporting Entity UNFPA,WHO Status Baseline(2011) Planned Actual 5000000 2012 Target(2016) 6050000 9200000 5000000 161 4.4.2 4.4.3 Planned Adequate Resources mobilized towards OP 4.4 (USD, WHO) Actual Adequate Resources Actually Planned Disbursed towards OP 4.4 (USD, Actual UNFPA) Adequate 4.4.4 Resources Actually Disbursed towards OP 4.4 (USD, WHO) 1632000 2027892 9200000 0 0 Planned UNFPA,WHO 408000 1656902 1100000 Actual 0 Status Baseline(2011) FD4.5. - Financial Data Output 4.5 Indicator 4.5.1 4.5.2 4.5.3 4.5.4 Reporting Entity Adequate Resources mobilized Planned towards OP 4.5 (USD, UNFPA) Actual Adequate Resources mobilized Planned towards OP 4.5 (USD, UNICEF) Actual Adequate Resources mobilized UNFPA,UNICEF,WHO Planned towards OP 4.5 (USD, WHO) Actual Adequate Resources Actually Planned Disbursed towards OP 4.5 (USD, UNFPA) 3500000 Actual 2012 Target(2016) 3625000 4000000 3500000 408000 1632000 613245 4000000 0 0 515521 162 Adequate Resources Actually 4.5.5 Planned Disbursed towards OP 4.5 (USD, Actual UNICEF) Adequate Resources Actually 4.5.6 Planned Disbursed towards OP 4.5 (USD, Actual WHO) FD4.6. - Financial Data Output 4.6 Indicator 4.6.1 4.6.2 4.6.3 towards OP 4.6 (USD, UNFPA) Adequate Resources mobilized Status UNFPA,WHO Actual Actual Adequate Resources Actually Planned Disbursed towards OP 4.6 (USD, Disbursed towards OP 4.6 (USD, WHO) Actual UNFPA 1300000 Planned towards OP 4.6 (USD, WHO) Adequate Resources Actually Baseline(2011) Planned Adequate Resources mobilized UNFPA) 4.6.4 Reporting Entity 2012 Target(2016) 1625000 2600000 1300000 408000 1632000 399389 2600000 0 0 343943 Planned Actual 163 FD4.7. - Financial Data Output 4.7 Indicator 4.7.1 4.7.2 4.7.3 4.7.4 4.7.5 4.7.6 4.7.7 4.7.8 4.7.9 Reporting Entity UN-Habitat) Planned WHO) Actual Habitat) (USD, WHO) 523000 Planned UNICEF) Actual Disbursements (OP 4.7) 130750 0 Actual To be Mobilized (OP 4.7) (USD, (USD, UNICEF) 1115000 Planned To be Mobilized (OP 4.7) (USD, UN- Actual Disbursements (OP 4.7) 278750 Actual Already Mobilized (OP 4.7) (USD, (USD, UN-Habitat) Target(2016) Planned UNICEF) Actual Disbursements (OP 4.7) 2012 Actual Already Mobilized (OP 4.7) (USD, WHO) Baseline(2011) Planned Already Mobilized (OP 4.7) (USD, To be Mobilized (OP 4.7) (USD, Status Actual UN-HABITAT,UNICEF,WHO Planned Actual 0 Planned Actual Planned Actual Planned Actual 164 FD4.8. - Financial Data Output 4.8 Indicator 4.8.1 4.8.2 4.8.3 4.8.4 4.8.5 4.8.6 Reporting Entity Status Baseline(2011) 2012 Target(2016) 1578750 6315000 785750 3143000 Planned Already Mobilized (OP 4.8) (USD, UNICEF) Actual Planned Already Mobilized (OP 4.8) (USD, WHO) Actual 0 Planned To be Mobilized (OP 4.8) (USD, UNICEF) Actual Planned To be Mobilized (OP 4.8) (USD, UNICEF,WHO WHO) Actual 0 Planned Actual Disbursements (OP 4.8) (USD, UNICEF) Actual Planned Actual Disbursements (OP 4.8) (USD, WHO) Actual 2470437 FD4.9 - Financial Data Output 4.9 Indicator 4.9.1 Reporting Entity Status UNODC Planned Baseline(2011) 2012 Target(2016) 0 0 165 Adequate resources mobilized Actual towards (OP 4.9) (USD, UNODC) 4.9.2 0 Planned Adequate resources disbursed towards (OP 4.9) (USD, UNODC) 189600 14000 Actual FD4.10. - Financial Data Output 4.10 Indicator 4.10.1 4.10.2 4.10.3 4.10.4 4.10.5 4.10.6 4.10.7 Reporting Entity ILO) Actual Planned Already Mobilized (OP 4.10) (USD, WHO) Actual Planned To be Mobilized (OP 4.10) (USD, ILO) WHO) Target(2016) Planned UNICEF) To be Mobilized (OP 4.10) (USD, 2012 Actual Already Mobilized (OP 4.10) (USD, UNICEF) Baseline(2011) Planned Already Mobilized (OP 4.10) (USD, To be Mobilized (OP 4.10) (USD, Status Actual ILO,UNICEF,WHO Planned Actual Planned Actual Planned 166 Actual Disbursements (OP 4.10) Actual (USD, ILO) 4.10.8 4.10.9 Planned Actual Disbursements (OP 4.10) (USD, UNICEF) Actual Planned Actual Disbursements (OP 4.10) (USD, WHO) Actual F.D.4.11 - Financial Data Output 4.11 Indicator 4.11.1 4.11.2 4.11.3 4.11.4 Adequate resources mobilized towards (OP 4.11) (USD, ILO) Reporting Entity Status 2012 Target(2016) Planned Actual Adequate resources mobilized Planned towards (OP 4.11) (USD, WHO) Actual Adequate resources disbursed Planned towards (OP 4.11) (USD, ILO) Baseline(2011) Actual Adequate resources disbursed Planned towards (OP 4.11) (USD, WHO) Actual FD5.1. - Financial Data Output 5.1 167 Indicator 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 Reporting Entity towards output 5.1 (USD, UNICEF) Actual 2012 towards output 5.1 (USD, WFP) Actual 600000 19,770,000 2,770,000 Planned Adequate resources mobilized UNICEF,WFP,WHO towards output 5.1 (USD, UNICEF) Actual 100000 100000 Planned Actual 2,400,000 1,590,000 19,770,000 Planned Adequate resources disbursed towards output 5.1 (USD, WFP) Target(2016) 1,140,000 Planned Adequate resources mobilized Adequate resources disbursed Baseline(2011) Planned Adequate resources mobilized towards output 5.1 (USD, WHO) Status Actual Planned Adequate resources disbursed towards output 5.1 (USD, WHO) Actual 0 Status Baseline(2011) 0 100,000 2012 Target(2016) FD5.2. - Financial Data Output 5.2 Indicator 5.2.1 Adequate resources mobilized towards output 5.2 (USD, FAO) Reporting Entity FAO,UNICEF,WFP,WHO Planned Actual 2,500,000 0 168 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 5.2.7 5.2.8 Planned Adequate resources mobilized towards output 5.2 (USD, UNICEF) Actual Adequate resources mobilized Planned towards output 5.2 (USD, WFP) Actual Adequate resources mobilized Planned towards output 5.2 (USD, WHO) Actual Adequate resources disbursed Planned towards output 5.2 (USD, FAO) Actual Adequate resources disbursed Planned towards output 5.2 (USD, UNICEF) Actual Adequate resources disbursed Planned towards output 5.2 (USD, WFP) Actual Adequate resources disbursed Planned towards output 5.2 (USD, WHO) 3,700,000 1,900,000 1,776,000 0 400,000 316000 2,500,000 0 3,700,000 250000 1,776,000 0 400000 Actual 0 Status Baseline(2011) FD5.3. - Financial Data Output 5.3 Indicator 5.3.1 5.3.2 Reporting Entity Planned Adequate resources mobilized towards output 5.3 (USD, FAO) Adequate resources mobilized towards output 5.3 (USD, UNICEF) FAO,UNICEF,WFP,WHO Actual Target(2016) 3,100,000 200000 Planned Actual 2012 710000 75000 169 5.3.3 5.3.4 5.3.5 5.3.6 5.3.7 5.3.8 Planned Adequate resources mobilized towards output 5.3 (USD, WFP) Actual 38,000 0 Planned Adequate resources mobilized towards output 5.3 (USD, WHO) Actual Adequate resources disbursed Planned towards output 5.3 (USD, FAO) Actual Adequate resources disbursed Planned towards output 5.3 (USD, UNICEF) Actual Adequate resources disbursed Planned towards output 5.3 (USD, WFP) Actual Adequate resources disbursed Planned towards output 5.3 (USD, WHO) 3,100,000 0 710000 0 38,000 0 Actual FD5.4. - Financial Data Output 5.4 Indicator 5.4.1 5.4.2 5.4.3 Reporting Entity Status Adequate resources mobilized Planned towards output 5.4 (USD, FAO) Actual Adequate resources mobilized towards output 5.4 (USD, WFP) FAO,WFP Baseline(2011) Adequate resources disbursed Planned towards output 5.4 (USD, FAO) Actual Target(2016) 5,000,000 0 Planned Actual 2012 10371000 0 5,000,000 0 170 5.4.4 Adequate resources disbursed Planned 10371000 towards output 5.4 (USD, WFP) Actual 0 Status Baseline(2011) FD5.5 - Financial Data Output 5.5 Indicator 5.5.1 5.5.2 Reporting Entity Planned Adequate resources mobilized towards output 5.5 (USD, FAO) Adequate resources disbursed 2012 FAO towards output 5.5 (USD, FAO) Actual Target(2016) 500000 0 Planned 500000 Actual 0 Status Baseline(2011) FD5.6 - Financial Data Output 5.6 Indicator 5.6.1 5.6.2 Reporting Entity Planned Adequate resources mobilized towards output 5.6 (USD, FAO) Adequate resources disbursed towards output 5.6 (USD, FAO) FAO Actual Target(2016) 1,000,000 500,000 Planned Actual 2012 1,000,000 0 171 FD5.7 - Financial Data Output 5.7 Indicator 5.7.1 5.7.2 Reporting Entity Adequate resources disbursed Baseline(2011) 2012 Planned Adequate resources mobilized towards output 5.7 (USD, WFP) Status WFP towards output 5.7 (USD, WFP) Actual Target(2016) 7,200,000 0 Planned 7,200,000 Actual 0 Status Baseline(2011) FD 6.1 - Financial Data for Output 6.1 Indicator 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 Reporting Entity Adequate resources mobilized Planned towards output 6.1 (USD, ADB) Actual Adequate resources mobilized Planned towards output 6.1 (USD, ILO) Actual Adequate resources mobilized Planned towards output 6.1 (USD, IOM) Actual Adequate resources mobilized Planned towards output 6.1 (USD, UNAIDS) Adequate resources mobilized towards output 6.1 (USD, UNESCO) Outcome Group 6 / JUNT Actual 300800 Target(2016) 0 0 0 0 0 0 0 0 0 0 0 0 0 75000 250000 0 335000 Planned Actual 2012 100000 0 172 6.1.6 6.1.7 6.1.8 6.1.9 6.1.10 6.1.11 Adequate resources mobilized towards output 6.1 (USD, UNFPA) Adequate resources mobilized towards output 6.1 (USD, UNICEF) Adequate resources mobilized towards output 6.1 (USD, UNODC) Adequate resources mobilized towards output 6.1 (USD, WHO) Planned Actual 500000 205,000 Planned Actual Planned Actual 935000 Adequate resources disbursed Planned towards output 6.1 (USD, ADB) Actual Adequate resources disbursed Planned towards output 6.1 (USD, ILO) Actual 6.1.13 6.1.14 6.1.15 6.1.16 780000 29000 0 210363 0 0 0 Planned 6.1.12 2550000 372642 49000 525000 100000 30000 372642 Planned Actual 500000 30000 300,000 0 0 0 Adequate resources disbursed towards output 6.1 (USD, IOM) Actual Adequate resources disbursed Planned towards output 6.1 (USD, UNAIDS) Adequate resources disbursed towards output 6.1 (USD, UNESCO) Adequate resources disbursed towards output 6.1 (USD, UNFPA) Actual 0 0 75000 Planned Actual Planned 0 0 0 Planned Actual 0 0 500000 105553 500000 30000 173 Adequate resources disbursed Actual towards output 6.1 (USD, UNICEF) 6.1.17 6.1.18 98300 Planned Adequate resources disbursed towards output 6.1 (USD, UNODC) Actual 372642 244658 Planned Adequate resources disbursed towards output 6.1 (USD, WHO) 30000 372642 49000 Actual 31712 29000 Status Baseline(2011) 2012 Target(2016) 0 0 FD 6.2 - Financial Data for Output 6.2 Indicator 6.2.1 6.2.2 6.2.3 Reporting Entity Planned Adequate resources mobilized towards output 6.2 (USD, UNAIDS) Actual Planned Adequate resources mobilized towards output 6.2 (USD, UNFPA) Adequate resources mobilized Actual Outcome Group 6 / JUNT 6.2.5 0 0 170000 Planned 0 0 58000 1100000 towards output 6.2 (USD, UNICEF) Actual 6.2.4 85000 Adequate resources mobilized towards output 6.2 (USD, UNODC) 300000 Planned Actual Planned 58000 20000 0 0 20000 0 0 174 Adequate resources mobilized Actual towards output 6.2 (USD, WFP) 6.2.6 6.2.7 6.2.8 6.2.9 6.2.10 6.2.11 6.2.12 15000 Planned Adequate resources mobilized towards output 6.2 (USD, WHO) Actual 597900 525000 Planned Adequate resources disbursed towards output 6.2 (USD, UNAIDS) Actual towards output 6.2 (USD, UNFPA) Actual 85000 towards output 6.2 (USD, UNICEF) Actual 64519 towards output 6.2 (USD, UNODC) Actual Adequate resources disbursed Planned towards output 6.2 (USD, WFP) Actual Adequate resources disbursed Planned towards output 6.2 (USD, WHO) 0 0 58000 263000 Planned Adequate resources disbursed 597900 0 Planned Adequate resources disbursed 780000 0 Planned Adequate resources disbursed 0 58000 20000 0 20000 0 17052 0 597900 Actual 20507 597900 Status Baseline(2011) 2012 Target(2016) 119500 0 FD 6.3 - Financial Data for Output 6.3 Indicator 6.3.1 Reporting Entity Planned 175 Adequate Resources Mobilized Towards Output 6.3 (USD, UN Actual 0 119500 Women) 6.3.2 6.3.3 6.3.4 Towards Output 6.3 (USD, UNAIDS) Towards Output 6.3 (USD, UNODC) Adequate Resources Mobilized Towards Output 6.3 (USD, WHO) towards Output 6.3 (USD, UN Women) 6.3.6 6.3.7 6.3.8 Actual Adequate resources disbursed towards Output 6.3 (USD, UNAIDS) Adequate resources disbursed towards Output 6.3 (USD, UNODC) Adequate resources disbursed towards Output 6.3 (USD, WHO) 278,002 150000 Planned Adequate Resources Mobilized Adequate resources disbursed 6.3.5 Planned Adequate Resources Mobilized Outcome Group 6 / JUNT Actual Planned Actual 525000 0 175721 119500 194682 53039 0 Planned Actual 30000 278002 Planned Actual 780000 119500 Planned Actual 450000 53039 30000 Planned Actual 194682 53039 165000 300000 53039 30000 17951 30000 7.1.1 - Financial Data Joint UN Programme (FAO, UNDP/UNEP, UNESCO, UN-HABITAT) 176 Indicator Reporting Entity Joint Programme - Adequate 7.1.1.1 Resources Mobilized toward ouput Planned Resources Mobilized toward ouput Actual (OP 7.1) (USD) Joint Programme - Adequate Resources Mobilized toward ouput (OP 7.1) (USD, UNEP) Joint Programme - Adequate 7.1.1.5 Resources Mobilized toward ouput (OP 7.1) (USD, UNESCO) Joint Programme - Adequate 7.1.1.6 Resources Mobilized toward ouput (OP 7.1) (USD, UN-Habitat) Joint Programme - Adequate 7.1.1.7 resource disbursed towards ouput (OP 7.1) (USD, FAO) 0 550,000 550,000 Actual (OP 7.1) (USD, UNDP) 7.1.1.4 Target(2016) Planned Resources Mobilized toward ouput Joint Programme - Adequate 2012 Actual Joint Programme - Adequate 7.1.1.3 Baseline(2011) Planned (OP 7.1) (USD, FAO) 7.1.1.2 Status FAO,UNDP,UNEP,UNESCO,U N-HABITAT Planned Actual Planned Actual Planned Actual Planned Actual 177 Joint Programme - Adequate 7.1.1.8 Planned resource disbursed towards ouput Actual (OP 7.1) (USD) Joint Programme - Adequate 7.1.1.9 0 7.1.1.1 1 7.1.1.1 2 0 0 Planned resource disbursed towards ouput Actual (OP 7.1) (USD, UNDP) 7.1.1.1 550,000 Joint Programme - Adequate Planned resource disbursed towards ouput Actual (OP 7.1) (USD, UNEP) Joint Programme - Adequate Planned resource disbursed towards ouput Actual (OP 7.1) (USD, UNESCO) Joint Programme - Adequate Planned resource disbursed towards ouput Actual (OP 7.1) (USD, UN-Habitat) 7.2.1 - Financial Data FAO Indicator 7.2.1. 1 FAO - Adequate Resources Mobilized Towards Output (OP 7.2) (USD) Reporting Entity FAO Status Baseline(2011) 2012 Target(2016) Planned Actual 2,500,000 1,279,000 178 7.2.1. 2 Planned FAO - Adequate Resources Disbursed Towards Output (OP 7.2) (USD) Actual 2,500,000 0 1,279,00 7.3.1 - Financial Data UNDP Indicator Reporting Entity UNDP - Adequate Resources 7.3.1.1 UNDP - Adequate Resources 7.3.1.2 Baseline(2011) 2012 Target(2016) Planned Mobilized Towards Output (USD) (USD) Status Actual UNDP Disbursed Towards Output (OP 7.3) 9,200,000 Planned 9,200,000 Actual (USD) (USD) 800000 50,034 7.4.1 - Financial Data UNDP Indicator Reporting Entity UNDP - Adequate Resources 7.4.1.1 Mobilized Towards Output (OP 7.4) (USD) 7.4.1.2 Status Baseline(2011) 2012 Target(2016) Planned UNDP Actual Planned 550,000 552,000 550,340 179 UNDP - Adequate Resources Disburses Towards Output (OP 7.4) Actual 0 109,591 (USD) 7.5.1 - Financial Data UNEP Indicator Reporting Entity UNEP - Adequate Resources 7.5.1.1 UNEP - Adequate Resources 7.5.1.2 Baseline(2011) 2012 Target(2016) Planned Mobilized Towards Output (OP 7.5) (USD) Status Actual UNEP Disbursed Towards Output (OP 7.5) Planned Actual (USD) 1,500,000 1,500,000 0 7.6.1 - Financial Data UN-HABITAT Indicator Reporting Entity UN-HABITAT - Adequate Resources 7.6.1.1 Mobilized Towards Output (OP 7.6) (USD, UN-Habitat) 7.6.1.2 Status Baseline(2011) 2012 Planned UN-HABITAT Actual Planned Target(2016) 0 1,200,000 0 1,200,000 180 UN-HABITAT - Adequate Resources Disbursed Towards Output (OP 7.6) Actual 0 (USD, UN-Habitat) 7.7.1 - Financial Data - Joint UN Programme (ILO, ITC, UNCTAD, UNIDO) Indicator Reporting Entity Joint Programme - Adequate 7.7.1.1 Joint Programme - Adequate 7.7.1.2 Baseline(2011) 2012 Planned Resources Mobilized toward output (OP 7.7) (USD, UNIDO) Status Actual ILO,ITC,UNCTAD,UNIDO resources actually Disbursed 1,205,600 1,205,600 1,205,600 Planned Actual toward (OP 7.7) (USD, UNIDO) Target(2016) 1,205,600 0 976,536 7.8.1 - Financial Data UNIDO Indicator 7.8.1.1 Reporting Entity Status UNIDO Planned Baseline(2011) 2012 Target(2016) 1,200,000 181 UNIDO - Adequate resources mobilized toward ouput (OP 7.8) Actual 1,200,000 666,667 (USD, UNIDO) UNIDO - Adequate resource 7.8.1.2 Planned actually disbursed toward output Actual (OP 7.8) (USD, UNIDO) 1,200,000 0 120,277 7.9.1 - Financial Data FAO Indicator Reporting Entity FAO - Adequate Resources 7.9.1.1 FAO - Adequate Resources 7.9.1.2 Baseline(2011) Planned Mobilized Towards Output (OP 7.9) (USD) Status Actual FAO Disbursed Towards Output (OP 7.9) (USD) Target(2016) 52,000 1,387,000 Planned Actual 2012 1,387,000 0 8.1.1 - Financial Data Joint UN Programme (FAO, UNDP, UN-HABITAT) 182 Indicator Reporting Entity Joint Programme - Adequate 8.1.1.1 Joint Programme - Adequate 8.1.1.2 Baseline(2011) 2012 Planned Resources Disbursements toward output (OP 8.1) (USD) Status Actual FAO,UNDP,UN-HABITAT Resources Mobilized towards 2,500,000 0 0 Planned Actual output (OP 8.1) (USD) Target(2016) 2,500,000 0 0 Baseline(2011) 2012 8.2.1 - Financial Data UN-HABITAT Indicator Reporting Entity UN-HABITAT - Adequate Resources 8.2.1.1 UN-HABITAT - Adequate Resources 8.2.1.2 Planned Disbursements toward output (OP 8.2) (USD) Status Actual UN-HABITAT Mobilized towards output (OP 8.2) 500,000 0 0 Planned Actual (USD) Target(2016) 500000 0 100,000 8.2.2 - Financial Data UNICEF Indicator Reporting Entity Status Baseline(2011) 2012 Target(2016) 183 UNICEF - Adequate Resources 8.2.2.1 Disbursements toward output (OP 8.2) (USD) UNICEF - Adequate Resources 8.2.2.2 Planned Actual UNICEF Mobilized towards output (OP 8.2) 0 Planned Actual (USD) 500,000 500,000 0 8.3.1 - Financial Data UNDP Indicator Reporting Entity UNDP - Adequate Resources 8.3.1.1 Disbursements toward output (OP UNDP UNDP - Adequate Resources Mobilized towards output (OP 8.3) Baseline(2011) 2012 Planned 8.3) (USD) 8.3.1.2 Status Actual 5,800,000 0 0 Planned UNDP (USD) Actual Target(2016) 5,800,000 400,000 9.145.450 8.4.1 - Financial Data UNDP Indicator 8.4.1.1 Reporting Entity Status UNDP Planned Baseline(2011) 2012 Target(2016) 2,500,000 184 UNDP - Adequate Resources Disbursements toward output (OP Actual 0 0 8.4) (USD) UNDP - Adequate Resources 8.4.1.2 Planned Mobilized towards output (OP 8.4) Actual (USD) 2,500,000 280,000 710,000 8.5.1 - Financial Data FAO Indicator Reporting Entity FAO - Adequate Resources 8.5.1.1 FAO - Adequate Resources 8.5.1.2 Baseline(2011) 2012 Planned Disbursements toward output (OP 8.5) (USD) Status Actual FAO Mobilized towards output (OP 8.5) (USD) Target(2016) 1,500,000 0 Planned 1,500,000 Actual 300,000 884,325 Status Baseline(2011) 2012 8.6.1 - Financial Data FAO Indicator 8.6.1.1 Reporting Entity Planned Target(2016) 2,500,000 185 FAO - Adequate Resources Disbursements toward output (OP FAO Actual 0 8.6) (USD) FAO - Adequate Resources 8.6.1.2 Planned Mobilized towards output (OP 8.6) (USD) 2,500,000 Actual 300,000 250,000 Status Baseline(2011) 2012 8.7.1 - Financial Data UN-HABITAT Indicator Reporting Entity UN-HABITAT - Adequate Resources 8.7.1.1 Disbursements toward output (OP 8.7) (USD) UN-HABITAT - Adequate Resources 8.7.1.2 Planned Actual UN-HABITAT Mobilized towards output (OP 8.7) 1,200,000 0 0 Planned 1,200,000 Actual 0 120,000 Reporting Entity Status Baseline(2011) 2012 WFP Planned (USD) Target(2016) 8.8.1 - Financial Data WFP Indicator 8.8.1.1 Target(2016) 1,250,000 186 WFP - Adequate Resources Disbursements toward output (OP Actual 0 0 8.8) (USD) WFP - Adequate Resources 8.8.1.2 Planned Mobilized towards output (OP 8.8) (USD) 1,250,000 Actual 0 1,160,000 Status Baseline(2011) 2012 Target(2016) 7667616 15717285 9.1.1 - Financial Data UNDP Indicator 9.1.1.1 9.1.1.2 Reporting Entity Planned Adequate resources mobilized toward output (OP 9.1) (USD) Adequate resources disbursed UNDP towards output (OP 9.1) (USD) Actual 4984393 Planned 6071891 3143457 12573828 Actual 0 5519999 Status Baseline(2011) 2012 Target(2016) 2096040 5281500 9.2.1 - Financial Data UNDP Indicator 9.2.1.1 9.2.1.2 Reporting Entity Planned Adequate resources mobilized toward output (OP 9.2) (USD) UNDP Actual Planned 1034220 3159571 1056300 4225200 187 Adequate resources disbursed toward output (OP 9.2) (USD) Actual 0 965333 Status Baseline(2011) 2012 9.3.1 - Financial Data UNDP Indicator 9.3.1 9.3.2 Reporting Entity Planned Adequate resources mobilized toward output (OP 9.3) (USD) Adequate resources disbursed Target(2016) UNDP toward output (OP 9.3) (USD) Actual Planned 0 Actual 600,000 Status Baseline(2011) 10.1.1 - Financial Data Output 10.1 Indicator Reporting Entity Adequate Resources mobilized 10.1.1 10.1.2 10.1.3 Adequate Resources mobilized towards (OP 10.1) (USD, UNFPA) Target(2016) 325000 700000 Planned towards (OP 10.1) (USD, UN Women) 2012 Actual UNFPA 200000 Planned Actual 200000 200000 Planned 188 Adequate Resources disbursed towards (OP 10.1) (USD, UN Actual 100000 Women) 10.1.4 Adequate Resources disbursed towards (OP 10.1) (USD, UNFPA) Planned 105821 Actual 83859 10.2.1 - Financial Data OP 10.2 Indicator Reporting Entity Adequate Resources mobilized 10.2.1 Adequate Resources disbursed 10.2.2 Baseline(2011) 2012 100000 22500 Baseline(2011) 2012 Target(2016) Planned towards (OP 10.2) (USD, UN Women) Status Actual UN Women towards (OP 10.2) (USD, UN Planned Actual Women) 10.3.1 - Financial Data OP 10.3 Indicator 10.3.1 Reporting Entity Status UN Women Planned Target(2016) 189 Adequate Resources mobilzed Actual towards (OP 10.3) (USD, UN Women) 10.3.2 10.3.3 10.3.4 Planned Adequate Resources mobilzed towards (OP 10.3) (USD, UNFPA) Actual Adequate Resources Disbursed Planned towards (OP 10.3) (USD, UN Women) Actual Adequate Resources Disbursed Planned towards (OP 10.3) (USD, UNFPA) Actual 680742 680742 0 680742 680742 100000 0 0 E. Recommended revised M&E Framework for UNCT Endorsement Outcome 1 - By 2015, more equitable and sustainable growth promoted for poor people in Lao PDR Indicator I II III Proportion of NSEDP indicators in the annual report disaggregated by sex, age, wealth quintile and geography (Percent) Percentage RTM action points are related to equitable and sustainable growth (Percent) Monitoring and Evaluation Framework for NSDEP established and implemented that measures equitable and sustainable growth (Percent) Baseline(2011) Target(2016) 50 0 100 60 1 0 190 IV V Number of concessional projects applying natinal environmental and social safegard guidelines (Number) % of activities in support of the National Investment Strategy related to concessionary investment (Percent) 60 0 50 0 Output 1.1 - Low-income households and micro-entrepreneurs have better access to financial services Indicator 1.1.1 1.1.2 No of additional active saving s clients from low income households and micro enterepreneurs that have access to financial services (Number) No of additional active loan clients from low income households and micro entrepreneurs that have access to financial services (Number) Baseline(2011) Target(2016) 140000 0 70000 0 Output 1.2 - Government and national institutions are better able to enhance sustainable tourism, clean production and export capacity Indicator 1.2.1 Management practices, workplace cooperation, as well as skills and productivity of workers in the tourism sector are improved (Point system) Baseline(2011) Target(2016) 5 0 191 1.2.2 Structure for backward linkages between organic agriculture products, handicraft and the tourism industry strengthened (Yes/No, UNCTAD) 3 0 Output 1.3 - Ministry of Planning and Investment, sectors and provinces are better able to develop, implement, monitor and evaluate plans and policies based on up-to-date data and analysis Indicator 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 LSIS, LECS and Census provide data disaggregated by wealth quintiles, location (urban/rural with road and without road), sex, age and ethnicity (Point system) % of selected sectors and provinces using data disaggregated by wealth quintiles, location, sex, age and ethnicity in their development plans, monitoring and evaluation (Percent) NSEDP M&E indicators monitored through LaoInfo (Yes/No) At least one National Human Development Report produced (Yes/No) Social protection issues integrated in the social welfare decree ( (Yes/No) No of analysis and studies on socioeconomic development and Baseline(2011) Target(2016) 1 0 50 0 1 0 1 0 1 0 10 2 192 children in Lao PDR published (Number) Output 1.4 - Central and local governments have capacity to better screen, plan and monitor Foreign Direct Investments to ensure sustainable economic development Indicator 1.4.1 1.4.2 1.4.3 1.4.4 % of investment screen preapproval process for quality attributed (Percent) Number of national and provincial staff with capacity to review investment projects by applying DESIA's technical environmental and social safeguard guidelines (Number) % of new agriculture concession approved using model contract templated (Percent) Number of provinces conduct monitoring on the quality of selected investments (Number) Baseline(2011) Target(2016) 1 0 100 0 90 0 6 2 Output 1.5 - National training and research institutions are better able to contribute to analysis of demographic changes and social development 1.5.1 Indicator Baseline(2011) No. of analysis and studies published (Number) 2 Target(2016) 10 Output 1.6 - Ex-poppy cultivating communities have increased household productivity and improved infrastructure 193 Indicator 1.6.1 1.6.2 1.6.3 At least 50% of the project target areas in Phongsaly, Oudomxay and Huaphanh provinces that have increased food and agricultural production by the end of the project (Percent) At least 100 small farmer enterprises and local entrepreneurship in Phongsaly, Oudomxay and Huaphanh provinces newly developed by the end of the project (Number) At least newly 40 basic infrastructur of the project target areas in Phongsaly, Oudomxay and Huaphanh provinces constructed by the end of the project (Number) Baseline(2011) Target(2016) 50 19 100 0 40 0 Output 1.7 - The National Drug Control Master Plan, which is part of the 7th National Socio-Economic Development Plan, is implemented Indicator 1.7.1 1.7.2 No of police officers, prosecutors, judges and drug control officers trained on the applicaton of the Law on Drugs (Number) Cash income of the project target areas in Phongsaly, Oudomxay and Huaphanh provinces increased by Baseline(2011) Target(2016) 350 50 30 0 194 1.7.3 1.7.4 30% by the end of the project (Percent) At least 80% of the total addicts in target areas in Phongsaly, Oudomxay and Houaphanh treated (Percent) Implementation of the National Drug Control Master Plan is assessed as part of the 7th NSEDP (Yes/No) 80 0 1 0 Output 1.8 - Farmers have better access to markets and more sustainable integrated farming systems Indicator 1.8.1 No of farmers organisation formed (Number) 1.8.2 No of fair contract farming agreement made (Number) 1.8.3 No of households with improved food security (Number) Baseline(2011) Target(2016) 2112 1544 95 7 40869 13986 Output 1.9 - Government supported to develop capacity for labour market information systems and policies Indicator 1.9.1 No. of districts implementing strategy or components of it to generate jobs and income in rural areas (Number) Baseline(2011) Target(2016) 10 0 195 1.9.2 1.9.3 1.9.4 Information from Labour force survey used for the policy planning (Yes/No) Decree on employment promotion drafted, revised and finalized (Yes/No) No. of job seekers and employers using employment services per year (Number) 1 0 1 0 60000 30 Output 1.10 - Government officials have knowledge on and national policy to eliminate hazardous forms of child labour Indicator 1.10.1 1.10.2 Department of Statisics publishes data on child labour incidences on hazardous work (Point system) Long-term national action plan on ending the worst form of child labour in Lao PDR drafted (Yes/No) Baseline(2011) Target(2016) 1 0 1 0 Output 1.11 - Local authorities better able to deal with challenges and opportunities of urbanization Indicator 1.11.1 National Urban Forum established (Yes/No, UN-Habitat) 1.11.2 Pilot on decentralization of basic services and urgan rural linkages (Yes/No, UN-Habitat) 1.11.3 Baseline(2011) Target(2016) 1 0 1 0 35 196 No of small towns where a Urban Inequalities Survy (UIS) was conducted (Number) 0 Output 1.12 - Opportunities for new livelihoods linked to culture and development, the creative sector, and intangible cultural heritage explored Indicator 1.12.1 Policy and action plan for the Convention of Intangible Cultural Heritage drafted (Yes/No) Baseline(2011) Target(2016) 1 0 Output 1.13 - Government at central and provincial level increase aid and development effectiveness through the Round Table Process Indicator 1.13.1 1.13.2 1.13.3 No of successful Round Table Meetings and Implementation Meetings supported by UNDP (Number) Availability of funtioning ODA database (Yes/No) RTP forums better aligned to support achievements of the 7th Plan goals (Yes/No) Baseline(2011) Target(2016) 4 1 1 0 1 0 Output 1.14 - Strengthening institutional and national capacities related to standard, metrology, testing and quality 197 Indicator 1.14.1 No of regulations, standard, quality, methodology developed (Number) 1.14.2 No. of laboratories have been internationally accredited (Number) 1.14.3 No of standard and qualties that are issued to producers (Number) Baseline(2011) Target(2016) 30 0 2 0 15 0 Output 1.15 - Enhancing SME development through integrated local economic development Indicator 1.15.1 1.15.2 1.15.3 No of trained IT speciliast and statisticians of NSC and MoIC (Number) 2008 International Recommendations for Industrial Statistics (IRIS 2008) introduced to Department of Industry and Handicraft (Yes/No) Setting up of Database system , Prototype software system, Methodological framework developed (Yes/No) Baseline(2011) Target(2016) 12 0 1 0 1 0 Outcome 2 - By 2015, the poor and vulnerable benefit from the improved delivery of public services, an effective protection of their rights and greater participation in transparent decision making Indicator Baseline(2011) Target(2016) 198 I II III IV V VI VII VIII IX X Law on local administration revised to empower local administration to manage service delivery (Point system) Progress towards use of citizens report cards surveys on accessibility, affordability, and quality of services (Point system) No. of civil servants trained by the National Civil Service Training Centre per year (Number) No. of towns that implement propoor water governance (Number) Progress towards implementation of Legal Sector Master Plan strategic directions (Point system) Progress towards “Law on laws” on unified standards to draft laws (Point system) Civil Service Code of Conduct approved (Point system) No. of provinces with at least one legal aid clinic providing for poor and vulnerable (Number) Progress towards a legal framework for establishment of local councils (Point system) % of new laws and bills accompanied by technical analysis, fact finding reports, or legislative studies on impact on poor and vulnerable groups per year (Percent) 1 0 4 1 750 237 8 0 3 0 2 0 0 17 1 2 0 15 0 199 XI % of senior level (level 5 upwards) civil servants who are women (Percent) 25 16 Output 2.1 - The National Assembly is able to better perform its oversight, legislative and representational roles Indicator 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 % of National Assembly (NA) members with improved skills in legislative drafting and review (Percent) No. of NA fact finding missions undertaken (Number) No. of new laws adopted or revised in line with international treaty obligations which are available to the public (Number) % of complaints and petitions per year processed and documented at the NA (Point system) No. of new or revised legislation on gender based violence adopted in line with CEDAW and CRC recommendation (civil and penal law; law on protection and promotion of women) (Number) No. of new legislation reviewed from a gender perspective in compliance with CEDAW and CRC (Number) Baseline(2011) Target(2016) 80 52 8 1 115 89 3 0 5 3 8 200 Output 2.2 - Improved capacity of the civil Service at national and sub-national level to better manage and deliver services to the poor Indicator 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 No. of One-Door-Service Centres operational (Number) No. of districts benefiting from decentralized fiscal transfers (Number) No. of Local Governments implementing their plan and budget according to approved annual plan per year (Number) National and sub-national capacity development initiatives (GPAR Fund) (Number) No. of Local Governments implementing integrated planning and budgeting in coordination with sectoral departments (especially health and education) to remove bottlenecks to service delivery (Number) No. of sectors applying the decree on remuneration of civil servants in remote areas (Number) No. of sectors that are applying roles and responsibilities of functions at the central and subnational levels, in line with the national law on public administration and guidance on job descriptions (Number) Baseline(2011) Target(2016) 50 13 70 35 70 35 30 10 2 0 2 0 2 0 201 Output 2.3 - Labour migration policy and mechanisms developed and adopted to protect Laotian migrant workers from exploitation and abuse during recruitment and employment Indicator 2.3.1 2.3.2 2.3.3 Availability of the draft Emigration Operations Manual (Point system) No. of fully functioning Migration Resource centres (MRCs) with trained staff (Number) Sex-disaggregated data system in place in MOLSW (Point system) Baseline(2011) Target(2016) 1 0 3 0 1 0 Output 2.4 - The Legal Sector Master Plan is effectively implemented advancing the Rule of Law and accelerated realization and protection of human rights Indicator 2.4.1 2.4.2 2.4.3 2.4.4 % of accepted 74 Universal Periodic Review Recommendations which are fully implemented (Percent) % of new laws drafted/existing laws revised in line with international treaty obligations (Percent) National Committee or Agency for the Protection of Human Rights established in line with the Paris principles relating to the national human rights institutions (Point system) Progress towards a functioning monitoring system for enforcement of laws (Point system) Baseline(2011) Target(2016) 100 0 100 0 1 0 2 0 202 2.4.5 2.4.6 2.4.7 Fully functioning National Database on legislation and legal resource (Point system) Progress towards a functioning Government led joint coordination mechanism for juvenile justice at national and sub-national levels (Point system) No. of CRC recommendations including observations addressed by government (Number) 2 0 5 0 10 0 Output 2.5 - The Government is able to effectively fight corruption Indicator 2.5.1 2.5.2 2.5.3 2.5.4 UNCAC implementation review completed (Point system) Progress towards amending national anti-corruption legislation in line with UNCAC's requirement (Point system) % of officers of the Government Inspection Authority having received training on UNCAC and the national anti-corruption law (Percent) % of prosecutors, judges and police officers having received training on UNCAC and the national anticorruption law (Percent) Baseline(2011) Target(2016) 1 0 3 0 20 0 10 0 203 Output 2.6 - Government is better able to prevent and combat human trafficking Indicator 2.6.2 Prime Minister's Office approved National Plan of Action on Human Trafficking (Point system) Anti-Human Trafficking Law drafted (Point system) 2.6.3 No. of legal and law enforcement officials trained (Number) 2.6.1 Baseline(2011) Target(2016) 1 0 1 0 800 300 Output 2.7 - Government officers are better able to apply the existing criminal and civil law from arrest to prosecution Indicator 2.7.1 2.7.2 Progress towards lawyers, judges, investigators, prosecutors and policemen equipped with the knowledge and skills to apply existing criminal and civil law from arrest to prosecution in line with international human rights standard (Point system) Progress towards lawyers, judges, investigators, prosecutors and policemen equipped with the knowledge and skills to apply international juvenile justice standards in the application of national laws (Point system) Baseline(2011) Target(2016) 5 0 5 0 204 2.7.3 2.7.4 Progress towards judges, prosecutors, policemen and drug control officers equipped with the knowledge and skills to apply the Law on Drugs and related criminal law (Point system) Network of legal professionals equipped with the knowledge to apply national laws and influence change meet to share best practices and lessons learnt (Point system) 3 0 3 0 Output 2.8 - People in Lao PDR have greater access to information and more opportunities to participate in planning and decision-making as well as monitoring and implementation of national and sub-national development plans Indicator 2.8.1 No. of registered Not-for-Profit Associations -NPAs (Number) 2.8.2 No. of community radios on air (Number) 2.8.3 2.8.4 Participatory local planning policy and guideline in place (Point system) NA hotline permanently open (Point system) Baseline(2011) Target(2016) 100 1 15 4 1 0 1 0 Output 2.9 - Support to Macro-reforms for improved efficiency, accountability and transparency in public administration Indicator Baseline(2011) Target(2016) 205 2.9.1 2.9.2 2.9.3 Regulations to implement Civil Service Code of Conduct exist (Point system) Competence and merit-based civil service performance management system in place (performance appraisals and promotions of civil servants based on new civil service performance management system) (Point system) Revision of Law on Local Government (Point system) 1 0 1 0 2 0 Output 2.10 - National law on drugs and crime is updated and implemented according to ratified international treaties Indicator 2.10.1 2.10.2 Interpretation guidelines or draft amendment to existing drug control law, criminal law and/or criminal procedure law (Point system) No. of new NA members participating in awareness raising sessions on gaps between national law and ratified treaties on drugs and crime (Number) Baseline(2011) Target(2016) 2 0 50 0 Output 2.11 - Sector reforms supported for more pro-poor water and sanitation governance Indicator Baseline(2011) Target(2016) 206 2.11.1 Strategy on pro-poor water governance drafted (Point system) 2.11.2 No. of utilities that operationalize a gender action plan (Number) 1 0 12 0 Output 2.12 - New Labour Legislation adopted with social dialogue mechanisms to ensure industrial peace and institutionalized Indicator 2.12.1 2.12.2 2.12.3 2.12.4 New Labour Legislation adopted with the provision on labor disputes mechanism and procedures (Point system) Formal mechanisms to settle labour disputes established and functional (Point system) Formal mechanism to determine the minimum wage established (Point system) % of labour dispute cases per year which were pre-adjudicated (Percent) Baseline(2011) Target(2016) 1 0 1 0 1 0 50 26 Output 2.13 - The justice sector strengthened to respond to the needs of women and promote and protect women's human rights Indicator 2.13.1 Curricular established in law school that incorporate CEDAW principles (Point system) Baseline(2011) Target(2016) 1 0 207 2.13.2 2.13.3 CEDAW compliant strategy and guidelines within justice sector exist (Point system) No. of judges and legal aid providers equipped with skills to respond to needs of women and protect women's human rights (Number) 1 0 Outcome 3 - By 2015, under serviced communities and people in education priority areas benefit from equitable quality education and training that is relevant to the labour market Indicator Baseline(2011) I Gross pre-school enrolment rate for girls and boys (Percent, Boys) 22.0 II Gross pre-school enrolment rate for girls and boys (Percent, Girls) 22.3 III Gross pre-school enrolment rate for girls and boys (Percent) 22.1 IV Net primary enrolment rate for girls and boys (Percent, Boys) 93.7 V Net primary enrolment rate for girls and boys (Percent, Girls) 91.7 VI Net primary enrolment rate for girls and boys (Percent) VII VIII IX Gross lower secondary enrolment rate for girls and boys (Percent, Boys) Gross lower secondary enrolment rate for girls and boys (Percent, Girls) Target(2016) 39 98 92.7 64.6 55.5 75 208 XII Gross lower secondary enrolment rate for girls and boys (Percent) % of girls and boys starting grade 1 who reach grade 5 (Percent, Boys) 60.2 XII % of girls and boys starting grade 1 who reach grade 5 (Percent, Girls) 72.0 XII % of girls and boys starting grade 1 who reach grade 5 (Percent) 71.1 71.0 98 XVI Transition rate from primary to lower secondary for girls and boys (Percent, Boys) Transition rate from primary to lower secondary for girls and boys (Percent, Girls) Transition rate from primary to lower secondary for girls and boys (Percent) Literacy rate in age group 15-24 years (Percent, Female) XVII Literacy rate in age group 15-24 years (Percent, Male) 72 XVIII Literacy rate in age group 15-24 years (Percent) 64 XIII XIV XV 82.6 78.7 85 80.7 56 99 Output 3.1 - Government has the capacity to effectively coordinate, plan, implement and monitor education sector development Indicator Baseline(2011) Target(2016) 209 3.1.1 3.1.2 MoES services at central, provincial and district levels utilize disaggregated education sector data from the Education Management Information System for planning, budgeting, monitoring and strengthening policies Increased coordination (under leadership of the MoES) in the delivery of the Education Sector Development Plan, consistent with Aid Effectiveness Principles Presentation platform in place No data presentation platform in place Revised ESWG Structure with TOR for each level elaborated ESWG Executive TOR only available Output 3.2 - Pre-school aged children, especially girls in educationally disadvantaged communities, are better prepared for school Indicator 3.2.1 Baseline(2011) Target(2016) Availability of a robust, communitybased ECE service model for national application Evaluated Pilot Available No Pilot 210 Documented assessment of ECE policy areas inform ECE sector reform 3.2.2 ECE Sub-Sector Assessment available No assessment available 3.2.3 % of pre-school students receiving mid-morning snacks in targeted provinces (Percent) Output 3.3 - Primary and secondary school-aged children, especially girls in educationally disadvantaged communities, are enrolled in and complete primary and secondary education that uses a life-skills approach Indicator 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 % of primary schools with functioning water and sanitation facilities (Percent) % secondary schools with functioning water and sanitation facilities (Percent) % of primary schools meeting the national Quality Education Standards (Percent) % of secondary schools meeting the national Quality Education Standards (Percent) % of students participating in nonformal equivalency programmes who pass the primary completion exam (Percent) Baseline(2011) Target(2016) 50 29.4 75 75 80 3.3.6 211 % of primary and secondary students receiving mid-morning snacks and/or take-home rations in targeted provinces (Percent) Output 3.4 - The needs of disadvantaged children are addressed through curricula revisions in pre-primary, primary and secondary and teacher education Indicator 3.4.1 Progress towards pre-school, primary and secondary pre-service and classroom teaching and learning materials developed with attention to gender and ethnic, linguistic and cultural diversity (Point system) Baseline(2011) Target(2016) 3 0 Output 3.5 - Government and concerned industries have the capacity to develop and approve Skill Standards and Testing modules and certify the upgraded skills of workers Indicator 3.5.1 No. of Skill Standards and Testing Modules approved (Number) 3.5.2 Institution functioning to certify the upgraded skills of workers (Point system) Baseline(2011) Target(2016) 20 10 1 0 Outcome 4 - By 2015, people in Lao PDR benefit from more equitable promotive, preventive, curative and rehabilitative health and social welfare services 212 Indicator I II III IV V Baseline(2011) DPT3 coverage (Percent) 90 31.8 Out of pocket expenditure as % of private expenditure on health (Percent) Tobacco use in adults (Percent) 30 46.1 9 19 % of women who desire to delay or prevent pregnancy who are not currently using contraceptive methods (Percent) % of births attended by trained health worker (excl. TBAs) (Percent) 18 20 50 42 VII Progress towards availability of disaggregated health data (Point system) % of people using improved drinking water (Percent) 57 VIII % of people using improved sanitation facilities (Percent) 53 VI IX X Target(2016) No. of provinces that have indicator-based and events-based surveillance systems with reports reaching National level (Number) Progress towards a National Social Welfare Development Strategy (Point system) 3 0 80 60 17 8 6 0 Output 4.1 - Health systems are better governed, financed, staffed and have better management, data, products and technology* 213 Indicator 4.1.1 Outpatient visits per person per year (Number) Baseline(2011) Target(2016) 0.89 0.38 Output 4.2 - Policies and programmes in place that address underlying social and economic determinants of health Indicator 4.2.1 % increase in national indicators disaggregated by sex and age and at least two other determinants (ethnicity, place of residence, and/or socioeconomic status) (Percent) Baseline(2011) Target(2016) 5 0 Output 4.3 - Non-communicable conditions, mental disorders, violence, injuries and visual impairment prevented and reduced and risk factors for health conditions* prevented or reduced Output 4.4 - Ministry of Health and other relevant institutions improve information, coverage and quality of sexual and reproductive health information and services* Indicator 4.1.1 Number of Midwives accredited (Number) 4.1.2 National ANC1 data from health management information systems reported annually (Percent) Baseline(2011) Target(2016) 1500 139 85 71 214 Output 4.5 - Individuals, families and communities in priority areas have access to an integrated package of services on maternal, neonatal and child health Indicator 4.5.1 4.5.2 % of fixed site service delivery points with no stock out of family planning commodities and at least five life-saving maternal/reproductive health drugs in six months prior to survey (Percent) % measles immunization coverage (Percent) Baseline(2011) Target(2016) 65 43 95 64 Output 4.6 - Vulnerable and most-at-risk young people in priority urban areas have better access to quality youth-friendly, gender-sensitive, sociallyinclusive sexual and reproductive health information and services Indicator 4.6.1 % of young people aged 15-24 in target areas that received adolescent sexual and reproductive health life-skills education (Percent) Baseline(2011) Target(2016) 60 27 Output 4.7 - Communities in small towns and vulnerable children and women in rural areas have improved access to water and sanitation services Indicator 4.7.1 No. of small towns with water supply and sanitation services [a minimum of a) water treatment Baseline(2011) Target(2016) 15 10 215 4.7.2 4.7.3 4.7.4 plant, b) pipe networks, c) household metered connections, d) 24/7 water supply] (Number) % of rural villages in poorest 21 districts having access to and using improved water sources (Percent) % of rural villages in poorest 21 districts having access to sanitation services (Percent) No. of provinces accessing water supply and sanitation services (Number) 80 51 60 38 15 10 Output 4.8 - International Health Regulations core capacity requirements achieved (including for emerging, neglected tropical and other communicable diseases) Indicator 4.8.1 4.8.2 4.8.3 4.8.4 Baseline(2011) Target(2016) Laboratory services available to test for priority health threats 2 Infection prevention and control is established and functioning at national and hospital level Multi-hazard National Public Health Emergency Preparedness and Response Plan is developed and implemented General obligations at points of entry are fulfilled 2 1 2 Output 4.9 - People in Lao PDR have increased awareness of drug prevention and better access to treatment, rehabilitation and reintegration services 216 Indicator 4.9.1 4.9.2 4.9.3 4.9.4 Number of students/youth reached by awareness rallies and direct activities (Number) No. of drug awareness and prevention material distributed nationwide (Number) No. of youth participated in improved recreational and occupational/vocational training activitie (Number) No. of health workers, social workers and police officers trained on drug counselling (Number) Baseline(2011) Target(2016) 50000 0 120000 9000 9000 1400 550 80 Output 4.10 - National and subnational government is better able to implement a social welfare system Indicator 4.10.1 4.10.2 Progress towards a functioning coordinating mechanism led by the Ministry of Labour and Social Welfare for child protection (Point system) Progress towards establishment of a functioning Government-led joint coordination mechanism for social welfare (Point system) Baseline(2011) Target(2016) 6 0 4 0 Output 4.11 - National Health Insurance scheme is established and piloted, and coverage under social health protection schemes has been extended in target areas 217 Indicator 4.11.1 % of population covered under social health protection schemes in target areas (Percent) Baseline(2011) Target(2016) 50 23 Outcome 5 - By 2015, vulnerable people are more food secure and have better nutrition Indicator Baseline(2011) I Prevalence of stunting in children under 5 years of age (Percent) 44 II Prevalence of wasting in children under 5 years of age (Percent) 6 IV Prevalence of underweight in children under 5 years of age (Percent) Prevalence of anaemia in children under 5 years of age (Percent) V Prevelance of anaemia in WRA (Percent) VI % of households consuming iodized salt (Percent) III VII Target(2016) 34 4 22 27 30 41 25 36 90 80 Food consumption score (Percent) 5 12.7 Output 5.1 - Prevention and appropriate management of malnutrition promoted (including micro-nutrient deficiencies) resulting in improved nutritional status (e.g. stunting, wasting, micronutrient deficiencies prevalence) of targeted girls and boys under 5 years of age Indicator 5.1.1 Baseline(2011) Target(2016) 80 218 5.1.2 5.1.3 % of children receiving Ready-toUse Supplementary food to prevent chronic malnutrition in targeted areas (Percent) Countrywide treatment protocol for acute malnutrition in place (Point system) Proportion of children 6-59 months who received at least 1 high dose Vitamin A supplement in the past 6 months (Percent) 1 0 90 92 Output 5.2 - Individuals, families and communities have improved food and nutrition security knowledge and practices Indicator 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 % of targeted villages where nutrition training was delivered (Percent) No. of VHVs and civil society members trained to support counselling on IYCF, maternal nutrition, micronutrient supplementation, hand washing, hygiene and care practices in targeted areas (Number) % of children under 6 months exclusively breastfed (Percent) % of children 6 – 8 months receiving solid, semi-solid or soft foods (Percent) Baseline(2011) Target(2016) 80 250 0 70 40 90 52 1 219 National IYCF guidelines in place (Point system) 0 Output 5.3 - Government is better able to implement an integrated and coordinated approach to food and nutrition security and to translate it into appropriate programmes Indicator 5.3.1 5.3.2 5.3.3 Inter-sectoral coordination mechanism for food security and nutrition established (Point system) Nutrition and food security stakeholder mapping completed (Point system) Strengthened nutrition monitoring and reporting mechanisms through linking with HMIS and surveillance system (Point system) Baseline(2011) Target(2016) 4 0 2 0 2 0 Output 5.4 - Consumption and production of edible insects and indigenous foods supported Indicator 5.4.1 5.4.2 No. of households that consider indigenous food farming mechanisms have increased their Food and Nutrition Security in target areas (Number) No. of households with expanded and diversified home food production or greater access to markets (Number) Baseline(2011) Target(2016) 500 0 30000 220 Output 5.5 - Sustainable fisheries arrangements and aquaculture under local management developed Indicator 5.5.1 5.5.2 5.5.3 5.5.4 5.5.5 5.5.6 Fisheries management regulations developed (Point system) Fisheries mangement regualations established in 30 districts covering conservation of broodstock & nursing grounds; restrictions on destructive gears, access controls, closed seasons (Number) Increase in fisheries management groups by 2015 (Percent, Rivers) Increase in fisheries management groups by 2015 (Percent, Water bodies) % of respondents in target communities that agree that local management of fisheries is sustainable (Percent) Aquaculture provides 25% increase in supply to rural and peri urban areas (Number) Baseline(2011) Target(2016) 1 0 100 30 75 0 50000 40000 Output 5.6 - Farmers are better able to implement integrated pest management, good agricultural practices and pesticide risk reduction Indicator 5.6.1 Baseline(2011) Target(2016) 5000 221 5.6.2 5.6.3 No. of farmers trained (at least 2 weeks training) in Pesticide Risk Reduction or season-long IPM Farmers Field School (Number) % of IPM/FFS trained farmers that use 50% less pesticide (Percent) % of trained farmers that have increased use of non-chemical pest management approaches (Percent) 2000 90 10 90 15 Output 5.7 - Small holder farmers are better linked to the market and agencies procuring food commodities are increasingly buying from them Indicator 5.7.1 5.7.2 Baseline(2011) % of WFP's food purchased locally from small millers participating in the P4P initiative (Percent) No. of smallholders participating in trainings to increase productivity and improve nutritional knowledge (Number) Target(2016) 30 6000 Outcome 6 - By 2015, key populations at higher risk of HIV infection benefit from increased coverage and quality of integrated prevention and treatment, care and support services Indicator Baseline(2011) I % of sex workers who are HIV infected (Percent) 1.28 II % of men having sex with men who are HIV infected (Percent) 2.28 Target(2016) 5 5 222 III % of eligible adults and children currently receiving antiretroviral therapy (Percent) 90 52.27 Output 6.1 - More most-at-risk populations* have access to quality HIV/STI prevention information and services Indicator 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 Injecting Drug Users - No. of provincial groups of local harm reduction service providers established (Point system) Men with multiple sex partners - % of targeted mobile men (including civil servants, uniformed men, migrants, transport workers, business men, others) that report consistent condom use with casual partners (Percent) STI Services - % of 94 priority districts (94 priority districts of 143 listed I National Strategic and Action Plan on HIV/ADIS/STI 2011-2015, Annex 6B) that have at least one quality-assured site for STI treatment (Percent) PMTCT - % of antenatal clinic attendants that received Provider Initiated Counselling and Testing (Percent) General Population - A minority has access to HIV-AIDS prevention in their language (Point system) Baseline(2011) Target(2016) 2 0 70 0 100 100 50 1 1 0 223 6.1.6 General Population - % of young women and men aged 15–24 both correctly identify ways of preventing the sexual transmission of HIV and who reject major misconceptions about HIV transmission (Percent) 80 18.4 Output 6.2 - More People living with HIV and AIDS have equitable access to and use of effective, gender-sensitive HIV treatment, care and support services Indicator 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 % of adults age 15+ who have advanced HIV infection receive antiretroviral treatment (Percent) % of adults and children with HIV known to be on treatment 12 months after initiation of antiretroviral therapy (Percent) % of HIV patients tested for TB and vice-versa by using PICT approach (Percent) % of identified HIV-positive pregnant women received antiretroviral medicines to reduce the risk of mother-to-child transmission (Percent) % of children diagnosed with HIV can equitably access home and community based care and support services (Percent) Baseline(2011) Target(2016) 90 54.75 87.3 100 18 90 14 90 0 90 224 % of children age 0-14 who have advanced HIV infection receive antiretroviral treatment (Percent) 32.13 Output 6.3 - National AIDS Authorities and their HIV partners are better able to plan, implement evidence and rights-based, gender-sensitive and resourced HIV policies Indicator 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5 6.3.6 6.3.7 No. of provinces that have sentinel surveillance data integrated into GIS system (Number) National estimates and projection endorsed and disseminated at national and global level (Point system) No. of GAPR & NASA produced and officially submitted to UNAIDS and disseminated (Number) No. and percentage of CBO involved in national joint programme review (Number) No. of JUNT technical support provided to address bottlenecks in GF grant implementation (Number) HIV related indicators included in the 7th HSDP and monitored on a quarterly basis (Point system) National guidelines and standard operating procedures exist for key HIV services (including testing & counseling, medical management of HIV, PMTCT, targeted prevention Baseline(2011) Target(2016) 6 1 1 1 4 1 6 3 12 2 1 0 1 0 225 6.3.8 6.3.9 interventions and home/community-based care) (Point system) Progress towards national harm reduction policies and plans (Point system) Progress towards a functioning national task force on harm reduction (Point system) 2 0 2 0 Outcome 7 - By 2015, the government ensures sustainable natural resources management through improved governance and community participation Indicator I II III IV V Proportion of land area covered by forest (%) per year (Percent) No. of participatory natural resource management agreements developed (2010:0, 2015:30, MoV: Review of provincial and central records) (Number) Average timber revenue received by village clusters in targeted districts per village per year (2010: USD262, 2015: USD350, MoV: DoF Annual Report) (USD) National Bio-Safety Framework adopted by Government (2010: No; 2015: Yes; MoV: Framework Document) (Point system) Baseline(2011) Target(2016) 65 42 30 0 1 0 1 226 VI Bio-safety law passed by National Assembly (2010: No; 2015: Yes; MoV: Bio-Safety Law) (Point system) No. of provincial or district governments with agro-biodiversity conservation plans (2010: 0, 2015: 8, MoV: MAF sectoral annual progress reports) (Number) 0 8 0 Output 7.1 - Government has comprehensive participatory development plans for urban wetlands and is able to implement them Indicator 7.1.1 Master plan for individual urban wetlands developed (Point system) 7.1.2 No. of hectares of urban wetlands brought under management plan (Number) Baseline(2011) Target(2016) 1 0 15000 0 Output 7.2 - Communities and government are better able to manage forests sustainably Indicator 7.2.1 Area managed jointly by communities in targeted (to be defined prior to start of UNDAF cycle) districts (Percent) Baseline(2011) Target(2016) 40 20 Output 7.3 - Communities are more engaged in the management of natural resources 227 Indicator 7.3.1 No of existing participatory natural resource management and biodiversity management model with corresponding programmes (Number) (Number) Baseline(2011) Target(2016) 3 1 Output 7.4 - National and sub-national authorities are better able to manage the environment in line with Forestry and Fishery Laws Indicator 7.4.1 No. of training packages for government officer at central and local levels, and communities on national legal framework and issues related to 3 Rio Conventions (Number) Baseline(2011) Target(2016) 3 0 Output 7.5 - National and sub-national authorities are better able to manage bio-safety risks in line with the National Socio-economic Development Plan and the Cartagena Protocol on Bio-safety Indicator Baseline(2011) 7.5.1 National Bio-safety Framework drafted (Point system) 0 7.5.2 Bio-safety law drafted (Point system) 0 Target(2016) 1 1 Outout 7.6 - National and sub-national authorities develop policies and pilots individual land titling, land use zoning and land recording 228 Indicator 7.6.1 7.6.2 Policies and tools on individual land titling, land use zoning and land recording exist (Point system) No. of provinces which pilot individual land titling, land use zoning and land recording (Number) Baseline(2011) Target(2016) 1 0 3 0 Output 7.7 - Improved resource productivity, environmental performance of competitive and sustainable tourism industry, building up efficient backward linkages with the handicraft and silk industries Indicator 7..7.1 7..7.2 7..7.3 Increased availability of environmentally sound goods (in particular clean and organic food products) and services (e.g. sustainable tourism) (Point system) Increased exports of environmentally sound goods and services (Point system) Compliance with food safety, service quality and environmental standard, improved within the tourism sector through the introduction of a voluntary national quality certification mark (Point System) (Point system, UNIDO) Baseline(2011) Target(2016) 2 0 2 0 4 0 Output 7.8 - Government supported in adopting best techniques and environmental practices and is better able to manage Persistent Organic Pollutants 229 Indicator 7.8.1 7.8.2 Government policies and regulations adopted to facilitate BAT/BEP implementation (Point system) Enforcement mechanism in place (Point system) Baseline(2011) Target(2016) 1 0 1 0 Output 7.9 - Communities actively participate in fair, equitable and rational territorial development plans in facilitated negotiation with relevant government authorities and private sector stakeholders Indicator 7.9 No. of District Participatory Territorial Development Plans approved by government (Number) Baseline(2011) Target(2016) 2 0 Outcome 8 - By 2015, the government and communities better adapt to and mitigate climate change and reduce natural disaster vulnerabilities in priority sectors Indicator I II No. of priority sectors (Such as forestry, agriculture and water resources, as identified in 2nd National Communication, NAMA, NAPA and National CC strategy) that have a sectoral plan that explicitly include climate change mitigation and adaptation No. of key ministries (i.e. ministries with a sector working group) that Baseline(2011) Target(2016) 2 &lt;1 4 0 230 III IV V have approved Disaster Risk Management Plans Number of national and local level authorities and community members trained on disaster preparedness Number of hazard or climate risk “Vulnerability and Adaptation Assessments” conducted at the subnational level % of households across 16 target districts benefiting from climate change resilient agriculture and/or infrastructure improvements (Percent) 1950 0 14 0 15 0 Output 8.1 - Long-term recovery of natural disaster victims is supported and their vulnerabilities to future natural disasters are reduced Indicator 8.1.1 Baseline(2011) Progress towards risk preparedness and reduction mechanisms in target communities (Point system) Target(2016) 5 Output 8.2 - Climate Change Adaption/Disaster Risk Reduction measures linked to water, sanitation, hygiene and shelter improved Indicator 8.2.1 No. of villages that have the capacity for community based risk management action plans (Number) Baseline(2011) Target(2016) 300 100 231 8.2.2 8.2.3 8.2.4 Inter-agency coordination mechanism in place for WASH cluster (Point system) No. of pilots on water and sanitation and build-back better housing and designing conducted (Number) No. of people benefiting from pilots (Number) Yes 1 3 0 15000 0 Output 8.3 - Government at national and sub-national level has developed and piloted programmes for climate change adaptation and mitigation Indicator 8.3.1 Extent to which climate-resilient development is integrated into national development plans (Point system) Baseline(2011) Target(2016) 2 1 Output 8.4 - Government* and vulnerable communities can more effectively respond to emergencies, adapt to climate change and prepare for disasters Indicator 8.4.1 Disaster Management Law drafted (Point system) 8.4.2 Indicator on emergency operation centre to be defined (Point system) 8.4.3 Baseline(2011) Target(2016) Yes 0 5 232 Progress towards NDMO's greater coordination capacity (Point system) 0 Output 8.5 - Rural communities develop agroforestry climate change resilience Indicator 8.5.1 No. of households in target districts that have adopted agroforestry (According to International Centre of Research on Agroforestry Forestry) farming systems (Number) Baseline(2011) Target(2016) 100 0 Output 8.6 - Rural communities are better prepared for disaster risk and climate change in indigenous livestock, fisheries, agricultural production and NTFPs Indicator 8.6.1 % of trained households that practice disaster-prepared animal husbandry aquaculture and agriculture (Percent) Baseline(2011) Target(2016) 40 0 Output 8.7 - Community-based solid waste management and decentralized waste water treatment piloted Indicator 8.7.1 No. of towns with community-based solid waste management and waste water treatment (Number) Baseline(2011) Target(2016) 6 0 233 Output 8.8 - National and local authorities are able to effectively prepare for and respond to food shortages and hunger emergencies caused by natural disasters Indicator 8.8.1 8.8.2 No. of National, Provincial and District Disaster Management Committees on Disaster Preparedness & Response that have been trained (Number) • No. of national and local level authorities and community members trained to effectively prepare for and respond to hunger emergencies caused by natural disasters (Number) Baseline(2011) Target(2016) 65 0 1950 0 Outcome 9 - By 2015, national and local governments and communities have reduced the impact of unexploded ordnance on people in Lao PDR Indicator I II III IV Baseline(2011) No. of UXO casualties in Lao PDR per year (Number) 300 Hectares released for productive use by all UXO operators per year (Number) No. of UXO destroyed per year (Number) 70920 No. of affected districts where clearance operation is based on District Clearance Plans [Note: Districts are considered ‘affected' by Target(2016) 75 60000 20 0 234 V UXOs if they are identified as such by district authorities] (Number) Methods developed, training undertaken to create a capacity in NRA and UXO Lao A basic capacity to both the NRA and UXO Lao to ensure and measure development impact of work in the UXO sector by 2015 extremely limited capacity VI UXO sector-wide multiyear work plan developed (UNDP) work plan developed and implemented by 2014 for period to 2020 No plan Output 9.1 - UXO Lao is better able to manage clearance and risk education programmes for the needs of communities at risk Indicator 9.1.1 9.1.2 No. of hectares of priority land released in accordance with National Standards and the Convention on Cluster Munitions per year (Number) Progress towards a sustainable programme management capacity for UXO (Point system) Baseline(2011) Target(2016) 2600 2600 4 1 Output 9.2 - The National Regulatory Authority for the UXO/Mine Action Sector is better able to coordinate and regulate the UXO sector Indicator 9.2.1 9.2.2 No. of UXO survivors whose needs are tracked (Number) Baseline(2011) Target(2016) 10000 0 20 235 9.2.3 No. of districts with district clearance plan based on district survey (Number) % of operators accredited (Percent) 0 100 33 9.2.4 % of operators reporting electronically to the NRA (Percent) 9.2.5 % of population in UXO affected areas with improved knowledge, attitudes and practices related to UXO risk reduction (Percent) 80 13 90 82 Output 9.3 - National institutions are better able to implement the Convention on Cluster Munitions obligations Indicator 9.3.1 9.3.2 9.3.3 9.3.4 Article 7 CCM Reports submitted by Jan 27th per year (Point system) No. of global CCM meetings (1 Intersession Meeting and 1 State Party Meeting per year) attended by the Lao PDR Government from 2012-2015 (Number) National contribution to the UXO sector in million kips per year (Million kips) Total UXO sector expenditure per year (USD) Baseline(2011) Target(2016) 1 1 8 2 8000 250 50,000,000 20,000,000 236 Outcome 10 - By 2015, People in Lao PDR benefit from policies and programmes which more effectively promote gender equality and increased participation and representation of women in formal and informal decision making Indicator Baseline(2011) 10.1.1 Gender differentials in hours spent in domestic labor (hrs/day, Female) 2.4 10.1.2 Gender differentials in hours spent in domestic labor (hrs/day, Male) 0.5 10.1.3 Target(2016) 2.3 0.4 Age at first birth (Years old, Female) 20 19 10.1.4 No. of CEDAW recommendations acted upon by sector (Number) 10.1.5 Number of policy framework which promote gender equality based on human rights standard developed (Number) 20 2 5 3 Output 10.1 - Institutions at central and sub-national level are better able to enhance gender equality and follow up CEDAW recommendations Indicator 10.1.1 No. of sectoral and provincial SubCommissions for the Advancement of Women systematically monitoring and reporting on implementation of National Strategy for the Advancement of Women (Number) Baseline(2011) Target(2016) 15 0 Output 10.2 - Civil society organizations are better able to advocate for gender responsive policies and demand accountability in line with CEDAW commitments 237 Indicator 10.2.1 10.2.2 10.2.3 10.2.4 10.2.5 10.2.6 10.2.7 Data available to influence government response to GBV/VAW (Number) No. of work plan including M&E framework developed to implement the National Strategy for the Advancement of Women 2011-2015 (Number) No of media professionals with enhanced understanding on GBV (Number) No. of youth groups participating in EVAW Campaign (Number) No. of policy consultations that participated by members of the CEDAW Watch Group to advocate for gender responsive policies (Number) No. of civil society organizations engaged in the CEDAW reporting process and/or implementation of CEDAW Concluding Comments (Number) No. Of nationally representative studies providing evidence on VAW prevalence (Number) Baseline(2011) Target(2016) 1 0 55 0 20 0 8 2 8 1 25 13 1 0 Output 10.3 - Women groups have enhanced capacity and opportunities to engage in decision making and planning process Indicator Baseline(2011) Target(2016) 238 10.3.1 No. of women groups trained on political participation, leadership and participation in decision making (Number) 2 0 239 240 241