QUARTERLY PHYSICAL REPORT OF OPERATION Details of Accomplishment 2nd Quarter 2015 (April 1, 2015-June 30, 2015) STAFF/REGIONAL OFFICE: NEDA Regional Office VIII MFO 1. SOCIO-ECONOMIC AND PHYSICAL PLANNING AND POLICY SERVICES Performance Indicator Set 1 QUANTITY: Percentage of requested policy recommendations on socio-economic and development matters prepared or reviewed and submitted. QUALITY: Percentage of policy recommendations with no adverse feedback received. TIMELINESS: Percentage of policy recommendations prepared within prescribed timeframe. External Requests NAME OF POLICY REQUESTS (Specify the policies requested for review) REQUESTING PARTY (Senate/ HOR/ NEDA Board Committees/ RDCs, etc.) REVIEWED WITHIN PRESCRIBED PERIOD (Y for Yes and N for No) RECEIVED ADVERSE FEEDBACK* (Y for yes and N for no) REMARKS 1. Matnog Port Congestion Eastern Visayas Chamber of Commerce, Inc. Y N 2. Unliquidated Cash Advances of Local Government Units RDC VIII-DAC Y N 3. Danajon Bank Double Barrier Reef Project for Cebu Leyte Bohol and Southern Leyte (CELEBOSOLE) Visayas RDCom Y N Endorsed by RDC 4. Farm Machinery for Sugarcane Planters Association of Eastern Visayas Sugarcane Planters’ Associations of Eastern Visayas Y N Endorsed by RDC Eastern Visayas Chamber of Commerce, Inc. Y N Endorsed by RDC 6. Catbalogan Sky City Mega Project Catbalogan City Y N Endorsed by RDC. For PPP Technical Assistance. 7. information campaign of the demonetization BSP VIII Y N BLGF VIII Y N 5. Investment Folios for Eastern Visayas Endorsed by RDC program of the Bangko Sentral ng Pilipinas (BSP) Page 1 of 15 NAME OF POLICY REQUESTS (Specify the policies requested for review) REVIEWED WITHIN PRESCRIBED PERIOD (Y for Yes and N for No) RECEIVED ADVERSE FEEDBACK* (Y for yes and N for no) Y N Y N Samar Province Y N Samar Province Y N Y N DILG Y N DepEd Y N REQUESTING PARTY (Senate/ HOR/ NEDA Board Committees/ RDCs, etc.) REMARKS 8. Iskor ng Bayan (Fiscal Sustainability Scorecard) gauges of the Bureau of Local Government Finance (BLGF) DILG VIII 9. Proposed Measures to Address BuB Funds Liquidation Bottlenecks to ensure LGU Seal of Good Local Governance (SGLG) compliance of the DILG DBM VIII 10. LGU-Public Financial Management Tool (PFMAT) of the DBM 11. Tarangnan, Gandara, San Jorge, Pagsanjan (TAGASAPA) Area Irrigation and Drainage (Flood Control) Project Proposed to NIA 12. DENR and NHA interventions for the immediate resettlement of typhoon-affected constituents of the Municipality of Daram consistent with DENR-DILGDND-DPWH Joint MC No. 2014-01 as part of their disaster recovery and rehabilitation efforts Samar Province 13. DSWD intervention for the immediate release of the Emergency Shelter Assistance (ESA) of the Municipality of Daram as part of their disaster recovery and rehabilitation efforts 14. Institutionalization of proper flow of information of BuB projects at the LGU level by informing the Mayors of the status of these projects and bringing this concern to the Regional Poverty Reduction Action Team (RPRAT) level as a reminder to the BuB participating agencies through the DILG Endorsed by RDC 15. Support for the Senior High School Program Implementation in Region VIII and Immediate Construction of Needed Classrooms and Hiring of Teachers Page 2 of 15 NAME OF POLICY REQUESTS (Specify the policies requested for review) 16. Funding and Technical Assistance for the (Senate/ HOR/ NEDA Board Committees/ RDCs, etc.) REVIEWED WITHIN PRESCRIBED PERIOD (Y for Yes and N for No) RECEIVED ADVERSE FEEDBACK* (Y for yes and N for no) Congressman Rogelio Espina Y N EV Chamber of Commerce, Inc. Y N Y N REQUESTING PARTY REMARKS Improvement of the Biliran Airport in the Province of Biliran 17. For the Philippine Statistics Authority to Generate the Provincial Gross Domestic Product. 18. Issuance of the Special Patent of the Lots Proposed as the Site for the Rebuilding of a Typhoon Resilient Visayas State University (VSU) Tolosa Campus. Visayas State University 19. Reorganization of the Regional Nutrition Committee Regional Nutrition Committee (RNC) Y N 20. Organization of the Regional Nutrition Clusters RNC Y N 21. Regional Nutrition Council Strategic Plan 2014-2016 RNC Y Y TOTAL NUMBER OF POLICIES REVIEWED: 21 TOTAL NUMBER OF POLICIES REVIEWED WITHIN PRESCRIBED PERIOD= 21 TOTAL NUMBER OF POLICIES REVIEWED WITH NO ADVERSE FEEDBACK RECEIVED= 21 * Adverse feedback refers to any written or verbal negative comments received directly from requesting parties. Page 3 of 15 Internal Requests NAME OF POLICY REQUESTS REQUESTING PARTY (Staffs/NROs) (Specify the policies requested for review) 1. Adoption of the Eastern Visayas Typhoon Yolanda Implementation, Coordination and Monitoring Mechanism REVIEWED WITHIN PRESCRIBED PERIOD (Y for Yes and N for No) RECEIVED ADVERSE FEEDBACK* (Y for yes and N for no) REMARKS NRO VIII PMED TOTAL NUMBER OF POLICIES REVIEWED: 1 TOTAL NUMBER OF POLICIES TOTAL NUMBER OF POLICIES REVIEWED WITHIN PRESCRIBED REVIEWED WITH NO ADVERSE PERIOD= 0 FEEDBACK RECEIVED= 0 * Adverse feedback refers to any written or verbal negative comments received directly from requesting parties. Performance Indicator Set 2 QUANTITY: Number of plans prepared/ updated. QUALITY: PDP and RM submitted to the President and RDPs presented to or endorsed by the Regional Development Councils (RDCs). TIMELINESS: Plans prepared/ updated within schedule. NAME OF PLAN DOCUMENT 2015 TARGET ACCOMPLISHMENT AS OF Q2 REMARKS Philippine Development Plan – 1 RM Review Assessment Report Results Matrix (PDP-RM) (c/o MES) 2015-2045 National Physical Framework Plan (NPFP) (c/o RDS) Spatial Development Framework (SDF) (c/o NROs) Per CY 2015 RDO Work Program Refined Area Spatial Development Framework Further refinements were made on the Visayas Spatial Development Framework (VSDF), per request of the Visayas RDCom. Visayas Spatial Development Framework (VSDF) was endorsed by the RDC VIII on March 17, 2015 and the Visayas RDCom on March 24, 2015; Per CY 2015 RDO Work Program Page 4 of 15 MFO 2: TECHNICAL SUPPORT AND ADVISORY SERVICES Performance Indicator Set 1 QUANTITY: Number of meeting documents prepared. QUALITY: Percentage of members who were satisfied with the completeness and accuracy of meeting documents prepared and released. TIMELINESS: Percentage of meeting documents released within the prescribed timeframe. Definitions: • • • • The number of meeting documents refer to the number of minutes prepared. The minutes or highlights refer to the minutes or highlights of the previous meeting included in the agenda folder. The minutes or highlights of the meetings are the bases for identifying the members’ satisfaction on the services provided by the Secretariat. Target schedule of release (based on standard set by the Committee/council or the concerned units) of the agenda folder as compared with the actual release (e.g. agenda folder released one day before the meeting). NAME OF COMMITTEE/COUNCIL a. NEDA Board b. NEDA Board Committees NUMBER OF MEETINGS FOR THE PERIOD NUMBER OF MINUTES OF MEETINGS PREPARED NUMBER OF COMMITTEE MEMBERS NO. OF COMMITTEE MEMBERS WHO WERE SATISFIED WITH THE COMPLETENESS AND ACCURACY OF THE MINUTES TARGET SCHEDULE OF RELEASE OF MEETING DOCUMENTS (EITHER HARD COPIES OR THROUGH E-MAIL) ACTUAL RELEASE OF MEETING DOCUMENTS MEETING DOCUMENTS RELEASED WITHIN THE PRESCRIBED TIMEFRAME (Y for Yes and N for No) REMARKS ICC-TB ICC-CC INFRACOM SDC CTRM Page 5 of 15 NAME OF COMMITTEE/COUNCIL RDCom (Visayas) NLUC (RLUC VIII) NO. OF COMMITTEE MEMBERS WHO WERE SATISFIED WITH THE COMPLETENESS AND ACCURACY OF THE MINUTES TARGET SCHEDULE OF RELEASE OF MEETING DOCUMENTS (EITHER HARD COPIES OR THROUGH E-MAIL) NUMBER OF MEETINGS FOR THE PERIOD NUMBER OF MINUTES OF MEETINGS PREPARED 1 1 (NRO VIII prepared the minutes of the Mar. 24, 2015 meeting) 6 2 2 5 (NaLUA-TWG) 5 3 days before the meeting 30 (RLUC VIII) 30 3 days before the meeting NUMBER OF COMMITTEE MEMBERS ACTUAL RELEASE OF MEETING DOCUMENTS 3 days before the meeting MEETING DOCUMENTS RELEASED WITHIN THE PRESCRIBED TIMEFRAME (Y for Yes and N for No) REMARKS Y Q2 Meeting rescheduled to Q3 to suit the availability of the Chair and members, and upon the request of NRO VI due to creation of Negros Island Region within schedule Y NaLUA-TWG meeting on Apr. 21, 2015 within schedule Y RLUC VIII meeting on June 19, 2015 RDCs Full Council 1 1 70 70 3 days before meeting 24 June 2015 Y Joint meeting with Saamr Provincial Development Council Executive Committee 1 1 70 70 15 April 2015 15 April 2015 Y RDC VIII-ExCom Meeting was convened for the FY 2016 RLAs/SUCs budget review Sectoral Committees Page 6 of 15 NUMBER OF MEETINGS FOR THE PERIOD NUMBER OF MINUTES OF MEETINGS PREPARED NUMBER OF COMMITTEE MEMBERS NO. OF COMMITTEE MEMBERS WHO WERE SATISFIED WITH THE COMPLETENESS AND ACCURACY OF THE MINUTES 1 1 45 45 1 1 54 54 03 June 2015 1 1 46 46 1 1 60 60 RPMC 1 1 25 (4 RPMC members, 6 PPDOs, 15 PSRs) 25 Regional Poverty Reduction Action Team (RPRAT) Technical Working Group (TWG) 2 2 - LGU Public Financial Management (PFM) 2 - Regional Interagency Team (RIAT) 5 5 NAME OF COMMITTEE/COUNCIL Economic Dev’t Committee (EDC VIII) Development Administration Committee (DAC VIII) Infrastructure and Utilities Devt Committee (IUDC VIII) Social Development Committee (SDC VIII) TARGET SCHEDULE OF RELEASE OF MEETING DOCUMENTS (EITHER HARD COPIES OR THROUGH E-MAIL) ACTUAL RELEASE OF MEETING DOCUMENTS MEETING DOCUMENTS RELEASED WITHIN THE PRESCRIBED TIMEFRAME (Y for Yes and N for No) 3 days before the meeting within schedule Y June 11, 2015 03 June 2015 Y 2nd Quarter Joint RDC VIII-DAC and Samar Provincial Development Council Meeting 2 weeks before the meeting 2 weeks before the meeting Y June 10, 2015 1 week before meeting 1 week before meeting (emailed). REMARKS Hard copies given during the meeting. c. Other inter-agency committees Advisory committee - 8 2 weeks before the meeting 2 weeks before the meeting Y 17 April 2015 23 April 2015 Y April 23, 2015 21 June 2015 8 17 April 2015 23 April 2015 RIAT Meetings Page 7 of 15 NAME OF COMMITTEE/COUNCIL NUMBER OF MEETINGS FOR THE PERIOD NUMBER OF MINUTES OF MEETINGS PREPARED TOTAL NO. OF MINUTES OF MEETINGS PREPARED= 17 NUMBER OF COMMITTEE MEMBERS NO. OF COMMITTEE MEMBERS WHO WERE SATISFIED WITH THE COMPLETENESS AND ACCURACY OF THE MINUTES % OF MEMBERS WHO WERE SATISFIED WITH THE COMPLETENESS AND ACCURACY OF MEETING DOCUMENTS PREPARED AND RELEASED = 100% TARGET SCHEDULE OF RELEASE OF MEETING DOCUMENTS (EITHER HARD COPIES OR THROUGH E-MAIL) ACTUAL RELEASE OF MEETING DOCUMENTS MEETING DOCUMENTS RELEASED WITHIN THE PRESCRIBED TIMEFRAME (Y for Yes and N for No) 11 May 2015 11 May 2015 Y 20 May 2015 28 May 2015 11 June 2015 15-26 June 2015 20 May 2015 28 May 2015 11 June 2015 15-26 June 2015 REMARKS Orientation for Catbalogan City LGU PFMAT validation RIAT Meeting RIAT Meeting RIAT LGU Executives Orientation Seminar % OF MEETING DOCUMENTS RELEASED WITHIN THE PRESCRIBED TIMEFRAME = 100% Performance Indicator Set 2 QUANTITY: Number of economic reports prepared. QUALITY: Percentage of economic reports with no negative feedback received on completeness and accuracy of content/ information. TIMELINESS: Percentage of economic reports submitted to the President within prescribed timeframe. c/o NPPS and TSIS MEMORANDA FOR THE PRESIDENT ON THE FOLLOWING ECONOMIC REPORTS: 2015 TARGETS 2015 Q2 ACCOMPLISHMENT RECEIVED NEGATIVE FEEDBACK ON COMPLETENESS AND DATE OF SUBMISSION TO THE PRESIDENT SUBMITTED WITHIN THE PRESCRIBED PERIOD REMARKS Page 8 of 15 ACCURACY OF CONTENT/INFORMATION (Y for yes and N for no) a. National Accounts 4 b. Merchandise Exports 12 TOTAL NUMBER OF ECONOMIC REPORTS = % OF ECONOMIC REPORTS WITH NO NEGATIVE FEEDBACK RECEIVED = TARGET DATE OF SUBMISSION ACTUAL DATE OF SUBMISSION (Y for Yes and N for No) % OF ECONOMIC REPORTS SUBMITTED TO THE PRESIDENT WITHIN PRESCRIBED TIMELINE = c/o NROs REGIONAL ECONOMIC REPORTS 2015 TARGETS 2015 Q2 TARGETS 2015 Q2 ACTUAL 4 1 1 1 1 ACCOMPLISHMENT RECEIVED NEGATIVE FEEDBACK ON COMPLETENESS AND ACCURACY OF CONTENT/INFORMATION (Y for yes and N for no) DATE OF SUBMISSION TO THE RDC TARGET DATE OF SUBMISSION ACTUAL DATE OF SUBMISSION SUBMITTED WITHIN THE PRESCRIBED PERIOD (Y for Yes and N for No) REMARKS Regional Economic Situationer a. Annual RES b. Quarterly RES TOTAL NUMBER OF ECONOMIC REPORTS= N % OF ECONOMIC REPORTS WITH NO NEGATIVE FEEDBACK RECEIVED = 100% June 30, 2015 June 25, 2015 Y QRES Q1 2015 uploaded in the NRO VIII website % OF ECONOMIC REPORTS SUBMITTED TO THE PRESIDENT WITHIN PRESCRIBED TIMELINE = 100% MFO 3: INVESTMENT PROGRAMMING SERVICES Performance Indicator Set 1 QUANTITY: Number of public investment program documents prepared/ updated. QUALITY: Public investment program documents presented to or endorsed by the appropriate inter-agency committees. TIMELINESS: Percentage of public investment program documents prepared/ updated within schedule. Page 9 of 15 NAME OF DOCUMENT 2015 TARGET STATUS AS OF Q2 TARGET SCHEDULE OF UPDATING/ COMPLETION REMARKS a. Public Investment Program (PIP) (c/o PIS) 1 Report on the Revalidated PIP b. Comprehensive and Integrated Infrastructure Program (CIIP) (c/o IS) 1 Updated 2014-2016 CIIP Working Draft prepared c. Regional Development Revalidated Regional Investment Programs (c/o NROs) Development Investment Plans d. 2016-2018 Eastern Visayas (EV)Three-year Rolling Infrastructure Program (TRIP) 1 document Ongoing packaging of the document e. FY 2016 RLAs/SUCs RDC budget review 29 resolutions passed by the RDC completed 30 April 2015 f. Training on Project Development 16 participants successfully completed the training completed 11-14 May 2015 Participants included 11 from E. Samar, 1 from Samar, 1 from Leyte and 3 from NGAs g. Conducted ocular site inspection/validation of the Ports of Padre Burgos and Limasawa in Southern Leyte on Port Zone Delineation (PZD) applications 2 municipalities PZD applications validated completed 26-27 April 2015 Southern Leyte Provincial Development Board Resolution for Padre Burgos PZD already passed. No resolution yet passed for the Limasawa PZD. 3rd-4thQ 2015 Per 2015 RDO Work Program July 2015 FY 2016 budget proposals of 20 RLAs and 9 SUCs were endorsed. Prepared RDC VIII - ExCom Res. Nos. 3 (DA), 4 (PCA), 5 (BFAR), 6 (PFIDA), 7 (NIA), 8 (DAR), 9 (DENR), 10 (DOT), 11 (DTI), 12 (DILG), 13 (PNP/BOF), 14 (DPWH), 15 (SRA), 16 (PPA), 17 (DOH), 18 (DOLE), 19 (DSWD), 20 (TESDA), 21 (DEPED), 22 (ESSU), 23 (NSU), 24 (NwSSU), 25 (PIT), 26 (SLSU), 27 (SSU), 28 (VSU), 29 (EVSU), 30 (LNU), and 31 (DOST). Page 10 of 15 Performance Indicator Set 2 QUANTITY: Percentage of submitted projects appraised. QUALITY: Percentage of appraised projects presented to the ICC-Technical Board. TIMELINESS: Percentage of projects appraised within prescribed timeframe. Projects presented to ICC-TB (Q2 2015) (c/o PIS) TITLE LEAD EVALUATING STAFF DATE OF PRESENTATION TO ICC-TB/CC REMARKS Official Development Assistance (ODA)/Locally-Funded Project (LFP) Financing: Public-Private Partnership (PPP) Financing: TOTAL NUMBER OF PROJECTS = (c/o NCO Staffs and NROs) LIST OF PROJECTS RECEIVED FOR APPRAISAL* LEAD EVALUATING UNIT PROPONENT AGENCY Worth 1 billion and above (Y for yes and N for No) Evaluated within the prescribed period (Y for yes and N for No) Presented to ICC-TB (Y for yes and N for no) REMARKS Q2 1. Reconstruction and Strengthening of VSUTolosa Campus PDIPBD Visayas State University (VSU) N Y N Submitted to PIS on 29 April 2015 2. Inclusive Partnership of Agricultural Competitiveness (IPAC) PDIPBD Department of Agrarian Reform (DAR) Y Y Y Submitted to ANRES on 13 April 2015 TOTAL NUMBER OF PROJECTS APPRAISED = 2 *Refers to projects with complete submission of documents/information from proponent agencies Page 11 of 15 MFO 4: MONITORING AND EVALUATION SERVICES Performance Indicator Set 1 QUANTITY: Official Development Assistance (ODA) Portfolio Review Report prepared and submitted. QUALITY: Percentage of implementing agencies reviewed have confirmed ODA Portfolio Review Report findings. TIMELINESS: ODA Portfolio Review Report submitted by the NEDA Secretariat to Congress on or before June 30 annually. (c/o MES) NAME OF DOCUMENT LIST OF IMPLEMENTING AGENCIES REVIEWED QUANTITY ODA Portfolio Review AGENCIES WHICH CONFIRMED THE REVIEW (Y for Yes and N for No) 1. TARGET DATE OF SUBMISSION ACTUAL DATE OF SUBMISSION REMARKS On or before June 30 2. TOTAL = TOTAL NUMBER OF AGENCIES = TOTAL NUMBER OF AGENCIES WHICH CONFIRMED THE REVIEW= Performance Indicator Set 2 QUANTITY: Number of socio-economic assessment reports prepared. QUALITY: Percentage of socio-economic assessment reports endorsed by the NEDA Secretariat. TIMELINESS: Percentage of socio-economic assessment reports released within schedule. (c/o NPPS and NROs) NAME OF DOCUMENT a. Socio-economic Report (SER) b. 2014 Annual Regional Development Report (RDR) TOTAL = 16 ENDORSED BY THE NEDA SECRETARIAT (Y for Yes and N for No) % OF REPORTS ENDORSED BY THE NEDA SECRETARIAT = DATE OF RELEASE REMARKS TARGET ACTUAL % OF REPORTS RELEASED WITHIN SCHEDULE= Page 12 of 15 (c/o NROs) 2015 Targets 2015 Q2 Targets 2015 Q2 Actual Accomplishments RECEIVED ADVERSE FEEDBACK (Y for Yes and N for No) CONDUCTED/ PREPARED WITHIN SCHEDULE (Y for Yes and N for No) 200 50 295 N Y No. of monitoring visits conducted 4 1 4 No. of RPMES reports prepared 4 1 1 No. of projects monitored REMARKS LOCALLY-FUNDED PROJECTS 2015 TARGETS PROJECT NAME Q1 Q2 Q3 Q4 2015 Q2 ACCOMPLISHMENTS REMARKS a. Communication and Advocacy Program – Support Project (CAP-SP) (c/o DIS) b. Implementation of the Management Information System Network (NEDA Information Network Project) (c/o ICTS) c. NEDA Contract Price Escalation Database System (c/o IS) d. Value Engineering/ Value Analysis (VE/VA) Project (c/o IS) Number of studies awarded/ bidded out e. Public-Private Partnership Capacity Building Project Page 13 of 15 FOREIGN-ASSISTED PROJECTS PROJECT NAME FY 2015 TARGETS FY 2015 Q2 TARGETS FY 2015 Q2 ACTUAL ACCOMPLISHMENT PERCENTAGE OF ACCOMPLISHMENT REMARKS a. Capacity Development Technical Assistance (CDTA) Results-Oriented Strategic Planning and Development Management for Inclusive Growth (c/o PIS) b. Integrating Disaster Risk Reduction and Climate Change Adaptation (DRR/CCA) in Local Development Planning and DecisionMaking Processes (c/o RDS) c. Japanese Grant Aid for Human Resource Development Scholarship (JDS) Project (c/o PIS) SUPPORT TO OPERATIONS PERFORMANCE INDICATOR Yolanda Project Monitoring Office (PMO) organized FY 2015 TARGETS Yolanda PMO organized and operational FY 2015 Q2 TARGETS Yolanda PMO budget prepared Yolanda PMO staffing proposed FY 2015 Q2 ACTUAL ACCOMPLISHMENT PMO budget for July-December 2015 submitted Proposed staffing for Yolanda PMO submitted REMARKS Ad hoc NRO VIII Yolanda Project Management Unit was created while PMO staff have not yet assumed office. The Unit coordinated the survey and focused-group discussions in Tacloban and Palo for the outcome monitoring of the Yolanda Resettlement Cluster. Page 14 of 15 GENERAL ADMINISTRATIVE AND SUPPORT SERVICES PERFORMANCE INDICATOR FY 2015 TARGETS FY 2015 Q2 TARGETS FY 2015 Q2 ACTUAL ACCOMPLISHMENT REMARKS Trainings conducted on technical and administrative matters. 3 Trainings 1 Training Training on Project Development Training on Resolution Writing For NRO VIII staff and LGU staff; NRO staff as resource persons. For NRO VIII staff; Dir. Reyes of DIS as resource person. Office systems and processes improved/upgraded Local Area Network upgraded Newly procured LAN installed New LAN installed and used in office processes On-going configuration; awaiting NCO training on network administration. Improved physical assets Repair/renovation of Design and cost office buildings and estimates of facilities damaged by remaining works. Typhoon Yolanda NRO VIII Disaster Resiliency Plan (DRP) prepared NRO VIII Disaster Resiliency Plan prepared and implemented Design and cost estimates completed for ARD Office, windows and other glass works in preparation for bidding. Draft NRO VIII Disaster Semi-final NRO VIII Disaster Resiliency Resiliency Plan Plan NRO VIII Disaster Control Group was organized to craft the Plan. Draft Plan is for approval of the Regional Director. NARRATIVE ACCOMPLISHMENT REPORT* *should include the Staff/Office’s key accomplishment for the 2nd quarter of 2015. * May include other accomplishments not covered by the performance indicators APPROVED BY: ________________________ BONIFACIO G. UY NRO VIII Regional Director Page 15 of 15