Presentation On Sub-committees of Special Committee for Inter Linking of Rivers 1 Special Committee for Interlinking of Rivers • MOWR vide OM dated 13th Feb, 2015 set-up following three Sub-committees: Sub-Committee for comprehensive evaluation of various studies/reports available on issue of ILR; Sub-Committee for System Studies for identification of most appropriate alternative plan; and Sub-Committee for Restructuring of NWDA. In addition, Special Committee decided that existing Group for consensus building between the States headed by Chairman, Central Water Commission (CWC) would be converted into a Sub-Committee for the same purpose. 2 Sub-Committee for comprehensive evaluation of various Studies / Reports • Composition 1 Shri B.N. Navalawala, Chief Advisor, Ministry of WR, RD & GR Chairman 2 Shri A.D. Mohile, Former Chairman, CWC Member 3 Shri A.C. Tyagi, Secretary General, ICID Member 4 Shri S.N. Huddar, Former Secretary (WRD), Government of Maharashtra Member 5 Shri A.D. Bhardwaj, Former DG, NWDA and Former Member, CWC Member 6 Prof. S. Iqbal Hasnain (Retd.), Eminent environmental expert Member 7 Prof. Samar K. Dutta, IIM, Ahmedabad Member 8 Director/Superintending Engineer, NWDA Secretary 3 Sub-Committee for comprehensive evaluation of various Studies / Reports (contd....) •Terms of Reference : To consider and evaluate various Reports/Studies carried out by NWDA To consider and review recommendations/suggestions made in the Reports of Task Force on Interlinking of Rivers (2004) and its Sub-Groups/Committees To review the Status Reports in the form of Affidavits/Counter Affidavits filed before the Hon’ble Supreme Court during the pendency of the Writ Petition on Networking of Rivers 4 Sub-Committee for comprehensive evaluation of various Studies / Reports (contd....) Based on above review of Reports/Studies, the SubCommittee to give suggestions/ recommendations and further course of action for preparation of plans for implementation of ILR Programme To carry out any other work/studies required to achieve the above objective The Committee shall submit its Report within a period of 6 months and may meet as frequently as required so as to submit the Report within time limit 5 Sub-Committee for system studies for identification of most appropriate alternative plan •Composition 1 Prof. P.B.S. Sarma (Retd.), CED, IIT Delhi Chairman 2 Prof. Sanjeev Kapoor, IIM, Lucknow Member 3 Dr. D.K. Srivastava, Retd. Prof., Department of Hydrology, IIT Roorkee Member 4 Prof. Kamta Prasad, Chairman, IRMED, Delhi Member 5 Dr. Sharad K. Jain, Scientist G, NIH, Roorkee Member 6 Shri M. Illangovan, Retd. Chief Engineer, CWC Member 7 Shri Sriram Vedire, Advisor, Ministry of WR, RD & GR Member 8 Director/Superintending Engineer, NWDA Secretary 6 Sub-Committee for system studies for identification of most appropriate alternative plan (contd..) •Terms of Reference : To consider all the reports of the expert bodies and the status reports filed before the Hon’ble Supreme Court during the pendency of Writ Petition on Networking of Rivers To carry out comprehensive system studies to examine all the possible alternatives optimising the benefits to the society from the available water resources duly considering all aspects like social, environmental and economic etc. To carry out critical review of different options and identification of alternative action plans 7 Sub-Committee for system studies for identification of most appropriate alternative plan (contd..) To carry out scientific evaluation of the views/suggestions of various stakeholders To recommend the most appropriate and acceptable action plan for implementation of ILR Programme The Committee shall submit its Report within a period of 6 months and may meet as frequently as required so as to submit the Report within the time limit. 8 Sub-Committee for Restructuring of NWDA •Composition 1 2 3 4 5 6 Shri M. Gopalakrishnan, Former Secretary General, ICID Shri M.E. Haque, Former Member, CWC Prof. Vasant Gandhi , IIM, Ahmedabad Dr. Gautam Pingle (Retd. Prof.), Administrative Staff College of India (ASCI), Hyderabad Joint Secretary (PP), Ministry of WR, RD & GR Chief Engineer (HQ), NWDA - Chairman Member Member Member Member MemberSecretary 9 Sub-Committee for Restructuring of NWDA (contd…) •Terms of Reference : To review present organisational structure and staff strength of NWDA vis-à-vis present mandate of NWDA To suggest suitable modifications in the mandate of NWDA to include various aspects related to implementation of ILR Programme To suggest suitable organisational structure for NWDA to cover the enhanced mandate for implementation of ILR Programme To suggest the proposed Organisational Structure for enhanced mandate of NWDA The Committee shall submit its Report within a period of 2 months and may meet as frequently as required so as to submit the Report within time limit. 10 Setting up of Interactive Group and Resource Sub-Groups on Interlinking of Rivers •Chief Advisor, MoWR, RD & GR in meeting held on 2.12.2014 decided to draw a time-bound schedule of interactive meetings with Secretaries and Ministers for WRD and if possible with the Chief Ministers of States, who have expressed their concerns/reservations for the respective link. • It was also decided to constitute a interactive Group comprising very senior officers from the Ministry, CWC and NWDA 11 •Interactive Group Composition Chairman, CWC Additional Secretary, Ministry of WR, RD & GR Director General, NWDA Joint Secretary (PP), Ministry of WR, RD & GR Commissioner (SP), Ministry of WR, RD & GR This Interactive Group will hold discussions with concerned States to address their link wise specific concerns/reservations and to reach an understanding for taking up Detailed Project Report of link projects and their further implementation. 12 •Resource Sub Groups To facilitate the Interactive Group regarding discussion with the States, it is proposed to constitute the following Resource Sub Groups: Resource Sub-Group-I --for Manas – Sankosh - Teesta-Ganga, Farakka -Sundarbans and Ganga-Damodar-Subarnarekha links Shri M. Sinha Shri V. Chawla K. Former Chief Engineer, CWC (Retd.). Shri Sinha has also worked as Chief Engineer (North) in NWDA and was responsible for carrying out various studies of the link projects in Himalayan Component of National Perspective Plan projects. K. Former Chief Engineer, CWC, New Delhi (Retd.). Shri Chawla has vast experience in water resources and irrigation planning. 13 •Terms of Reference: To review the Feasibility/other relevant reports, identify the main issues and suggest probable approach/solution in respect of following link projects : Manas – Sankosh – Tista- Ganga link Farakka - Sunderbans link Ganga - Damodar- Subarnarekha link To prepare technical notes as may be required by Interactive Group for discussions with concerned States in respect of above links First stage work of the Sub-Group will be completed within 4 14 weeks time Resource Sub-Group-II - for Kosi-Ghaghra, Ghaghra-Yamuna, Gandak-Ganga, Sarda-Yamuna links originating from Nepal Shri K P Singh Former Chief Engineer, CWC (Retd.). Shri K P Singh has also worked as Chief Engineer (North) in NWDA and was responsible for carrying out various studies of the link projects of National Perspective Plan. Shri M. S. Former Director (Retd.), CWC. Shri Gupta Gupta has also worked as Chief Engineer in NWDA and has dealt with various studies of the link projects. Director (Tech.), NWDA will provide technical and other assistance to the Sub-Group. 15 •Terms of Reference: To review Feasibility/other relevant Reports, identify main issues and suggest probable approach/solution in respect of following link projects: Kosi – Ghaghara Link Ghaghara-Yamuna Link Gandak-Ganga Link Sarda-Yamuna Link To prepare technical notes as may be required by Interactive Group for discussions with concerned States in respect of above links First stage work of Sub-Group will be completed within 4 16 weeks time Resource Sub-Group-III - Mahanadi-Godavari and Sabarnarekka-Mahanadi Links Shri D. Kaushik K. Former Chief Engineer, CWC(Retd.). Shri Kaushik has worked as Superintending Engineer in NWDA and dealt with Interbasin water transfer links. Shri N.J.Singh Former Chief Engineer, CWC(Retd.). Shri Kaushik has worked as Superintending Engineer in NWDA and dealt with Interbasin water transfer links. Concerned SE, NWDA will provide technical and other assistant to the Sub Group 17 •Terms of Reference: To review Feasibility/other relevant Reports, identify main issues and suggest probable approach/solution in respect of following link projects: Mahanandi (Manibhadra)-Godavari (Dolaiswaram) Subarnarekha-Mahanandi To prepare technical note as may be required by Interactive Group for discussions with concerned States in respect of above links. First stage work of the Sub-Group will be completed within 4 weeks time 18 Resource Sub-Group-IV - for Godavari Krishna Links Shri Illangovan M. Former Chief Engineer, CWC.(Retired). Shri Illangovan has worked as Chief Engineer (South) in NWDA and was responsible for carrying out various studies of the link project involved in Peninsular Component of National Perspective Plan. Shri. M. D. Former, Director, CWC (Retired). Shri M. D. Radhakrishna Radhakrishna has worked as SE in NWDA and was actively involved in the study of link projects under Peninsular Component of NPP. Superintending Engineer, NWDA, Hyderabad will provide technical and other assistance to the above Sub-Group 19 •Terms of Reference: To review Feasibility/other relevant reports, identify main issues and suggest probable approach/solution in respect of following link projects: Godavari (Polavaram)- Krishana (Vijayawada) Link Godavari (Inchampalli)- Krishana (Nagarjunasagar) Link Godavari (Inchampalli)- Krishana (Pulichinatala) Link To prepare technical note as may be required by Interactive Group for discussions with concerned States in respect of above links. First stage work of Sub-Group will be completed within 4 weeks time 20 Sub-Group - IV will take up work of following links after completion of work of Godavari- Krishna links mentioned above, as the issues of the following 5 links are dependent on the Godavari-Krishna Links. Krishna (Almatti)- Pennar Link Krishna (Srisailam) –Pennar Link Krishna (Nagarjunasagar) – Pennar (Somasila) Link Pennar (Somasila) – Cauvery (Grand Anicut) Link Cauvery (Kattlalai) –Vaigai –Gundar Link Names of resource persons/experts for above 4 Sub-Groups have been proposed in consultation with Chairman, CWC. 21 THANKS 22