VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: capital budgeting and its nature Unit: 02 Hour: 01 CAPITAL BUDGETING Dictionary Meaning: Budget: DEFINITION: Financial “Capital Budgeting is long term planning for making and financing proposed capital plan outlay”. - Charles T Hongreen “Capital Budgeting consists in planning for development of available capital for the purpose of maximizing the long-term profitability of the firm” Key Words: -R. M. Lynch Capital budgeting is the process Capital Budgeting: of evaluating Capital budgeting is the process of evaluating and selecting long term and selecting investments that are consistent with the goal of shareholders wealth maximization. long term investments Capital Budgeting: Capital budgeting decision involves the decision of allocation of capital or commitment of funds to long-term assets that would yield benefits in the future. Capital Budgeting decision relates to the choice of the new asset out of the alternatives available or the reallocation of capital when an existing asset fails to justify the funds committed Teaching Aid: Capital Expenditure: CB Capital expenditure is an outlay of funds that is expected to produce benefits over a period of time exceeding one year. These benefits may be either in the form of increased revenues or reduced costs. Capital expenditure management includes disposition, modification and replacement of fixed assets. MEANING: CAPITAL BUDGETING PROCESS OR STEPS INVOLVED IN CAPITAL BUDGETING: 1. Idea Generation: Generating the proposals for investment is the first process of capital budgeting. For an ongoing business concern, investment proposals of various types may originate at different levels within a firm. The investment proposal may fall into one of the following categories: Proposals to add new product to the product line, and Proposal to expand production capacity in existing product lines. Proposals to reduce the costs of the output of the existing products without altering the scale of operation. 25 Books Referred: Financial management I.M. Pandey 2. Project Evaluation: Project evaluation involves two steps: Estimation of benefits and costs Selection of an appropriate criterion to judge the desirability of the project. The benefits and costs of the project are measured in terms of cash flows. The estimation of the cash inflows and cash outflows mainly depends on future uncertainties. The risk associated with each project must be carefully analyzed from the aspects like marketing, technical, financial and economic. 3. Project selection: No standard administrative procedure can be laid down for approving the investment proposal. The screening and selection procedures are different from firm to firm. In a real life situation all capital budgeting decisions are made by top management. However the projects can scientifically be screened by middle level management in consulting with the head of the finance department. 4. Financing the selected project: After the selection of the project, the next step is financing. Financing arrangements have to be made. There are two broad sources available such as equity and debt. While deciding the capital structure, the decision maker has to keep in mind some factors, which influence capital structure. The factors are flexibility, risk, income, control and tax benefit. 5. Execution or implementation: Planning is paper work and implementation is physically implementing the selected project. Implementation of an industrial project involves the stages like engineering designs, negotiations and contracting, construction, training and plant commissioning. Translating an investment proposal from paper work to concrete work is complex, time consuming and a risky task. 6. Review of the project: Once the project is converted from paper work into concrete work, then there is a need to review the project. Performance review should be done periodically, in which phase the actual performance is compared with the pre-determined performance 26 NATURE OF CAPITAL BUDGETING (OR) TYPES OF CAPITAL INVESTMENT DECISIONS TYPES BASED ON FIRM’S EXISTENCE BASED ON NATURE’S DECISION 1. Mutually Exclusive Decision 2. Accept – Reject Decision 3. Capital Rationing Decision Revenue Expansion Decision Cost Reduction Decision 1. Expansion decision 2. Diversification Decision 1. Replacement Decision 2. Modernization Decision BASED ON NATURE’S DECISION: 1. Mutually Exclusive Decisions: Decisions are said to be mutually exclusive if two (or) more alternative proposals are such that the acceptance of one proposal will exclude acceptance of the other alternative proposals. For example, a company is intending to buy a new machine. There are three competing brands, each with a different initial investment and operating costs. All these machines compared and select the best among the alternatives. The mutually exclusive project decisions are not independent. 2. Accept-Reject Decisions: These are opposite to mutually exclusive decisions. The Accept-Reject decisions occur when proposals are independent and do not complete with each other. The firm may accept (or) reject a proposal on the basis of a minimum return on the required investment. All proposals that give a return higher than a certain desired rate are accepted and the rest are rejected. 3. Capital Rationing Decision: In a situation the firm has unlimited funds, all independent investment proposals yielding return greater than some pre-determined level are accepted. However, this situation does not prevail in most of the business firms in actual practice. They have a fixed capital 27 budget. A large number of investment proposal compete for these limited funds. The firm must therefore ration them. The firm allocates funds to projects in a manner that it maximises long run returns. Capital rationing employs ranking of the acceptable investment projects. The projects can be ranked on the basis of pre-determined criterion such as the rate of return. BASED ON FIRM’S EXISTENCE: 1. Cost Reduction Decisions: These Decisions focus on reduction of operating cost and improving efficiency. They can be sub classified into: a. Replacement Decisions: To Replace an existing asset with a new and improved one which version to choose etc., b. Modernization Decisions: To install new machinery in the place of an old one, which has become technologically outdated 2. Revenue Technologically Outdated: These Decisions focus on improving sales, product lines, improved versions of products, etc., These are sub classified into: a. Expansion Decision: To add capacity to existing product lines to meet increased demand, to improve production facilities and to increase market share or existing products. b. Diversification Decision: To diversify and enter into new product lines, venture into new markets, to reduce business risk by dealing in different products and operating in different markets. Possible Questions & University Questions: 1. What is capital budgeting or define capital budgeting? 2. What is capital expenditure? 3. Explain the nature of capital budgeting decision. 4. Explain capital budgeting process or steps involved in capital budgeting. VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Identifying relevant cash flows Unit: 02 Hour: 02 Cash flow vs accounting profit Capital budgeting is concerned with investment decisions which yield return over a period of time in future. The foremost requirement for evaluation of any capital investment 28 proposal is to estimate the future benefits accruing to quantify benefits: (i) Accounting profit and (ii) Cash flows. Dictionary Meaning: The basic difference between them primarily due to the inclusion of certain noncash expenses in the profit and loss account. Example: depreciation. Therefore, the accounting profit is to be adjusted for non-cash expenditure to determine the actual cash inflow. The cash flow approach of measuring future benefits of a project is superior to the accounting approach as cash flows are theoretically better measures of the net economic benefits of cost associated with a proposed project. Elements of Cash flow Stream To evaluate a project, one must determine the relevant cash flows, which art the Key Words: incremental after-tax cash flows associated with the project. The cash flow stream of a conventional project - a project which involves cash outflows followed by cash inflowscomprises three basic components: Teaching Aid: CB 1. Initial Investment: The initial investment is the after-tax cash outlay on capital expenditure and net working capital when the project is set-up. In general, the initial cash outflow for a project is determined. As seen, the cost of the asset is subject to adjustments to reflect the totality of cash flows associated with its acquisition. These cash flows include installation costs, changes in net working Books capital, sale proceeds from the disposition of any assets replaced, and tax Referred adjustments. 2. Operating Cash Inflows: They are after tax cash inflows resulting from the operations of the projects during its economic life. After making the initial cash outflow that is necessary to being implementing a project, the firm hopes to benefit from the future cash inflows generated by the projects. Generally, these future cash flows can be determined by following the step-by-step procedure outline. 3. Terminal Cash Inflow: The terminal cash inflow is the after tax cash flow resulting from the liquidation of the project at the end of its economic life. Finally, turned attention to determine the project incremental cash flow in its final, or terminal, year of existence. The apply the same step-by-step procedure for this periods cash flow as we did to those in all the interim periods. These potential project wind-up cash flows are: The salvage value Taxes Any project termination related change in working capital 29 GUIDELINES FOR ESTIMATING PROJECT CASH FLOWS 1. Identify Incremental Cash flows: Incremental cash flows are the changes in cash flows that are attributable to the decision to invest in a given project. Cash flows not attributable to a new project are irrelevant to the investment decision-making process. When a firm decides whether to replace an old machine with a new, more efficient one, the relevant cash flows consist of those generated by the new machine less those that would have been retained by keeping the old machine. The decision should hinge on the differences in cash flows between the two machines. Favourable incremental net cash flows resulting from making the decision will provide the relevant data needed to make the decision. Although the principle of incremental analysis is a simple idea, applying it in practice is often difficult. 2. Focus on After-Tax Flows: The only cash flows relevant to capital budgeting are those generated by a project and still remaining after paying taxes. This is true for all phases of a project's life. Considering a project's untaxed revenues overstates its benefit because the firm cannot invest all these funds in other projects or pay them out to shareholders. Some more common tax provisions influencing cash flows involve depreciation expense as well as gains and losses from the sale of existing fixed assets. 3. Postpone Considering Financing Costs: A common mistake in estimating cash flows involves the treatment of interest expense and other financial cash flows attributable to financing the project. Financing costs are payments that the company makes to the parties supplying capital to finance the project. These costs may include interest paid to lenders or dividends paid to shareholders. As a general principle, capital budgeting analyses require separating investment (capital budgeting) and financing decisions, i.e., analysts should evaluate a capital budgeting project independently of the source of funds used to finance' the project. 4. Net Operating Working Capital: Adopting a project may require a change in a firm's Net Operating Working Capital (NOWC), which is the change in all current assets that do not pay interest less the change in all current liabilities that do not charge interest. For example, a project that entails producing and selling a new product will probably require the firm to increase its inventories and to hold more cash to conduct additional transactions 5. Sunk Costs: A sunk cost is an outlay incurred before making an investment decision and represents a historical cost. Past expenditures on a project should not influence the decision whether to undertake, continue, or end a project because they are not incremental cash flows. Instead, decision-makers should base their decision on future costs and benefits. Sunk costs are irrelevant because the decision to adopt or reject the proposed project will not result in any change in the project's cash flows related to these costs, the firm has already incurred the sunk cost with or without the project. Because these sunk costs are irrevocable and have no bearing on a new project, they are not incremental cash flows. Thus, sunk costs are not part of the evaluation process. 30 6. Opportunity Costs: Estimating project cash flows requires considering both direct outlays and opportunity costs. An opportunity cost is the most valuable alternative use of a resource or an asset that the firm gives up by accepting a project. By using the asset or resource in the proposed project, the firm forgoes the opportunity to employ the asset in its alternative use. The cash flows that the firm forgoes represent an opportunity cost to the proposed project. Opportunity cost can be difficult to estimate, but they are important to recognize when estimating the relevant cash flows for analyzing a project. 7. Allocated Overhead: For internal reporting purposes, accountants often allocate existing overhead, such as general and administrative expenses, to each unit or division that undertakes a project, However, if the firm's current overhead will remain unchanged by accepting a project, the firm should exclude this allocated overhead from the project's cash flows in the capital budgeting analysis. Here, overhead is an existing (fixed) cost, not an incremental cost. Managers should recognize only an increase in overhead that will result from accepting the project, such as hiring a new accountant, as part of a project's cash flows. 8. Side Effects: Adopting and implementing new projects may have important side effects because they affect the cash flows of other products or divisions. Project planners should consider these potential side effects, or externalities, in the capital budgeting analysis for the project. Side effects are complements if they enhance the cash flows of existing assets and substitutes if the effect is negative. BIASES IN CASH FLOW ESTIMATION. As cash flows have to be forecasted far into the future, errors in estimation are bound to occur. Yet, given the critical importance of cash flow forecasts in project evaluation, adequate care should be taken to guard against certain biases which may lead to overstatement or under-statement of true project profitability. 1) Overstatement of Profitability: Knowledgeable observers of capital budgeting believe that profitability is often over-stated because the initial investment is underestimated and the operating cash inflows are exaggerated. The principal reasons for such optimistic bias appear to be as follows: i. Intentional Over-Statement: In a bid to present their projects in a favorable light, proj.ect sponsors may intentionally over-estimate the benefits and under-estimate the costs. Given the uncertainties characterizing the future, project sponsors enjoy some latitude in twisting the figures the way they want. ii. Lack of Experience: Inadequate experience on the part of project sponsors generally leads overoptimistic estimates. Experience often induces conservatism that checks over-optimistic tendencies. Inexperience, on the other hand, may lead to wishful thinking. iii. Myopic Euphoria: Individuals responsible for preparing forecasts may become too involved and lose their sense of proportion. The lack of objectivity In this case is neither intentional nor due to inexperience. It may simply be the effect of 'masspsychology' as each person's favorable opinion may be reinforced and magnified by others in the group. Referred to as "risky shift" or "group polarization effect" in 31 social psychology, this phenomenon is widely supported by empirical studies. iv. Capital Rationing: Companies typically operate under-capital-rationing, which maybe externally determined or internally imposed. An awareness of such constraint induces project sponsors to exaggerate the benefits of projects proposed by them. After all every sponsor is keen that his proposal finds a place in the limited capital budget when there is competition among various claimants. 2) Under-Statement of Profitability: The problem of optimistic bias that may lead to an over-statement of project cash flows and profitability. There can be an opposite kind of bias relating to the terminal benefit which may depress a project's true profitability. To understand this bias let us look at how the terminal cash flow is estimated in practice. Typically it is defined as: Net salvage value of fixed assets + Net recovery of working capital margin. Generally, the net salvage value of fixed assets is put equal to five per cent of the original cost and the net recovery of working capital margin is set equal to its original book value (under the assumption that current assets do not depreciate). The above approach almost invariably leads to under-estimation of the terminal benefit of the project, due to the following reasons: i. Salvage Values are Under-Estimated: To put the net salvage value of fixed assets equal to just five per cent (which may more or less correspond to the book value after 8 to 10 years) of the original cost is to ignore the fact that in real life situations fixed assets, ever after 8 to 10 years of use, generally command a substantial market value. ii. Intangible Benefits are ignored: The terminal benefits from a project cannot be equated with just the salvage values of tangible. assets left in the project; Apart from investment in tangible assets for which salvage values can be estimated more easily (taking into account the factors mentioned above) major projects -are designed to establish a market position, perfect research and engineering capability, develop a distribution network, and build brand loyalty. To assume that these benefits are worthless beyond an arbitrarily chosen time horizon is to overlook important business realities. These benefits should not be ignored just because it is difficult to quantify them. iii Value of Future Options is Over looked: More often than not, a project has a strategic pay-off in the form of new investment opportunities that may possibly open-up if the project is undertaken. Possible Questions & University Questions: 1. Identify the relevant cash flow stream. 2. What are the guidelines to estimate the project cash flow? 32 VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Methods and Techniques Unit: 02 Hour: 3 CAPITAL BUDGETING APPRAISAL METHODS AND TECHNIQUES/ EVALUATION OF INVESTMENT: Three steps are involved in the evaluation of an investment. Estimation of Cash Flows. Estimation of the required rate of returns. Application of a decision rule for making the choice. Dictionary Meaning: Any appraisal method should provide for the following: 1. 2. 3. 4. 5. Reciprocal: A basis of distinguishing between acceptable and non-acceptable projects. Give and take Ranking of projects in order of their desirability. Equal Choosing among several alternatives. Mutual A criterion which is applicable to any conceivable project. Joint Recognizing the fact that bigger benefits are preferable to smaller ones and early Shared benefits are preferable to later one. Among the various methods, the following are commonly used by many business concerns: Traditional (or) non time value method (or) non discounted. Pay-back period Improvement of Traditional Approach to Pay-back period method Post Pay-back Profitability method Discounted Pay-back period Reciprocal Pay-back period method Average / Accounting Rate of Return. Discounted cash flow methods/time adjusted methods/present value method. Net present value Profitability index. Internal rate of return Key Words: Pay-back period may be defined as the period of time. i.e. the number of years required for cash inflow to get back the original cost of the project Teaching Aid: CB I. Traditional Method: 1) Payback method: The payback period refers to the length of time which will be required for the sum of annual net cash benefits to equal the initial investment. Pay-back period may be defined as the period of time. i.e. the number of years Books required for cash inflow to get back the original cost of the project. According to this Referred with method, every capital expenditure pays itself back over a number of years. This method is page number: 33 also known as pay off period, break even period (or) Recoupment period. Financial management M.Y. Khan and P.K. Jain Computation of the pay-back period: (a) When annual inflows are equal: When the cash inflows being generated by a proposal are equal per time period i.e., the cash inflow are in the form are annual, the pay-back period can be computed by dividing the cash outflows by the amount of annuity. Initial Investment Payback period = --------------------------Annual cash inflow Annual cash inflow is the net income from the project (or) assets after tax but before depreciation. (b) When annual inflows are unequal: In case the cash inflows from the proposal are not in annuity form then the cumulative cash flows are used to compute the payback period. In such a case, payback period is computed by the process of cumulating cash inflows till the time when cumulative cash inflows becomes equal to the original investment outlay. In the formula form: Payback period = E + B/C E No. of years immediately proceeding the year of recovery. B Balance of amount of Investment to be recovered. C Savings (Cash inflow) during the year of final recovery. Accept or Reject Criterion: If the Actual pay-back period is less than the standard pay-back period, the project would be accepted, if not, it would be rejected. When mutually exclusive projects are under consideration, they may be ranked according to the length of the payback period. Thus, the project having the shortest pay-back may be assigned rank one, following in that order so that the project with the longer pay-back would be the lowest. Under which circumstances, the Payback method is advisable? 1. 2. 3. 4. 5. When the cost of the project is small. When the project requires shorter period to accomplish. When the project goes for immediate production. When the promoter thinks that competition may damage the prospects of the concern. When the promoter considers that the industry may face technological competition and 34 problem of obsolescence. 6. When the project lacks long term stability. Merits: It involves simple calculation Selection or rejection of the project can be made easily The result obtained under this method is more reliable. It is the best method for evaluating high-risk projects Demerits: It is based on the principle of ‘rule of thumb’. It does not recognize the importance of ‘time value of money’. It does not consider the profitability of economic life of the project. It does not recognize the pattern of cash flows and its timing. Pay-back period concept does not reflect all the relevant dimensions of profitability. Improvement of traditional approach to pay-back period metho 1A) Pay-back profitability Method or Post Pay-back Profitability Method: Under this method, the cash inflow generated from a project during the economic life is taken into account whereas in pay-back period the cash inflows were considered only to the extent of recovering the original investment. But in the practical situation, after the pay-back period, a project or a machine is still capable of generating cash inflows. Therefore, to evaluate the project the entire amount of earnings or cash inflows must be considered. Computations of post pay-back profitability: Total cash inflow generated during the economic life of a project xxxxx Less: Original investment xxxxx Post pay-back profitability xxxxx Merits: It is based on simple calculations Less time consuming It is easy to follow and even a non-finance executive can also understand the concept. It takes into account the earnings of the project of entire life. Demerits: It is based on the principle of ‘rule of thumb’. It doesn’t consider the impact of time value of money. It ignores depreciation. 1B) Discounted pay-back method This method is also designed to overcome the limitations of the pay-back period 35 method. When savings are not leveled, it is better to calculate the pay-back period by taking into consideration the present value of cash inflows. Discounted pay-back method helps to measure the present value of all cash inflows and outflows at an appropriate discount rate. The time period at which the cumulated present value of cash inflows equals the present value of cash outflows is known as discounted pay-back period. This method takes into account both the interest factor as well as the return after pay-back period. 1C) Reciprocal pay-back period method This method helps to measure the expected rate of return of income generate by a project. Pay-back reciprocal is exactly equal to the unadjusted rate of return. Unadjusted rate means a rate which has not been adjusted by taking into account the time value of money. It is useful where the flows are relatively consistent and the life of the asset is at least double the payback period. If the pay-back period is same as the life of the asset, the reciprocal would be one. This can be calculated by the following formula: Annual Cash Inflows Reciprocal Pay-back period = ---------------------------------- x 100 Total Investment Possible Questions & University Questions: 1. Explain the traditional method of evaluating investment decision. 2. Explain pay-back period method in appraising capital budget. VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Accounting rate of return Unit: 02 Hour: 04 2) Average Rate of Return (ARR) or Accounting Rate of Return: Accounting / Average Rate of Return means the average annual yield on the project. In this method, profits after taxes are used for evaluation. Dictionary Meaning: It may be defined as the annualized net income earned on the average funds invested in a project. In other words, the annual returns of a project are expressed as a Yield: percentage of the net Investment in the project. Return Give in Calculation of ARR In case the expected profits (after tax) generated by a project are equal for all the year then the annual profit itself is the average profit. If the project is expected to generate unequal profits over different years, then the 36 ARR may be calculated by finding out the average annual profit and then comparing it with the average investment of the project as follows: Average Annual Profit (after tax) ARR = -------------------------------------------- x 100 Average Investment in the project Average Investment: The average investment refers to the average annual quantum of funds that remains invested or blocked in the proposal over its economic life. The average investment of a proposal is affected by the method of depreciation, salvage value and the additional working capital required by the proposal. The following two approaches are available t calculate the average investment. Key Words: Average Rate of Return means the average annual yield on the project. (i) Initial cash outlay as average investment: In this case, the original cost of investment and the installation expenses, if any, is taken as the amount invested in the project. (ii) Average annual book value after depreciation as average investment: Teaching Aid: CB For the firms which are adopting method of depreciation other than the straight line method: Find out the opening book values and the closing book values of the project for all the years of its economic life. Find out the average book values for all the years by taking the simple arithmetic mean of the opening and closing book values. Find out the average of all the yearly averages. This average will be the average investment of the proposal. For the firms which are adopting straight line method the following short cut methods can be used: Average Investment = [(Original Investment + Installation expenses – Scrap value)/2] + Scrap value. Average Investment = [(Original Investment + Installation expenses – Scrap value)/2] + Scrap value + Additional Working capital. Merits: This method is very simple to understand It is based on book figures which are easily available. The benefits over the entire life of the project are considered. It ignores the salvage value of the project. Demerits: It is based on accounting profit and not on cash flow. It does not take into consideration, the time value of money. The method ignores fluctuation in the profit from year to year. 37 Books Referred Financial management I.M. Pandey It considers only the Rate of Return and not the length of project lives. Possible Questions & University Questions: 1. Explain the Average rate of return in detail. VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: DCF Techniques, Net Present Value Unit: 02 Hour: 05 Dictionary Meaning: II. Discounted Cash Flow Techniques (DCF): Investments are essentially current capital expenditure incurred at present in anticipation of future returns. Hence, the timing of expected future cash flow is important Working in the investment decision. For example, investors play a higher value on recent returns capital: than on future ones. Hence, the technique that discounts the future value into them present values at a specified time value (discount rate) is called as DCF technique. Day to day Requirement (Current Asset – Discounting is reducing the values of future cash flows to make it directly comparable Current to the values at present. Liabilities) The rate at which the future cash flows are reduced to their present value is termed as discount rate. The Economic life of a project is used as the discounting period. However, the length Key Words: of discounting period depends on factors such as the life of equipment with the largest NPV = life span, technological change, availability of Raw materials, market stability, etc. The market rate of interest is normally considered for discounting. But the cost of Discounted capital computed based on the overall capital structure of the company or on the basis Cash Inflows less discounted of financial pattern would be an appropriate discount rate. Cash Outflows. What is discounting? 1) Net Present Value (NPV): The Net Present Value of an Investment proposal is defined as the sum of the present value of all future cash inflows less the sum of the present values of all cash Teaching outflows associated with the proposal. Aid: CB NPV = Discounted Cash Inflows less discounted Cash Outflows. Cash Outflow consist of : 1. Initial Investment and 2. Special payment and outflows. E.g., working capital outflow which arises in the year of commercial production. Tax paid on Capital Gain made by sale of old assets, if any. 38 Cash Inflows = Profit after tax + Depreciation Also, specific cash inflows like salvage value of new Assets and recovery of working capital at the end of the project, tax savings on loss due to sale of old asset, should be carefully considered. The general assumptions are that all cash inflows occur at Books Referred the end of each year. Discounting rate: Financial Management Instead of using the PV factor tables, the relevant discount factor can be computed I.M. Pandey as 1/ (1+K)ⁿ. Where, K Cost of Capital. n year in which the inflow (or) outflow takes place. Hence, PV factor at 10% after one year 1/1.10 = 0.9091 Similarly, PV factor at the end of 2 years 1(1.10)² = 0.8264 and so on. Merits: It considers the time value of money. Hence it satisfies the basic criterion for project evaluation. Unlike payback period, all cash flows are considered. NPV constitutes addition to the wealth of shareholders and thus focus on the basic objectives of financial management. Since all cash flows are converted into present value (current rupees), different projects can be compared on NPV basis. Thus, each project, can be evaluated independent of others on its own merits. Demerits: It involves complex calculations. It involves forecasting cash flow and application of discount rate. Thus accuracy of NPV depends on accurate estimation of these two factors which may be quite difficult in practice. NPV and ranking of project may differ at different proposals, etc., while evaluating mutually exclusive projects. Possible Questions & University Questions: 1. Explain the DCF techniques and Net present value. 39 VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Profitability Index and IRR Unit: 02 Hour: 06 2) Profitability Index (PI): Where different investment proposals each involving different initial investments Key Words: and cash inflows are to be compared, the technique of Profitability Index (PI) is used. Projects with PI > 1 are accepted and Profitability Index (PI) = Total of Discounted Cash Inflows PI < 1 are Total of Discounted Cash Outflows rejected. Accept or Reject Criterion: PI represents the amount obtained at the end of the project life, for every rupee invested in the project at the initial state. Hence, Projects with PI > 1 are accepted and PI < 1 are rejected. Teaching Aid: CB Merits: The method considers the time value of money It is a better project evaluation technique than NPV and helps in ranking projects where NPV is positive. It focuses on maximum return per rupee of investment and hence is useful in case of Books investment in divisible projects, when funds are not fully available. Referred Demerits: Financial Management Once a single large project with high NPV is selected, possibility of accepting several I.M. Pandey small projects which together may have higher NPV than the single project is excluded. Situations may arise where a project with a lower profitability index selected may generate cash flows in such a way that another project can be taken up one or two years later, the total NPV in such case being more than the one with a project with highest profitability Index. 3) Internal Rate of Return (IRR): Internal Rate of Return is the rate at which the sum total of discounted cash inflows equals the discounted cash outflows. The Internal rate of return of a project is the discount rate which makes net present value of the project equal to zero. 40 Acceptance Rule: If IRR > Cut Off rate i.e., Cost of Capital, then accept the project. If IRR = Cut Off rate i.e., Cost of Capital, then the firm is indifferent, either accept (or) reject the project. If IRR < Cut Off rate i.e., Cost of Capital, then reject the project. Merits: Time value of money is taken into account. All cash inflows of the project arising at different points of time are considered. Decisions are immediately taken by comparing IRR with the cost of capital. It helps in achieving the basic objective of maximization of shareholders wealth. Demerits: It is tedious to compute in case of multiple Cash Outflows. Multiple IRRs may result, leading to difficulty in interpretation. Method of Calculation: 1. When Cash inflows/savings are even for all the year: The factor to be located in the relevant annuity table II is calculated by using the following simple equation. F = I/C When, F – Factors to be located I – Original Investment C – Cash inflows per year. The factor, thus calculated is located in table II (or) the line representing the no. of years corresponding to the estimated useful life of the assets and the relevant percentage of the discount which represents the rate of return. 2. When Cash inflows/savings are not even: In this process, cash inflows are to be discounted by a number of trial rates. Total of such present values should be compared with the cost of investment. If the calculated total present value of cash inflow is lower than the cost of investment, then the further interpolation is carried on at lower rate. On the other hand, a higher rate should be attempted if the present value of Inflows is higher than the cost of investment. This process continues till the present value of cash inflows and the cost of investment are equal (or) nearly equal. However, the exact rate may be interpolated with the help of the following formula. 41 Positive NPV IRR = Lower Rate + ---------------------------------------------- x Difference in Rate Difference in calculated present value Accept or Reject Criterion: If the Internal Rate of Return is more than the required rate, the project is profitable, otherwise it should be rejected. Possible Questions & University Questions: 1. Explain the Profitability Index and Internal Rate of Return. VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Project selection under capital rationing Unit: 02 Hour: 07 COMPARE AND CONTRAST NPV WITH IRR NPV Vs IRR: The IRR approach solves for a rate unique to each project, while the NPV approach solves for the trade off cash inflows and outflows using a general required rate of return. On the basis of the above discussion of NPV and IRR, a comparison between the two may be attempted as follows: a. Superiority of IRR over NPV: 1. IRR gives percentage return while the NPV gives absolute return. 2. For IRR, the availability of required rate of return is not a pre-requisite while for NPV it is must. b. Superiority of NPV over IRR: 1. NPV shows expected increase in the wealth of the shareholders. 2. NPV gives clear cut accept-reject decision rule, while the IRR may give multiple results also. 42 3. The NPV of different projects are additive while IRR cannot be added. 4. NPV gives better ranking as compared to the IRR CAPITAL RATIONING When necessary funds are available; the management can take up all profitable projects. When funds are insufficient, the firm has to choose some more profitable projects and reject some less profitable investment proposals. Thus, because of lack of funds, the firm is able to invest in all profitable projects the extent to which the funds are sufficient. Moreover, the executives with the required managerial skills to fruitfully utilize the funds may also be a constraint. This situation is described as a capital rationing. Capital rationing refers to a situation where the firm is constrained for external or internal reasons to secure the necessary funds to invest in all profitable investment proposals. Reasons for Capital Rationing The situation of capital rationing may arise due to both: 1. External factors; or 2. Internal constrains imposed by the management 1. External factors External factors mainly refer to the situation in capital market. Fluctuations in capital market may force a firm to have capital rationing of its investment proposals. Such fluctuations arise due to deficiencies in market information, due to a difference between the interest rates of borrowing and lending, due to rigidities that affect the free flow of capital between firms. Because of such situations in capital market, the firm is unable to obtain necessary capital to finance all its profitable investment proposals. 2. Internal factors Internal factors refer to investment restrictions imposed by the firm itself. Various types of restrictions can be imposed by the management. By adopting a conservative policy, it may decide not to obtain additional capital by incurring a debt to finance its investment proposals. It may also impose the maximum limits up to which investment can be made by its middle level management. By stipulating a minimum rate of return to be higher than the cost of capital, the management may resort to capital rationing. 43 SELECTION PROCESS UNDER CAPITAL RATIONING Key Words: Ranking projects on the basis of profitability 1. Ranking projects on the basis of profitability measured by the most suitable measured. capital evaluation method. 2. Selection projects in the descending order of profitability until the funds are Teaching exhausted, i.e., the project with the highest rank has to be selected first and then Aid: the project with next highest rank and so on. This process can be continued till all CB the funds available for investment become exhausted. Under the situation of capital rationing, the firm is not in a position to accept all profitable investment proposals. By comparing the profitable investment proposals, the firm has to select the relatively more profitable proposals and to reject the others. The said selection process involves the following two steps: Books While ranking the projects, the profitable criterion can be measured by adopting NPV, Referred IRR or Profitability Index Methods. The preference can be given to the IRR method, as it is easy to understand. Financial Management: I.M.Pandey Possible Questions & University Questions: 1. Explain about capital rationing? 2. Compare and contrast NPV with IRR. VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Inflation and capital budgeting Unit: 02 Hour: 08 INFLATION AND CAPITAL BUDGETING Inflation and Cash Flows Estimating the cash flows is the first step which requires the estimation of cost and benefits of different proposals being considered for decision-making. Usually, two alternatives are Dictionary suggested for measuring the 'Cost and benefits of a proposal' i.e. the accounting profits and Meaning: the cash flows. Inflation: In reality, estimating the cash flows is most important as well as difficult task. It is because Price rise of uncertainty and accounting ambiguity. Price Accounting profit is the resultant figure on the basis of several accounting concepts and Increases policies. Adequate care should be taken while adjusting the accounting data, otherwise 44 errors would arise in estimating cash flows. The term cash flow is used to describe the cash oriented measures of return, generated by a proposal. Though it may not be possible to obtain exact cash-effect measurement, it is possible to generate useful approximations Key Words: based on available accounting data. The costs are denoted as cash outflows whereas the discount rate benefits are denoted as cash inflows. means the minimum Effects of Inflation on Cash Flows requisite rate Often there is a tendency to assume erroneously that, when, both net revenues of return on funds and the project cost rise proportionately, the inflation would not have much impact. These committed to lines of arguments seem to be convincing and it is correct for two reasons. First, the rate the project used for discounting cash flows is generally expressed in nominal terms. It would be inappropriate and inconsistent to use a nominal rate to discount cash flows which are not adjusted for the impact of inflation. Second, selling prices and costs show different degrees of responsiveness to inflation. Inflation and Discount Rate Teaching The discount rate has become one of the central concepts of finance. Some of Aid: its manifestations include familiar concepts such as opportunity cost, capital cost, CB borrowing rate, lending rate and the rate of return on stocks or bonds. It is greatly influenced in computing NPV. The selection of proper rate is critical which helps for making correct decision. In order to compute net present value, it is necessary to discount future benefits and costs. This discounting reflects the time value of money. Benefits and Books costs are worth more if they are experienced sooner. The higher the discount rate, the Referred lower is the present value of future cash flows. For typical investments, with costs concentrated in early periods and benefits Financial Management: following in later periods, raising the discount rate tends to reduce the net present value. I.M.Pandey Thus, discount rate means the minimum requisite rate of return on funds committed to the project. The primary Purpose of measuring the cost of capital is its use as a financial standard for evaluating investment projects. Implications of Expected Rate of Inflation on the Capital Budgeting 1) The Company should raise the output price above the expected rate of inflation. Unless it has lower Net Present Value which may lead to forego the proposals and vice versa. 2) If the company is unable to raise the output price, it can make some internal adjustments through careful management of working capital. 3) With respect of discount rate, the adjustment should be made through capital structure. Possible Questions & University Questions: 1. What is inflation and its implications? 45 VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Cost of capital Unit: 02 Hour: 7 Introduction to Cost of capital: Generally, most of the companies are financed by way of debt, bonds and equity. An investor’s investment in long-term funds such as shares, debentures, public deposits, etc. of a company are on the basis of expecting good rate or return. It is important because acceptance or rejection of an investment decision depends on the cost of capital of a firm. Thus, to the company, the cost of capital is the minimum rate of return that the company must earn on its investments to satisfy the expectations of its investors. Meaning: Dictionary Meaning: Bond: Debt instrument The term cost of capital refers to the rate of return on investment projects necessary to leave unchallenged the market price of a firm’s stocks. It is the rate of return required by Key Words: those who supply the capital. The cost of capital is a weighted average of the cost of each type of capital. cost of capital refers In simple words, cost of capital refers to minimum rate of return a firm must earn to minimum on its investment so that the market value of the company’s equity shares does not fall. rate of return a firm must This is consonance with the overall firm’s objective of wealth maximization. earn on its Definition: investment “The cost of capital is the minimum required rate of earnings or the cut-off rate for the allocation of capital to investments of projects. It is the rate of return on a project that will leave unchanged the market price of the stock” - James C. Van Horne Cost of capital may be defined as “the rate of return the firm requires from its investment in order to increase the value of the firm in the market place”. FACTORS AFFECTING THE COST OF CAPITAL OF A FIRM Teaching Aid: CB Books Referred 1. Risk-free Interest Rate: Financial The risk-free interest rate, If, is the interest rate on the risk free and default-free securities. Management: For example, the securities issued by the Government of India are taken as risk-free and I.M.Pandey default-free in respect of payment of periodic interest as well as principal repayment on maturity. 2. Business risk: The business risk is related to the response of the firm’s Earnings Before Interest and Taxes, EBIT, to change in sales revenue. Every project has its effect on the business risk of the firm. If a firm accepts a proposal which is more 46 risky than average present risk, the investor will probably raise the cost of funds so as to be compensated for the increased risk. 3. Financial risk: The particular composition and mixing of different sources of finance, known as the financial plan or the capital structure, can affect the return available to the investors. The financial risk is often defined as the likelihood that the firm would not be able to meet its fixed financial charges. Higher the proportion of fixed cost securities in the overall capital structure, greater would be the financial risk. The investors in such a case require to be compensated for this increased risk. 4. Other Considerations: The investors may also like to add a premium with reference to other factors. One such factor may be the liquidity or marketability of the investment. Higher the liquidity available with an investment, lower would be the premium demanded by the investors. Possible Questions & University Questions: 1. What is cost of capital? 2. What are the various factors affecting cost of capital? VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: concept and Types of cost of capital Unit: 02 Hour: 08 TYPES OF COST Dictionary Meaning: 1. Explicit Cost and Implicit cost: Explicit Cost: The Explicit cost of any source of finance may be defined as the discount rate that equates the present value of the funds received by the firm net of Dividend: underwriting costs, with the present value of the expected cash outflows. These outflows may be interested payment, repayment of principal (or) dividend. This may be calculated Bonus Share by computing value according to the following equation. Surplus Implicit Cost: The Implicit Cost may be defined as “the rate of return associated Payment with the best investment opportunity for the firm and its shareholders that will be forgone Extra if the project presently under consideration by the firm were accepted. 2. Future and Historical Cost: Future Cost refers to the expected cost of funds to finance the project, while 47 historical cost is the cost, which has already been incurred for financing a particular project. In financial decision making, the relevant costs are future costs and not the historical costs. However, historical costs are useful in projecting the future costs and providing an appraisal of the past performance when compared with standard (or) Teaching Aid: predetermined cost. CB 3. Specific Cost and Combined Cost: Specific Cost: The Cost of each component of capital (i.e., equity shares, preference shares, debentures, loans, etc.) is known as specific Cost of Capital. In order to Books determine the average cost of capital of the firm it becomes necessary first to consider the Referred cost of specific methods of financing. with page number: Combined Cost: The composite / combined cost of capital is inclusive of all cost of capital from all sources i.e., equity shares, preference shares, debentures and other Financial loans. In capital investment decisions, the composite cost of capital will be used as a basis Management: for accepting (or) rejecting the proposal even though the company may finance one I.M.Pandey proposal from one source of financing while another proposal from another source of financing. 4. Average Cost and Marginal Cost: Average Cost: The Average Cost of Capital is the weighted average of the costs of each component of funds employed by the firm. The weights are in proportion of the share of each components of capital in the total capital structure. Marginal Cost: Marginal Cost of Capital, on the other hand, is the weighted average cost of new funds raised by the firm for capital budgeting and financing decision, the marginal cost of capital is the most important factor to be considered. Possible Questions & University Questions: 1. What are the various types of costs? VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Methods of computing cost of capital Unit: 02 Hour: 09 VARIOUS METHODS OF COMPUTING COST OF CAPITAL The cost of each component of capital will have to be separately assessed. A firm may be in a position to use debt-financing at a lower rate of interest. But this is possible only up to a certain point, at which the overall cost of capital, is reduced. 48 Computation of overall cost of capital of a firm involves: A. Computation of cost of specific source of finance, and B. Computation of weighted average cost of capital. A. Computation of Specific source of Finance Computation of each specific source of finance, viz, debt, preference share capital, equity share capital and retained earnings is discussed as below: 1. Cost Debt Capital: The cost of debt is the rate of interest payable on debt. (i) Cost of Irredeemable debt Before tax = Kdb = Interest (I) / Net proceeds (NP) After tax = Kda = [Interest (1-tax rate)] / Net proceeds (NP) (ii) Cost of Redeemable debt Usually, the debt is issued to be redeemed after a certain period during the life time of a firm. Such a debt issue is known as Redeemable debt. The cost of redeemable debt capital may be computed as: (a) Before tax = Interest + (RV-Net proceeds) / N (RV + Net Proceeds)/2 (b) After tax = Interest (1-tax rate) + (RV-Net proceeds) / N (RV + Net Proceeds)/2 RV = Redeemable value of debt N = Life of the redeemable debt. 2) Cost of preference capital: Preference capital carries a fixed rate of dividend though this dividend is payable at the discretion of the board of directors, companies intend to pay the stated preference dividend regularly and preference shareholders expect to receive preference dividend regularly. The cost of preference capital which is irredeemable is the value of Kp in the following expression. Kp = Preference Dividend / Net Proceeds of issue Sometimes Redeemable Preference Shares are issued which can be redeemed or cancelled on maturity date. The cost of redeemable preference share capital can be calculated as: 49 Kp = Preference Dividend + (RV – Net proceeds) / N (RV+ Net Proceeds) / 2 RV = Redeemable value of preference shares N = Life of the redeemable preference shares. 3) Cost of Equity Capital: Cost of equity capital (Ke) represents the expectations of equity shareholders from a company. Based on investors’ behavior and expectations, the cost of equity capital can be determined by any of the following approaches. 1. Dividend Yield method or Dividend / Price approach: According to this method, the cost of equity capital is the ‘discount rate that equates the present value of expected future dividends per share with the net proceeds (or current market price) of a share. Formula, (a) Calculation of Cost of New Equity Ke = D / NP Where, Ke = Cost of Equity Capital D = Expected dividend per share NP = Net proceeds per share Drawbacks 1. 2. 3. 4. Gives more importance to dividend Ignores the growth in the capital value of the shares. Ignores the earnings on retained earnings. It may not be adequate to deal with the problem of determining the cost of equity share capital 5. It neglects the fact that stock market price rise may be due to retained earnings also. (b) Calculation of cost of existing equity shares According to this approach, the determination of cost existing equity shares is based on the market price of the company’s shares. The cost of existing equity shares is calculated with the help of the following formula: Ke = D / MP 50 Where, Ke = Cost of Equity Capital D = Expected dividend per share MP = Market Price per share The basic assumptions underlying this method are that the investors give prime importance to dividends and risk in the firm remains unchanged. 2. Dividend Yield plus Growth in dividend method: When the dividends of the firm are expected to grow at a constant rate and the dividend pay-out ratio is constant this method may be used to compute the cost of equity capital. According to this method the cost of equity capital is based on the dividends and the growth rate. Ke = (D / NP) + g Where, g = Rate of growth in dividends In case cost of existing equity share capital is to be calculated, the NP should be changed with MP (market price per share) in the above formula. Ke = (D / MP) + g Assumptions This approach is based on the following assumptions: 1. 2. 3. 4. Expected dividends determine the market value of shares. The growth rate will be constant over a period of time. Future earnings will grow at a constant rate. The market price is influenced only by variations in earnings. 3. Earnings Yield method or Earnings / Price approach: According to this method, the cost of equity capital is the ‘discount rate that equates the present value of expected future earnings per share with the net proceeds (or current market price) of a share. Formula, Ke = Earnings per share Net proceeds Where, the cost of existing capital is to be calculated Ke = Earnings per share . Market price per share 51 4. Realised Yield approach: According to this approach investor is presumed to be interested in present dividends and future earnings, which are reflections of past track record. This method takes into account the actual average rate of return realized in the past, may be applied to compute the cost of equity share capital. To calculate the average rate of return realized, dividends received in the past alongwith the gain realized at the time of sale of shares should be considered. The cost of equity capital is said to be the realized rate of return by shareholders. Assumptions: 1. The company should remain fundamentally the same irregardless of risk. 2. The shareholders are required to bear the risk for expecting the same rate of return 3. The shareholders’ reinvestment opportunity rate must be equal to the realized yield 4. Cost of Retained Earnings The cost of retained earnings may be considered as the rate of return which the existing shareholders can obtain by investing the after-tax dividends in alternative opportunity of equal qualities. It is, thus, the opportunity cost of dividends foregone by shareholders. Cost of retained earnings can be computed with the help of following formula: Kr = (D / NP) + G Where, G = Rate of growth in dividends Shareholders cannot obtain the entire amount of retained profits by way of dividends. Some adjustment has to be made for tax. Moreover, if the shareholders wish to invest their after-tax dividend income in alternative securities, they may have to incur some costs of purchasing the securities, such as brokerage. To make adjustment in the cost of retained earnings for tax and costs of purchasing new securities, the following formula may be adopted: Kr = [(D / NP) + G] x (1-tax rate) x (1-brokerage cost) Possible Questions & University Questions: 1. What are the various methods of measuring cost of capital? 52 VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Weighted average cost of capital Unit: 02 Hour: 10 WEIGHTED AVERAGE COST OF CAPITAL Weighted average cost of capital is the average cost of the costs of various sources of financing. Weighted average cost of capital is also known as composite cost of capital, overall cost of capital or average cost of capital. Once the specific cost of individual sources of finance is determined, we can compute the weighted average cost of capital by putting weights to the specific costs of capital in proportion of the various sources of funds to the total. The WACC may be described as follows: Dictionary Meaning: Marginal: Minor Subsidiary Secondary WACC = Ke.We + Kd.Wd + Kp.Wp Where, WACC = Weighted average cost of capital Key Words: Ke = Cost of equity capital In WACC, there must be a system of assigning weights to different specific cost of capital. Kd = After tax cost of debt Kp = Cost of preference shares We = Proportion of equity capital in capital structure Wd = Proportion of debt in capital structure Wp = Proportion of preference capital in capital structure In order to calculate the WACC, there must be a system of assigning weights to Teaching different specific cost of capital. The following considerations are worth noting while Aid: assigning weights to specific cost of capital to find out the WACC. CB Historical, Marginal and Target weights: (a) Historical or Existing weights: Historical or existing weights are the weights based on the actual or existing proportions of different sources in the overall capital structure. Such weighting system is based on the actual proportions at the time when the WACC is being calculated. The weighting system is the proportions in which the funds already been raised by the firm. (b) Marginal weights: The marginal weights refer to the proportions in which the firm wants to raise funds from different sources. In other words the proportions in which additional funds required to finance the investment proposals will be raised are known as marginal weights. 53 Books Referred Financial management – Sudharsan Reddy So, in case of marginal weights, the firm in fact, calculates the actual WACC of the incremental funds. (c) Target Weights: The target weights refer to the proportion in which the firm plans to raise the funds from various sources in the long run. In the target weights system, the firm in the first instance decides about the shape of the optimal capital structure and proportion of different sources in this optimal capital structure. Book value versus Market Value Weights: (a) Book Value Weights: The weights are said to be book value weights if the proportions of different sources are ascertained on the basis of the face values i.e., the accounting values. The book value weights can be easily calculated by taking the relevant information from the capital structure as given in the balance sheet of the firm. (b) Market Value Weights: The weights may also be calculated on the basis of the market values of different sources i.e., the proportion of each source at its market value. In order to calculate the market value weights, the firm has to find out the current market price of the securities in each categories. The advantages of using the market value weights are: The market value weights are consistent with the concept of maintaining market value in the definition of the overall cost of capital. The market value weights provide current estimate of the investor’s required rate of return. The market value weights yields goods estimates of the cost of capital that would be incurred if the firm requires additional funds from the market. However, the market values weights suffer from some limitations as follows: Not only that the market values of all types of securities issued have to be obtained but also that the market value of equity share is to be segregated into capital and retained earnings. The market values are subject to change from time to time and so the concept of optimal capital structure in terms of market values does not remain relevant any longer. Possible Questions & University Questions: 1. How to calculate weighted average cost of capital? VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Unit: 02 54 Hour: 11 Topic: Problems Non-Discounted cash flow techniques: A non-discount method of capital budgeting does not explicitly consider the time value of money. In other words, each dollar earned in the future is assumed to have the same value as each dollar that was invested many years earlier. The payback method and Accounting rate of return are some of the techniques used in capital budgeting that does not consider the time value of money. Payback period method The number of years required to recover the initial outlay of the investment is called payback period. It is the investment with short term payback period is preferred Payback period = initial investment / Annual or net cash inflow Payback period problems: 1. The project requires 100000 and yields annual cash inflow of 20000 for 8 years. Calculate payback period. 2. The project requires an initial investment of 20000 and the annual cash inflows of 5 years are 6000, 8000, 5000, 12000, 4000 respectively. Calculate payback period. 3. Ram limited company purchases of new machine which will carry out some operations performed by labor ‘X’ and ‘Y’ are alternative models. Calculate the payback period and recommend which model you would prefer. Particulars Project ‘X’ Project ‘Y’ Cost of machine 150000 250000 Estimated life 5 years 6 years Cost of indirect materials 6000 8000 Estimated savings in Scrap 10000 15000 Additional cost of 19000 maintenance Estimated savings in direct 150 wages per employee Total no. of employees 600 27000 Taxation 50% 200 600 50% 4. Consider the following projects and Calculate the payback period? Project C0 C1 C2 C3 C4 A B C D 1000 1000 300 300 600 200 100 0 200 200 100 0 200 600 100 300 1000 1000 600 600 55 Average Rate of Return/ Accounting Rate of Return (ARR)/ Return on Investment Users accounting information are revealed by financial statements to measure profitability of an investment the accounting rate of return is the ratio of average after tax profit divided by the average investment. Average investment is the half of the original investment. ARR = Average annual profits / Net investment project * 100 Average return on Average investment method = Average annual profit after depreciation and tax / Average investment * 100 Average investment = total investment / 2 1. A project requires an investment of Rs.500000 and as a scrap value of Rs.20000 after 5 years. It is expected to yield profits after depreciation and taxes during the 5 years amounting to Rs.40000, 60000, 70000, 50000, and 20000. Calculate the average rate of return on investment and average rate on average investment. 2. Calculate the average rate of return for project A & B from the following information Particulars Project ‘A’ Project ‘B’ Investment 20000 30000 Estimated life 4 years 5 years Projected net income (after interest, depreciation and tax) Year A B 1 2000 3000 2 1500 3000 3 1500 2000 4 1000 1000 5 - 1000 TOTAL 6000 10000 If the required rate of return is 12% which project should be undertaken? DISCOUNTED CASH FLOW TECHNIQUES: It is an evaluation of the future net cash flows generated by capital project by discounting them to the present day value. The discounting technique converts cash inflow and outflow for different years into the respective values at the same point of time allows for time value of money. 56 Net present value (NPV) The objective of the firm is to create wealth by using existing and future resources to produce goods and service. To create wealth, inflows must exceed the present value of all anticipated cash outflows. The net present value is obtained by discounting all cash outflows and inflows attributable to a capital investment project by choosen percentage. The method discounts the net cash flow from the investment by the minimum required rate of return and deducts the initial investment to give the yield from the funds invested. Steps to calculate: 1. Determine the discount rate 2. Compute the present value of total investment outlay at the determined rate. 3. Calculate the NPV of each project by subtracting the present value of cash inflows from the present value of cash outflows for each project 4. If NPV is positive (or) zero that proposal may be accepted otherwise it should be rejected. Suppose two or more proposal are having positive return the project which has highest NPV to be selected NPV Problems: 1. A firm invests in project ‘X’ Rs.2500 now and expected to generate yearend cash flow of Rs.900, 800, 700, 600 and 500 in years of 1 through 5. The opportunity cost of the capital may be assumed to be 10%. 2. The following two projects ‘A’ and ‘B’ required an investment of Rs.200000 each. The income returns after taxes for these projects are as follows: Year A B 1 80000 20000 2 80000 40000 3 40000 40000 4 20000 40000 5 60000 6 60000 Present value if the companies cost of capital is 10% & 16%. VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Problems Unit: 02 Hour: 12 Net Present Value (NPV) 1. Calculate the NPV for a small size project requiring an initial investment of 57 Rs.20000 and which provides net cash inflows of Rs.6000 each year for 6 years. Assume the cost of funds to be 8% per annum and that there is no scrap value. (The present value of an annuity for 6 years and 8% is 4.623) 2. From the following information calculate NPV of two projects and suggest which of two things should be invested. Assume the decision rate 10% Particulars Project ‘X’ Project ‘Y’ Initial investment 20000 30000 Estimated life 5 years 5 years Scrap value 1000 2000 Cash flows are as follows Year 1 Cash flow ‘X’ 5000 Cash flow ‘Y’ 20000 2 3 4 5 10000 10000 10000 5000 3000 3000 2000 2000 Internal rate of return It is a modern technique of capital budgeting that takes into account the time value of money. It is also known as time adjusted rate of return or yield method. In the NPV method, the net present value is determine by discounting the future cash flows of a project at a pre-determined rate called cut-off rate, but under the IRR method the cash flow of a project are discounted at a suitable rate of trial and error method, which equates the NPV calculated to the amount of investment. Under this method the discount rate is determined internally. The rate of discount at which present value of cash inflow is equal to present value of cash outflow Internal Rate of Return (IRR) problems: 1. Calculate IRR, consider the cash flow of a project. Year 0 1 2 3 4 Cash flow 100000 30000 30000 40000 45000 2. A project cost Rs.16000 and its expected to generate cash inflows of Rs.8000, 7000, and 6000 at the end of each year for next 3 years. Calculate IRR. 3. A firm’s cost of capital is 2.5% is considering two mutually exclusive project ‘X’& ‘Y’ Year X Y 0 70000 70000 1 10000 50000 58 2 20000 40000 3 30000 20000 4 45000 10000 5 60000 10000 Profitability Index (PI) Profitability Index / benefit cost ratio Problems: Profitability Index = present value of annual cash flows/ Initial investment Net profitability Index = NPV/ Initial investment The ratio of the present value of cash flow to the initial outlay is profitability index or benefit cost ratio. Acceptance rule: (i) (ii) (iii) Accept if P.I > 1 Reject if P.I < 1 Project may be accepted if P.I = 1 Profitability Index = Present Value of annual cash flows/ Initial Investment 1. The initial outlay of a project is 50000 and it generates cash inflows of 20000, 15000, 25000, and 10000 in 4 years using present value index method appraise profitability of the proposed investment, assuming 10% rate of discount. 2. The initial outlay of a project is 100000 and it can generate cash inflow of 40000, 30000, 50000, and 20000 in year ‘1’ through ‘4’. Assume a 10% rate of discount. VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Problems Unit: 02 Hour: 13 COMPARISON OF DISCOUNTED CASH FLOW TECHNIQUES 1. A company considering an investment proposal to install a new milling control at a cost of Rs.50000. the facility has a life expectancy of 5 years without any salvage value. The firm uses SLM of depreciation and the same is used for tax purposes. The tax rate is assumed to be 35%. The estimated cash flows before depreciation and tax(CFBT) from the investment proposal are as follows: Year 1 2 3 4 59 5 CFBT 10000 10692 12769 13462 20385 COMPUTE: i) ii) iii) iv) Payback period Average rate of return NPV at 10% discount rate Profitability index at 10% discount rate CAPITAL RATIONING PROBLEM 2. Determine the optimal project mix on the basis of the assumption that the project are divisible Project Required initial NPV at the appropriate cost of investment capital A 100000 20000 B 300000 35000 C 50000 16000 D 200000 25000 E 100000 30000 Total fund available is Rs.300000. determine the optimal contribution of projects assuming that the projects are divisible. INFLATION AND CAPITAL BUDGETING Inflation is defined as increase in the average price of goods and services. The accepted measure of general inflation is the retail price index which is based on the assumed expenditure patents of an average family. It is a monetary alignment in an economy and it can be defined as “the changes in purchasing power in a currency from period to period relative to some basket of goods and services. INFLATION PROBLEM: 3. A machine cost Rs.10000 and its expected to yield the following net cash returns (estimated current price) Year 1 2 3 Rs. 5000 8000 6000 We expect inflation to be at the rate of 5% per annum. The cost of capital is 15.5% per annum. 60 VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Problems Unit: 02 Hour: 14 DETERMINATION OF COST OF CAPITAL: 1. ‘X’ ltd issues of Rs.50,000, 8% debentures at par. The tax rate applicable to the company is 50%. Compute the cost of debt capital 2. ‘Y’ ltd issues of Rs.50,000, 8% debentures at premium of 10%, The tax rate applicable to the company is 60%. Compute Kdb? 3. ‘A’ ltd issues of Rs.50,000, 8% debentures at a discount of 5%, The tax rate applicable to the company is 50%. Compute the cost of debt? 4. ‘X’ ltd issues of Rs.1,00,000, 9% debentures at premium of 10%, the cost of floatation are 2%. The tax rate applicable to the company is 60%. Compute cost of debt? 5. A company issues of Rs.100000 at 10% redeemable debentures at a discount of 5%. The cost of floatation amount to Rs.30000. The debentures are redeemable after 5 years. Calculate before tax and after tax cost of debt assuming a tax rate of 50%? 6. ‘X’ ltd issues 12% debentures of face value of Rs.100 each and realises Rs.95 per debenture. The debentures are redeemable after 10 years at a premium of 10%. 7. The company issues Rs.10000 at 10% preference shares of Rs.100 each. Cost of issue is Rs.2 per share. Calculate of cost of preference share capital if these shares are i) At par ii) At premium of 10%/ iii) At a discount of 5% 8. ‘Y’ ltd issues preference shares of face value of Rs.100 each carrying 14%/ dividend and he realises Rs.92 per share. The shares repayable after 12 years. 9. A company issues of Rs.10000 at 10% preference share of Rs.100 each redeemable after 10 years, at a premium of 5%, cost of issue is 2 per share. Calculate cost of preference share capital. 10. A company issues 1000 at 7% preference share of Rs.100 at a premium of 10%, redeemable after 5 years. Compute cost of preference share capital. VSA SCHOOL OF MANAGEMENT Department of MBA Salem 10 Subject: Financial Management Topic: Problems Unit: 02 Hour: 15 COST OF CAPITAL The objective of business firm is to maximize the wealth of shareholders. The management should invest in projects which give a return in excess of cost of funds invested in the projects of the business. The cost of capital is the minimum rate of return expected by its 61 investors. The cost of capital is the rate of return, the company has to pay various suppliers of funds in the company. A decision to invest in a particular project depends upon the cost of capital which is the minimum rate of return expected by investors. Generally higher the risk involve in a firm, higher the cost of capital Concept of cost of capital 1. Cost of capital is not a cost 2. It is the minimum rate of return Cost of equity share capital 1. A company plans to issue 1000 new shares of Rs.100 each, the floatation cost are expected to be 5 % of the share price the company pays a dividend of Rs.10 per share initially and growth dividend is expected to be 5 %. Compute the cost of new issue of equity shares. If the market price of an equity share is Rs.150. calculate the cost of existing equity share capital. DIVIDEND YIELD METHOD Dividend per share is expected current market price. The present value of all expected future dividends per share with the net proceeds of sale (or) the current market price of a share this method is based on assumptions that the market value of shares is directly related to the future dividends on the share. Another assumption is that the future dividend per share is expected to be constant and the company is expected to earn at least yield to keep the shareholders constant current market price Present value Market value Future dividend DIVIDEND GROWTH MODEL Shareholders will normally expect dividend to increase year after year. In this method an allowance for future growth in dividend is added to the current dividend yield Problems 1. A firm is considering an expenditure of Rs.60, 00,000 for expanding its operations the relevant information is as follows. Number of existing equity share 10, 00, 000 market value of existing share Rs.60, net earnings Rs.90, 00, 000. Compute the cost of existing equity share capital and the cost of new equity capital. Assuming that new shares will be issued at a price of Rs.52 per share and the cost of new issue will be 2 per share. 2. Right start’s ltd has its equity share of Rs.10 each quoted in market price of Rs.56. 62 a constant expected annual growth rate of 6% and dividend of Rs. 3.60 per share has been paid for current year. Calculate the cost of capital 3. The shares of apple ltd selling at Rs.24 per share the firm had paid dividend at 1.30 per share last year. The estimated growth of company is 5% per year. Determine the cost of equity of the company. COST OF RETAINED EARNINGS Maintain as reserve from the capital for expansion, diversification, uncertainties, and branches. The retained earnings is one of the major sources of finance available for the established companies to finance in expansion and diversification programs. These funds are also taken into account while calculating cost of equity. Retained earnings are not distributed to the shareholders. A company can use the funds within the company for further profitable investment opportunities 1. The cost of equity capital is 24%. The personal taxation of individual shareholders is 35%. Calculate the cost of retained earnings. WEIGHTED AVERAGE COST OF CAPITAL/ OVERALL COST OF CAPITAL 1. As the average cost of companies finance (equity, debentures, bank loan) weighted according to the proportions each element bears to the total of capital. Weighting is usually based on market valuation current yields and cost after tax. 2. Guna cements ltd has the following capital structure. Particulars Market Book value Cost of tax (%) value Equity share capital 80 120 18 Preference share 30 20 15 capital Fully secured 40 40 14 debentures Calculate the companies weighted average cost of capital. INDIFFERENCE POINT 1. Calculate the level of EBIT at which the indifference point following financial alternatives Ordinary share capital is 10, 00, 000 (or) 15% debentures of Rs.5, 00, 000 and ordinary share capital of Rs. 5, 00, 000, tax rate 50% earning price Rs.10 per share 2. Ordinary share capital of Rs.10, 00, 000 (or) 13% preference share capital of Rs.5,00,000 and ordinary share capital of Rs.5, 00, 000, ordinary share price Rs.10 per share UNIT – 2 (COMPLETED) 63