file

advertisement
FTS-deposition Chamber Configuration
(all the flanges are KF-25 unless indicated otherwise)
Liquid nitrogen trap
FTS deposition chamber with
samples inside
(KF-40 full nipple)
Pumping direction
Bellow valve (trap&pump)
In-line filter with
stainless steel wool trap
Bellow valve (FTS container)
FTS container (1-2 cc)
Electrical feed-through
for measurements
(KF-40 flange with vacuum BNCs)
Chemically resistive mechanical
pump using Fomblin oil
Inside glove box.
Outside glove box
(Note: Ar glove box is not necessary, if you work with
single crystalline organic materials like rubrene that have
dense hydrophobic surfaces, or if the atmospheric
humidity is low. It is recommended for work with porous
systems, such as polymer films or more hydrophilic
systems (e.g., graphene, CNTs) that require annealing and
transfer under Ar before the FTS deposition).
Optimized procedure for deposition of FTS self-assembled monolayer on rubrene:
For the original paper, please see: M. F. Calhoun et al., Nature Mater. 7, 84 (2008).
1. Place samples in the FTS deposition chamber properly. Connect the monitoring sample (with contacts and wire leads) to the electrical
feed-through connectors and check the connectivity. Start the program monitoring sample’s conductivity. Assemble the rest of the system as
shown in the figure.
2. Make sure that the FTS container valve is closed. Load an appropriate amount of liquid FTS (Sigma Aldrich #448931) to the FTS
container: a few drops for a short-time treatment to achieve a partial coverage and somewhere between 1/3 and 1/2 of the container for a
long treatment to get full coverage. Attach the container to the deposition system properly as shown in the figure.
3. Turn on the mechanical pump and open the liquid nitrogen trap & pump valve (but not the FTS container valve). Pump the deposition
chamber for 40 minutes.
4. Fill the cold trap with liquid nitrogen and wait for another 10 minutes.
5. Slowly open the FTS container valve and leave it open for 1 min, while the mechanical pump is pumping the chamber through the cold
trap. This removes the small amount of air trapped in the FTS container and activates rapid evaporation of FTS molecules filling the
chamber with FTS fume.
6. After 1 min, close the liquid nitrogen trap & pump valve.
7. Turn off the pump and disassemble the liquid nitrogen trap. Leave all parts of the trap under a well ventilated hood. Clean all parts after
they reach room temperature.
8. When FTS deposition is done (which you monitor in-situ by conductivity measurements), close the FTS container valve.
9. Assemble the thoroughly cleaned liquid nitrogen trap and connect it to the system as shown in the figure. Turn on the pump and wait for
10~20 minutes, then add liquid nitrogen and wait for another several minutes.
10. Slowly open the liquid nitrogen trap & pump valve and pump the deposition chamber for 30 minutes to remove the FTS fumes and FTS
accumulated on the inner walls of the chamber. Keep sufficient amount of liquid nitrogen while pumping (refill the trap when necessary).
11. Close the liquid nitrogen trap & pump valve.
12. Turn off the pump and disassemble the liquid nitrogen trap. Leave all parts of the trap under a well ventilated fume hood.
Clean all parts again after they reach room temperature.
13. Stop the electrical measurements. Carefully open the FTS chamber to the atmosphere (or Ar, if you work under Ar). Remove
samples.
14. Remove the FTS container and clean it with acetone.
15. Reassemble the deposition system, including the FTS container and the cold trap.
16. Pump the chamber for 10 minutes with both valves open. Close both valves and turn off the pump. Store the empty
chamber in this closed condition when not in use to slow down degradation of parts.
Important notes:
1. For high-quality full-coverage FTS deposition, cleaning all the parts on the right side of the PVC hose (see the figure),
including O-rings, chamber parts, the FTS container valve and the electrical feed-through connectors, is recommended each
time before deposition. Clean the PVC hose as well if necessary.
2. Check the base pressure of the clean, dry and fully assembled empty chamber (w/o FTS or samples) regularly before each
treatment. FTS deposition failure is usually due to a poor vacuum. In our experience, the base pressure in a cleaned and fully
assembled chamber of our size is 7 - 8 10-4 Torr after a 40-min pumping plus adding liquid nitrogen to the trap. After a few
uses, the pressure becomes 1-2 10-3 Torr, which in our experience is sufficient for a high-quality FTS deposition. Condition
of the pump oil and the stainless steel wool trap should be checked regularly. Do not use a vacuum gauge for pressure
measurements in-situ while doing FTS deposition, because it may cause corrosion of the gauge.
3. When not in use, keep the deposition chamber fully assembled and under vacuum.
2D = 1.2·10-5
S/
Exposure to FTS vapor
Typical current as a function of time curve recorded during the FTS deposition
for a 2-probe pristine rubrene sample. Voltage applied is V = 1 V,
distance between the contacts L = 3 mm, width of the crystal W = 1 mm.
Same data on a semi-Log scale
Download