PACIFIC PARTNERSHIP 2012 07 MAR 12 OPT Brief This brief is classified: UNCLASSIFIED UNCLASSIFIED Roll Call • • • • • • • • • • • • • • • • CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351st Civil Affairs Command DLA Troop Support - Pacific ETG 30th NCR HSC-21 DET 2 MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict. UNCLASSIFIED 2 UNCLASSIFIED PP 12 Weekly Planning Rhythm 1100W read ahead slides posted to APAN CPF N3 Semi-Monthly Update 1200W MED WG Sun Mon Tues 1000W COMMS WG 1200W ENG WG 1300W FP WG Every other week Effective 22 FEB Wed Thurs 1300-1500W OPT VTC Fri Sat 1430W Comm Integration WG 1100W CA WG 1300W LOG WG UNCLASSIFIED 3 UNCLASSIFIED Planning Timeline AUG JUL JUN MAY Mid Planning Conference Initial Planning Conference CPF RFF FSLO Letter NGO Coordination (CPF N5) Final Transit Plan (CDS) APR EXORD PLANORD Interagency Coord (CPF N5) Partner Nations (CPF N5/C7F) MAR FEB Force Sourcing (CPFN3) JAN Meetings/Conferences (CPF/CDS) DEC NOV OCT SEP Mission Planning/CONOPS (CPF) MOU Letters Signed PN Invitation letters Final Initial Funding/Auths (CPF N5/N00F) Communications (CPF N6) Requirements Assessment (CA WG) Assessment plan Detailed CONOPS (CDS) PDSS/Advanced Echelon (CDS) Systems Country CONOPs PDSS Deployment (CDS) Advanced Echelon Deployment UNCLASSIFIED 4 UNCLASSIFIED ADF Planning Status General Planning • CJOPS Decision Brief for PP12 signed. Command • CMDR Ken Walters, RAN confirmed as Commander Australian Contingent. • Small number of ASNCE staff remain to be identified. Engineering • 12 engineers confirmed to participate as FIE in Indonesia. Medical • All Personnel for ADF Health PP12 positions identified. • Credentialing to follow. No Change UNCLASSIFIED 5 UNCLASSIFIED ADF Participation • Command Element – O-5 Commander and 4/5 support staff. • CIMIC – 2 personnel. • Engineering Section – 12 person section. – FIE Indonesia & SIE for remainder of mission. • Medical – Contribution of 20 personnel in each contingent. – Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines. – Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia. – HQJOC Health PP12 POC: • CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au No Change UNCLASSIFIED 6 UNCLASSIFIED PP12 RFI Tracker Number Status Date Req Responsible Question ADF-001 Closed 11 Nov 11 PACFLT Request a copy of the Indonesian PDSS itinerary ADF-002 Closed 11 Nov 11 PACFLT Status of Partner Nation invitation letter No Change UNCLASSIFIED Other 7 UNCLASSIFIED JSDF Planning Status • CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities Vehicles - JMSDF Ship LST“OOSUMI” - JASDF Aircraft(C-130 or KC-767×1) Medical team - Approximately 20~30 No Change UNCLASSIFIED 8 UNCLASSIFIED JSDF Planning Status • PDSS -Re-survey Philippines with U.S. member in MAR 5~MAR 9 • Humanitarian community in Japan - Recruit on 21 FEB • POC - PLANNING PRI: LCDR Haga : j3haga@js.mod.go.jp DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : j3yamaguchi_m@js.mod.go.jp - MED PRI: CDR Hayashizaki:j4hayashizaki@js.mod.go.jp SEC: MAJ Yamasaki:j4yamasaki@js.mod.go.jp - PA CDR Maeyama: j1maeyama@js.mod.go.jp No Change UNCLASSIFIED 9 UNCLASSIFIED JSDF Planning Status Number Status date WG Requests/Questions JPN -001 19 OCT PDSS Draft plan of PDSS in Philippine and Vietnam JPN-002 30 NOV PDSS Req. re-survey with US survey member in FEB or MAR. JPN-003 8 FEB OPS MERCY's arrival/departure port time at Calbayog and Vinh JPN-004 8 FEB CMO 1day seminar' s date,location,participant No Change UNCLASSIFIED Comments 10 UNCLASSIFIED NZDF Planning Status NZDF will deploy a multi-disciplinary team of 8 personnel for the duration of the deployment to Vietnam 10 – 24 Jul 12. Exact composition is to be finalised in due course but likely to be as follows with specialties to be advised: 2 x Health Planners 1 x Medical Officer 1 x Nursing Officer 1 x Dentist or Dental Hygienist 2 x Medics 1 x Environmental Health Officer Outline SOM: - Embark USNS MERCY in Subic Bay, Philippines on or prior to 6 July 12. - Conduct tasks as personnel embedded into appropriate health capability bricks. - Disembark at conclusion of Vietnam mission. - RTNZ via either Hanoi or Ho Chi Minh City. No Change UNCLASSIFIED 11 UNCLASSIFIED CPF FOPS Update - Manning Update - Approximately 70 billets being filled by FFC will be in 07MAR SDOB. - USARC will fill the 16 CA billets. - PACOM will task USARPAC in EXORD. UNCLASSIFIED 12 UNCLASSIFIED Medical Update • Transition to new DMOP – CAPT David Tanen • Medical Assessment: PI report being chopped. CAM cancelled. RMI will go forward, need to determine dates, team, etc. • Staffing – 97/623 billets remain “un-named” – reportedly filled, names have not been forwarded. 7 positions “unfillable” due to cross-reference with PDSS/ADVON (Gen surg X1, HCA/POMI/RSOI X1, Nurse Educator X 2, Vet X 2, Internist/CC = DMOP) • Credential requirements: Still being reviewed by PACFLT, latest from JAG is that we can provide requested information. • CONOPS – Medical Annexes PI, VN 90%, CAM, IND 75%. VET Annexes behind, vet now back from USAF ops. • MERCEX – SOE in place. OIC Notebook being developed. • RON – Hotel RON in IND and CAM discussed with MWG. Hotel reduces FHP risk, FP risk. PACFLT requesting data on RON requirements, similar to what ENG provided. Completed On-track Off-Track/Recoverable UNCLASSIFIED Off-Track not recoverable 13 UNCLASSIFIED Engineering Update Site Survey Philippines Cambodia Indonesia Vietnam Projects Recommended 3 schools & 1 medical clinic 3 health centers 3 health centers & 1 school 2 health centers SMEE Request P&E; Seawall Water; Bldg Design Seismic; Disaster Disaster; Safety Philippine Project Package preparation (ACB1 lead) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Engineering SMEE Plan. Completed On-track Off-Track/Recoverable UNCLASSIFIED Off-Track not recoverable 14 UNCLASSIFIED Logistics Update • Logistics WG held 6 Mar 12 • Logistics Resource Matrix Completed – Identifying Medical Life Support items for Indonesia and Philippines requiring contracted support • Funding – APRI, ORF, OCO on track • Pharmaceuticals and Consumables – Received 8 pallets initial MedSurge Consumables – Indonesia and Vietnam Estimated Contract Award April • Donation Material – Received 48 pallets from LDSC • Next Logistics WG meeting scheduled for 20 Mar 12 UNCLASSIFIED 15 UNCLASSIFIED PP12 Supply and Logistics Status FUNDING (7MAR12) Item / Task Status Action Date Req Notes APRI CPF/ SUPPO 5MAR12 - APRI ($1.7M of $1.9M required received) - $205K in queue earmarked for DLA MedSurge consumable procurement ORF C7F/ CDS-7/ SUPPO 1APR12 - ORF plan developed - Draft message completed pending CDS-7 review and approval OCO CPF/ SUPPO 15APR12 - Requirements data forwarded to CPF - Review in progress Completed On-track Off-Track/Recoverable UNCLASSIFIED Off-Track not recoverable 16 UNCLASSIFIED PP12 Supply and Logistics Status PHARMACEUTICALS and CONSUMABLES (6MAR12) Item / Task Status Action Date Req Notes Indonesia Load List SUPPO 31MAR12 - Estimated contract award April 2012 - DLA commenced initial purchase of standard consumable items - Initial MedSurge consumable items delivered 6 March Philippines Load List SUPPO 31MAR12 - Standard pharmaceutical items requisitioned - DLA commencing initial purchase of standard consumable items - Initial MedSurge consumable items delivered 6 March Vietnam Load List SUPPO 31MAR12 - Estimated contract award April 2012 - DLA commencing initial purchase of standard consumable items - Initial MedSurge consumable items delivered 6 March Cambodia Load List SUPPO 31MAR12 -Standard pharmaceutical items requisitioned -DLA commencing initial purchase of standard consumable items - Initial MedSurge consumable items delivered 6 March Completed On-track UNCLASSIFIEDOff-Track/Recoverable Off-Track not recoverable 17 UNCLASSIFIED PP12 Supply and Logistics Status DONATION MATERIAL (7MAR12) Item / Task Status Action Date Req Notes Load Plan MSC/ SUPPO 31JAN12 - Load plan developed and approved by MSC MERCY - 240 pallet maximum established Project Handclasp SUPPO 5APR12 - 40 pallets scheduled for delivery 15 MAR - Goal established at 60 pallets total LDSC SUPPO 5APR12 - 48 pallets received 6 MAR - 93 pallets total received - Weekly deliveries scheduled Worldwide VETs SUPPO 15MAR12 - 2 Pallets Received Completed On-track UNCLASSIFIEDOff-Track/Recoverable Off-Track not recoverable 18 UNCLASSIFIED PP12 CIS Information Systems Status (07MAR12) Item / Task Status Action Date Req Notes IT & Radio Operator Manning CPF N3/ CDS / 15MAR12 - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC Funding issue. - 4+Remote MEDCAP manning - IMEF providing 4 PERS/ 6 PRC-117 Radios Annex K / COMM Plan CPF/ C3F/CTF 15MAR12 -76/CDS - IAW NTTP 3-57 Navy HCA OPS and NWP 3-29 - Country CIS inventory and CONOPS Plan developed at MPC. - OPTASK COMMS will include daily plan based on CONOPS and Japanese ship COMMs capability BGAN SATCOM CPF N6/ CDS - Not required for PDSS. (17OCT11 CDS-7 N6 email). - OPTEST CPF BGANs (MAR12). - Develop CONOPS for BGAN use. - ADVON BGAN training by MERCY TBD Host Nation Spectrum Mgt C7F/CTF 01MAR12 -76 /CDS ENCAP CIS Requirements CDS Completed POSTMPC 15MAR12 - Awaiting C7F response to CDS-7 01FEB request for frequency assignments and restrictions for each host nation. Info rcvd 21FEB12. - CDS determine CIS requirements. On-track UNCLASSIFIEDOff-Track/Recoverable Off-Track not recoverable 19 UNCLASSIFIED PP12 CIS Information Systems Status (07MAR12) Item / Task Status Action Date Req Notes PAO Network CPF PAO/N6 / CDS/ MERCY 15MAR12 - Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only. - Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT ATO pkg in development at DMA. PAO assist in progress PN-NGO Business Center (SSC LANT CHARLESTON) CPF N6 APR12 / CDS /MERCY Partner Nation Interoperability CPF N6 / CDS POSTMPC - Identify JS OOSUMI (LST) CIS POC and CIS capability in progress - Develop CIS Interoperability Matrix in Annex K. Health Engagement Information System (HEIS) CIS WG/ CDS N6 TBD - HERS from MARFORPAC Experimental Center (MEC) is not available -Medical information collection is not a mission requirement. No further action required. Completed -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. - MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. Funding transfer to SPAWAR in progress - CDS procure printer consumables for entire mission. - IA/business rules provided CDS-7 N6 03NOV11. On-track UNCLASSIFIEDOff-Track/Recoverable Off-Track not recoverable 20 UNCLASSIFIED PP12 CIS Information Systems Status (07MAR12) Item / Task Action Date Req Notes Remote MEDDENCAP /CC Comms Arch CDS / CPF PREMPC - Draft CIS Element architecture and inventory under review at CDS-7 (20JAN12) - Completed at MPC. Host Nation MIL C4 PDSS OIC PDSS AAR - PDSS OICs for assessment action. - Training provided to Blue Team 21OCT11. Host Nation CIVIL Comms PDSS OIC PDSS AAR - PDSS OICs for assessment action. - Training provided to Blue Team 21OCT11. Remote Site US Mission CIS Assessment PDSS OIC/ AOIC PDSS AAR - JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance. - Command Center (CC) Comms assessment. - Training provided to Blue Team 21OCT11. PDSS CIS Comms CPF/ CDS PDSS OICs No Change Status Completed PREPDSS - Iridium Phones: CPF N6 issued phone to Blue OIC. - In country cell phones: MERCY to provide from PP10 mission phones. - Automated Data Collection (8 cell phones app) issued to OIC. On-track UNCLASSIFIEDOff-Track/Recoverable Off-Track not recoverable 21 UNCLASSIFIED PP12 CIS Information Systems Status (07MAR12) Item / Task Status Action Date Req Notes Knowledge Management /Data Protection CDS/ MERCY 7MAR12 - MEDCAP/CDS/Mission Data storage and protection Command Center Ashore CIS CDS PDSS AAR - Identify configuration and location in each country. - Completed at MPC IT SMEE Requests CDS PDSS AAR - PDSS determine scope (SYSADMIN, repair, training, etc.). - No IT SMEE were requested by the host nations SATCOM Requests C3F/ C7F/ CDS MAR12 - Standard USN process. Mission COMMs Readiness CDS / MERCY APR12 - Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite) Completed On-track UNCLASSIFIEDOff-Track/Recoverable Off-Track not recoverable 22 UNCLASSIFIED PP12 CIS Information Systems Status (07MAR12) Item / Task Action Date Req Notes FSET on MERCY CPF / MSC 13APR12 - Field Service Engineering Team (FSET) rqmt for San Diego to Guam cost estimate from SPAWAR received 16FEB12. SD-Guam -Funding transfer to SPAWAR in progress. End of Mission CIS Exit Plan CPF/ CDS TBD - Hardware: Transfer custody of loaned CIS items back to CPF -Data Exit Plan: TBD VHF Handheld Radios CPF/ CDS MAR12 -CDS determine required quantities ADVON CIS CDS MAR12 -Requirements determined at MPC. Under review at CPF N6/N3 Embarked Documentary Team CDS Ongoing -CDS determine requirements and set expectations -Afloat connectivity limited to NGO Business Center Rehearsal CIS CDS 01MAR12 -15FEB CDS requirements: Cell phones and 1 UHF voice net. No Change Status Completed On-track UNCLASSIFIEDOff-Track/Recoverable Off-Track not recoverable 23 UNCLASSIFIED Force Protection Update – USN Force Protection Asset Status • MESG1 Det Guam (24 EST, 24 Shore, 2 OIC & AOIC) – Travel Reqs nearly complete for FP Element – On The Horizon • EST Mercy FAM and Training (8-9MAR) – 24 EST Personnel participating in FP Scenarios • Mission Rehearsal Exercise (12-14MAR) – 24 EST Personnel participating in FP Scenarios • ADVON Travel Tracker Completion – Needed to complete APACS request – Due 30MAR12 – POC’s: Blue – LCDR Weatherup / LT Adams, Gold – LCDR Palacios / LT Nutting UNCLASSIFIED 24 UNCLASSIFIED Force Protection Update Pre-Deployment Travel Requirements ADVON/FIE SIE (Mil) • ISOPREP – Completed/validated by parent command within last 6 months – https://prmsglobal.prms.af.smil.mil/prms21 5/default.htm • ISOPREP – Completed/validated by parent command within last 6 months – https://prmsglobal.prms.af.smil.mil/prms21 5/default.htm • AOR location specific brief – Completed by parent command N2 or FPO • Level I ATFP (OCONUS) – NKO eLearning within last 6 months – https://wwwa.nko.navy.mil/portal/home/ • SERE 100 B • AOR location specific brief – Completed by embarked N2, NCIS, or FP OIC • Level I ATFP (OCONUS) – NKO eLearning within last 6 months – https://wwwa.nko.navy.mil/portal/home/ – NKO eLearning within last 18 months – https://wwwa.nko.navy.mil/portal/home/ • IATP / APACS – Completed by ADVON OIC/AOIC for ADVON and ENG OIC for FIE • • • SERE 100 B – NKO eLearning within last 18 months – https://wwwa.nko.navy.mil/portal/home/ https://iatp.pacom.mil/ https://apacs.dtic.mil/apacs/ UNCLASSIFIED 25 UNCLASSIFIED CAWG Update (29 FEB) Item / Task Status Action Date Req CJ-CMCC Concept Paper Dev CPF N5 15 FEB CMCC Battle Rhythm Sych DESRON 19 JAN Non-Medical SMEE CONOPS Draft Plan Operational Assessment Plan NGO and Partner Nation Engagement Process No Change CAWG 23 JAN CAWG MAR 12 CAWG / CPF N5 MPC UNCLASSIFIED Notes -Completed -Chops received and incorporated from DESRON, PP 09, 10, 11 reps, COE-DMHA (IHC) -CMCC concept document inputs received during MPC TTX. - Inputs submitted to DESRON. -Complete - Plan details will continue to be added, as possible, between now and ADVON deployment. However, CONOP finalization will not occur until ADVON. - Assessment WG has produced draft task list which will be socialized and refined during WGs. -Geared toward MOPs - 90% plan post MPC but add-ins will be ongoing. 26 UNCLASSIFIED CAWG Update (29 FEB) Item / Task PN Participation NGO Specialties Assignment Donation Plan No Change Status Action CAWG CAWG / MWG CAWG DESRON Date Req Notes 01 MAR 12 -Singapore will participate in VT only -Costa Rica drops out -Probably French add soon - Expect PN manning lists end of Feb Mid-March 01 MAR 12 UNCLASSIFIED Specialty requests are back from NGOs/PN and will distribute this list back to MTF for additional input, comments & requests. -95% details by 01 MAR - 90% by name by 15 MAR - Philippines and Cambodia donation lists with DESRON for approval - Indonesia and Vietnam lists still with USEMB 27 UNCLASSIFIED Projected HN/PN Participation by Mission Country (29 FEB 2012) Host / Partner Nation Indonesia Philippines Vietnam Cambodia Material / Platform Support Personnel Participation by Port SD HI GU ID RP RP VN KM GU HI SD POC LCDR Chris Giacomaro GiacomaroCM@state.gov FP, Engineers, Medical FP, Engineers, Medical LCDR Scott Alms AlmsSC@state.gov FP, Engineers, Medical LTC Wayne Turnbull TurnbullPW@state.gov FP, Engineers, Medical LTC Kristin Means MeansKA@state.gov CMDR Kenneth Walters: kenneth.walters@defence.gov.au SQNLDR Owen Gardner, owen.gardner@defence.gov.au. Australia Medical 15-20 PAX Engineer Section Canada Medical/Dental Japan JMSDF Ship Aircraft (C-130 or KC-767) Medical Team: 20-30 pax LCDR Haga : jj3haga@js.mod.go.jp New Zealand 8-12 PAX Medical Team MAJ Andrew Brooks andrew.brooks@nzdf.mil.nz Singapore Medical team Major Chow Weien: CHOW_Weien@starnet.gov.sg Thailand Medical, Engineers and CA Approx 15 Pax LCDR Jason Starmer starmer@jusmagthai.org 9 May 15 Pax 15 Pax 15 Pax 4 July 15 Pax 15 Pax 15 Pax 4 Sep CAPT Steve Merrll MerrillSR@state.gov ROK Chile Costa Rica 1 PAXMedical 1 PAX Medical No Change 1 PAX Medical UAE CAPT Lee Gagne LEE.GAGNE@forces.gc.ca 5 July 25 APR UNCLASSIFIED 24 July LCDR Julian Maldonado Julian.maldonado.cl@navy.mil LCDR David L Ricci riccidl@tcsc.southcom.mil CDR James C. Anderson MarbleAD@state.gov 28 UNCLASSIFIED Projected NGO Participation by Mission Country (29 FEB 2012) Host / Partner Nation Material / Platform Support Personnel Participation by Port SD HI GU ID RP RP VN KM GU HI POC SD LDS Medical, Engineering, SMEEs, Donations 35 57 51 67 Dr. Susan Puls PulsSu@lsdchurch.org UCSD PDS Medical, Engineering, SMEEs 51 53+ 54+ 50+ Dr. Irv Silverstein dsilverstein22@cox.net 16 16 16 16 6 6 7 6 Project Hope World Vets Medical , SMEES Veterinary, SMEEs UH Nursing Medical 5 5 4 4 UH Engineering Engineering 2 2 2 2 Project Handclasp Donations 0 0 0 0 Global Grins Donations 0 0 0 0 Vietnam Medical Assistance Program Medical Totals 139 134 Joselyn Miller joselyn.miller@globalgrins.org Nguyen Nguyen nguyen.nguyen@vnmap.org TBD 115 Lynn Bemiller lsbemiller@gmail.com Katie Horn katie@worldvets.org Kristine Qureshi kqureshi@hawaii.edu Ashish Babbar ashishbabbar@gmail.com LT Aron Rotklein aron.rotklein@navy.mil 145 In-Country NGOs Indonesia Help for Orphans(?) Hope World Wide No Change Philippines Vietnam Calbayog Rotary Club GIZ (TBD) UNCLASSIFIED Compassion Flower Vietnam Woman’s Union ASWHO Cambodia TDB 29 UNCLASSIFIED Public Affairs Update - Admin • Working to replace PA ADVON Lead for IND • Asst ADVON for VNM, KHM identified - Media Coordination • Coordinating Defense Logistics Agency (DLA) request to take B-roll, still photography of PP12 load-on and interview MERCY Suppo week of 23 APR. Purpose: Education videos and AFN spots UNCLASSIFIED 30 UNCLASSIFIED Public Affairs Update Item/Task Status Action Suspense Date Notes PAG CDS PA CPF PA TBD Draft to CDRE 15 DEC Routing will happen D-30 to 45 days Preparing MRX DC media trip/mission announcement CDS PA APR 2012 Coordinating draft concept w/ MSC and BUMED Public Affairs. PP Fact Sheet CDS PA, CPF PA 30 DEC Mission info to NAVINFO WEST for vetting Smartphone SOP CIWG, CPF Social Media 15 MAR Online presence/Social Media CDS PA, CPF PA 9 DEC Completed On-track Off-Track/Recoverable UNCLASSIFIED 07 MAR CPF PA telecon re: online presence/social media plans. Off-Track not recoverable 31 UNCLASSIFIED Public Affairs Update Item/Task Status Action Suspense Notes Date Dialogue initiated w/ MERCY on 04 JAN BGAN support- emergency use only, provided by CPF COMCAM Equipment requirements CDS PA, NPASE 31 MAR PO&AM inputs CDS PA, CPF PA 14 DEC Media Training Plan CDS PA 30 APR 05 MAR – Basic media/TV media training w/ MTF CO 12 MAR – MRX media prep w/ leadership COMREL purchase list CPF PA 24 FEB CPF PA commencing w/ purchase order Completed On-track Due to FOPS. PA-specific updates in progress Off-Track/Recoverable UNCLASSIFIED Off-Track not recoverable 32 UNCLASSIFIED PP12 Communication Integration • Identified initial list of communication “products” at MPC – Posters, gifts, backpacks, SMEE aids, etc. • Coordinating communication assessment support for PP12 (MAY – SEP 12) – Working with CPF N01H and N5 to develop assessment approach – Linguist candidates to support in-country media analysis, and CA/PA engagement • IND (1), TAG (3), VIET (2), CAMB (0) • CIWG will transition to the PAWG. UNCLASSIFIED 33 UNCLASSIFIED PP12 Communication Integration Item / Task Status Action Date Req Notes Stakeholder Analysis CIWG 15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec. Characterize Information Environment CPF N2/N39 15 NOV – 30 JAN -Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 100%, Philippines 100%. Communication Strategy/ Implementation Plan CPF N2/N39 31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan. Identify/Coordinate key messaging events CIWG 15 JAN - Identified; coordinating CIWG support: -- ETG Leadership Training -- MPC Assessment planning -- SLV support Develop messaging products CIWG/ CPF N2/N39, PA 15 APR - Identified initial information products to support mission execution. Researching feasibility, and working with mission SMEE coordinators to ID additional requirements; coordinating with PACOM, SOCPAC, USARPAC, in-country teams. Completed NO CHANGE On-track Off-Track/Recoverable UNCLASSIFIED Off-Track not recoverable 34 UNCLASSIFIED PP12 Communication Integration Item / Task Action Date Req Notes Develop communication MOE Indicators CIWG/ N2/N39 15 JAN - Draft indicators developed as part of overall PP12 assessment effort. Define Communication assessment methodology CPF N2/N39 30 JAN - Completed communication assessment framework and methodology for incorporation into overall PP12 assessment effort. Coordinate and monitor communication during execution CPF N2/N39 During PP12 - Identified initial monitoring requirements, resources and tools to support communication assessment, such as media analysis. Conduct communication assessment CIWG During PP12 - Not started. Develop AAR CPF N2/N39, PA 30 SEP - Not started. NO CHANGE Status Completed On-track Off-Track/Recoverable UNCLASSIFIED Off-Track not recoverable 35 Planning Timeline UPDATED: 07MAR12 36 UNCLASSIFIED Mission Commander Priorities • Country CONOPS Development – 29FEB: CONOPS and Medical/Eng Annexes forwarded to CPF (COMPLETE) – CONOPS Engineering Annex (COMPLETE) – CONOPS Medical Annex (IN PROGRESS) – CONOPS Veterinarian Annex (IN PROGRESS) – TBD: Post CONOPS to APAN (pending approval) • ADVON Composition / Notification – Composition approved by CPF – Notification in progress by OIC/AOIC • Collecting following information: contact info, passport, GOVCC, ATFP requirements, visas • Voyage Planning – CPF major sked change request approved (expect msg later this week) – MERCY transit plan 291731Z FEB 12 • CSFTP endorsement 011817Z MAR 12 • Endorsements remaining: C3F, CTF76, C7F UNCLASSIFIED 37 UNCLASSIFIED Mission Commander Priorities (continued) • MRX Planning – 08MAR: MRX planning TELCON (#3) • Participants: MTF MERCY, USNS MERCY, HSC 21, ENG, EST, CDS7: OPS, FP, Comms, & PAO reps – MRX Participant list finalized – All participants must be on MERCY messdecks on Monday, 12MAR at 0730-1200 for MRX pre-sail conference/briefs • Pre-deployment Briefings – 27MAR 1400 PST (272200ZMARR12) – C3F – 02APR 1630 PST (030030ZAPR12) – CTF76 (VTC) – 09APR 1630 PST (100030ZAPR12) – C7F (VTC) – TBD – CPF (13APR – proposed) • Concerns – Manning • Unfilled billets • 16x USA CA billets (351st) – JCSE funding – Timeline for dissemination of CONOPS on APAN to NGOs, PNs, HNs, etc for planning UNCLASSIFIED 38 UNCLASSIFIED Closing Questions/Comments • • • • • • • • • CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 • • • • • • • • UNCLASSIFIED 351st Civil Affairs Command DLA Troop Support - Pacific 30th NCR ETG HSC-21 DET 2 MCAST USNS MERCY CDS-7 39