Tracker Week, CERN, 20-24 Oct 2003
Salvatore Costa
INFN Catania
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003
Summary of recent TIB&TOB prod
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 2
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 3
Salvatore Costa - Catania
Firenze To Pd Santa Barbara
Tracker Week - Module Production 23 Oct 2003 4
Firenze To
Salvatore Costa - Catania
Bari Pd Pisa Santa Barbara
Tracker Week - Module Production 23 Oct 2003 5
Salvatore Costa - Catania
Santa Barbara
Tracker Week - Module Production 23 Oct 2003 6
AACHEN
Just completed pilot run for TEC with 10 R6 frames. Bonded and tested the 10 frames within two days. No problems with the P.A to sensor bondings. Had 1-2% failures (~5-8 liftoffs) during automatic bonding sensor-to-sensor. Investigating this with Hesse&Knipps.
BARI
Got 48 Hyb in Sep. Bonded APV-PA for 11. New PAs pose no bonding problems.
CATANIA
Both Hughes are back in operation and equipped with fresh wire, after fixing hw damage suffered in moving from old to new Dept. Building
Will begin bonding Test Structures, Modules after this TK Week
CERN
“Whiskers” still a problem in Bonding APVs to Planar PA with Delvotec).It appears that K&S
8090/8060 do not have this problem. So, UCSB OK.
FNAL has accepted to help in bonding TEC 2,5,6). Hybrid bonding at CERN is otherwise
OK. If FNAL does pick up 20% of PA-APV bonding, will need to bond about 24 hybrids per day instead of 35/day.
PISA
Showed Pull test results for Sensor qualification on 32 new Test Structures (16 STM and
16 Hamamatsu) .
– Over
898 channels total pull tested, FBL or SBL occurs on 16 strips ( 1,78 %)
– An overall summary of
199 Test Structures (145 STM and 54 Hamamatsu) indicates that over 5560 channels total pull tested, FBL or SBL occurs on 118 strips ( 2,12 %)
Tracker Week - Module Production 23 Oct 2003 Salvatore Costa - Catania 7
Reported on mechanical stress tests of proposed (now adopted) Hyb cable stiffener. 3 out of 4 Modules were retrofitted with stiffener and all 4 tortured with many different types of mechanical stress. Subsequently tested, the 3 with stiffener showed normal electric behavior, while in the one without 6/13 lines were lost, besides exhibiting evident cracks at optical inspection.
SANTA BARBARA
Received first Hybrids with Planar PA's, bonded, and didn't see any of the "whiskering" problem that Alan had found.
Received first 6-chip hybrids and bonded 8 of them. Also bonded 5 of the 4-chip hybrids.
(All the stereo hybrids received were already bonded).
Bonded 2 6-chip modules, 3 stereo modules.
All modules have been fully tested with ARCS and LT system
– Both pulsed and continuous LED tests taken
– ALL of 42 strips designated in DB as bad-CAC and isolated had regular test results
(passed)
– No problem seen with these channels
Also worked ( Tony ) on adding stiffener to Hybrid cable test also OK.
STRASBOURG
Working on Just received 15 modules of the ring 7.
VIENNA
Will need to adapt jig as soon as they receive Modules with new frame
ZURICH
Received 4 Modules which all failed test after ground bonding
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 8
Alan’s Comments on mod to TEC modules to avoid bond breakage
• TEC module design modified, adding a ceramic piece to be glued between Sen & PA spacer (and Sen-Sen). Ceramic piece and glue joint are exactly where one wants to support the module for bonding. Thus, bonding jigs must be modified. Alan would like to know how and how it works.
• TID modules may also have the same risk of bond breakage so some solution will have to be devised for them as well. Alan would like to know that solution and how it works.
Tracker Week - Module Production 23 Oct 2003 Salvatore Costa - Catania 9
Tracker Week, CERN, 20-24 Oct 2003
(a question from Bonding WG to Sensor experts)
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003
Recipe for strips to leave unbonded
• React only to bond immediately upstream of sensor with bad strip
• Skip (= leave unbonded)
– All bad IDIEL (considered pinholes)
( IDIEL_1_SEN_.POSITION_OF_BAD_STRIPS
)
– All Isolated bad CAC (believed to have high chance to develop into pinholes with irradiation)
( CAC100HZ_1_ SEN_.POSITION_OF_BAD_STRIPS
)
– All but lowest in a bad CAC chain (believed to represent shorts)
( CAC100HZ_1_ SEN_.POSITION_OF_BAD_STRIPS
)
CAC Example: 3 34 35 36 37 skip isolated 3, skip all but lowest in 34-37 chain, or: bond only 34
Tracker Week - Module Production 23 Oct 2003 Salvatore Costa - Catania 11
Isolated bad-CAC strips
Recently questioned, because:
• They should fail the Pinhole search with Karlsruhe’s LED system
• But some Italian Labs and UCSB have bonded them anyways in this initial Module Prod for investigation purposes and found no evidence of pinholes:
• >>>>>>>>>>>> LED test NEVER failed <<<<<<<<<<<<
We wanted to learn more on bad I_DIEL & bad C_AC strips
I’ve performed a comprehensive study of the bad strips…and…
as a result of this study, we are no longer confident on any part of our current rule to skip bad strips
So we are turning to Sensor experts for guidance!
Tracker Week - Module Production 23 Oct 2003 Salvatore Costa - Catania 12
Bad strips study
• In DB there are relevant data, in Tables IDIEL &
CAC100HZ, for 2427 Sensors
• For 7 Sensors, data are nonsense
2420 Sensors are included in this study
• For each of 2420 sensors, download from DB:
1) I_DIEL value (in nA) for all strips
2) List of bad strips for I_DIEL
3) C_AC value (in pF) for all strips
4) List of bad strips for C_AC
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 13
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 14
Bad strips study
Accounting: out of 2420 Sensors…
1.
Bad-I_DIEL strips are 2898 in total (~1.2 per Sensor in average)
2.
Bad-C_AC strips are 10251 in total (~4 per Sensor in average)
1.
Of these, 3707 are ‘isolated’, 6544 are ‘chain’ (‘shorted’)
2. Out of the 3707 isolated bad-C_AC strips:
1. 1146 (30%) are also flagged as bad-I_IDIEL
2. 2561 (70%) are not flagged as bad-I_IDIEL
Plot Distributions of:
1.
I_DIEL for good-I_DIEL strips (expect ~0)
2.
I_DIEL for bad-I_DIEL strips (expect >0, but… )
3.
‘relative’ C_AC for isolated bad-C_AC strips
(expect small values, <1)
3.
‘relative’ C_AC for chain bad-C_AC strips
(expect integer multiples, 2, 3,…, but… )
4.
IDIEL for isolated bad-C_AC strips which are also in bad-I_DIEL list
5.
IDIEL for isolated bad-C_AC strips which are not in bad-I_DIEL list
Tracker Week - Module Production 23 Oct 2003 Salvatore Costa - Catania 15
• Plotted for 869,158 strips
(approx 1700 Sensors)
• Extends to ~1 m
A but peaks near 0 as expected
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 16
• Plotted for 869,158 strips
(approx 1700 Sensors)
• 857,754 (99 %) are within
1 nA
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 17
• Plotted for 869,158 strips
(approx 1700 Sensors
• 742,388 (85 %) are within
0.1 nA
• ~560,000 (65%) have
I_DIEL=0.00
• There are a few negative values
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 18
I_DIEL for bad-IDIEL strips (1)
• 2400 Sensors
• 2898 bad-
IDIEL strips
• (~1.2/Sensor)
• Extends to
1.2x10
7 , but most are much lower
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 19
I_DIEL for bad-IDIEL strips (2)
• 2400 Sensors
• 2898 bad-IDIEL strips
• (~1.2/Sensor)
• 0<
I_DIEL <1.2x10
7 nA
• 1576 (54%)
1 m
A< I_DIEL
≤1mA
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 20
I_DIEL for bad-IDIEL strips (3)
• 2400 Sensors
• 2898 bad-IDIEL strips
• (~1.2/Sensor)
• 0<
I_DIEL <1.2x10
7 nA
• 1576 (54%)
1 m
A< I_DIEL
≤1mA
• 797 ( 27%)
0.1nA< I_DIEL
≤1 m
A
• A peak at ~100 nA
?
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 21
I_DIEL for bad-IDIEL strips (4)
• 2400 Sensors
• 2898 bad-IDIEL strips
• (~1.2/Sensor)
• 0<
I_DIEL <1.2x10
7 nA
– 1576 (54%)
1 m
A< I_DIEL
≤1mA
– 797 ( 27%)
0.1nA< I_DIEL
≤1 m
A
• 476 (16%) have ‘normal’
(=as 85% of good strips)
I_DIEL < 0.1nA !!!
Bond or not?
Tracker Week - Module Production 23 Oct 2003 Salvatore Costa - Catania 22
Relative C_AC for Isolated bad-CAC strips (1)
• 2400 Sensors
• 10251 bad-C_AC strips
• (~4/Sensor)
• 3707 Isolated
• (~1.5/Sensor)
• Extends from
-10000<
C_AC
<C_AC>
<2000 but most are much lower
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 23
Relative C_AC for Isolated bad-CAC strips (2)
• 2400 Sensors
• 3707 Isolated bad C_AC strips
• (~1.5/Sensor)
-10000<
C_AC
<C_AC>
<2000
• 3566 (96%)
<C_AC>
• Some negative values
• Peaks at ~0 and ~0.6
Bond or not?
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 24
I_DIEL for Isolated bad-CAC strips (1)
• 2400 Sensors
• 3707 Isolated bad C_AC strips
• (~1.5/Sensor)
• 1148 (30%) also in bad
I_DIEL list
• I_DIEL Distributions are similar to the whole bad-
I_DIEL ones in all scale ranges (as expected)
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 25
I_DIEL for Isolated bad-CAC strips (2)
• 2400 Sensors
• 3707 Isolated bad C_AC strips
• (~1.5/Sensor)
• 1148 (30%) also in bad
I_DIEL list
• I_DIEL Distributions are similar to the whole bad-
I_DIEL ones in all scale ranges (as expected)
Picked in bad IDIEL list
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 26
I_DIEL for Isolated bad-CAC strips (3)
• 2400 Sensors
• 3707 Isolated bad-
C_AC strips
• (~1.5/Sensor)
• 2561 (70%) not in bad
I_DIEL list
• I_DIEL Distributions are similar to the whole good-I_DIEL ones in all scale ranges
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 27
I_DIEL for Isolated bad-CAC strips (4)
• Out of the 2561 not in bad
I_DIEL list :
• 2556 (~100%)
0 < I_DIEL < 1nA
• 2358 (92%) have ‘normal’
0 < I_DIEL < 0.1nA
• Only 193 (8%) have
0.1nA < I_DIEL < 1nA
(not shown)
Bond or not?
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 28
Relative C_AC for Chain bad-CAC strips (1)
• 2400 Sensors
• 10251 bad-C_AC strips
• (~4/Sensor)
• 6544 Chain
• (~2.7/Sensor)
• Extends from
-200<
C_AC
<C_AC>
<1000 but most are much lower
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 29
Relative C_AC for Chain bad-CAC strips (2)
• 2400 Sensors
• 6544 Isolated bad C_AC strips
• (~2.7/Sensor)
• -200<
C_AC
<1000
<C_AC>
• 6508 (99%)
<C_AC>
• Expected integers (2,3,4…)
Some do, but most have <1 with distrib ~ Isolated:
Our rule that assumed them to be all shorts might be too naïve!
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 30
Relative C_AC for Chain bad-CAC strips (3)
• 2400 Sensors
• 6544 Isolated bad C_AC strips
• (~2.7/Sensor)
• -200<
C_AC
<1000
<C_AC>
5889 (90%)
<C_AC>
Neighbors, but ‘isolated’?
619 (10%)
<C_AC>
There is a peak at 2.5
Actually shorted?
Salvatore Costa - Catania Tracker Week - Module Production 23 Oct 2003 31
Summary & Request for guidance
1.
Strips in bad-IDIEL list:
16 % do not seem to have a bad I_DIEL: bond or skip?
2.
Isolated strips in bad-CAC list:
– They all seem to have bad C_AC (‘relative’ C_AC mostly <1)
– 30 % are also in bad-IDIEL list
– 70 % are not in bad-IDIEL list
– 92% of those not in bad-IDIEL list have indeed good I_DIEL, 8% slightly high I_DIEL, almost none outrageously high I_DIEL
– Those tested with LED pinhole search, all pass it
We wonder if we should bond these
3.
Chain strips in bad-CAC list:
– Only 10% of these seem to actually be shorted (‘relative’ C_AC >1)
– Most (90%) behave just like the isolated ones
We wonder if we should bond or skip these or treat them in a more sophisticated way, such as: compute relative C_AC, then
If <some threshold (1?), treat them the same way as the isolated
If > , apply the current rule for shorts i.e. bond only the 1 st in chain
In all cases we ask Sensor experts for guidance
Tracker Week - Module Production 23 Oct 2003 Salvatore Costa - Catania 32