Problem 9-17 Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec’s production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown. Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows: (a) Formulate and solve a linear programming model for this make-or-buy application. How many of each component should be manufactured and how many should be purchased? If required, round your answers to one decimal place. Let FM = number of frames manufactured FP = number of frames purchased SM = number of supports manufactured SP = number of supports purchased TM = number of straps manufactured TP = number of straps purchased Min s.t. 38 FM + 51 FP + 11.5 SM + 15.0 SP + 6.5 TM + 7.5 TP 3.5FM + 1.3 2.2 + SM 3.1 TM + 1.7SM FM 0.8 + FM FM + 0 + 1.7TM SM 1 FP SM + 1 SP TM + 1 TP ≤ 350 ≤ 420 ≤ 680 ≥ 0 ≥ 0 ≥ 0 FM, FP, SM, SP, TM, TP ≥ 0. Manufacture Purchase Frames 100 4900 Supports 0 10000 Straps 0 5000 (b) What is the total cost of the manufacturing and purchasing plan? When required, round your answer to the nearest dollar. 441200 $ (c) How many hours of production time are used in each department? Department (d) Hours of production time used Cutting 350 Milling 220 Shaping 3.10 hours hours hours How much should Frandec be willing to pay for an additional hour of time in the shaping department? 56.00 $ Another manufacturer has offered to sell frames to Frandec for $45 each. Could Frandec (e) improve its position by pursuing this opportunity? Why or why not? The input in the box below will not be graded, but may be reviewed and considered by your instructor. The 45.00 will minimize the slack utilizing all the resources for cutting and shaping and also reduce the cost to 411621 saving 29,579 in cost