MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION Program Quality Assurance Services COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Charter School or District: Watertown CPR Onsite Year: 2011-2012 Program Area: Special Education All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report dated 09/06/2012. Mandatory One-Year Compliance Date: 09/06/2013 Summary of Required Corrective Action Plans in this Report Criterion SE 2 Criterion Title Required and optional assessments SE 3 Special requirements for determination of specific learning disability Transfer of parental rights at age of majority and student participation and consent at the age of majority IEP Team composition and attendance SE 7 SE 8 SE 9 SE 14 Timeline for determination of eligibility and provision of documentation to parent Review and revision of IEPs SE 18B Determination of placement; provision of IEP to parent CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Criterion SE 20 Criterion Title Least restrictive program selected SE 29 SE 41 Communications are in English and primary language of home Procedures for approved and unapproved out-of-district placements Instructional grouping requirements for students aged five and older Age span requirements SE 43 Behavioral interventions SE 46 Procedures for suspension of students with disabilities when suspensions exceed 10 consecutive school days or a pattern has developed for suspensions exceeding 10 cumulative days; responsibilities of the Team; responsibilities of the district Appropriate special education teacher licensure SE 37 SE 40 SE 51 SE 52 SE 55 Appropriate certifications/licenses or other credentials -related service providers Special education facilities and classrooms CR 6 Availability of in-school programs for pregnant students CR 7 CR 7B Information to be translated into languages other than English Structured learning time CR 10 Anti-Hazing Reports CR 10A Student handbooks and codes of conduct CR 16 CR 23 Notice to students 16 or over leaving school without a high school diploma, certificate of attainment, or certificate of completion Use of physical restraint on any student enrolled in a publicly-funded education program Comparability of facilities CR 25 Institutional self-evaluation CR 17A CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Not Implemented COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 2 Required and optional assessments Partially Implemented Department CPR Findings: The review of student records and staff interviews indicated that the district does not conduct all required educational assessments (the Educational Status Assessments A and B) which contain information regarding the student's historical progress in the general curriculum and a current teacher's evaluation of the student's memory, ability to participate in class, communicate and interact with peers and the student's current classroom progress. The review of student records also indicated that not all consented to optional assessments were conducted by the district; specifically classroom observations. Description of Corrective Action: Will conduct training for all special education staff on 9/19/2012 on conducting the required educational assessments. Education Status Assessments A will be completed by a guidance counselor. Teachers will complete the SLD 4 Form, the Classroom Observation Checklist for the appropriate grade level in place of Educational Assessment Part B. The SLD 4 Form includes all of the information asked for in the Educational Assessment Part B Form. The importance of completing all consented to optional assessments including classroom observations will also be covered in the training. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services and Coordinator of Guidance and Completion: Assessment 09/20/2012 Evidence of Completion of the Corrective Action: Agendas, copies of handouts, and sign in sheets. Description of Internal Monitoring Procedures: Central Office will sample 12 evaluations each month, 2 from each school, including the preschool in the 2012-2013 school year to monitor if the files include Education Status Assessments A and the SLD 4 for the appropriate grade level (SLD 4 in place of the Educational Assessment Part B). These files will also be checked to make sure they contain all optional assessments that were consented to. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 2 Required and optional assessments Corrective Action Plan Status: Approved Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to train staff on completing required and optional assessments, as well as any optional assessments consented-to by parents. The Department also accepts the corrective action of conducting an internal record review of files to ensure that the noncompliance regarding this criterion has been remedied. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the staff training conducted on September 19, 2012, including attendance (with the name and role), agenda, and any training materials. Also submit the dates in which the Educational and other consented-to assessments were conducted for the students whose names were provided to the district. Provide the initials of each student along with the dates that the assessments were completed. This progress report MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 3 is due November 19, 2012. In addition, the district will conduct an internal record review post the 9/19 training. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be noncompliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 4 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 3 Special requirements for determination of specific learning Partially Implemented disability Department CPR Findings: The review of student records and staff interviews indicated that when the district evaluates a student suspected of having a specific learning disability, the IEP Team did not always complete a written determination as to whether the student has a specific learning disability. Description of Corrective Action: Team Chairs will be trained to complete SLD 1, 2, 3, 4 and 28M/10 when a child is found to have a specific learning disability. The training will take place on 9/19/2012. Title/Role(s) of responsible Persons: Expected Date of Team Chairs Completion: 09/20/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, participant attendance sheets. Description of Internal Monitoring Procedures: Central Office will check 14 new IEPs, 2 from each school in the system and 2 out of district each month to assess if those for children with specific learning disabilities include all the necessary SLD forms. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 3 Special requirements for Status Date: 10/04/2012 determination of specific learning disability Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to train staff regarding the required SLD forms, as well as the need for the Team to complete a written determination to be included in the student's file. The Department also accepts the corrective action of conducting an internal record review of files to ensure that the noncompliance regarding this criterion has been remedied. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the staff training conducted on September 19, 2012, including attendance (with the name and role), agenda, and any training materials. This progress report is due November 19, 2012. In addition, the district will conduct an internal record review post the 9/19 training of files in which SLD determinations were discussed and documented. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 5 and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 6 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 7 Transfer of parental rights at age of majority and student Partially Implemented participation and consent at the age of majority Department CPR Findings: Student records and staff interviews indicated that the district does not always document that the district informed the student and the parent one year before the student reaches age 18 of the student's right at the age of majority to make all decisions concerning special education programs and services. The review of student records also indicated that upon reaching the age of 18, the district did not always document those instances in which the student's decision was to share or delegate the educational decision-making with the parent. Description of Corrective Action: Director of Student Services will train Team Chairs and Case Managers at WHS and the Out-of-District Coordinators on the documentation of the notification of students and parents regarding the student's right at the age of majority to make all decisions concerning special education programs and services. Central Office will send out letters to all students’ turning 17 in the school year 2012-2013 and their parents regarding the student's rights at age of majority (18) to make decisions regarding their educational programs and services. The month students turn 18 Central Office will send out Age of Majority Letter to students and their parents asking students and their parents to sign the age of majority letter and document if they are going to share or delegate educational decision making with their parents. Central Office will track the return of these letters signed. The Team Chair at WHS and Case Managers at WHS will discuss a student's rights at the age of majority at their team meetings in the years they are seventeen and eighteen years old. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services, Team Chair and Case Managers at Completion: WHS, and Out-of-District Coordinators 09/20/2012 Evidence of Completion of the Corrective Action: Files of all the students turning seventeen in school year 2012-2013 will contain a copy of the letter sent to students and their parents informing them that at age 18 the student's will have the right to make all decisions regarding special education programs and services. A copy of the age of majority letter and documentation if students are going to share or delegate educational decision making with their parents is in the files of all students turning 18 school year, 2012-2013. Description of Internal Monitoring Procedures: Central Office will keep a list of all students turning seventeen and eighteen school year 2012- and 2013 and the list of students returning their age of majority letters to the district and the date of return. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 7 CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 7 Transfer of parental rights at age of Status Date: 10/04/2012 majority and student participation and consent at the age of majority Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to train staff regarding the requirement to inform all students and parents of all decision-making rights and options one year prior to the student's 18th birthday. The Department will also require the district to conduct an internal record review to ensure that the noncompliance regarding this criterion is remedied. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the staff training, including the date, attendance (with the name and role), agenda, and any training materials. Also submit the dates and documentation of students 17 years and older who were informed of their decision making rights and whose names were provided to the district. Provide the initials of each student along with the dates that these notifications were sent. This progress report is due November 19, 2012. In addition, the district will conduct an internal record review post-training for files in which students were 17 years of age. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 8 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 8 IEP Team composition and attendance Partially Implemented Department CPR Findings: Student records and staff interviews indicated that a regular education teacher was not always present at the IEP Team meeting when the IEP Team anticipated that the student would participate in the regular education program. Student records also indicated that students were not always invited to IEP Team meetings despite the fact that the purpose of meetings was to discuss transition services once the student turned 18. Description of Corrective Action: Director of Student Services will train all staff on the need to have regular education teachers and students, beginning at age 14 at IEP team meetings. Training will also provide Team Chairs and Case Mangers with a copy of the student invitation to all IEP meeting after the student turns 14. Director of Student Services will also inform building principals that regular education teachers are legally required and important contributors to IEP Team meetings and request their support in providing coverage for regular education teachers as necessary. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services, Team Chairs, Case Managers, Completion: Building Principals 09/20/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, participant sign in sheets. Copy of memo sent to principals on the importance of regular education teachers’ participation in IEP Team meetings. A copy of the student invitation will be maintained in student files. Description of Internal Monitoring Procedures: Secretary for Student Services will check all IEPs and generate a list of how many IEPs in each school have general education teachers participating and how many do not. The Director of Student Services will send the monthly reports to each principal. Secretary of Student Services will monitor the invitations sent to students over age 14 and notify Team Chairs and Case Mangers if they forgot to send an invitation. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 8 IEP Team composition and Status Date: 10/04/2012 attendance Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to train staff on the requirement to invite all students age 14 and older to their IEP meetings and, when appropriate, regular education teachers. The Department also accepts the district's corrective action of monitoring special education students who are 14 and older and require that they be invited to their IEP meetings. The Department will also require the district to conduct an internal record review to ensure that the noncompliance regarding this criterion in remedied. Department Order of Corrective Action: Required Elements of Progress Report(s): MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 9 Please provide evidence of staff training, including the date, attendance (with the name and role), agenda, and any training materials. This progress report is due November 19, 2012. In addition, the district will conduct an internal record review post-training for files in which the student was fourteen years of age and older, as well as for an additional set of files in which the student is or may be involved in a regular education program (at all levels). Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 10 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 9 Timeline for determination of eligibility and provision of Partially Implemented documentation to parent Department CPR Findings: The review of student records and staff interviews indicated that the district did not always complete assessments within the 30-day timeline nor did school personnel provide the proposed IEP and placement to the parent of eligible students within 45-days after receiving the parent's written consent to an initial evaluation or re-evaluation. Description of Corrective Action: The Coordinator of Guidance and Assessment is meeting with Team Chairs and Psychologists to create testing schedules which will result in assessments being completed within the 30 day timeline. Team Chairs will schedule meetings around those time lines so that a proposed IEP and placement will be provided to parents within 45 days. Title/Role(s) of responsible Persons: Expected Date of Coordinator of Guidance and Assessment, Team Chairs, Completion: Psychologists, Director of Student Services 09/20/2012 Evidence of Completion of the Corrective Action: Assessments will be completed within 30 days and parents will have proposed IEPs within 45 days of the parent's written consent to an initial evaluation or re-evaluation. Description of Internal Monitoring Procedures: Team Chairs will submit monthly compliance reports to the Director of Student Services. The compliance reports will track signed referrals and the number of evaluations completed within the 30 days, as well as how many IEPs and placements are provided to parents within 45 days. The Director of Student Services will generate quarterly reports to the Coordinator of Guidance and Assessment and to Team Chairs summarizing the compliance data from each school. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 9 Timeline for determination of Status Date: 10/04/2012 eligibility and provision of documentation to parent Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action that Guidance and Team Chairs meet and create a system to ensure that the appropriate timelines are being met for both completing assessments and conducting IEP meetings. The Department also accepts the district's monitoring plan regarding assessments and timelines, but will require that it conducts an internal record review to ensure that the noncompliance regarding this criterion is remedied. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the Guidance and Team Chair meetings that were conducted, including the date, attendance (with the name and role) and agenda. Also include any samples of templates and tools created out of these meetings that will be used to remedy the non-compliance. This progress report is due November 19, 2012. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 11 In addition, the district will conduct an internal record review after the November Progress Report submission of records including initials and re-evaluations to ensure that timelines spanning from parental consent through the conducting of the IEP meeting were met in accordance with the criterion. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 12 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 14 Review and revision of IEPs Partially Implemented Department CPR Findings: The review of student records and staff interviews indicated the procedural misuse of amendments for a change in placement and extending annual review timelines. The review of student records indicated that annual review meetings were not always held on or before the anniversary dates of the IEP. Description of Corrective Action: The Director of Student Services will provide training to Student Services staff on the correct use of amendments and the requirement for annual reviews to be held on or before the anniversary dates of the IEP. Team Chairs and Case Managers will be asked to develop a schedule annual review for the whole year in the fall to ensure annual reviews meet time lines and are distributed evenly though out the year. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services, Team Chairs, Case Managers, OutCompletion: of-District Coordinators 09/20/2012 Evidence of Completion of the Corrective Action: Agendas, handouts, sign in sheets for training. Amendments will only be used for very minor changes in the IEP. amendments will not be used for a change in placement or to extend annual review time lines. Annual review meetings will be held on or before the anniversary dates of the IEP. Description of Internal Monitoring Procedures: Amendments that are sent to Central Office for a change in placement or extending annual review time lines will be sent back to Team Chairs and Case Managers for resubmitting in the correct format. A change in placement will require generating a new IEP. Amendments to extend the annual review time lines will be sent back with a reminder that annual review time lines must be met - they cannot be extended. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 14 Review and revision of IEPs Corrective Action Plan Status: Approved Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to train staff regarding the correct use of amendments and the requirement for annual reviews. The Department also accepts the district's monitoring plan regarding amendments and annual timelines, but will require that it conducts an internal record review to ensure that the noncompliance regarding this criterion is remedied. The Department also accepts the district's monitoring plan regarding annual review timelines, but will require that it conducts an internal record review to ensure that the noncompliance regarding this criterion is remedied. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the staff training, including the date(s), attendance (with the name and role), agenda, and any training materials. Also, while the misuse of amendments to extend IEP annual timelines is being addressed through district training, it MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 13 will be necessary for the district to submit the dates when these overdue IEP Teams ultimately met. Provide the initials of each student along with the dates that the IEP meetings were conducted. This progress report is due November 19, 2012. In addition, the district will conduct an internal record review post-training of the files in which amendments were used. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 14 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 18B Determination of placement; provision of IEP to parent Partially Implemented Department CPR Findings: The review of student records and staff interviews indicated that the district does not provide the parent with the proposed IEP immediately following the development of the IEP. Description of Corrective Action: Staff will be trained on the use of the Watertown Public Schools, Special Education Services, Team Meeting Summary Form or the use of a draft IEP. The expectation is that staff will use the form to summarize decisions made at the Team Meeting. The completed Form will include a summary of the decisions made in the meeting in relation to eligibility, types and amounts of services to be included on the service grid, accommodations, and a statement on the major goal areas. The Form will be completed and signed by the Team Chair or Case Manager and given to the parents at the conclusion of the meeting. Alternately a draft IEP can be brought to the meeting and modified at the meeting based on Team decisions and sent home with the parent(s). Title/Role(s) of responsible Persons: Expected Date of Director of Student Services, Team Chairs, Case Managers Completion: 09/20/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, participant sign in sheets from training on 9/20/2012. Team Chairs, Case Managers & Student Services Staff will provide parent(s) with the proposed IEP and N1 letter within 3 to 5 days of the Team Meeting or within 10 school days if a Team Meeting Summary Form was given out to parent at the IEP meeting. Description of Internal Monitoring Procedures: Each month 14 student records will be reviewed, 2 from each school and 2 from out-ofdistrict placements records with IEPs that were generated in the previous month. The review will assess if there are completed Team Meeting Summary Forms in the files and if the IEPs are sent to the parents within 10 school days of the IEP meeting. If there are no Team Meeting Summary Forms reviewers will assess if the IEPs were sent to the parents within 3 to 5 school days. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 18B Determination of placement; Status Date: 10/04/2012 provision of IEP to parent Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to train staff on the requirement for providing the parent with two copies of a proposed IEP immediately following the development of the IEP. The Department also accepts the corrective action of conducting a monthly internal record review of files to ensure that the noncompliance regarding this criterion has been remedied. Department Order of Corrective Action: Required Elements of Progress Report(s): MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 15 Please provide evidence of the staff training conducted on September 20, 2012, including attendance (with the name and role), agenda, and any training materials. This progress report is due November 19, 2012. In addition, the district will conduct an internal record review post the 9/20 training of files in which IEP meetings were conducted and the parent was provided with two copies of the proposed IEP immediately following the development of the IEP. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 16 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 20 Least restrictive program selected Partially Implemented Department CPR Findings: The review of student records indicated that when a student is removed from the general education classroom, the IEP Team does not always state on the IEP why the removal is considered critical to the student's program and the basis for its conclusion that the education of the student in a less restrictive environment, with the use of supplementary aids and services, could not be achieved satisfactorily. Description of Corrective Action: Team Chairs and Case Managers will be trained on the need to include documentation in all IEPs for students who are removed from the general education classroom and placed in a more restrictive environment. Documentation must include why removal is critical to the student's program and why the Team concluded that the student could not be educated in a less restrictive environment with supplementary aids and services. Title/Role(s) of responsible Persons: Expected Date of Team Chairs and Case Managers Completion: 09/20/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, participant sign in sheets. Description of Internal Monitoring Procedures: Student Services Staff will monitor incoming IEPs of all students in substantially separate classrooms for some portion of the day for the inclusion of this information in the IEP. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 20 Least restrictive program selected Corrective Action Plan Status: Approved Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to train staff on the need to document in the non-participation justification statement appropriate information regarding removal of the student from the general education classroom. The Department also accepts the district's monitoring plan of special education students who are removed from the general education classroom. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the staff training, including the date(s), attendance (with the name and role), agenda, and any training materials. This progress report is due November 19, 2012. In addition, the district will conduct an internal record review post-training to determine whether the non-participation justification statement is completed as required. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring, the district must maintain the following MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 17 documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 18 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 29 Communications are in English and primary language of Partially Implemented home Department CPR Findings: Student records did not always contain translated written communications (IEPs, progress reports and notices to parents) when translations were necessary because the primary language of the home was other than English. Description of Corrective Action: The Director of Student Services will train staff on the need to have interpreters at meetings and documents translated if the primary language of the home is other than English on September 19, 2012. The Director of Student Services will meet with the Coordinator of ELL to create a form asking parents if they need interpreters for meetings or to have materials translated. These forms will be sent home with all consent to evaluation forms if a student's IEP indicates that the primary language in the home is other than English. The forms will be translated into several languages. The forms for parents to fill out requesting interpreters and translations will be sent out from Central Office. All requests for interpreters and translation will be communicated to the Team Chairs and Case Managers. The procedure for requesting interpreters at meetings and submitting written materials for translation will also be clarified at the training on September 19, 2012. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services, Team Chairs, Case Managers, and Completion: Coordinator of ELL 09/20/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, sign in sheets. Description of Internal Monitoring Procedures: In June Central Office staff will review 14 consents to evaluation that came in for the 2012-2013 school year in which the Primary Language of the Parent/Guardian is not English. They will check to see if the form requesting that parents indicate if they would like interpreters at meeting, and documents translated has been completed and signed by the parent. They will also check to see if the parent has indicated that they need an interpreter and translated documents if an interpreter signed off on the attendance sheet and if there are translated documents in the file. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 29 Communications are in English and Status Date: 10/04/2012 primary language of home Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to train staff regarding the need to provide translations of important documents, as well as interpreters, when requested by families. The Department also accepts the district's corrective action of monitoring translation needs of special education students and their families through the tracking of the newly created request forms and any consent-to-test referrals that come into the district. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 19 The Department will also require the district to conduct an internal record review to ensure that the noncompliance regarding this criterion in remedied. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the staff training conducted on September 19, 2012, including attendance (with the name and role), agenda, and any training materials. Also, for those names that were provided to the district in which English is not the primary language spoken in the home and translation was required, submit evidence that written communications such as IEPs, progress reports, and notices to parents, were translated. Provide the initials of each student along with copies of the translated materials. This progress report is due November 19, 2012. In addition, the district will conduct an internal record review post-training of the files in which parents are limited English proficient and require translations. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 20 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 37 Procedures for approved and unapproved out-of-district Partially Implemented placements Department CPR Findings: While contracts indicated that there are plans to monitor all out-of- district students, student records did not always have evidence of the actual monitoring activities in the files of every out-of-district student. Description of Corrective Action: The Director of Student Services will meet with the Out-of-District Coordinators on 9/13/2012 to review the district's responsibility to monitor services and programs provided by out-of-district placements. The district is also responsible for ensuring documentation of monitoring visits is placed in each student files for review. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services and the Out-of-District Coordinators Completion: 09/13/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, and sign in sheets for meeting on 9/13/2012. Description of Internal Monitoring Procedures: In January Central Office staff will review the files of 10 out-of-district students who have had Team Meeting in the fall to assess if the student's folder contains a completed monitoring form current for the 2012-2013 school year. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 37 Procedures for approved and Status Date: 10/04/2012 unapproved out-of-district placements Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action that the Director of Student Services and Out-of-District Coordinators met on 9/13/2012 to review the district's responsibility to monitor out-of-district placements. The Department also accepts the district's corrective action that an internal record review be conducted to ensure that monitoring of out-of-district placements is being conducted, documented and contained in the student file. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the staff meeting with the Director of Student Services and the Out-of District Coordinators that was conducted on September 13, 2012, including attendance (with the name and role), agenda, and any training materials. Also submit evidence of monitoring plans that were conducted and placed in student files for the students whose names were provided to the district. Provide the initials of each student along with the dates that the monitoring took place and a copy of the actual monitoring activity. This progress report is due November 19, 2012. In addition, the district will conduct an internal record review post the 9/13 meeting of out-of-district student files. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 21 any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 22 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 40 Instructional grouping requirements for students aged five Partially Implemented and older Department CPR Findings: District documentation and interviews indicated that in Watertown Middle School's Learning Support substantially separate program, two of the Math instructional groupings, one in grade 6 and one in grade 7, exceed the regulatory group sizes. Description of Corrective Action: The district has hired an additional special education teacher at WMS this year. Training for all Student Services staff regarding group size for instructional groupings will take place at the training on 9/19/2012. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services, Secondary Special Education Completion: Coordinator 09/20/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, sign in sheets. Description of Internal Monitoring Procedures: The Director of Students Services and the Secondary Special Education Coordinator will check all instructional groupings for group sizes against the regulations for group size. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 40 Instructional grouping Status Date: 10/04/2012 requirements for students aged five and older Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action that it will hire an additional special education teacher to bring instructional groupings into compliance. The Department also accepts the district's proposed corrective action to train staff on the regulations regarding group size for instructional groupings. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the staff training, including the date(s), attendance (with the name and role), agenda, and any training materials. This progress report is due November 19, 2012. Submit proof of certification for the newly hired special educator. This progress report is due November 19, 2012. Submit the class rosters for the substantially separate grade 6 and grade 7 math instructional groupings in the Watertown Middle School's Learning Support program. Submit the list of students (by initials), the names of the teachers and the names of the paraprofessionals. Submit this information for November 19, 2012. Progress Report Due Date(s): 11/19/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 23 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 41 Age span requirements Partially Implemented Department CPR Findings: District documentation indicated that there are two instances in which the age of the youngest and oldest child in an instructional grouping differs by more than 48 months and that a written request for approval of a wider age range has not been submitted to the Department. One is an adaptive physical education instructional grouping of the LEAP program, a substantially separate program at Watertown High School. The other instructional grouping is the Learning Support substantially separate program at the Cunniff Elementary School. Description of Corrective Action: The Director of Student Services will conduct training to all staff on September 19 regarding the regulations for age span requirements and the need if so, of a written request for approval of a wider age range being submitted to the Commissioner of Education. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services & Coordinator of Secondary Completion: Education 09/20/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, sign in sheets. Description of Internal Monitoring Procedures: Checking of age span for all the instructional groupings annually. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 41 Age span requirements Corrective Action Plan Status: Partially Approved Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: While the Department accepts the district's corrective action and recognizes the need for staff training regarding age span requirements, the district's corrective action does not address the specific instances cited at the High School and Cunniff Elementary School. Department Order of Corrective Action: Please submit evidence that the district has applied to the Department of Elementary and Secondary Education for a wider age span waiver for both the Leap Program and Learning Support Program, if needed, for the 2012-2013 school year. Required Elements of Progress Report(s): Please provide evidence of the staff training conducted on September 19, 2012, including attendance (with the name and role), agenda, and any training materials. This progress report is due November 19, 2012. Please submit the class rosters with the initials of students and dates of birth for the APE instructional grouping of the LEAP program and the substantially separate program at Watertown High School. Provide evidence that the district has applied to the Department of Elementary and Secondary Education for an age span waiver, if needed, along with a copy of the approval. This progress report is due November 19, 2012. Progress Report Due Date(s): 11/19/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 24 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 43 Behavioral interventions Partially Implemented Department CPR Findings: See SE 46. Description of Corrective Action: Training to all staff will be provided on September 19, 2012 regarding the need for Functional Behavioral Assessments and the need to develop a behavioral intervention plan when a student's behavior is determined to impede the student's learning or the learning of others. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services, Team Chairs, Integrated Services Completion: Program staff 09/20/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, sign in sheets. A list of staff members who can conduct Functional Behavioral Assessments will be developed for each school. Description of Internal Monitoring Procedures: Team Chairs and Integrated Services Program staff will track student's whose behavior is thought to be impeding the learning process and they will be referred for a functional behavioral assessment. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 43 Behavioral interventions Corrective Action Plan Status: Approved Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: See SE 46 Department Order of Corrective Action: Required Elements of Progress Report(s): See SE 46 Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 25 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 46 Procedures for suspension of students with disabilities Partially Implemented when suspensions exceed 10 consecutive school days or a pattern has developed for suspensions exceeding 10 cumulative days; responsibilities of the Team; responsibilities of the district Department CPR Findings: Student records and staff interviews indicated that when district personnel, the parent, and other relevant members of the IEP Team conducted manifestation determinations for students whose suspensions exceeded ten consecutive or cumulative school days and it was determined that the behavior was a manifestation of the disability, the IEP Team did not always complete a functional behavioral assessment nor did it always create a behavioral intervention plan to address the behavior. Student records, documentation and staff interviews also indicated that the district sometimes placed students on its own authority in an interim alternative educational setting for up to 45 days in response to discipline related behaviors/suspensions and not due to behaviors involving weapons, illegal drugs, another controlled substance or the infliction of serious bodily injury on another person while at school or a school function. Description of Corrective Action: Training will take place on September 19, 2012 regarding the need to complete a Functional Behavioral Assessment and the creation of a behavioral intervention plan well before a student with disabilities approaches being suspended 10 consecutive or cumulative days. Training will clarify that interim 45 day placements can only be used for in cases in which the student carries a weapon to school; or possesses or sells illegal drugs or controlled substances while at school or a school function: or causes serious bodily injury upon another person at school, on school premises, or at a school function. Title/Role(s) of responsible Persons: Expected Date of Team Chairs, Integrated Services Staff, Out-of-District Completion: Coordinators 09/19/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, sign in sheets. Description of Internal Monitoring Procedures: Integrated Services Staff and Team Chairs will track students suspensions, when students have 3 suspensions a referral for a Functional Behavioral Assessment will be made and a Behavioral Intervention Plan developed so that students are helped to avoid reaching the ceiling of 10 suspensions and requiring a Manifestation Determination Meeting. The Out-of-District Coordinators will request private schools and collaboratives to refer students for an FBA after 3 suspensions. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 26 CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 46 Procedures for suspension of Status Date: 10/04/2012 students with disabilities when suspensions exceed 10 consecutive school days or a pattern has developed for suspensions exceeding 10 cumulative days; responsibilities of the Team; responsibilities of the district Basis for Partial Approval or Disapproval: The Department accepts the district's corrective action that it will train staff on the need to complete a Functional Behavior Assessment and create a Behavioral Intervention Plan before a student with disabilities approaches 10 consecutive or cumulative days of suspension. The Department also accepts the district's corrective action that it will train staff on the appropriate use of interim 45-day placements. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of the staff training conducted on September 19, 2012, including attendance (with the name and role), agenda, and any training materials. This progress report is due November 19, 2012. In addition, the district will conduct an internal record review post-training of files in which multiple suspensions led the district to conduct a Functional Behavioral Assessment and, if applicable, a Behavioral Intervention Plan. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be noncompliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due February 4, 2013. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 27 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 51 Appropriate special education teacher licensure Partially Implemented Department CPR Findings: District documentation and staff interviews indicated that one of the special education teachers at the Cunniff Elementary School is not licensed in Special Education and has not received a waiver from the Department of Elementary and Secondary Education. Description of Corrective Action: Training will take place on 9/19/2012 regarding the need for appropriate special education teacher licensure when hiring staff. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services, Director of Personnel Completion: 09/20/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, sign in sheets. Description of Internal Monitoring Procedures: Both the Director of Student Services and the Director of Personnel will ask candidates for the appropriate special education teacher licensure when hiring staff. If need be, a waiver must be requested from the Department of Elementary and Secondary Education before the candidate is hired. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 51 Appropriate special education Approved teacher licensure Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: While the Department accepts the district's corrective action and recognizes the need for staff training regarding special educator licensure, the district's corrective action does not address the specific teacher cited at the Cunniff Elementary School who was found to be not licensed, nor on a waiver. Department Order of Corrective Action: The district must submit evidence that the special education teacher cited at the Cunniff Elementary School as not being licensed or on a waiver has now obtained a special educator license or a waiver approved by the Department of Elementary and Secondary Education. Required Elements of Progress Report(s): Please submit a copy of the special education teacher's licensure or waiver that was issued by the Department of Elementary and Secondary Education. This progress report is due by November 19, 2012. Progress Report Due Date(s): 11/19/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 28 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 52 Appropriate certifications/licenses or other credentials -Partially Implemented related service providers Department CPR Findings: District documentation and staff interviews indicated that one of the Social Workers at the Cunniff Elementary School is not licensed as a social worker. One of the Speech Therapists at the Hosmer Elementary is not licensed as a Speech Therapist. Both staff members provide direct related services to special education students. Description of Corrective Action: Training will take place on September 19, 2012 regarding the appropriate certifications/licenses or other credentials for related service providers that are required in order to provide directed related services to the special education students. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services & Director of Personnel Completion: 09/19/2012 Evidence of Completion of the Corrective Action: Agenda, handouts, sign in sheets. Description of Internal Monitoring Procedures: Both the Director of Student Services and the Director of Personnel will ask candidates for the appropriate special education teacher licensure when hiring staff. If need be, a waiver must be requested from the Department of Elementary and Secondary Education before the candidate is hired. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 52 Appropriate certifications/licenses Approved or other credentials -- related service Status Date: 10/04/2012 providers Basis for Partial Approval or Disapproval: While the Department accepts the district's corrective action and recognizes the need for staff training regarding special educator and related service provider licensure, the district's corrective action does not address the specific staff members cited at the Cunniff and Hosmer Elementary Schools who were found to be not licensed, nor on a waiver. Department Order of Corrective Action: The district must submit evidence that the Social Worker cited at the Cunniff Elementary School as not being licensed has now obtained the appropriate licensure and that the Speech Therapist cited at the Hosmer Elementary School as not being licensed has now obtained the appropriate licensure. Required Elements of Progress Report(s): Please submit a copy of the Cunniff Elementary School's Social Worker licensure and the Hosmer Elementary School's Speech Therapist licensure. This progress report is due by November 19, 2012. Progress Report Due Date(s): 11/19/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 29 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 55 Special education facilities and classrooms Partially Implemented Department CPR Findings: Observations of special education facilities at Hosmer Elementary School indicated that the Connections Program at the preschool is not at least equal in all physical respects to the average standards of other preschool classrooms. It is located in three small spaces (rooms 70, 76 and 77) none of which is sufficient size to provide for the eight students and eight adults assigned to the program. Description of Corrective Action: Watertown released a bid for a contractor to add an additional classroom at the preschool for the Connections Program. A contractor was selected and work had begun. It is anticipated the work will be completed by December 1, 2012. Title/Role(s) of responsible Persons: Expected Date of Director of Business Services, Director of Facilities, Early Completion: Childhood Coordinator 12/01/2012 Evidence of Completion of the Corrective Action: There will be an additional classroom at the preschool for the Connections class. Description of Internal Monitoring Procedures: Progress at the preschool will be reviewed weekly by the Early Childhood Coordinators to ensure the building project is progressing on schedule. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 55 Special education facilities and Status Date: 10/04/2012 classrooms Basis for Partial Approval or Disapproval: The Department accepts the district's proposed correction action for the building of an additional classroom at the Hosmer Elementary School by December 1, 2012 for the purpose of relocating the Connections Program. Department Order of Corrective Action: Required Elements of Progress Report(s): Please submit an updated floor plan of the Hosmer Elementary School highlighting the additional classroom. This progress report is due November 19, 2012. The Department will conduct an onsite visit at the Hosmer Elementary School on or before February 4, 2013 to verify the additional classroom for the Connections Program. Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 30 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 6 Availability of in-school programs for pregnant students Partially Implemented Department CPR Findings: District documentation indicated that the district does have a policy for pregnant students; however, the policy requires a pregnant student to obtain the certification of a physician to continue in school, which the district does not require of all students with other physical or emotional conditions requiring the attention of a physician. Description of Corrective Action: The new school committee policy listed below regarding pregnant students was adopted on June 11, 2012. In addition, this new policy was reflected in the High School and Middle School Handbooks. This policy is on Watertown Public Schools' website. Title/Role(s) of responsible Persons: Expected Date of Principal, Watertown High School Completion: 06/11/2012 Evidence of Completion of the Corrective Action: School Committee Policy File: JIE PREGNANT STUDENTS Pregnant students are permitted to remain in regular classes and participate in extracurricular activities with non-pregnant students throughout their pregnancy, and after giving birth are permitted to return to the same academic and extracurricular program as before the leave. LEGAL REF.: M.G.L. 71:84 Title IX: 20 U.S.C. 1681; 34 CFR 106.40(b) Revised: June 11, 2012 Insert attachment(s): Description of Internal Monitoring Procedures: Steve Watson will ensure that the above school committee policy is adhered to in his building. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 31 CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved CR 6 Availability of in-school programs Status Date: 10/04/2012 for pregnant students Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action of updating the Pregnancy Policy to ensure that it aligns with federal and state regulations. The Department has also verified that this revised language for the Pregnancy Policy is contained in the handbooks. Department Order of Corrective Action: Required Elements of Progress Report(s): No progress reports are due for this criterion. Progress Report Due Date(s): MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 32 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 7 Information to be translated into languages other than Partially Implemented English Department CPR Findings: District documentation and staff interviews indicated that important information and documents, such as handbooks/codes of conduct and report cards are not translated into the major languages spoken by parents or guardians with limited English proficiency. Furthermore, the district's procedures for providing information in languages other than English includes a statement that has been attached to important documents and information asking the recipients to use a family member, friend or neighbor to translate documents before requesting translation assistance from the principal of their child's school. Description of Corrective Action: The ELL Coordinator will work with the Guidance Department to ensure that documents are translated to the two major languages spoken by students and residents. The statement that was previously attached to documents regarding translation services will be edited to ensure that the families contact the Principal or go to our website, if they need translation services. The sentence requiring families to contact family or friends to translate documents will be eliminated from this document. Title/Role(s) of responsible Persons: Expected Date of ELL Coordinator Completion: Director of Assessment and Guidance 09/01/2013 All Principals Evidence of Completion of the Corrective Action: Allison Levit, ELL Coordinator has worked with the Director of Assessment and Guidance and all of the Principals to ensure that all appropriate documents are translated into the two major languages. The sentence requiring friends or family to translate documents has been removed. Description of Internal Monitoring Procedures: The ELL Coordinator will monitor translation compliance on an ongoing basis. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 33 CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved CR 7 Information to be translated into Status Date: 10/04/2012 languages other than English Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action that it will translate major documents such as handbooks/codes of conduct and report cards into the two major languages, other than English, spoken in the district. The Department also accepts the district's proposed corrective action of eliminating the statement requiring families to contact family or friends, first, for translation needs before contacting the district. Department Order of Corrective Action: Required Elements of Progress Report(s): Please submit copies of major documents such as handbooks/codes of conduct and report cards that were translated into the two major languages, other than English, of the district. This progress report is due November 19, 2012. Submit the edited statement to be attached to documents directing families if they require translated information. Submit this information by November 19, 2012. Progress Report Due Date(s): 11/19/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 34 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 7B Structured learning time Partially Implemented Department CPR Findings: District documentation and staff interviews indicated that physical education is not required for all students at Watertown High School every year of high school; specifically students in grade 12. Description of Corrective Action: Starting September 2013, physical education will be required of students for all four years at the high school. For school year 2012-2013, physical education is offered as an elective for seniors. The student handbook will be amended to reflect the new graduation requirements of 4 years of physical education in school year 2013-2014. Title/Role(s) of responsible Persons: Expected Date of High School Principal and Physical Education & Health Completion: Coordinator 09/01/2013 Evidence of Completion of the Corrective Action: The information listed below was added to the course catalog: Watertown High School : Phys Ed (GR12) < Prev GoTo: Next > Course ID: H8553 Short Name: Phys Ed (GR 12) Academic Year: 2012-2013 Description: This course will emphasize the benefits of exercise, how to develop a fitness plan, recreational games/activities, sportsmanship, critical thinking skills and skill instruction in team and individual sports. CPR Certification opportunity. Semester Course Course Details Course Type: Print Class List: Major/Minor: Print On Transcript: Priority: From Grade: Number of Requests: 55 To Grade: Number of Alt Requests: 0 Failure: Number of Sections: 3 Horizontal Avg: Has Meeting Time: Vertical Avg: # of Terms Vertical Weight: Cont? Number Of Periods 12 GPA Rank: Honor Type: Pass/Fail: Ineligibility Type: Curriculum Level: Max Seats: Use Detailed Schedule: Linked Course: Course Search AP Courses (DOE): Pre-Schedule: Course Search Subject Area/Course (EPIMS): Search for a value Master Scheduler Builder Details Description of Internal Monitoring Procedures: Our Physical Education/Health Coordinator has been the strongest advocate of offering physical education all four years. She will be the ongoing monitor. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 35 CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: CR 7B Structured learning time Corrective Action Plan Status: Partially Approved Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: While the Department accepts the district's corrective action that it will include in the 2013-14 handbook the requirement that all high school students participate in physical education for all four years, it must also demonstrate that students, specifically in 12th grade this 2012-13 school year, are participating in physical education as required by regulation. Department Order of Corrective Action: Provide documentation indicating the steps the district is taking to increase the number of students in the 12th grade that are participating in physical education for the 2012-2013 school year. Required Elements of Progress Report(s): Submit the steps taken thus far to increase participation in physical education by 12th grade students. Also submit the total number of 12th grade students currently participating in physical education. Submit this information by November 19, 2012. Please submit a copy of the policy revision that is included in the 2013-2014 school year handbook. This progress report is due September 6, 2013. Progress Report Due Date(s): 11/19/2012 09/06/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 36 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 10 Anti-Hazing Reports Partially Implemented Department CPR Findings: District documentation and staff interviews indicated that while the principal of each secondary school in the district has issued a copy of M.G.L. c. 269 §§ 17 through 19 to every student enrolled full-time, it has not yet received signed acknowledgements from designated officers of all student groups, teams, organizations and every student group, including every unaffiliated student group that they have received a copy of the school's anti-hazing disciplinary policy. Description of Corrective Action: While the hazing policy is distributed in the student handbook, Watertown Public Schools will amend the student sign off sheet to include an acknowledgment of anti-hazing policies. Secondary building principals will be required to have designated officers of student groups sign off that they will review our anti-hazing policies with the student groups prior to beginning the group activities. Title/Role(s) of responsible Persons: Expected Date of Principal Watertown High School Completion: Principal, Watertown Middle School 10/01/2012 Evidence of Completion of the Corrective Action: The designated officer sign off sheet will be developed by October 1, 2012. Description of Internal Monitoring Procedures: When the secondary principals award stipends to the teachers for running student groups, the principals will have the teachers sign a document that acknowledges their agreement to have the groups sign off on the antiCORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: CR 10 Anti-Hazing Reports Corrective Action Plan Status: Approved Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: The Department accepts the district's corrective action that it will amend the student handbook acknowledgment form to include information about the district's anti-hazing policy. The Department also accepts the corrective action that the secondary principals will track signed anti-hazing policy acknowledgments of student groups, teams, organizations and every student group, including every unaffiliated student group. Department Order of Corrective Action: Required Elements of Progress Report(s): Please submit a copy of the student handbook sign off sheet that includes the updated anti-hazing policy. This progress report is due November 19, 2012. Please submit signed anti-hazing policy acknowledgments submitted by designated officers of all student groups, teams, organizations and every student group, including every unaffiliated student group. This progress report is due November 19, 2012. Progress Report Due Date(s): 11/19/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 37 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 10A Student handbooks and codes of conduct Partially Implemented Department CPR Findings: District documentation indicated that while the district's 2011-12 handbooks at Watertown Public Schools contain a nondiscrimination policy that is consistent with M.G.L. c. 76, s. 5, and affirms the school's non-tolerance for harassment based on race, color, national origin, sex, religion, or sexual orientation, or discrimination on those same bases, it did not contain the schools' procedures for accepting, investigating and resolving complaints alleging discrimination or harassment and the disciplinary measures that the schools may impose if it determines that harassment or discrimination occurred. Description of Corrective Action: Watertown Public Schools has revised a procedure effective April 4, 2011. We will assure that the changes to this procedure are reflective in all of the schools handbooks and the handbooks specifically reflect the school’s procedures for accepting, investigating and resolving complaints and allegations of discrimination or harassment. The handbooks will also inform students and families about the disciplinary measure that the school may impose if it is determined that the harassment or discrimination has occurred. These changes will be reflective in the school year handbook 2013-2014. However, the website will be updated with these changes effective immediately. Title/Role(s) of responsible Persons: Expected Date of Principal and the Director of Assessment and Guidance and Completion: central office. 09/01/2013 Evidence of Completion of the Corrective Action: A copy of the handbooks will be uploaded. Description of Internal Monitoring Procedures: The central office team will monitor the websites to ensure that this information has been changed in the handbooks and the new handbooks have been uploaded onto the Watertown Public Schools' website. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially CR 10A Student handbooks and codes of Approved conduct Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: While the Department accepts the district's corrective action that it has included updated language regarding procedures for accepting, investigating and resolving complaints of discrimination or harassment on its district website, this plan does not take into account that some families may not have access to computers and/or the internet and, therefore, will not receive the updated elements of this policy. Department Order of Corrective Action: The district must create an alternative to the internet and its website as a method of delivering parents the updated language in its discrimination/harassment policy. This alternative method must be trackable to ensure that all parents have received it. Required Elements of Progress Report(s): Please submit to the Department a copy of the nondiscrimination policy and the district's alternative communication method to ensure that all parents in the district are updated and informed of the discrimination/harassment policy. This progress report is due November 19, 2012. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 38 Please submit a copy of the student handbook revision that contains the procedures for accepting, investigating and resolving complaints of discrimination or harassment. This progress report is due September 6, 2013. Progress Report Due Date(s): 11/19/2012 09/06/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 39 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 16 Notice to students 16 or over leaving school without a Partially Implemented high school diploma, certificate of attainment, or certificate of completion Department CPR Findings: District documentation and staff interviews indicated that the district does not send annual written notices to the last known address of former students who have not yet earned their competency determination and who have not transferred to another school to inform them of the availability of publicly funded post-high school academic support programs and to encourage them to participate in those programs. Description of Corrective Action: The High School Guidance Department will send out annual notices to students 16 years or older who have not yet earned their competency determination or who have not transferred to another school. The notices will inform the students about the availability of publicly funded post high school academic support programs and will encourage them to participate in these programs. Title/Role(s) of responsible Persons: Expected Date of Watertown High School Principal Completion: Director of Assessment and Guidance 10/01/2012 Evidence of Completion of the Corrective Action: Letter will be developed. Description of Internal Monitoring Procedures: Every year the Director of Assessment and Guidance will send this letter to inform students of the availability of publicly funded post high school academic support programs CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved CR 16 Notice to students 16 or over Status Date: 10/04/2012 leaving school without a high school diploma, certificate of attainment, or certificate of completion Basis for Partial Approval or Disapproval: The Department accepts the district's corrective action that it will develop a letter to be sent out to former students 16 and older who have not yet earned their competency determination and who have not transferred to another school, informing them of the availability of publicly funded post-high school academic support programs. Department Order of Corrective Action: Required Elements of Progress Report(s): Please submit a copy of the district's newly developed letter provided to former students who have not yet earned their competency determination and who have not transferred to another school. This progress report is due November 19, 2012. Please submit evidence that notification letters have been sent to former students 16 and older who have not yet earned their competency determination and who have not transferred to another school, include the dates that the letters were sent and the initials of the students they were sent to. This progress report is due February 4, 2013. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 40 Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 41 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 17A Use of physical restraint on any student enrolled in a Partially Implemented publicly-funded education program Department CPR Findings: District documentation and staff interviews indicated that while schools conducted staff training at least annually on the use of physical restraint consistent with regulatory requirements, such training did not always occur within the first month of the school year. Description of Corrective Action: Construction of the new classrooms has begun the week of September 10, 2012. This will allow for proper configuration of comparable facilities for all students and faculty working in sub-separate programs. Title/Role(s) of responsible Persons: Expected Date of Director of Special Education Completion: 09/04/2012 Evidence of Completion of the Corrective Action: On September 4, 2012, the Director of Special Education offered restraining training to all Watertown Public School employees. Description of Internal Monitoring Procedures: Two days prior to the start of the student year, teachers have professional development days. The Director of Special Education will offer restraint training during these first two days of professional development every year. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved CR 17A Use of physical restraint on any Status Date: 10/04/2012 student enrolled in a publicly-funded education program Basis for Partial Approval or Disapproval: The Department accepts the district's corrective action that it will train all staff within the first month of school on the regulatory requirements and use of physical restraint. Department Order of Corrective Action: Required Elements of Progress Report(s): Please submit evidence of the district's restraint training, including the date, attendance (with the name and role), agenda and any training materials. This progress report is due November 19, 2012. Progress Report Due Date(s): 11/19/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 42 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 23 Comparability of facilities Partially Implemented Department CPR Findings: See SE 55. Description of Corrective Action: Construction of the new classrooms will be completed in school year 2012-2013. This will allow for proper configuration of comparable facilities for all students and faculty working in sub-separate programs. Title/Role(s) of responsible Persons: Expected Date of Superintendent of Schools Completion: 12/01/2012 Evidence of Completion of the Corrective Action: The project was put out to bid and awarded to a contractor. Construction will be completed by December 1, 2012. Description of Internal Monitoring Procedures: The Superintendent, Principal, Facilities Director and Director of Business Services will monitor the progress of the construction project. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: CR 23 Comparability of facilities Corrective Action Plan Status: Approved Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action for the building of an additional classroom at the Hosmer Elementary School by December 1, 2012 for the purpose of relocating the Connections Program. Department Order of Corrective Action: Required Elements of Progress Report(s): See SE 55. Progress Report Due Date(s): 11/19/2012 02/04/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 43 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 25 Institutional self-evaluation Not Implemented Department CPR Findings: District documentation indicated that the district does not have procedures for conducting an institutional self-evaluation to ensure access for all special populations to the district's programs and school sponsored activities. Description of Corrective Action: The School individually review their School Improvement plans and Department Improvement Plans. These plan will be brought annually to the administrators summer retreat. District wide evaluation of systems will be the outcome of this retreat. Title/Role(s) of responsible Persons: Expected Date of Superintendent of Schools Completion: 06/30/2013 Evidence of Completion of the Corrective Action: School improvement and department improvement plans have been reviewed to ensure equal access to programs for all students. At the annual summer retreat, this information will be analyzed district wide. Description of Internal Monitoring Procedures: The Superintendent holds an annual summer retreat for administrators. All school administrators will bring their school and department improvement plans to the annual summer retreat and the entire group will ensure annually that students have equal access to all educational programs including athletics and other extracurricular activities. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: CR 25 Institutional self-evaluation Corrective Action Plan Status: Approved Status Date: 10/04/2012 Basis for Partial Approval or Disapproval: The Department accepts the district's corrective action that the summer retreat held by the Superintendent for all school administrators will be the time that individual improvement plans will be brought together and analyzed for the purpose of selfevaluation. However, please ensure that this includes an evaluation of all aspects of the k-12 program. Department Order of Corrective Action: Required Elements of Progress Report(s): Submit a copy of the institutional self-evaluation by November 19, 2012. Progress Report Due Date(s): 11/19/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 44 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW Charter School or District: Watertown Public Schools Corrective Action Plan Forms Program Area: English Learner Education Prepared by: Watertown Public Schools/ Allison Levit CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: November 15, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 5 Program Placement and Structure Rating: Partially Implemented Department CPR Finding: The district developed ESL curriculum maps and provided other curricula sources which seem to be part of the general education curriculum, but no ESL components of these materials were included in the curriculum maps. Regarding the curriculum, the district should note that the Department has new regulations in place, which may affect the district’s corrective action plan (CAP). Please refer to: http://www.doe.mass.edu/retell/ for more information. Documentation reviewed indicated that the hours of ESL services provided to English language learners (ELLs) is inconsistent with Department guidance. Except for ELLs in middle school who receive the recommended amounts of ESL instruction at all MEPA (Massachusetts English Proficiency Assessment) levels. However, the majority of ELLs at the elementary and high schools are not receiving adequate hours of ESL instruction at all the levels of English proficiency. (Please refer to http://www.doe.mass.edu/mcas/mepa/guidance.html - p. 5) Please refer to ELE 15 for comments on Sheltered English Immersion (SEI) professional development training. The Department concludes that the district does not have a fully implemented SEI program as content area teachers have not received training in all four SEI categories, the hours of ESL instruction provided to ELLs is inconsistent with Department guidance and a plan to meet the new ESL curriculum guidelines must be put in place. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 45 Narrative Description of Corrective Action: During department meetings, ESL Coordinator with the ESL staff will review all Beginners curriculum maps and materials K-12 and assess what may need to be revised to align with new standards and to decide on a standard format across grade levels. During department meetings, the ESL Coordinator with the ESL staff will revise the beginners curriculum. Additionally, we will review our Intermediate/Advanced curriculum, which is termed ESL Reading at some schools, to align it with the common core and to include Performance Indicators. In grade level teams K-12, ESL and core teachers will add Performance Indicators to the curriculum maps of ELA, Math, Science and Social Studies. Watertown High School increased the ESL staff from 2.4 to 2.8 FTEs for this school year, thus providing adequate ESL services. The ESL Coordinator will submit a budget for next year will include requests for increase in staffing to meet regulations at the Hosmer, Lowell, and Cunniff Schools. Watertown Public Schools is part of cohort 2 of RETELL requiring the first of three cohorts of teachers starting September 2013. This cohort will be 26 teachers. The RETELL Liaison will organize staff lists to identify which groups of teachers will receive training in year 1, 2 and 3 of our cohort. Additionally, groups of administrators and teachers with 2 categories of previous training will be identified. The RETELL Liaison will work with District Administration to develop a schedule of dates and times for the training to begin in Sept 2014 and transmit this information to ESE. The RETELL Liaison will roster classes for SEI Endorsement. Teachers will be informed if they are included in the SEI endorsement course. The ESL Coordinator will develop and oversee SEI Professional Development for non core/non cohort teachers to provide them with techniques to provide quality instruction to ELL students in their classrooms and to help them fulfill new requirements for 15 PDPs of SEI training. Title/Role of Person(s) Responsible for Implementation: ESL Coordinator RETELL Liaison Expected Date of Completion for Each Corrective Action Activity: Review of Beginners ESL Curriculum 07/01/13 Revision of Beginners ESL Curriculum 07/01/13 Revision of Int/Adv Curriculum 07/01/14 Addition of Performance Indicators to core curriculum 07/01/15 Lists of teachers requiring training 01/30/13 Schedule of Classes 07/01/13 Teacher Rosters 07/01/13 15 PDP SEI training 09/01/13 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 46 Evidence of Completion of the Corrective Action: Revised ESL and Core Curriculum Maps Rosters of teachers taking RETELL training Professional Development Catalog with ESL PD Description of Internal Monitoring Procedures: ESL Coordinator will monitor curriculum alignment and mapping on an ongoing basis CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 5 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Since the new regulations as they pertain to WIDA were passed prior to the on-site visit, the Department will be neither approving nor disapproving any curriculum documents/plans that were made for on-site visits conducted before the state’s adoption of the WIDA standards in June 2012. The Department will be communicating with all districts during the upcoming school year to provide them with further guidance on developing Department approved ESL/ELD curriculum. No further submission is required at this time. The Department accepts the district’s plan to ensure that all core academic teachers with ELLs and administrators that supervise core academic teachers of ELLs are endorsed. No further submission is required at this time. Department Order of Corrective Action: N/A Required Elements of Progress Report(s): 1) Please provide a detailed plan that shows that the district is providing sufficient ESL instruction to all ELL students during the 2013-2014 school year based on the Department's Guidance on using MEPA Results to Plan Sheltered English Immersion (SEI) Instruction and make Reclassification Decisions for Limited English Proficient (LEP) Students from September 2009 found at http://www.doe.mass.edu/mcas/mepa/2009/guidance.doc 2) Please complete district information in the attached spreadsheet labeled ELL List by school for each ELL student in the district. Progress Report Due Date(s): December 16, 2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 47 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 6- Program Exit and Readiness Rating: Partially Implemented Department CPR Finding: Documentation reviewed and onsite interviews indicated that the district has an appropriate exiting process. However, the written policy reviewed does not specify if the district monitors students for a two-year period after re-designation. Narrative Description of Corrective Action: The ESL program procedure manual has wording that specifies that exited students should be monitored for two years. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Corrective Action Activity: EsL Coordinator Evidence of Completion of the Corrective Action: Description of Internal Monitoring Procedures: Annual Staff Training on ELL policies and procedures CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 6 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: N/A Department Order of Corrective Action: N/A Required Elements of Progress Report(s): None required Progress Report Due Date(s): N/A MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 48 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 9- Instructional Grouping Rating: Partially Implemented Department CPR Finding: Although documentation reviewed indicated that high school ELLs are grouped by English proficiency levels, the district did not specify if ESLs at other educational levels are also grouped for ESL instruction. Narrative Description of Corrective Action: The ESL Coordinator will revise the ESL program procedure manual to specify the grouping of students for ESL by proficiency level. The ESL Coordinator will train ESL staff on grouping of ESL students for instruction. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Corrective Action Activity: ESL Coordinator Revised ESL program procedure manual 03/01/13 Training of ESL staff 03/01/13 Evidence of Completion of the Corrective Action: Revised ESL program procedure manual Agenda of January Department Description of Internal Monitoring Procedures: Annual review of program procedure manual Annual training of staff on program procedures including grouping CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 9 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: N/A Department Order of Corrective Action: N/A Required Elements of Progress Report(s): Provide a copy of the 2013-14 ESL teacher schedules for all grade levels district wide. All schedules should include the following for each block of time: 1. Names of the ELL students 2. Grade level for each student 3. English proficiency level for each student. Progress Report Due Date(s): December 16, 2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 49 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 11- Equal Access to Academic Programs and Services Rating: Partially Implemented Department CPR Finding: District documentation and staff interviews indicated that important information and documents, such as handbooks, codes of conduct and report cards are not translated into the major languages spoken by parents or guardians with limited English skills. Furthermore, the district's procedures for providing information in languages other than English includes a statement that has been attached to important documents and information instructing the recipients to ask a family member, friend or neighbor to translate documents before requesting translation assistance from the principal of their child's school. Narrative Description of Corrective Action: The ESL Coordinator will develop a translation procedure for extracurricular activities and school events. The ESL Coordinator will work with the Guidance department to ensure that documents are translated into two major languages spoken by students and residents. The statement that was previously attached to documents regarding translation services will be edited to ask families to contact the Principal or go to the website, if they need translation services. The ESL Coordinator will edit the Home Language Survey to add a statement asking if there is a need for information from school to be translated into their native language and if they require an interpreter/translator at Parent-Teacher meetings. This information will be recorded into the school data system for newly registering students. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Corrective Action Activity: ESL Coordinator Draft Translation procedure 03/01/2013 Principals Finalized Translation procedure 05/01/2013 Director of Assessment and Guidance Translated documents 09/01/2013 Evidence of Completion of the Corrective Action: Edited Home Language Survey Translated Documents Description of Internal Monitoring Procedures: ESL Coordinator will monitor translation compliance on an ongoing basis. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 50 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 11 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By December 16, 2013, the district will submit the following documentation: Revised translation procedures A list of documents that includes handbooks, codes of conduct and report cards identified by the ESL coordinator and the Guidance Department that will be translated into the two major languages spoken by students and residents. Revised statement attached to important documents By February 24, 2014, submit copies of translated documents and information. Progress Report Due Date(s): December 16, 2013 & February 24, 2014 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 51 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 12- Equal Access to Nonacademic and Extracurricular Programs Rating: Partially Implemented Department CPR Finding: Interviews indicated that information is not always provided to LEP students about extracurricular activities and school events in a language that they understand. Narrative Description of Corrective Action: The ESL Coordinator will develop a translation procedure for extracurricular activities and school events. The ESL Coordinator will translate into 2 major languages spoken in the district: A yearly calendar of events for all schools Afterschool Program flyer for all schools Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Corrective Action Activity: ESL Coordinator Draft Translation procedure 03/01/2013 Finalized Translation procedure 05/01/2013 Translation of Yearly Calendar 09/01/2013 Translation of Afterschool Program 10/01/2013 Evidence of Completion of the Corrective Action: Draft Translation procedure Finalized Translation procedure Translated copies of Yearly Calendar for all schools Translated copies of Fall Afterschool Program for all schools Description of Internal Monitoring Procedures: ESL Coordinator will monitor translation compliance on an ongoing basis CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 12 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By December 16, 2013, submit updated procedures for the translation of information about extracurricular activities and school events. By February 24, 2014, submit copies of the translated notices. Progress Report Due Date(s): December 16, 2013 & February 24, 2014 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 52 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Rating: Partially Implemented Criterion & Topic: ELE 15- Professional Development Requirements Department CPR Finding: Documentation reviewed indicated that few teachers have completed all four of the Sheltered English Immersion (SEI) professional development categories (3 in the elementary grades, none in middle school and 1 in high school). The district developed a multi-year plan for SEI professional Development. Implementation dates provided were for 2012-13 and 2013-14 school year. The plan included training teachers in all the SEI categories and all educational levels. In this regard the district should note that the Department’s regulations and requirements concerning SEI training have changed. Refer to: http://www.doe.mass.edu/retell/ for more information. Narrative Description of Corrective Action: Watertown Public Schools is part of cohort 2 of RETELL requiring the first of three cohorts of teachers starting September 2013. 26 teachers The RETELL Liaison will organize staff lists to identify which groups of teachers will receive training in year 1, 2 and 3 of our cohort. Additionally, groups of administrators and teachers with 2 categories of previous training will be identified. The RETELL Liaison will work with District Administration to develop a schedule of dates and times for the training to begin in Sept 2014 and transmit this information to ESE. The RETELL Liaison will roster classes for SEI Endorsement. Teachers will be informed if they are included in the SEI endorsement course. The ESL Coordinator will develop and oversee SEI Professional Development for non core/non cohort teachers to provide them with techniques to provide quality instruction to ELL students in their classrooms and to help them fulfill new requirements for 15 PDPs of SEI training. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Corrective Action Activity: RETELL Liaison Lists of teachers requiring training January ESL Coordinator 2013 Schedule of Classes July 2013 Teacher Rosters July 2013 15 PDP SEI training September 2013 Evidence of Completion of the Corrective Action: Rosters of teachers taking RETELL training Professional Development Catalog with ESL PD Description of Internal Monitoring Procedures: Retell Liaison will monitor on an ongoing basis MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 53 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: See ELE 5 Department Order of Corrective Action: N/A Required Elements of Progress Report(s): None required Progress Report Due Date(s): N/A COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 16- Equitable Facilities Rating: Partially Implemented Department CPR Finding: Observations of the ELE facilities at Hosmer Elementary School indicated that the district does not always ensure that LEP students are provided facilities comparable to those provided to the overall student population since one of the ESL spaces (room 50) has three ESL teachers often conducting their lessons in the same classroom simultaneously and the other (room 224E) is too small for the number of students in some of the groups serviced at that location. Narrative Description of Corrective Action: The ESL Coordinator will work with the Hosmer Principal to identify alternative classroom spaces for ESL teachers for next year. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Corrective Action Activity: ESL Coordinator New room assignments for ESL teachers at Hosmer Elementary Principal Hosmer School 09/01/2013 Evidence of Completion of the Corrective Action: New room assignments for ESL teachers at Hosmer School. Description of Internal Monitoring Procedures: ESL Coordinator will monitor on an ongoing basis. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 16 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By December 16, 2013, the district will submit a revised floor plan for Hosmer Elementary School that indicates the locations of the ESL spaces. A site visit will be conducted by the Department in December 2013 to verify the corrective action. Progress Report Due Date(s): December 16, 2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Watertown CPR Corrective Action Plan 54