PRESENTATION TO THE SELECT COMMITTEE ON ECONOMIC AND BUSINESS DEVELOPMENT ON THE 2015-2020 STRATEGIC PLAN AND 2015/16 ANNUAL PERFORMANCE PLAN OF THE DEPARTMENT OF PUBLIC WORKS Director-General Department of Public Works 14 May 2015 TABLE OF CONTENTS No Item Slide 1. Format and layout of the Strategic Plan and Annual Performance Plan 3 2. Summary of Part A: Strategic overview 6 4. Summary of Part B: Programme and sub programme plans 29 Programme 1 – Administration Programme 2 – Intergovernmental Coordination Programme 3 – Expanded Public Works Programme Programme 4 - Property And Construction Industry Policy Regulation Programme 5 – Prestige Policy 5. Summary of Part C: Links to Long Term Plans 33 2 1 Format and layout of the Strategic Plan and Annual Performance Plan This section sets out the minimum requirement for Strategic Plans and Annual Performance Plans as per the Framework for Strategic Plans and Annual Performance Plans 3 NATIONAL TREASURY GUIDELINES FOR STRATEGIC PLANS AND ANNUAL PERFORMANCE PLANS • The Framework for Strategic Plans and Annual Performance Plans, issued in September 2010, provides a new format and revised timeframes for the compilation of the Strategic Plan and Annual Performance Plan. • National Treasury issued an Instruction Note (No. 33) in July 2011 on the full compliance to the mandatory requirements of the Framework for Strategic Plans and Annual Performance Plans. • A Strategic Plan covers a period of at least five years ideally from the first planning cycle following an election linked to the identified outcomes of the Presidency. • A Strategic Plan may be changed during the five year period it covers. However, such changes should be limited to revisions related to significant policy shifts or changes in the service delivery environment • The Annual Performance Plan sets out what the institution intends doing in the upcoming financial year and during the MTEF to implement its Strategic Plan. • The format of the APP (including the tables) is prescribed by the National Treasury Framework for Strategic Plans and Annual Performance Plans and aims is to link the plans, budget and performance of the Department. • Annual targets are broken up into quarterly targets where possible to ensure effective monitoring of performance on a quarterly basis 4 NATIONAL TREASURY GUIDELINES FOR STRATEGIC PLANS AND ANNUAL PERFORMANCE PLANS 5 2 PART A: Strategic overview This section specifies the vision, mission, values and the goals that the Department aims to achieve over a five-year period. (SP Pages 16-68) 6 LEGISLATIVE AND OTHER MANDATES Constitutional mandate: The Constitutional mandate is provided for in Schedule 4, Part A, of the Constitution of the Republic of South Africa: Functional Areas of Concurrent National and Provincial Legislative Competence. Legislative mandate The legislative mandates of the Department are underpinned by the following Acts: i. Government Immovable Asset Management Act, 2007 (Act No. 19 of 2007); ii. the Construction Industry Development Board Act, 2000 (Act No. 38 of 2000) iii. Council for the Built Environment Act, 2000 (Act No. 43 of 2000) iv. Professional Council Acts that regulate the six Built Environment Professions (BEPs); v. Public Finance Management Act, 1999 (Act No. 1 of 1999). vi. Other Acts listed in Annexure A Policy mandates i. DPW White Paper: Public Works, Towards the 21st Century, 1997 ii. DPW White Paper: Creating an Enabling Environment for Reconstruction, Growth and Development in the Construction Industry, 1999 iii. Construction Sector Transformation Charter, 2006 iv. Property Sector Transformation Charter, 2007 v. DPW Broad-based Black Economic Empowerment Strategy, 2006 vi. Property Management Strategy on BBBEE, Job Creation and Poverty Alleviation, 2007 vii. Green Building Framework, 2011 7 INTRODUCTION AND STRATEGIC CONTEXT The following Government priorities form the basis of the Strategic Plan informed by the Performance Agreement of the Minister of Public Works and the 2014-2019 Medium Term Strategic Framework: NDP/ MTSF PRIORITY MTEF Budget Outcome 4 (Chapter 3 of the NDP) - Decent employment through inclusive economic growth – The EPWP will continue to be an effective cushion for the poor and unemployed. Phase 3 of the EPWP which covers the period 2014/15 to 2018/19 aims to create 6 million work opportunities. The medium-term budget allocation for EPWP (including compensation of employees and goods and services) is R6.8 billion. 8 EPWP : OVERALL EPWP PHASE III WORK OPPORTUNITIES TARGETS: PER PROVINCE Work 2014/15 2015/16 2016/17 2017/18 2018/19 Opportunities Eastern Cape 21,345 21,898 22,504 23,301 24,025 Free State 11,086 14,589 14,993 15,524 16,006 Gauteng 18,758 19,970 20,522 21,250 21,910 KwaZulu-Natal 46,714 53,107 54,576 56,511 58,266 Limpopo 20,345 21,728 22,329 23,120 23,838 Mpumalanga 13,039 17,770 18,262 18,909 19,497 Northern Cape 9,950 10,728 11,025 11,416 11,770 North West 15,544 17,982 18,479 19,134 19,728 9 Western Cape 11,730 14,803 15,212 15,751 16,241 EPWP INCENTIVES - MTEF ALLOCATION 2014/15 (R’000) 2015/16 (R’000) 2016/17 (R’000) 2017/18 (R’000) EPWP Integrated grant to Provinces Infrastructure and environment and Culture 348,947 350,612 402,009 423,802 EPWP Incentive Grant to Provinces - Social Sector 257,972 240,563 359,662 385,583 EPWP Integrated grant to municipalities Infrastructure, Environment & Culture and Social Sector 594,575 587,685 663,991 716,427 Non-State Sector (Non-profit institutions) 477,481 534,816 600,257 630,270 1,678,975 1,713,676 2,025,919 2,156,082 Total 10 EXPENDITURE ON EPWP INTEGRATED GRANT TO PROVINCES AS OF 31st MARCH 2015 Provinces Final Grant Allocation (R'000) Actual Year To % Actual Year To Total ExpenditureExp % on Date Transfers Date Transfers to date Allocation (R'000) (R'000) Eastern Cape 69,544 69,544 100% R 64,986 93% Free State 26,601 26,601 100% R 23,737 89% Gauteng 23,565 23,565 100% R 20,526 87% Kwa-Zulu Natal 97,945 97,945 100% R 94,235 96% Limpopo 32,247 31,004 96% R 26,619 83% Mpumalanga 39,928 39,928 100% R 35,946 90% Northern Cape 20,348 20,348 100% R 18,076 89% North West 14,249 14,249 100% R 13,846 97% Western Cape 24,520 24,520 100% R 21,796 89% 348,947 347,704 100% R 319,767 92% Total 11 INTRODUCTION AND STRATEGIC CONTEXT In addition the following national priorities has also been considered as significant to the Strategic Plan: NDP/ MTSF PRIORITY MTEF Budget Outcome 5 (Chapter 9 of the NDP) – Skilled and capable workforce to support an inclusive growth path. The Department has a combination of development programmes such as the young professionals programme, internship programme, learnership programme and artisan programme providing valuable on the job experience. • CETA: R50 million (ending March 2016 which is the end of the current commitments on National Skills Development Strategy 111) • DPW Young Professional Programme : R45 million (ending 2016/2017) • DPW Management Trainees: R16,2 million (ending 2016/2017) • DPW Mentorships (Professional Services): R9,6 million (ending 2016/2017 • CBE : R23.9 million The Department has also taken a comprehensive approach to promote sustainable growth of the Built Environment Professionals (BEPs) through the CBE. The CBE has initiated a Skills Development Programme to support learners undertaking Mathematics and Science at school level to be able to pursue a career in the built environment. Outcome 13 (Chapter 11 of the NDP) – “The provision of work opportunities is one of the best forms of social protection”, which is in line with the EPWP’s current primary objective of providing the unemployed with an opportunity to work and empowering communities. The medium-term budget allocation for EPWP Social Sector Grant is R985 million 12 INTRODUCTION AND STRATEGIC CONTEXT Vision A service-oriented Public Works Department focussing on the formulation of policy and legislative prescripts for the delivery of sound immovable asset management while contributing to the national agenda for social and economic development. Mission i. setting legislative and policy prescripts together with norms and standards for the management of state-owned and leased-in accommodation, land and infrastructure for the Public Works sector; ii. supporting provinces to fulfil the concurrent functions and service delivery obligations in the Public Works sector; iii. contributing to the national goals of job creation and poverty alleviation through the coordination of the Expanded Public Works Programme (EPWP); iv. providing guidance to our stakeholders to facilitate delivery in the builtenvironment within the context of Department’s mandate; and v. affording strategic leadership to the South African Construction and Property industries 13 INTRODUCTION AND STRATEGIC CONTEXT Values i. Integrity ii. Professionalism iii. Teamwork iv. Innovation Strategic Goals i. Sound legislative and policy prescripts to accelerate service delivery; ii. Oversight, leadership and support to Provincial Public Works; iii. Coordination of the EPWP Phase III for the creation of decent employment through inclusive economic growth; iv. Strategic leadership and regulation of the construction and property sectors to promote economic empowerment and skills development; and v. Good corporate governance to support effective and efficient service delivery. 14 PLANNED POLICY INITIATIVES The Department will review and/or develop the following policies and legislation: i. Review of the Department’s White Papers: “Public Works towards the 21st century, 1997; and Creating an Enabling Environment for Reconstruction, Growth and Development in the Construction Industry, 1999” towards the development of an enabling legislation ii. establish Agrément South Africa (ASA) as a public entity mandated to assess nonstandardised and/or unconventional construction products, materials and systems fit for purpose, iii. develop a draft Built Environment Professions (BEP) Policy towards possible amendments to the legislative framework governing the BEPs, iv. promulgation of a new Expropriation Act (repealing the Expropriation Act 63 of 1975) to ensure consistency with the Constitution and uniformity in the expropriation of property by all expropriating authorities, v. develop legislation to establish the Independent Development Trust (IDT) to support the State in the delivery of social infrastructure, vi. develop a Green Building Policy and Strategy for the Department to give effect to Government’s green economy initiatives. 15 STRATEGIC OVERVIEW – EXTERNAL ENVIRONMENT i. Economic trends and outlook - Whilst our economy will benefit from the reduction in the oil price and the immediate lift that it provides for the trade and current account balances, the energy deficit that we face over the medium-term will remain a material constraint on economic performance. ii. The Property Sector - The current trends in the Property Sector offer some relief to the escalations in leasing costs to the PMTE. The challenges encountered by the PMTE include the backlog of maintenance on State-owned accommodation resulting in the over reliance on leased in accommodation. A coordinated and uniform approach in the management of its immovable assets will be undertaken to create a better balance between private leases and utilisation of existing stock of State-owned accommodation iii. The Construction Sector - The building and construction sector is expected to grow at an average of 4.6%. Government’s ability to roll out its infrastructure programme has been criticized in the past few years. The Department has put in place various key interventions to build capacity to spend its infrastructure budget and to address fraud and corruption in the sector iv. Political Environment - Trends in the political environment are influenced by events taking place in other emerging economies worldwide. Domestic drivers of politics for the next five years will include issues of governance. To complement the drive for good governance the Department has put into place processes to strengthen the previously weak SCM operating model, procedures and processes. 16 STRATEGIC OVERVIEW – INTERNAL ENVIRONMENT The Department’s policy priorities are derived from the Policy Statement of the Minister of Public Works and the Seven Year Turnaround Plan 1. Key policy priorities i. The creation of 6 million work opportunities for poor and unemployed people through the labour-intensive delivery of public services and infrastructure. ii. The operationalisation of Property Management Entity (PMTE) and the transformation of the core property business (including construction management); iii. The operationalisation of the Governance, Risk and Compliance Branch to drive anti-corruption and to spearhead the second phase of the Turnaround Strategy; iv. A policy review which will culminate in a Public Works Act; and v. A renewed and sustained Programme of Action to transform the built environment and the construction and property sectors, as part of the second more radical phase of transition to democracy 17 STRATEGIC OVERVIEW – INTERNAL ENVIRONMENT 2. The Turnaround Strategy Phase I – The Stabilisation Phase This Phase was initiated during 2012 with the specific purpose of ensuring clear and systematic improvements across the Department. The Stabilisation Phase (ended on 31 March 2014) has achieved critical and foundational milestones although there are still various stabilisation projects continuing into the next phase. In this regard, the following successes are noted: i. The operationalisation of the PMTE to oversee the State’s asset investment, property and facilities management functions in line with Generally Recognised Accounting Practice (GRAP). ii. Developing a complete and credible Real Estate Asset Register (REAR) under the Department’s custodianship in terms of which registered and unregistered land parcels were reconciled against the deeds records and other National and Provincial immovable asset registers. iii. A comprehensive audit of 2 161 leased properties was completed. This audit included the physical verification of 2 143 leased properties. iv. Substantial improvements by the Department were made as is evidenced by progression from disclaimers in 2010/11 and 2011/12 to a qualification in 2012/13 and an unqualified audit outcome in 2013/14. v. Improved internal efficiencies within the Prestige portfolio have been realised by centralising this function in the office of the Director-General. 18 STRATEGIC OVERVIEW – INTERNAL ENVIRONMENT 2. The Turnaround Strategy (cont…..) Phase II – Efficiency Enhancement The Efficiency Enhancement Phase commenced on 01 April 2014 during which time, ten (10) projects were prioritised to drive this phase of the Turnaround Strategy. These projects include, among others: i. The Service Delivery Improvement Plan (SDIP) and Macro Service Delivery Model are in place. The SDIP, will in the longer term, become the business improvement process for the Department and PMTE; ii. The operationalisation of the PMTE and its establishment as a Trading Entity. iii. Supply Chain Management (SCM) is being restructured to meet the business requirements. iv. Improving internal efficiencies to meet the service delivery requirements of Prestige clients is underway to ensure that deliverables comply with the prescripts of the Ministerial Handbook. v. Developing an Information Technology (ICT) strategy, architecture and platform as a key enabler has been prioritised for immediate implementation. vi. Combating fraud and corruption within the Department as well as in the construction and property sectors, while holding transgressors accountable for their actions and vii. Implementing an effective Change Management Strategy to enable a performance driven culture has already been initiated in an effort to restore a performance management culture in the Department. 19 STRATEGIC OVERVIEW – INTERNAL ENVIRONMENT 3. The business model of the Department of Public Works Whilst operationalising the PMTE, the Department will place greater emphasis on: i. developing best practice within the sector; ii. managing the transformation and growth of the construction and property sectors; iii. drafting legislation and undertaking regulatory functions; iv. formulating policies and implementation guidelines for the sector; v. setting norms and standards for the Public Works Sector; vi. managing the norms and standards and policy formulation for the Prestige Client Portfolio; vii. coordinating the implementation of the EPWP; viii. focusing on its role in terms of the concurrent functions and the management of performance in this regard; and ix. carrying out oversight functions and coordination of the Entities. 20 STRATEGIC OVERVIEW – INTERNAL ENVIRONMENT 4. Public Works Concurrent Function i. The public works function is a shared competency between the National and Provincial Governments in accordance with Schedule 4 of the Constitution of the Republic of South Africa, 1996 (Act 108 of 1996). ii. In the absence of the Public Works Act, MinMec has provided the basis for oversight and coordination of the concurrent functions. iii. As a forum of co-operative Government, MinMec has been utilised to consult, coordinate implementation and align programmes/priority areas including: iv. a) The upscaling of EPWP to ensure sustainability, delivery of public services and infrastructure and adequate institutional capacity; b) Infrastructure planning, delivery and management in terms of GIAMA (U-AMPs/ C-AMPs) and IDMS; c) Service delivery improvement interventions, capacity building, resource management and proper internal controls (incl. SCM); d) Socio-economic growth through consultation and cooperation with wider stakeholders towards renewed and sustainable development The Policy Review, including the appraisal of the White Papers (1997 and 1999) and broad consultation with the wider Public Works community will provide a solid foundation for the Public Works Act. This process aligns with the third phase of Turnaround Strategy and will ensure the creation of coherent Government structures and processes that will deliver the mandated services21 through the three spheres of Government. PERFORMANCE ENVIRONMENT 1. 2. The following achievements have been noted in the service delivery environment i. Commendable improvements in internal controls which has resulted in improved audit outcomes for DPW. ii. Achievements of EPWP Phase II with the creation of over 4 mil work opportunities. Significant contribution has been noted in various sectors. Challenges in the current service delivery environment and strategies for redress i. Deficiencies in the internal control environment – The Department has compiled a comprehensive action plan which is also reviewed by Internal Audit. The Action Plan is updated quarterly and discussed at Accountability EXCO. ii. Inadequate internal performance management operating procedures – interventions include the development of policies, procedures and processes, proper record keeping, training, improved quality controls, M&E Forum iii. Lack of integration of performance information structures and systems within existing management processes and systems (ICT) – A 3 Phased approach to improving ICT infrastructure and systems has been developed. The business application stack is key in the stabilisation phase. iv. Inability to retain and attract the required skilled personnel – A Change Management Strategy has been developed to address capacity challenges and manage the change process. The implementation of the new organisational structure will be supported by a 22 comprehensive Human Resource Plan. PERFORMANCE ENVIRONMENT 3. Additional strategies identified to improve efficiencies in the performance environment i.Alignment of the concurrent functions ii.Development and implementation of the Service Delivery Model Framework (SDMF) iii.Meeting the needs of Prestige clients iv.Actively reducing fraud and corruption in the Department 4. Demand for services – Demand for EPWP in terms of the upscaling for Phase III i.High and growing rates of unemployment are a consequence of dynamics on both the demand and supply sides of the labour market. ii.There has not been sufficient employment growth to absorb new labour market entrants or to provide jobs for those people who experienced job losses due to shrinking demand for labour iii.The EPWP is a nationwide programme covering all spheres of government and state-owned enterprises. It aims to draw significant numbers of unemployed people into productive work accompanied by training, so that they increase their capacity to earn an income. 5. Spending focus over the MTEF in accordance with the Department’s priorities i.The Department’s budget over the medium-term is R20.7 billion. The budget of R6.4 billion is projected to increase to R6.9 billion in 2016/17 and R7.4 billion in the 2017/18 financial years. ii.The devolution of the budget allocation of approximately R11.2 billion to the PMTE has resulted in the decrease in the Departmental budget allocations over the medium-term. The budget allocation for the devolved functions has been reclassified as transfers and subsidies to the PMTE within Programme 4. 23 HIGH LEVEL ORGANISATIONAL STRUCTURE Minister Mr. T.W. Nxesi Deputy Minister Mr. J.P. Cronin Director-General Mr. M. Dlabantu Head of PMTE Internal Audit (Acting) Mr. M. Govender Ms. T. Tusiki Prestige Mr. M. Sazona Construction and Property Policy Development (Acting) Ms. M Fatyela-Lindie Expanded Public Works Programme Chief Financial Officer Mr. S. Henderson Mr. C Mokgoro Corporate Services Mr. C. Mtshisa Governance, Risk and Compliance Intergovernmental Relations Mr. I Fazel (Vacant) 24 ORGANISATIONAL ENVIRONMENT i. The Department has reviewed the organisational structure for DPW and PMTE which will be approved and implemented over the MTEF. ii. PMTE is being operationalised to undertake management functions across the asset lifecycles the immovable asset iii. The Department has refined its role to give effect to improved oversight practices to ensure the coordinated and integrated delivery of services through, policy formulation, determining regulatory prescripts including setting norms and standards, and overseeing the implementation of these functions. iv. The Department has an approved establishment of 1 618 posts of which 1 413 are filled. Focus over the next term is on strengthening the functions within DPW – Intergovernmental Relations, Policy, EPWP, Prestige and Governance, Risk and Compliance. v. An integrated Human Resource Plan has been developed to respond to Government’s priorities and to align the Department’s workforce with the mission, vision, strategic goals and financial resources of the Department. vi. DPW will continue to provide support to the PMTE during the transition to the Government Component whilst strengthening the remaining functions 25 BUDGET ALLOCATION SUMMARY PER PROGRAMME Adjusted appropriation Programmes 2014/15 Medium-term expenditure estimate 2015/16 2016/17 2017/18 (R’000) (R’000) (R’000) (R’000) 474 253 475 996 502 183 519 825 25 750 47 223 50 091 52 827 Expanded Public Works Programme 1 951 295 1 992 234 2 324 773 2 470 050 Property and Construction Industry Policy Regulation 3 543 989 3 802 962 3 960 662 4 220 227 126 033 92 672 97 469 104 767 6 121 320 6 411 087 6 935 178 7 367 696 Administration Intergovernmental Coordination Prestige Total 26 BUDGET ALLOCATION SUMMARY PER ECONOMIC CLASSIFICATION Economic classification Adjusted appropriation 2014/15 Medium-term expenditure estimate 2015/16 2016/17 2017/18 (R’000) (R’000) (R’000) (R’000) 3 027 775 882 781 925 666 961 642 Compensation of employees 1 667 797 474 995 499 639 516 136 Goods and services 1 359 978 407 786 426 027 445 506 Transfers and subsidies 2 563 905 5 500 246 5 968 004 6 356 769 1 201 520 1 178 866 1 425 668 1 525 818 802 506 3 703 137 3 907 109 4 163 963 Foreign governments and international organisations 22 548 23 273 24 506 25 731 Public corporations and private enterprises 50 000 50 000 - - 477 481 534 816 600 257 630 270 9 850 10 154 10 464 10 987 529 640 28 060 41 508 49 285 Current payments Provinces and municipalities Departmental agencies and accounts Non-profit institutions Households Payments for capital assets Buildings and other fixed structures 416 065 Machinery and equipment 107 232 28 060 41 508 49 285 6 343 - - - 6 121 320 6 411 087 6 935 178 7 367 696 Software and other intangible assets Total 27 MTEF ALLOCATION – EARMARKED FUNDS Medium-term expenditure estimate Earmarked Budget Allocation Expanded Public Works Programme non state sector Expanded Public Works Programme provision for payments of non wage costs by the non state Independent Development Trust (Independent Development Trust) Intermediary programme management cost) Construction Industry Development Board Council for the Built Environment Turnaround programme Parliamentary Villages Management Board Property Management Trading Entity Independent Development Trust 2015/16 (R’000) 2016/17 (R’000) 2017/18 (R’000) 509,400 572,494 602,169 25,416 26,763 28,101 11,275 11,884 12,478 65,626 41,994 33,370 9,090 3,584,652 50,000 62,059 43,413 31,138 9,572 3,790,172 89,984 48,568 37,092 10,051 4,013,347 Conditional Grants to Local Government Expanded Public Works Programme Integrated Grant to municipalities 587,586 587,586 663,991 663,991 716,427 716,427 Conditional Grants to Provincial Government Expanded Public Works Programme Integrated Grant to Provinces Social Sector Expanded Public Works Programme Incentive Grant to Provinces 591,175 350,612 240,563 761,671 402,009 359,662 809,385 423,802 385,583 5,509,584 5,973,157 6,367,602 Total 28 3 PART B: Strategic objectives and programme plans This section specifies strategic objectives and their resource implications for each budget programme (SP Pages 70-83 and APP Pages 20-71) 29 PROGRAMME OBJECTIVES AND BUDGET Programme Strategic Objective(s) 5 Year Targets Budget Administration • To provide strategic corporate services to PMTE and DPW through the implementation of corporate service plans. • Corporate service (Human Resources, ICT, Security, Legal, Gender, International Relations and Communications) plans developed to resource DPW and PMTE. • Unqualified audit outcome The cost drivers for this Programme are compensation of employees and goods and services. The budget allocated for 2015/16 is R475m. The reduction in the budget for this Programme is due to the budget for the provision of office accommodation for Public Works being moved to the PMTE • To pursue common service delivery objectives within the public works sector through the coordinated implementation of programmes at National and Provincial level • Public Works sector supported in areas of concurrence The Programme’s Budget is expected to increase over the MTEF as the functions are properly established and personnel appointed. • To ensure compliance to management practices through the MPAT improvement plan • 100% compliance of management practices as per MPAT • To ensure sound financial resource management through compliant and responsive financial management practices to maintain an unqualified audit outcome. Intergovernme ntal Coordination The bulk of spending in this Programme will be on providing sound sectoral intergovernmental relations and strategic monitoring and evaluation, compensation of employees as well as goods and services. The budget allocation for 2015/16 is R47m. 30 PROGRAMME OBJECTIVES AND BUDGET Programme Strategic Objective(s) 5 Year Targets Budget Expanded Public Works Programme • To co-ordinate, monitor and evaluate the implementation of EPWP Phase III that aims to create 6 million work opportunities and provide income support to the poor, lowly skilled and unemployed between 2014 - 2019 6 million work opportunities created by public bodies in the EPWP aligned to the Phase III Business Plan The budget allocated for this Programme for the 2015/16 financial year is R1.9bn. The spending focus for EPWP will remain on the payment of performance-bases incentives to eligible Provinces, Municipalities and Non-Profit Organisations for the creation of jobs on labour intensity. The Programmes received an additional funding of R50m on transfers and subsidies to the Non-State Sector 31 PROGRAMME OBJECTIVES AND BUDGET Programme Strategic Objective(s) 5 Year Targets Budget Property and Construction Industry Policy and Research • Promote sound immovable asset management in the public sector • New legislative and policy frameworks to govern the immovable assets under the custodianship of the Department Due to the re-organisation of the budget programme structure of the Department to support the operationalisation of PMTE, the budget structure of this Programme was amended, which resulted in a significant increase in its allocation. The budget allocation for 2015/16 is R3.8 bn, the bulk of the which will be a transfer to PMTE. • To regulate and transform the Construction and Property industries • Public Works Act promulgated The spending focus for this Programme over the medium term will continue being on the promoting the growth and transformation of the property and construction sector. Prestige Policy • To develop, monitor and improve prestige policy frameworks annually • To provide movable assets (office and residential) and structures to Prestige clients • 7 Approved Policy Frameworks for Prestige • Movable assets (office and residential) provided to Prestige clients within 60 days of receipt of request The bulk of spending for this Programme over the medium term will be on the development of norms and standards for Prestige accommodation, the provision of movable assets and meeting protocol responsibilities for the State functions. The budget allocation for 2015/16 is R92m. 32 5 PART C: Links to long term infrastructure plan This section provides the details to other plans that the Department factors into its planning process, Public Entities reporting to the Department and Conditional Grants (SP Page 103-147) 33 PART C – LINKS TO OTHER PLANS 1. Service Delivery Improvement Plan – The SDIP is a detailed plan with target to improve delivery in critical services over the next three (3) years. The SDIP is underpinned by the need to adopt the Infrastructure Delivery Management System (IDMS) as the primary system for the management of delivery. The SDIP sets out in clear terms the following three areas for improvement which have been identified through a scientific situational analysis process. i. ii. iii. 2. Provisioning of accommodation through construction (aligned to the IDIP); Provisioning of accommodation through private leases (aligned to IDIP); and Customer relationship management. Strategic Risk Plan – Listed below are the strategic risks where specific attention and resources will be focused. i. Fraud and Corruption arising from failure to comply with legislative prescripts ii. Inability to implement the proposed structure iii. Insufficient technical capacity to support PMTE iv. Lack of integrated business systems v. Loss of State funds due to breach of contracts by non performing contractors vi. Uncertainty of Business Continuity resulting from change vii. Exposure to fraud and corruption viii. Failure to deliver quality services ix. Ineffective implementation of the Expanded Public Works by implementing bodies x. Low levels of transformation in the Construction and Property Industries xi. Non adherence to Prestige Regulatory frameworks by Prestige clients 34 PART C – CONDITIONAL GRANTS 3. The Department received the following conditional grants under the Expanded Public Works Programme: i. EPWP Integrated Grant to Provinces ii. EPWP Integrated Grant to Municipalities iii. Social Sector EPWP Grant for to Provinces iv. Non State Sector Wage Subsidy. 35 PART C – PUBLIC ENTITIES 4. There are four Public Entities reporting to the Department of Public Works. The Entities serve as an extension of and assist the Department in delivering on its mandate. Name of Public Entity 2015/16 Budget Construction Industry Development Board (cidb): The cidb supports the Department by providing strategic direction and developing effective partnerships for growth, reform and improvement of the construction sector; R128 098 (DPW transfer: R65 626 and other revenue R62 472) Council for Built Environment (CBE): The CBE implements projects and programmes that address the built environment issues and add value to the built environment professions, Government and the general public; R43 947 (DPW transfer: R41 994 & other revenue R1 953) Independent Development Trust (IDT): The IDT supports the Department in contributing to Government’s priorities of job creation, sector skills development, green buildings initiatives and eradication of social infrastructure backlogs. R451 000 000 (DPW transfer: R 50 000 000 Management fees for the financial year: R396 900 000 Investment Income – R5 000 000) R13 631 (DPW transfer of R11 682 and other revenue of R1 949). Agrément SA (ASA): ASA supports the Department by technically assessing innovative construction technologies and promoting their use to stimulate the creation of sustainable short and long-term work opportunities; 36 THANK YOU National Department of Public Works (NDPW) Head Office: Public Works CGO Building Cnr Bosman and Madiba Pretoria Central Private Bag X65 Pretoria 0001 Website: http://www.publicworks.gov.za 37