HCC report Summary of the tests of the LSS8L power converters in short-circuit F. Rodríguez-Mateos on behalf of R.Ballet-Thouble, E.Barbero-Soto, F.Bordry, S.Brown, M.Cayla, P.Charrue, F.Chevrier, Ch.Coupat, PY.Collaud, C.Dehavay, JY.Dutoit, A.Foreste, E.Garde, JC.Guillaume, E.Hatziangeli, J.Iñigo-Golfín, Q.King, M.Lamont, R.Lauckner, E.Molina, B.Ocelli, S.Page, J.Pedersen, R.Saban, H.Thiesen, J.Thomsen, J.Wozniak TC CO July 28 2005 Outline Equipment under test configurations Procedures Main findings Conclusions and outlook TC CO July 28 2005 Equipment under test Q5 [5kA/8V] RQ5.L8B1 RQ5.L8B2 RCBCH5.L8B1 RCBCHS5.L8B1 RCBCHS5.L8B2 RCBCV5.L8B2 RCBCVS5.L8B1 RCBCVS5.L8B2 [±120A/±10V] Q4 XL8 RQ4.L8B1 [4kA/8V] RQ4.L8B2 RQX.L8 RTQX1.L8 RTQX2.L8 RD2.L8 [7kA/8V] RD1.L8 RCBYH4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYVS4.L8B1 RCBYVS4.L8B2 RCBXH1.L8 RCBXH2.L8 RCBXH3.L8 RQSX3.L8 [±120A/±10V] TC CO July 28 2005 courtesy H.Thiesen RCOSX3.L8 RCSSX3.L8 RCTX3.L8 [7kA/8V] RCBXV1.L8 RCBXV2.L8 RCBXV3.L8 [±600A/±10V] RCOX3.L8 RCSX3.L8 [±120A/±10V] Power converters configurations (1) 18kV 400V UPS PC Water TC CO July 28 2005 RCBYH4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYVS4.L8B1 RCBYVS4.L8B2 RCBCH5.L8B1 RCBCHS5.L8B1 RCBCHS5.L8B2 RCBCV5.L8B2 RCBCVS5.L8B1 RCBCVS5.L8B2 RQ4.L8B1 RQ4.L8B2 RD1.L8 RD2.L8 RCBXH1.L8 RCBXH2.L8 RCBXH3.L8 RCBXV1.L8 RCBXV2.L8 RCBXV3.L8 RQSX3.L8 RCOSX3.L8 RCOX3.L8 RCSSX3.L8 RCSX3.L8 RCTX3.L8 courtesy H.Thiesen RQ5.L8B1 RQ5.L8B2 UPS 18kV 400V PC1 PC2 Water Power converters configurations (2) RQX.L8 RTQX1.L8 RTQX2.L8 18kV 400V 600A 4.7kA UPS 7kA I.T. En Cal. FIP PIC Water Chilled Water TC CO July 28 2005 courtesy H.Thiesen TC CO July 28 2005 Procedures Action Equipment Group(s) Responsible 1 The individual electrical feeder is unlocked and the converter is connected to the grid AB/PO TS/EL 2 Tests to verify that the converter shuts down in case of loss of cooling water in the converter or in the cables and tubes AB/PO TS/EL TS/CV 3 The converter is turned on and the control loop is tuned AB/PO 4 Tests to verify the remote operation of the power converter via the WorldFip AB/PO AB/CO 5 8-hour heat runs at Iult carried-out with the converter connected to the Control Network AB/PO TS/EL TS/CV TC CO July 28 2005 The findings Cabling Thermal behaviour of cables is very sensitive to their arrangement on trays, ducts, transitions, etc. Corrections have been applied and validated Validation of optimized sections (240 and 35 mm2, respectively, for corrector circuits generically known as “600A”and “120A”): special attention to hot spots A more complete procedure for high voltage tests on water-cooled cables is required The crimped fittings on the flexible tubes of the water cooled cables must be insulated Indirect cooling of cables in the ducts: an alarm must be generated if the temperature exceeds a given value Water cooling Setting and balancing of water circuits must be done before short-circuit tests start Scheme for three-cable circuits (Q4,Q5) will be changed Reference Database: ultimate currents TC CO July 28 2005 The findings (2) Power converters Estimated times for the different phases are confirmed Contrary to what was initially specified, World-Fip has to be operational from the very beginning of the tests While the individual commissioning of the PC is done in situ, the field control room is really needed for the parallel testing during the 8-h heat runs The power terminals of one of the IT high-current converters seem to be too far apart “Visites d’inspection” must be scheduled well in advance be documented in such a way that the different Groups see clearly the points which pertain to their systems be attended by the engineers responsible of each system also focus on a global system approach TC CO July 28 2005 The findings (3) Controls The sequencer – invaluable tool Logging – not really operational Alarms – not mature but ran solidly Fixed displays – running from the start but needs refinement e-logbook was missing Communication infrastructure – performed as expected Control room Noisy environment, not easy to have discussions! MTF has been operational from the first moment, and proves to be very useful and necessary IN THE FIELD TC CO July 28 2005 Conclusions It has been a successful start of the LHC HC We have gathered plenty of valuable information that must be now documented and retrofitted: cabling controls converters cooling coordination environment inspections safety We need to optimize preparations and procedures update the Reference Database (and drawings) update LHC-R-HCP-0001 refine the procedure for high voltage tests of water-cooled cables implement procedure for the water flow settings define procedure for the “visite d’inspection” TC CO July 28 2005 Outlook In September everything we have learnt will be applied to a larger scale i.e. the complete set of converters in UA83 Every finding, every nonconformity, every new lesson must be documented. HCC will follow it up Everyone has shown great flexibility and collaboration spirit: we must keep it up! TC CO July 28 2005 Ultimate currents PC_NAME MAGNET I_RATED_PC I_ULT_CIRCUIT I_NOM_CIRCUIT Comment [A] [A] [A] RPHH.UA83.RQ4.L8B1 RPHH.UA83.RQ4.L8B2 RPHGB.UA83.RQ5.L8B2 RPHGB.UA83.RQ5.L8B1 RPHF.UA83.RD2.L8 MQY MQY MQM MQM MBRC RPLB.UA83.RCBCH5.L8B1 RPLB.UA83.RCBCHS5.L8B2 RPLB.UA83.RCBCHS5.L8B1 RPLB.UA83.RCBCVS5.L8B2 RPLB.UA83.RCBCVS5.L8B1 RPLB.UA83.RCBCV5.L8B2 RPLB.UA83.RCBYHS4.L8B2 RPLB.UA83.RCBYHS4.L8B1 RPLB.UA83.RCBYH4.L8B2 RPLB.UA83.RCBYVS4.L8B2 RPLB.UA83.RCBYVS4.L8B1 RPLB.UA83.RCBYV4.L8B1 MCBCH MCBCH MCBCH MCBCV MCBCV MCBCV MCBYH MCBYH MCBYH MCBYV MCBYV MCBYV RPHF.UA83.RQX.L8 RPHGC.UA83.RTQX2.L8 RPMBB.UA83.RTQX1.L8 RPHF.UA83.RD1.L8 MQXA MQXB MQXA MBX RPMBB.UA83.RCBXH2.L8 RPMBB.UA83.RCBXH3.L8 RPMBB.UA83.RCBXH1.L8 RPMBB.UA83.RCBXV1.L8 RPMBB.UA83.RCBXV2.L8 RPMBB.UA83.RCBXV3.L8 RPMBB.UA83.RQSX3.L8 RPLB.UA83.RCOSX3.L8 RPLB.UA83.RCOX3.L8 RPLB.UA83.RCSSX3.L8 RPLB.UA83.RCTX3.L8 RPLB.UA83.RCSX3.L8 MCBXH MCBXH MCBXH MCBXV MCBXV MCBXV MQSX MCOSX MCOX MCSSX MCTX MCSX TC CO July 28 2005 4000 4000 6000 6000 8000 3900 3900 4650 4650 6500 3610 3610 4310 4310 6000 120 120 120 120 120 120 120 120 120 120 120 120 80 80 80 80 80 80 77 77 77 77 77 77 74 74 74 74 74 74 72 72 72 72 72 72 8000 6000 600 8000 7000 11410 7000 6100 6450 10630 6450 5800 600 600 600 600 600 600 600 120 120 120 120 120 600 600 600 600 600 600 600 110 110 110 86 55 550 550 550 550 550 550 550 100 100 100 80 50 Magnet String operating at 4.5K Magnet String operating at 4.5K Magnet String operating at 4.5K Magnet String operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 4.5K Magnet operating at 1.9K Current to be used during sc tests = 4.41kA, Magnet operating at 1.9K Current to be used during sc tests = 600A, Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K Magnet operating at 1.9K