Dr. Ignace Gatare, Minister of ICT at th President's

advertisement
IT
Broadband Connectivity
Infrastructure Projects
Projects Status
IT
Rwanda Vision For Science & Technology – Focus on ICT
• Step 1: Enabling Environment already in place that allows investment in
sector: Policies, Institutions, Regulatory Environment
• Step 2: Infrastructure Challenge being addressed
– See next Diagram (NBB, KMN, WiBro, Rwandatel and MTN fiber
Networks and Several ISP Wimax Solutions now exist)
• Step 3: Developing IT driven Service Sector [Ongoing, needs accelerated
development]
– Efficient Banking Systems, Tourism and Public Service Delivery
– Financing of Development
• Step 4: Needs concerted efforts in building a critical mass of highly skilled
workforce— We have chosen Software Development as a key driver of our
transformation process
2
Policies Infrastructure  Business
IT
Knowledge-Based
economy
Service sector development
Infrastructure development
Enabling environment
2001-2005
2006-2010
2010-2015
2015-2020
IT
Enabling Environment: Investment ICT in Infrastructure
NATIONAL BACKBONE
International
Gateway
ARTEL
(Satellite Com)
WiBro
KMN
Local IEX
Kigali Metropolitan Network
Network Operations
Center
National
Data Center
4
The Projects
1. NBB: National Backbone Fibre-Optic
Network
2. KMN: Kigali Metropolitan Network
3. WiBro: Wireless Broadband Network
IT
Broadband Connectivity Infrastructure Projects
National Backbone Network
About the Project
• A high-speed 2,300 Km fiber-optic network that will
interconnect all the districts and border posts of the
Country
• This network shall also provide converged IP/MPLS
services to 226 identified located in the districts
• Sites to be connected: district headquarters, schools,
universities, hospitals, health centers, social security
fund offices, RRA & Customs offices, police offices,
immigration offices, utilities, army camps/barracks, BNR
branches, Judiciary Offices, ORTPN sites, etc…
• Border post connectivity for regional and international
traffic
IT
Broadband Connectivity Infrastructure Projects
National Backbone Network
IT
Broadband Connectivity Infrastructure Projects
National Backbone Network
Civil Works: Kigali Gatuna
IT
Broadband Connectivity Infrastructure Projects
The Projects
1. NBB: National Backbone Fibre-Optic
Network
2. KMN: Kigali Metropolitan Network
3. WiBro: Wireless Broadband Network
IT
Broadband Connectivity Infrastructure Projects
Kigali Metropolitan Network
About the Project
• Construction of a high-speed Fiber-optic network in the
Kigali metropolitan area;
• Deployment of Network Equipments (MPLS) to provide
IP data, voice and video services to all government
agencies in Kigali City;
• Construction of a Network Operations Control Center
(NOC) for central network management and operation;
• Network capacity: 10Gbps ring (STM-64), max1Gbps
network equipment for each government site
• Interconnection with the National Backbone Network (all
the 30 districts and border posts)
IT
Broadband Connectivity Infrastructure Projects
Kigali Metropolitan Network
Completed Activities
• Phase 1:
– Installation of underground fibre-optic cables (57 Km, 54
government buildings, 63 agencies)
– Deployment of IP/MPLS Network Equipments to (46 Routers,
105 Switches, 53 Optical Fiber Distribution Frame (ODF), 72
Network racks, 73 UPS)  Installation and configuration
completed for 46 government agencies
– Construction of Network Operation Center (NOC) at Telecom
House
– 3040 VoIP phones delivered (1725 phones configured)
– Configuration of VoIP System & Data Connectivity
– Network Migration: 10th of December 2009
IT
Broadband Connectivity Infrastructure Projects
Kigali Metropolitan Network
Network Operation Center (NOC) at Telecom House for Realtime Network Control & Monitoring
IT
Broadband Connectivity Infrastructure Projects
The Projects
1. NBB: National Backbone Fibre-Optic
Network
2. KMN: Kigali Metropolitan Network
3. WiBro: Wireless Broadband Network
IT
Broadband Connectivity Infrastructure Projects
WiBro Network
About the Project
• WIBRO stands for Wireless Broadband; it is a Korean Mobile
WiMax Technology which provide superior broadband
services for data, voice , video
• The network consists of a core fibre-optic transmission
network , wibro radio equipments, antennas and masts
installed at various locations in the city
• Project implementation started in June 2008. First trial-run
succesfully conducted in Dec 2009
• The project is divided into 2 phases.
– The first phase is coverage of Kigali City
– Second phase is coverage of 5 towns: Rwamagana, Huye,
Rusizi, Ruhengeri and Gisenyi.
Broadband Connectivity Infrastructure Projects
IT
WiBro Network
IT
Broadband Connectivity Infrastructure Projects
WiBro Network
Topology
Internet Backbone
Centenary House
BCDI
City Plaza
AAA
APEX
Biryogo
AAA
Nyarugenge
Nyakabanda
RWT Switch
Nyamirambo
Kabuga
Kinamba
ACRTelecom
House
Okapi Hotel
Mininfra
Kimihurura 1
Gisozi
Nyarutamara
Covibar
RITA
Kacyiru 1
Gitega
Kacyiru 2
Kimihurura 2
KIST 2
KIST 3
Inind House
Kicukiro
Samantha House
Gorilla Hotel
Golf Club
KL House
Kibagabana
Stadium Giporoso
Mburabuturo
Kimironko 2
Giporoso
Gicondo 1 Gicondo 2
IT
Kanombe
Broadband Connectivity Infrastructure Projects
Kissementi
Minijust
WiBro Network
Project Status





Civil works for fibre-optic cables installation – 95% completed
Site acquisition – 100% completed
Power Installation – 80% completed
Telecommunication Tower construction – 90% completed
Equipment installation(Antennas, Base station, repeaters...) –
95 % completed – Total of 40 Sites (Towers & Rooftop)
 WIBRO Network Operating Center – 90% completed
Kigali WiBro Network scheduled to go live on December 10th, 2009
– Trial Run Phase (Dec 2009 to February)
– Commercial Services requires a company set-up (Regulatory
Requirement)  WiBro network should be owned and managed by
a Commercial Entity
IT
Broadband Connectivity Infrastructure Projects
WiBro Network
Tower Construction &
Installation
RDB-IT has constructed 40 Sites (Towers and Rooftop types) in Kigali City
IT
Broadband Connectivity Infrastructure Projects
END
IT
Broadband Connectivity Infrastructure Projects
Download