UPED-20030227-007_TR42_Report

advertisement
TIA TECHNICAL COMMITTEE
(Contribution Number)
Title: UPED Update of Activities within TR-42, User-Premises
Telecommunications Infrastructure
Distribution to: Participants of TIA UPED
Name
Company
Address
Phone
Fax
E-mail
Bob Jensen
Fluke Networks
9015 Mountain Ridge, Austin, TX
(512) 514-7760
(512) 343-2457
robert.jensen@flukenetworks.com
Date:
24-Feb-03
Location: Teleconference
Recommendation: (choose one)
For decision
For discussion
For information
Abstract: This document contains an update of TIA TR-42 activities.
COPYRIGHT STATEMENT:
The Source1 grants a free, irrevocable license to the Telecommunications Industry Association (TIA) to incorporate text or other copyrightable material
contained in this contribution and any modifications thereof in the creation of a TIA Publication; to copyright and sell in TIA's name any TIA
Publication even though it may include all or portions of this contribution; and at TIA's sole discretion to permit others to reproduce in whole or in part
such contribution or the resulting TIA Publication. The Source will also be willing to grant licenses under such copyrights to third parties on
reasonable, non-discriminatory terms and conditions for purpose of practicing a TIA Publication which incorporates this contribution.
This document has been prepared by (Company) to assist the TIA Engineering Committee. It is proposed to the Committee as a basis for discussion
and is not to be construed as a binding proposal on (Company). (Company) specifically reserves the right to amend or modify the material contained
herein and nothing herein shall be construed as conferring or offering licenses or rights with respect to any intellectual property of (Company) other
than provided in the copyright statement above.
The Source agrees that if the Source has changed or added text to the required language in the TIA contribution template as contained in the TIA
Engineering Manual, any such change or addition which is inconsistent with such contribution template, is of no force or effect.
1 The
owner of the copyright or license right, if any, submitted in the contribution.
TR-42 Initiatives
• Liaison Reports given once during the
week rather than at each Subcommittee
(reduces time)
– Liaisons from other SDOs
– Administrative information to members
• FTP site, reflector, cover sheets, other items from
Subcommittees, Technical Committees, and TIA
• TR-42 Operational Guide
– Updated with method for issuing liaison
letters to other SDOs between meetings
TR-42 Initiatives
• Reviewing document numbering and
organization
• Items reviewed in ISO/IEC JTC1 SC25
WG1 and WG3 produced by TR-42
– TIA 606-A had clauses adopted chapters
into ISO/IEC document
– TIA 569-B Multi-tenant being reviewed and
initiated into addendum to ISO/IEC 18010
– TIA 862 Building Automation Systems
reviewed for incorporation into ISO/IEC
– TIA 570-A, Residential Cabling
Harmonized with ISO/IEC 15018
– TSB140, reviewed and incorporated into
ISO/IEC Planning and Installation Guide
TR-42 Initiatives
• Coordination of Project Team
between TR-42, US TAG, and
ISO/IEC JTC1 SC25WG3
– Initiative started with focus on
industrial cabling
– Envision quicker TIA standard that
is internationally harmonized (See
following 2 slides)
Coordinated Project Team
Harmonised requirements for:
• channel transmission performance
• environmental channel performance
• cabling structure and terminology
• media types and supported applications
IEC SC48B
Connecting hardware
IEC SC46C
Cables
CLC SC48B Connecting hardware
CLC
EN 50173-2
CLC SC46XC Cables
ISO/IEC
Industrial
Premises
Cabling
“Design”
Standard
US
Canada
Mexico
TIA
42.9
TIA 42.7.1 Connecting hardware
TIA 42.7.2 Cables
Pathways & Spaces: TIA/EIA- 569 series
Installation: EN 50174 series
Testing: EN 50346 series
Testing: TIA/EIA -568 series
Other regional standards
Installation: ISO/IEC TR14763-2
Testing
IEC 61935-1 and
ISO/IEC TR14763-3
BAS: TIA/EIA -862
Support
SCs
(e.g., 42.7)
US,
Canada,
Mexico
Project
Team
WG3
Project
Team
Other
SDO
Project
Team
Yes
Yes
TR-42.9
Contribution
Other
SDO
Contribution
No
No
Harmonization
Addendum to TIA 568-B.1,
Commercial Cabling
• Addendum 2 (Approved to Publish)
– Bonding/Grounding of screened twisted-pair
cabling
• Addendum 3 (Approved to Publish)
– Fiber Applications Guide
• Addendum 4 (Approved to Publish)
– Recognize Cat 6 and 50/125 m laseroptimized optical fiber and category 6 cabling
Addendum to TIA 568-B.2,
Copper Cabling
• Addendum 6 (initiating work)
– Contains category 6 comments that were
tabled for future consideration
– This addendum is not viewed to substantially
change the current requirements for category
6 connecting hardware
• Addendum 7 (initiating work)
– Modifications to Annex A for non RJ-45
connecting hardware
– Expect ballot to forward at February meeting
Revision of TIA 569-A,
Pathways and Spaces
• All but one technical comment was
resolved regarding power separation
from telecommunications cabling
– Task Group established to resolve issue
• The revised draft will be out for
industry ballot shortly
Revision of TIA 570-A,
Residential Cabling
• New items
– Applications table
– Termination of cabling within the distribution device
(IDC)
– Distribution device sizing
– Testing
– Coaxial cabling
– Installation Guide
– Administration
• Need help on upholding RJ-11 Plug specification
by manufacturers (can FCC help)
• Working with SCTE on Coaxial test specification
Revision of TIA 758,
Customer-owned OSP
• Out for ballot – June ballot
resolution
Industrial Cabling SC
• Cabling
– Tabulation of environmental parameters
defines severity of industrial
environment by reference to IEC
recognized parameters (accepted as
working set)
Ballot for June Meeting
• TSB 136 – Array Connector Polarity
• TSB 140 – Fiber Cabling Test
Certification
• Mitigating ESD Problems
• Data Center Cabling
Ongoing Work
• DTE Task Group
– Defining requirements for delivering
power over copper cabling in
cooperation with IEEE 802.3af
Work Initiated
• Study group for next generation
copper cabling
• Draft of TIA-568-C Series
incorporating all the addenda and
consistent organization
Work Initiated
• Telecommunications Enclosures
Addendum to 568-B.1
– Confusion and improper application of
TEs in the field and in the market
– Will develop addendum as TIA 569-B
nears approval
Forthcoming Work
• IEEE 802.3 approved working on
10GBASE-T
– Unknown what will be required
TR-42 Wish List
• Electronic rosters for sign-in at meeting
–
–
–
–
Quorum Call
Track attendance
Hotel room nights
Ease of incorporating database into meeting
reports
• Ballots need ability to be done off-line and
indexed within database.
• Style Guide
• Initiate review of Engineering Manual
• Meeting locations need to be pursued
Download