37 Construction in Saudi Arabia. Summary: 37.1 Introduction. 37.2 Project Control Systems. 37.3 Productivity and Efficiency. 37.4 Example Infrastructure Development. 37.5 Construction Problems in Saudi Arabia. 37.6 Conclusions. 1 37.1 Introduction. • In recent years, construction in Saudi Arabia has been prosperous. • Construction has been undertaken by construction firms from all over the world: – consequently, management of construction projects has not been standardized: – four different types of project management practices are found in Saudi Arabia: • traditional A/E - usually government funded, lump-sum; • design-build - generally military projects, negotiated; • design construction manager - generally large scale projects like airports; 2 • professional CM. • North American and Western European contractors dominated the market in the 1970’s; • Since then, S.E. Asian contractors started making a significant contribution; • The number of foreign contractors operating in Saudi Arabia has been increasing. 3 37.2 Project Control Systems. • From the simplest manual system to the most sophisticated computer-based methods are used: – bar charts (Gantt charts); – CPM (Critical Path Method); – PERT (Program Evaluation and Review Technique); • The type of system used is rarely specified by the contract: • however, this is slowly changing. 4 37.3 Productivity and Efficiency • Productivity of contractors operating in Saudi Arabia has improved tremendously over the years. • A series of development plans for the country have been implemented: – first (1970-75) = 49.6% of total government expenditure; – second (1975-80) = 32% of total spending; – third (1980-85): projects worth over a $130 billion were executed in the country; – fourth (1985-90): successful, but labor force decreased due to computerization, automation, and mechanization. 5 37.4 Example Infrastructure Development • Universities in Saudi Arabia (8 new) have made a major contribution to the evolution of construction in the country; • Example: King Saudi University, 1984: – – – – – – cost $4,400,000,000; nine different colleges; 870 bed teaching hospital; 2,000,000 volume library; dormitories for 15,000 students; 3,000 housing units ….. • Other significant projects: – construction of three international airports: Jeddah; Riyadh; and Dharan. – Road networks; – Port facilities; 6 – Agriculture and industrialization. 7 8 9 • To facilitate foreign investments, a new law ( 2000): – foreign investors the same benefits, incentives and guarantees offered to Saudi Arabian individuals and companies; – foreign investors the right to own property; – allows investors to remit funds abroad, protects their property from confiscation; and; – reduces by 15 percent the amount of taxes imposed on foreign companies that have an annual profit of more than 100,000 riyals (about 26,700 dollars). 10 37.5 Construction Problems in Saudi Arabia • The great development of Saudi Arabia has created a series of problems: – Economic problems: • rate of inflation high in the first two years of the second plan: – manipulation and overpricing by foreign contractors; – inability of construction market to meet available cash for construction (money supply > available products = inflation). • Inflation in 1976 at 38%, caused by: – congestion in main harbors; – shortage of construction materials. 11 – Social problems: • hundreds of thousands of laborers have been imported from different cultural backgrounds to a conservative society: – the foreigners could not easily socialize, and became despondent; – there is concern within Saudi that local people will pick-up bad habits from the presence of 6,000,000 foreigners, and the frequent travelling of Saudis. – Technical problems: • newly constructed structures have been subject to several problems, most of which are geotechnical in nature: – limestone solution cavities; – high water table; and – swelling of clay fills; • the harsh desert climate conditions cause other technical problems; • consultants and contractors from different backgrounds are familiar with different codes of practice and standard specifications. 12 – Legal and management problems: • most projects are based on accelerated schedules; • many foreign contractors try to use imported control systems in a way that ignores local conditions (eg: no consideration of productivity variation during fasting month); • consequntly, this leads to delays, and thus legal and administrative problems. 13 37.6 Conclusions • Construction evolution is taking place in Saudi: – – – – 25% of the total civilian labor force is in construction; 14% of energy consumption is in construction; 19.8% of non-oil GDP is construction; during the 1980’s and 1990’s, for example, approximately $500 billion was spent on construction. • Basic infrastructure has been completed, and in recent years most work has been in the industrial sector; • As the basic infrastructure and other facilities have been completed, the demand for maintenance and 14 operation facilities has increased; • Architects and Engineers need to be more sensitive to the needs of the Saudi environment, and culture, rather than repeating what they would produce in their own countries: – for example, facilities should be designed so that operations and maintenance costs are kept to a minimum (most labor is imported). • data collection, analysis, and documentation should be more rigorous to allow for more lessons learned and thus better future performance; • there should be more effort to establish partnerships with Saudi firms. 15 38 Survey of Planning and Control Techniques Used in Saudi Arabia. Summary: 38.1 Introduction. 38.2 Results. 38.3 Summary of Results. 38.4 Conclusions. 16 38.1 Introduction. • Contractors operating in Saudi have had to become more efficient due to increased competition. • An important mechanism by which this is being achieved is through project planning, scheduling, and control (PSC). • The objectives of the study reported here was to explore: – – – – – the familiarity, usage and benefits of PSC in Saudi; the major areas of application of PSC in Saudi; the extent of success of PSC in Saudi; the factors leading to successful implementation of PSC; 17 the factors leading to failure in implementing PSC. • 61 contractors out of 200 responded to the questionnaire (30.5%). • In the study, contractor size given as (SR = Saudi Riyal): – volume < SR 25 million = small; – volume < SR 55 million = medium; – volume >= SR 55 million = large; • There were 6 small, 22 medium, and 33 large contractors in the study. 18 38.2 Results 19