ÖKOPROFIT 2005 Presentation on the environmental report for the Vienna International Centre United Nations Office at Vienna 24 April 2006 Introduction of the Enterprise Magnitudes / indicative figures IAEA UNIDO 222,226 m2 VIC area (excl. garage and outdoor areas) central (common) 4,000 staff members services / areas 1,200 conference participants / visitors per day CTBTO UNOV / UNODC € 22 million (or $ 27 million) maintenance / utility costs per annum financed by the Organizations, e.g. UNOV – United Nations Office at Vienna UNODC – United Nations Office on Drugs and Crime UNIDO – United Nations Industrial Development Organization IAEA – International Atomic Energy Agency CTBTO – Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization 2006-04-24 Waltraud Jochum/UNOV € 99 (or $ 121) per m2/per annum Folie 2 Environmental Policy • Our attitude – Environmentally conscious behaviour • Our objectives – Healthy and safe working environment – Consideration of the impact on the environment • Our basis – General environmental laws and relevant regulations of Austria on waste disposal – Montreal Protocol (e.g. refrigerant of cooling systems) – Kyoto Protocol (re emissions) • Our programme – Focus on buildings maintenance – Focus on administration UNOV/UNODC 2006-04-24 Waltraud Jochum/UNOV Folie 3 Enterprise areas • VIC compound areas • Project areas – – – – – – – – – – Offices >>> Conference Rooms Labour Print Shop EDP Services >>> Buildings Management >>> Medical Service Cafeteria, Restaurant Commissary Banks, Post Office, Newspaper Stand, Travel Offices – Child Care Centre – Garage 2006-04-24 Waltraud Jochum/UNOV – Offices – EDP Services – Buildings Management Folie 4 Environmental Profile INPUT – Working materials kg / year Total VIC EUR / year UNOV/UNODC Total VIC UNOV/UNODC 477,900 114,000 465,300 96,600 Envelopes 6,200 2,500 47,400 22,000 Toners 3,600 600 506,100 95,500 2,400,000 550,000 684,500 377,200 4,103,300 1,141,300 Photocopying and printing paper Reproduction services Outgoing mail (94,500 /61,900 kg dispatched material incl. envelopes) Total Working materials OUTPUT – Products kg / year Total VIC Documents (ca. 99 million sheets 117,100 487,700 UNOV/UNODC 478,000 114,000 24 million sheets for UNOV/UNODC) 2006-04-24 Waltraud Jochum/UNOV Folie 5 Environmental Profile INPUT – Water L / year City water (51 %), Well water (49 %) Sewage quantity 189,493,000 190,704 L / year Waste water INPUT – Energy EUR / year 151,697,000 kWh / year Electricity (incl. air-conditioning) EUR / year 27,494,400 1,331,000 135,000 6,700 Remote heating 32,591,000 1,601,500 Total Energy consumption without fuel 60,220,400 2,939,200 Natural gas Emissions kg / year CO2 2006-04-24 12,614,100 Waltraud Jochum/UNOV Folie 6 Waste Management Waste Quantities kg / year Non-hazardous waste (sorted by residual & junk waste) Non-hazardous waste Sorted and disposed by categories: Waste paper Waste cartons Biological waste Glass Plastic waste Grease separator Wooden waste Scrap metal Electronics waste Picture tubes Cartridges Styropor Cables 313,600 72,100 1,138,600 10,500 5,700 4,000 1,457,900 86,600 431,890 145,150 200,000 115,000 90,000 55,000 49,700 38,000 5,680 3,540 3,000 960 660 Hazardous waste (sorted by 5 categories incl. used oil) Total Waste 2006-04-24 Disposal costs EUR / year Waltraud Jochum/UNOV Folie 7 Environmental Laws and Directions • Environmental laws – Waste disposal according to ÖNORM 2100 – Waste disposal by companies with official registration number – Certified waste managers in Buildings Management • Officially mandated conditions – None, as the V.I.C. is exterritorial area – Voluntary compliance with the general environmental protection laws of Austria – Proper separation, storage, disposal and transport of waste 2006-04-24 Waltraud Jochum/UNOV Folie 8 Environmental Achievements and Environmental Programme • Buildings Management Service (Details see Umweltbericht page 15 – 20) – Ecological measures • Savings in energy, water, chemicals; avoidance/minimization of waste and emissions; environmental benefits – Environmental achievements • • • • • • • • • • • • Change-over of toilet flushing to well water Renewal of the central buildings automation control system (e.g. air-conditioning) Lowering of the inlet temperature of warm water Replacement of the heat exchangers and air-condition to the latest technical status Renovation / replacement of the elevator installations Installation of meters for electricity, water and heating consumption Exchange of paper towel dispensers with cloth towel rolls Light intensity coupled with daylight and evening hours Optimal regulation of the air-conditioning and automatic shutdown in the evening Painting of the garage with reflective colours Insulation of auxiliary buildings Sorting and disposal of waste by 20 categories – Environmental programme • • • • • 2006-04-24 Improvement in correct separation of waste in the offices, e.g. separation of plastic bottles from office waste Exchange of ceiling lights Adaptation of the air-conditioning system (condensation water pipes) Replacement of the carpet floor with cork floor Exchange of the window panes with insulating glass with high insulation characteristics Waltraud Jochum/UNOV Folie 9 Environmental Achievements and Environmental Programme • Administration – Ecological measures • Savings in paper consumption and energy • Avoidance of paper waste and toner cartridges • Environmental benefits and disposal of old devices Material flow analysis at VIC – UNOV/UNODC • Change-over to electronic (paperless) offices in UNOV/UNODC • Yearly paper consumption at V.I.C. almost 100 million sheets (478,000 kg) • UNOV/UNODC approx. 24 million sheets (114,000 kg or 9,300 boxes a 2,500 sheets) • Target is reduction of 4 million sheets (19,000 kg or 1,550 boxes a 2,500 sheets) (= 17 %) in the yearly paper consumption in UNOV/UNODC in 2006 2006-04-24 Waltraud Jochum/UNOV Folie 10 Environmental Achievements and Environmental Programme • Administration in UNOV/UNODC (Details see Umweltbericht page 18, 21 - 23) – Environmental achievements • Doubled-sided printing and copying • Change-over to flat screens with half the power consumption – Environmental programme Actions already set or still to be set towards an electronic (paperless) office • Integrated electronic workflow processes, e.g. for management information (IMIS), for enterprise resource planning for UNODC projects (ProFi), for recruitment (GALAXY), for reporting on budget programme performance (IMDIS) and alike constitute the on-line working platform in UNOV/UNODC • • • • • • • • • • • • 2006-04-24 Administration / workflow processes on Lotus Notes platform Electronic information circulars, administrative instructions etc. via Email and Intranet Central electronic official documents archives (ODS) Electronic scanning of incoming official correspondence for UNOV/UNODC Electronic scanning and distribution of incoming invoices Electronic receipt and sending of fax messages via PCs Storage of conference documents and publications on CDs Introduction of electronic signature Introduction of an electronic documents filing / archiving system for offices Proposal for purchase of recycled paper Savings in toners by simple printing without background shadings Motivation of staff to cooperate with a view to a paperless workflow and avoidance of waste Waltraud Jochum/UNOV Folie 11 END 2006-04-24 Waltraud Jochum/UNOV Folie 12