Barents 2020 Phase 4 - Working group RN03 Kick-off meeting Moscow August 24 - 25, 2010 Børre Paaske 23 August 2010 RN-03: Risk Management and risk assessment for major hazards Topside integrity: - Containment - Ignition source control - Fire&Explosion risk mitigation Selected scope Well control barriers (drilling and production) - Down hole safety valves - BOP & control system - X-mas tree - Risers - Surface flow tree - Compensators Barents 2020 Phase 4 - Working group RN03 23 August 2010 © Det Norske Veritas AS. All rights reserved. 4 Scope of work for phase 3 (previous phase) To identify need for change, if any, in existing offshore oil and gas standards related to risk management of major hazards for operations in the Barents Sea. Risk management of major hazards is here understood as controlling the risks related to major hazards through - developing safe design - use of risk assessment techniques as a tool in the design process Barents 2020 Phase 4 - Working group RN03 23 August 2010 © Det Norske Veritas AS. All rights reserved. 5 Objective and scope of RN03 work in Phase 4 Objective: Ensure that best international practice of risk management and risk assessment is efficiently used for planning and development of oil and gas fields in the Barents Sea. Scope of work: - Task 1 – Outline and plan two risk management seminars - Task 2 – Prepare and carry out risk management seminar for Russian authorities, oil and gas companies and designers, with emphasis on concrete cases typical for installations in the Barents Sea. Cases reflecting both the usage of risk management and risk assessment in the development process, and actual recent accidental events (e.g. Mexican Gulf) will be used to illustrate the risk management process. - Task 3 – Prepare and carry out seminar / workshop with focus on experience exchange and comparative analysis of efficiency of methods and software for risk assessment in arctic conditions, as well as required databases to increase safety of offshore operations in the Barents Sea. This may include: - Modeling of hydrocarbon leaks, including dispersion and impact of natural and mechanical ventilation on generation of explosive mixtures; - Modeling and assessment of explosion and fire risks at process facilities for enclosed and open designs, including effects of active weather panels. - Comparison of Russian and Norwegian databases on incidents, accidents, failure and reliability data for use in risk assessments - Human factors in the arctic – discuss influence on risk assessment methods Barents 2020 Phase 4 - Working group RN03 23 August 2010 © Det Norske Veritas AS. All rights reserved. 6 Barents 2020 Phase 4 – Working Group 3 Members Russian team Norwegian/OGP team V.V. Lesnykh, Gasprom VNIIGAZ - coordinator Bill Banner, TOTAL Andrey.A. Petrulevich, Gazprom VNIIGAZ Dmitry Kazakovtsev, BP Mikahil.V. Yaroshevich, Giprospetsgaz Mark Young, Cairn Energy Vladimir.S. Safonov, Gazprom Dobycha Shelf Odd Thomassen (observer),Norwegian Petroleume Safety Authority Mikhail.V. Lisanov (S.N. Mokrousov), Industrial Safety Institute Dennis.V. Gordienko, FGU VNIIPO Emercom . Viktoria Smirnova, Gazprom Ekaterina Srebnyak, RF Maritime Rescue Service Sergey Gubkin, GNII Barents 2020 Phase 4 - Working group RN03 23 August 2010 © Det Norske Veritas AS. All rights reserved. 7 Børre Paaske, DNV - coordinator Deliverables and mode of operation Deliverables: - 2 seminars which should enable dialogue between Russian and Norwegian experts and executive authorities (regulatory bodies) about risk management and risk assessment in the offshore design process for the Barents Sea, and application of functional safety standards. This shall contribute to ensure that best international practice is used efficiently for planning and development of oil and gas fields in the Barents Sea. Mode of operation: - Russian and Norewegian experts meet in 24.-25. August to define target group, format, contents, potential lectureres, cases etc. and timing of the seminars. Lecturers contacted, format and contents developed during Sept – Nov. Experts can be involved in producing and/or reviewing seminar contents, and may also stand as lecturers. 1st seminar tentatively to be arranged between 6.-10. December in Moscow. Group web-site will be created for uploading of documents. Proposal: Establish a Google Group Barents 2020 Phase 4 - Working group RN03 23 August 2010 © Det Norske Veritas AS. All rights reserved. 8 Working program for expert groups Barents 2020 Phase 4 Proposal 24-25 August 2010 September / November 2010 December 2010 February 2010 Moscow Moscow Moscow Moscow First meeting, agree objectives and working steps for the whole period. Prepare seminar contents and plan seminar. Carry out 1 seminars Carry out 1 seminar Set out work task to members of the group - until next meeting Possibly 1 group meeting in Moscow. Barents 2020 Phase 4 - Working group RN03 23 August 2010 © Det Norske Veritas AS. All rights reserved. 9 Decisions to be made at kick-off 24.-25. august Specifify objective for each seminar Target group Contents Format Cases – involvement from industry partners Lecturers/speakers Timing Location ..etc. Barents 2020 Phase 4 - Working group RN03 23 August 2010 © Det Norske Veritas AS. All rights reserved. 12 Safeguarding life, property and the environment www.dnv.com Barents 2020 Phase 4 - Working group RN03 23 August 2010 © Det Norske Veritas AS. All rights reserved. 13