Barents 2020 Phase 4

Barents 2020 Phase 4
Working Group RN04 - EER
Presentation to Barents2020 Conference, 9 December 2010, Moscow
Gus Cammaert
Sergey Kovalev
TOPICS
 SUMMARY OF 2010
ACTIVITIES
 STATUS AND FORMAT OF
DRAFT EER REPORT
 FUNCTIONAL
SPECIFICATIONS
 PLANS FOR 2011
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
2
Barents 2020 Phase 4 – Panel RN04 Members
Panel RN04 (International members)
Panel RN04 (Russian members)
Expert
Organisation
Location
Sergey Kovalev
Gazprom VNIIGAZ
Moscow
Yevgeniy Taranukha
40th GNII MO RF
St. Petersburg
Vladimir Shlyachkov
Krylov's Research Institute
St. Petersburg
Dmitriy Melekhov
Gazprom
Moscow
Sergey Myagkov
Gazprom Dobycha Shelf
Moscow
Sergey Morozov
Gosmorspassluzhba
Moscow
Albert Shigabutdinov
CNIIMF
St. Petersburg
Anatoliy Suvalov
40th GNII MO RF
St. Petersburg
Alexey Sakharov
40th GNII MO RF
St. Petersburg
Expert
Organisation
Location
Gus Cammaert
DNV R& I
Høvik, Norway
Ekaterina Safonova
DNV
Høvik, Norway
Sigurd Jacobsen
PTIL
Stavanger, Norway
Rune Bråthen
Statoil
Stavanger, Norway
Frederic Turlan
Total
Paris, France
Alexandre Viaud
SDAGTotal
Paris, France
Terje Hatlen
Transocean
Stavanger, Norway
Ron Sainsbury **
ExxonMobil
Leatherhead, UK
** resigned
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
EER Technical Challenges
 “Extreme environmental conditions varying from solid stationary ice, dynamic ice,
grounded and ungrounded ice rubble to partial cover, and open water pose
formidable challenges
 No single evacuation method currently available (is) suitable for abandonment under
the full range of environmental/ ice conditions
 ISO 19906 (Arctic Offshore Structures Standard) enhances existing requirements by
establishing performance based goals from which designers set the functional
requirements of the EER system rather than relying on prescriptive measures alone
 (It) addresses primarily design requirements (and design optimization) for icecovered waters plus some key operational provisions impacted by cold climate”
from a presentation by Jim Poplin of ExxonMobil at an OGP
Workshop (Working in Extreme Conditions) in 2008
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
RN04 Mandate for Phase 4
 In the Phase 3 report we reported the following:
 We are now suggesting two additional reports – functional
specifications for an Arctic lifeboat and an emergency
preparedness vessel
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
RN04: Summary of Phase 4 Activities
 Workshop at Krylov Marine
Institute, St. Petersburg,
Oct. 19-20, all members
 Meeting with PSA in Stavanger
Nov. 8, DNV
 Circulation of commentary forms
on ISO19906
 Recommended report formats
 Commenced preparation of outline
EER report based on comments
 Table of contents for two
functional requirements reports
 Technical discussions and
reviews of other standards
 Finalizing terms and definitions
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
RN04: Deliverables Phase 4
Table of Contents
Commentary on ISO19906 – EER Provisions
18.1
18.2
18.3
18.4
18.5
18.6
18.7
18.8
18.9
18.10
18.11
18.12
18.13
18.14
18.15
General
Escape, evacuation and rescue philosophy
EER strategy
Environment
Hazard and risk analysis
Continuous assessment
EER system design
Emergency response organization
Competency assurance
Communications and alarms
Personal protective equipment
Man overboard recovery
Escape design
Evacuation design
Rescue Design
Functional Requirements – Arctic Lifeboats
Functional Requirements – Emergency Preparedness Vessels
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
RN04: Format of EER Report
 EER Report is organized
to reflect the ISO19906
sections
 Informative sections
following Normative
(middle column), and
comments or suggested
revisions in right-hand
column
 Report is now 25%
complete
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
RN04: Emergency Preparedness Vessel Report
 Outline Table of Contents:
- Objectives / Introduction
- Main mission and general
requirements
- Performance requirements
- Winterization
- Environmental conditions
- Hull structure
- Main and auxiliary power plant
- Deck machinery
- Special deck equipment and
systems (recovery equipment)
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
No functional specification has
been published for Barents Sea
conditions
Separate document planned
Final format (GOST/DNV/ISO) to
be decided
RN04: Arctic Lifeboat Functional Specifications:
 Outline Table of Contents:
Objectives
Environmental conditions
Materials
Structural design
Launching method in ice
Operational requirements
Occupant safety and comfort
Model scale testing and full scale
testing
- Equipment (communication system,
heating, etc)
-
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
Also: No functional specification
available for Barents Sea conditions
Separate document planned
To concentrate on ice strengthening
and winterization of “conventional”
lifeboats
VNIIGAZ Plans for EER Documents
 In 2011 VNIIGAZ will start working on development of 2 normative documents for
personnel evacuation and rescue on offshore oil and gas installations.
 GOST P “Oil and gas industry. Offshore production installations. Evacuation and
rescue systems. Main requirements.”
 GOST P “Oil and gas industry. Offshore production installations. Evacuation routes
and temporary refuge. Main requirements.”
 These GOST standards will be based on the following documents:
-
ISO 19906,
ISO 15544,
ISO 13702,
NORSOK Z-013,
NORSOK S-001,
DNV-OS-A101,
Russian Federal Law No. 116-ФЗ “About industry safety of dangerous production objects”,
Russian Federal Law No. 123-ФЗ “Fire safety technical regulations”,
Doc no. ПБ 08-623-03 “Safety regulations during exploration and development of offshore oil
and gas fields”
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
Breaking News!
 Subcontract being discussed with
Krylov Marine Institute to prepare a
draft report on emergency
preparedness vessel
 Krylov Marine Institute will share
information on lifeboats used on
Russian icebreakers
 SDAG has given RN04 panel a
presentation on lifeboat design for
Shtokman Project
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
12
RN04 – Plans for 2011
December
2010
By end April
2011
May
2011
September
2011
December
2011
Moscow
Not specified
Oslo
Moscow or St.
Petersburg
Moscow
Confirm goals
Meetings of
subgroups on
specific topics
Draft report
60% ready, all
unclear,
controversial
issues
identified and
discussed
Draft report
95% ready for
discussion
and review,
solutions
proposed for
all important
issues.
Discuss final,
cosmetic
changes only
(1%?)
Review progress,
identify concerns,
correct direction
if required.
Agree on report
formats
Report to Barents
2020 conference
Get feedback.
Norway,
Russia or via
teleconference
Main
contributions
received
Finalizing
content
Draft
proposals for
final report
format
Barents 2020 Phase 4 - Working Group RN04
December 2010
© Det Norske Veritas AS: All rights reserved.
13
Discuss
changes or
improvements
Present group
report and
deliverable at
VNIIGAZ
conference, and
get final
comments from
invited experts.