Barents 2020 Phase 4 Working Group RN04 - EER Presentation to Barents2020 Conference, 9 December 2010, Moscow Gus Cammaert Sergey Kovalev TOPICS SUMMARY OF 2010 ACTIVITIES STATUS AND FORMAT OF DRAFT EER REPORT FUNCTIONAL SPECIFICATIONS PLANS FOR 2011 Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. 2 Barents 2020 Phase 4 – Panel RN04 Members Panel RN04 (International members) Panel RN04 (Russian members) Expert Organisation Location Sergey Kovalev Gazprom VNIIGAZ Moscow Yevgeniy Taranukha 40th GNII MO RF St. Petersburg Vladimir Shlyachkov Krylov's Research Institute St. Petersburg Dmitriy Melekhov Gazprom Moscow Sergey Myagkov Gazprom Dobycha Shelf Moscow Sergey Morozov Gosmorspassluzhba Moscow Albert Shigabutdinov CNIIMF St. Petersburg Anatoliy Suvalov 40th GNII MO RF St. Petersburg Alexey Sakharov 40th GNII MO RF St. Petersburg Expert Organisation Location Gus Cammaert DNV R& I Høvik, Norway Ekaterina Safonova DNV Høvik, Norway Sigurd Jacobsen PTIL Stavanger, Norway Rune Bråthen Statoil Stavanger, Norway Frederic Turlan Total Paris, France Alexandre Viaud SDAGTotal Paris, France Terje Hatlen Transocean Stavanger, Norway Ron Sainsbury ** ExxonMobil Leatherhead, UK ** resigned Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. EER Technical Challenges “Extreme environmental conditions varying from solid stationary ice, dynamic ice, grounded and ungrounded ice rubble to partial cover, and open water pose formidable challenges No single evacuation method currently available (is) suitable for abandonment under the full range of environmental/ ice conditions ISO 19906 (Arctic Offshore Structures Standard) enhances existing requirements by establishing performance based goals from which designers set the functional requirements of the EER system rather than relying on prescriptive measures alone (It) addresses primarily design requirements (and design optimization) for icecovered waters plus some key operational provisions impacted by cold climate” from a presentation by Jim Poplin of ExxonMobil at an OGP Workshop (Working in Extreme Conditions) in 2008 Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. RN04 Mandate for Phase 4 In the Phase 3 report we reported the following: We are now suggesting two additional reports – functional specifications for an Arctic lifeboat and an emergency preparedness vessel Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. RN04: Summary of Phase 4 Activities Workshop at Krylov Marine Institute, St. Petersburg, Oct. 19-20, all members Meeting with PSA in Stavanger Nov. 8, DNV Circulation of commentary forms on ISO19906 Recommended report formats Commenced preparation of outline EER report based on comments Table of contents for two functional requirements reports Technical discussions and reviews of other standards Finalizing terms and definitions Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. RN04: Deliverables Phase 4 Table of Contents Commentary on ISO19906 – EER Provisions 18.1 18.2 18.3 18.4 18.5 18.6 18.7 18.8 18.9 18.10 18.11 18.12 18.13 18.14 18.15 General Escape, evacuation and rescue philosophy EER strategy Environment Hazard and risk analysis Continuous assessment EER system design Emergency response organization Competency assurance Communications and alarms Personal protective equipment Man overboard recovery Escape design Evacuation design Rescue Design Functional Requirements – Arctic Lifeboats Functional Requirements – Emergency Preparedness Vessels Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. RN04: Format of EER Report EER Report is organized to reflect the ISO19906 sections Informative sections following Normative (middle column), and comments or suggested revisions in right-hand column Report is now 25% complete Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. RN04: Emergency Preparedness Vessel Report Outline Table of Contents: - Objectives / Introduction - Main mission and general requirements - Performance requirements - Winterization - Environmental conditions - Hull structure - Main and auxiliary power plant - Deck machinery - Special deck equipment and systems (recovery equipment) Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. No functional specification has been published for Barents Sea conditions Separate document planned Final format (GOST/DNV/ISO) to be decided RN04: Arctic Lifeboat Functional Specifications: Outline Table of Contents: Objectives Environmental conditions Materials Structural design Launching method in ice Operational requirements Occupant safety and comfort Model scale testing and full scale testing - Equipment (communication system, heating, etc) - Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. Also: No functional specification available for Barents Sea conditions Separate document planned To concentrate on ice strengthening and winterization of “conventional” lifeboats VNIIGAZ Plans for EER Documents In 2011 VNIIGAZ will start working on development of 2 normative documents for personnel evacuation and rescue on offshore oil and gas installations. GOST P “Oil and gas industry. Offshore production installations. Evacuation and rescue systems. Main requirements.” GOST P “Oil and gas industry. Offshore production installations. Evacuation routes and temporary refuge. Main requirements.” These GOST standards will be based on the following documents: - ISO 19906, ISO 15544, ISO 13702, NORSOK Z-013, NORSOK S-001, DNV-OS-A101, Russian Federal Law No. 116-ФЗ “About industry safety of dangerous production objects”, Russian Federal Law No. 123-ФЗ “Fire safety technical regulations”, Doc no. ПБ 08-623-03 “Safety regulations during exploration and development of offshore oil and gas fields” Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. Breaking News! Subcontract being discussed with Krylov Marine Institute to prepare a draft report on emergency preparedness vessel Krylov Marine Institute will share information on lifeboats used on Russian icebreakers SDAG has given RN04 panel a presentation on lifeboat design for Shtokman Project Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. 12 RN04 – Plans for 2011 December 2010 By end April 2011 May 2011 September 2011 December 2011 Moscow Not specified Oslo Moscow or St. Petersburg Moscow Confirm goals Meetings of subgroups on specific topics Draft report 60% ready, all unclear, controversial issues identified and discussed Draft report 95% ready for discussion and review, solutions proposed for all important issues. Discuss final, cosmetic changes only (1%?) Review progress, identify concerns, correct direction if required. Agree on report formats Report to Barents 2020 conference Get feedback. Norway, Russia or via teleconference Main contributions received Finalizing content Draft proposals for final report format Barents 2020 Phase 4 - Working Group RN04 December 2010 © Det Norske Veritas AS: All rights reserved. 13 Discuss changes or improvements Present group report and deliverable at VNIIGAZ conference, and get final comments from invited experts.