ACT Basin Priority Project Canberra Clean Water Improving long term water quality in the ACT and the Murrumbidgee River System Conservation Council 23 July 2015 Project Background • WMPA: Basin States to undertake one or more Priority Projects that will: o Substantially contribute to improved efficiency of rural water use o The sustainability of water use o Overall health of the Basin ACT Basin Priority Project • February 2014: the ACT Government signed a funding agreement with the Commonwealth of up to $85 million for the ACT Basin Priority Project. • The Project will Improve the Long Term Water Quality in the ACT and the Murrumbidgee River System • The Project will be delivered in two phases with a focus on six priority catchments ACT Basin Priority Project • Catchments selected to achieve representation of the broad variety of catchment types and land development across the Territory o Yarralumla Creek –Mature catchment flowing into Molonglo River o Lake Tuggeranong – Mature urbanised catchment flowing into Lake Tuggeranong o Upper Molonglo – Semi-rural catchment flowing into Lake Burley Griffin o Fyshwick – Industrial catchment flowing into Lake Burley Griffin and Jerrabomberra Wetlands o Lower Molonglo – Developing catchment flowing into Molonglo o Riverview (West Belconnen) – Greenfield development flowing into Murrumbidgee River Governance Structure Joint Commonwealth/ACT Steering Committee BPP Management Team ACT and Region Catchment Management Coordination Group Senior Executive Water Group (ACT Government) Project Advisory Group – Technical Experts Future Delivery Team Designers/Construction Contractors Phase 2 Project Advisory Group – Community Stakeholders Phase 1 – to Feb 2016 Pre-feasibility: Gathering data on existing conditions & infrastructure • Audit of WQ Data and establish data management framework • Water quality monitoring in 6 catchments. • Pre-feasibility identification of options (GHD Synthesis report) • Audit of existing water quality infrastructure assets Phase 1 Six catchments project – completed March 2015 Objective: • Water quality database • Design and implement a water quality monitoring framework for the six catchments • Preliminary recommendations on appropriate interventions (GHD Report on six catchments) Phase 1 ACT wide monitoring project – to December 2015 Framework for surface water and ground water based on water quality objectives for the ACT. Options include: • Bathymetry • Sediment sampling • Micropollutants Phase 1 Audit of Infrastructure project – August 2015 Objectives: • Audit representative selection of existing stormwater assets; • Advise on performance, efficiency and effectiveness, maintenance costs and measures to improve performance; • Inform future options under the BPP for both the type and placement of infrastructure assets. • Looks at gross pollutant traps, rain gardens, swales, bioretention, water quality & settlement ponds and wetlands. Phase 1 – To Feb 2016 Final Options Identification – April to September 2015 • Identification of treatment train options across 6 catchments and in-lake o Establish key environmental, social, economic criteria o Develop investment framework and MCA tool • Community engaged in option identification Phase 1 - Engagement • Targeted meeting in each catchment with key stakeholders in late May – Project Advisory Group – Community Stakeholders and select government officials – To introduce the catchment treatment train options process – To identify water quality infrastructure options • Community engagement in July – Seek community views on proposed treatment trains Open House events • • • • • • • • Dates by catchment Tuesday 28 July - Lake Tuggeranong Wednesday 29 July - Yarralumla Creek/Woden Thursday 30 July - Jerrabomberra Creek/Fyshwick Tuesday 4th Aug - Lower Molonglo Wednesday 5th Aug - Upper Molonglo Thursday 6th Aug - West Belconnen Further detail: http://www.environment.act.gov.au/water/act-basin-priorityproject Basin Priority Project - Social Expectations Survey (July – August) • Survey and analysis of expectations, current knowledge, attitudes and values of residents regarding ACT and region waterways, stormwater issues and factors affecting water quality in the ACT and region. • Will provide data on which to base an effective behaviour change campaign and to support decision making on infrastructure investment. • Betterwater.net.au - over 1500 responses in one week – target 3000 Phase 1 – to Feb 2016 Business Case • Ranked options to Cabinet – Sep 15 • Draft business case to Commonwealth – Dec 15 • Final business case to Commonwealth – Feb 16 Phase 2 -To be completed by March 2019. • Will involve the construction or augmentation of water quality infrastructure. • Is subject to the Commonwealth Government’s final assessment and agreement. • A supplementary report to the initial business case utilising information from Phase One will inform Phase Two. Phase 2- Design and Construction May 2016 to March 2019 • • • • Design of approved treatment train infrastructure Development application approvals Construction Need to manage risk of short timeframe Comments Thank you... Basin Priority Project matt.kendall@act.gov.au justin.foley@act.gov.au http://www.environment.act.gov.au/water/act-basin-priority-project MCA-CBA Project and Catchment Options Project