PRACTICES ADOPTED IN NLDC & RLDCs These are in addition to S.O.P S. No. Function Frequency control management SRLDC High frequency Surrender by constituents at ISGS on meritorder basis, surrendering LTA/MTOA in consultation with Trader/Generators Other than ISGS, suggesting constituents to backdown own generation on merit order basis. In extreme case suggesting states to surrender and re-allocation to other states as per frequency conditions and same is applicable to RLDCs example URS power at IGSTPS at present. Kadamaprai, Srisailam Pump storage hydro units can be run into pump mode, in consultation with SLDCs TNEB, AP. 1 Low frequency If any unit of Kadamaparai Pump storage is operating in pump mode and if the concerned beneficiary is over drawing, SRLDC shall advise the concerned SLDC for discontinuing the pump operation. Load shedding to be carryout by O/D constituents. Issuing messages like operational messages /frequency violation messages including ACE correction. Revision of ISGS backdown schedule in case of large unit tripping in contingency allowing with in two time blocks Power flow management 2 Power Flow which will critically load a circuit during probable N-1 outage needs regulation in addition to deterioration of other grid parameters like voltage etc. Based on line constients like Hiriyur-neelamanagala/Kolar-Hosur D/c suggesting constituents Karantaka/TNEB/KSEB to maintain their schedule/regulating generation and loads of drawl points. Modulation of HVDC power order in consultation with NLDC Generation Rescheduling In case of congestion in S1-S2 corridor, followinfg actions may be taken, regulation of inform power, removal of Pump operation, maximization of generation at kadamparai, Kundah complex,Mettur, Load re- arrangements at Chennai area, regulation of NCTPS generation In case of congestion actions may be taken as per procedure of “Measures to relieve congestion in real time operation” 5.3 .issuing of Congestion warning message , 5.4 curtailment transactions followed by ATC revision, 5.5 Revision of ATC, 5.6 Notice for application of congestion charge. Pre studied congested nodes like violation of Flow gates, S1-S2, KolarHosur D/C etc are closely monitored. Contingency handling 3 Voltage control and reactive power management 4 Deviation control 5 Test charging in consultation with SLDC/CTU. Necessary revision in schedule should be carried out. Modulation of HVD C set points in coordination with RLDCs/NLDC Regulation of Hydro/Thermal generation. Example in case of tripping of Kolar-Hosur S/C actions taken in real time: modulation of HVDC points/load shedding by TNEB,KSEB as well as generation backdown of NCPTS/Vallur , No under drawl by S1 Constituents Preparation of FIR report to aware grid situation in real time In case of Block out/ islanding immediately informing to RLDCs/NLDC heads and constituents regarding situation and actions to be taken. Extending startup power to thermal generators , formation islands and extending supply to essential services Switching operation of bus reactors, line reactors. Absorption of MVAr near High voltage areas as per capability curve. Running of SSLM units in condenser mode of operation After detailed study suggestion of tap changing of ICTs/GTs Modulation of HVDC set points Opening of Long and lightly loded lines Switching operation of HVDC filter Issuing Voltage control messages All constituents ,ISGS and regional Entities has to maintain schedule. Issuing of Alert ,Emergency, Compliance messages as follows. Alert- If the deviation > 150 MW or 12 % schedule whichever is less for 5 minutes Emergency- If the deviation > 250 MW for 5 minutes or > 150 MW for 10 minutes. Non complianceZero crossing –messages Alert, Emergency, Non compliances follows If drawal is >schedule Congestion management 6 Defence mechanism 7 Scheduling 8 Reporting system 9 Monitoring of flow gates :Flow gate -I ( allowable limit≈ 850MW) 400kV KolarHosur D/C Scenarios: • High drawl by S2 constituents • Injection from S1 S1-S2 Flow gate –II ( allowable limit≈ 2400 MW) lines under S1-S2 flowgate. NLR-SPDR NLR-ALM KLR-HSR-D/C SMN-HSR CTR-THVLM D/C NLR-THVLM D/C CTR- SPDR KLR-THVLM 220 kV inter state lines(S1-S2) In congestion of congestion constituents has to maintain schedule. Issuing of congestion warring message As per congestion relieving procedure. Regulation of infirm power from S1 to S2. Automatic and Under Frequency Load Shedding Scheme Special Protection schemes Power Demand Over (PDO) ride at Gazuwaka and Talcher Islanding schemes HVDC frequency controllers Preparation of dispatch and drawal schedules. Allocation of URS power on FCFS basisas per SR operating procedure. Surrenders by beneficiaries on prorate basis up to technical minimum of ISGS units. Revision of STOA transactions in case of UNIT outages of STOA transactions. Curtailment of trasactions in case of Planned shutdowns or in case of congestion followed by ATC revision. Following reports prepared from Grid Management Power supply position report Unit outage report Transmission line outage report Frequency graph NPMC,NPSD reports Coal Shortage reports Schedule and Drawls report Regional graphs Loss of Generations report SCADA and Actual of drawls comparison 9 0’clock Flash report Peak and off reports Reservoir levels report In case of disturbance Flash report Report will be prepared based on data of SCADA and Constituents. All the constituents will furnish the Generation, Interstate line flows data after 00:00 hrs of each day through web based reporting system, Email, Fax, or telephone for the preparation of Reports. Operational security 10 System restoration procedures 11 Shutdown & outage procedure 12 SCADA/PMU displays 14 15 Data Exchange/ Communication System/It Tools All the constituents/ISGS/Regional entities have to maintain schedules. All the grid parameters has to be maintained with in the IEGC limits. All the protections, Defense mechanism to be in service always. Availability of accurate real time data. Study to be carried out for shut downs of elements and report to be prepared. Proactive action during real time operation. o Self starting facilities available in generators will be availed transmission o Start up power to be fed to thermal generators by making use of available transmission networks. o Avoid consumer plant damage o Restore essential services o Conducting Mock drill exercise o Procedure for Availing the Outage in Real Time Request for outages which are approved by OCC must be sent by the owner of the transmission asset at least 3 days in advance to SRLDC by 10:00 hours. In case the owner is not availing the OCC approved outage, the same shall be intimated to the SRLDC at least 3 days in advance. On the day of outage, the outage availing agency shall seek the code for availing outage from SRLDC/NLDC (wherever applicable). All 400 kV D/C and 765 kV and above elements shut downs to be sent to outage coordinators for clearances. In XA 21 widely used picture for real time operation as follows: SR regional Grid display, Schedule and drawl’s, All constituents Generation display, regional UI, Constituents UI with frequency trend, drawling checking, all 400 kV and above Substation SLDC, Mvar absorption of Generators display, DDC. In SR PMU workstation following displays widely used for system operation : all the SR PMU locations frequency , Line flows, Voltages, currents, angles , sequence components, Phasor diagram, Modal analysis in real time Real time Getting from felid RTUs, SASs through communication channels like FO, microwave, Satellite. NLDC NERLDC ERLDC DC SLDC SRLDC DC SLDC KARNATAKA (AP) A WRLDC C NRLDC SLDC SLDC SLDC (TS) (TAMILNADU (of other states) DC DC DC SubSLDC SubSLDC GUNADALA CHINAKAMPALLY By 10.00 hrs. ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities By 1100 hrs. SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. SRLDC shall convey the ex-power plant despatch schedule to each ISGS and net drawal schedule to each State / Beneficiary. The details of unrequisitioned surpluses shall also be intimated. By 1500 hrs. By 1700 hrs. By 2200 hrs. By 2300 hrs. ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule SRLDC shall issue the final despatch and drawal schedule