Date: November 17, 2015 Presented by: Brian Patrick 10,200+ students Ages 3-21+ Pre-School—Skyline Center 31 IDEA students 69 Title 1 students Headstart Parent Participation Pre-School County Extension Agency 15 Elementary Schools 250-500 students 2 Middle Schools 1450 students each 3 High Schools 2 @ 1400 CMR GFHS/Fieldhouse/S. Campus PGEC: 204 students Total of 28 buildings Buildings and Grounds at Lowell Little Russell Storage District Office Building Annex Buildings and Grounds Shop Warehouse Paris Gibson Square (leased) Great Falls Public Schools School Building History BUILDING CENTRAL SCHOOL/PARIS GIBSON SQUARE ROOSEVELT GREAT FALLS HIGH SCHOOL WHITTIER LOWELL RUSSELL PARIS GIBSON LINCOLN LONGFELLOW WEST ELEMENTARY LEWIS & CLARK EAST MIDDLE SCHOOL ADMINISTRATION BUILDING ANNEX MEADOW LARK MORNINGSIDE RIVERVIEW SUNNYSIDE VALLEY VIEW CHIEF JOSEPH SACAJAWEA LOY WAREHOUSE CHARLES M. RUSSELL MOUNTAIN VIEW SKYLINE NORTH MIDDLE SCHOOL BISON FIELDHOUSE GROUNDS SHOP GFHS - SOUTH CAMPUS DATE BUILT Age 1896 1928 1931 1938 1939 1939 1948 1951 1952 1952 1953 1957 1959 1959 1960 1960 1960 1960 1960 1962 1962 1963 1964 1965 1970 1970 1970 1979 1989 1998 119 87 84 77 76 76 67 64 63 63 62 58 56 56 55 55 55 55 55 53 53 52 51 50 45 45 45 36 26 17 Average Age of School Buildings = 58 years old Decades of Buildings: 1890’s 1 1920's 1 1930's 4 1940's 1 1950's 5 1960's 9 1970's 4 1980’s 1 1990’s 1 Community Informational Meetings: Wednesday, February 25 – 5:30-7:30 – CMR Auditorium Monday, March 2 – 5:30–7:30 pm – Roosevelt gym Tuesday, March 10 – 5:30–7:30 pm – Longfellow cafeteria Wednesday, March 25 – 5:30-7:30 pm – GFH Auditorium Board Work Sessions: Monday, November 4, 2013, 5:00-8:00 – GFHS South Campus Tuesday, December 2, 2014, 5:00-7:00 – Aspen Wednesday, December 10, 2014, 4:30-6:30 – Aspen Monday, January 5, 2015, 4:30-6:30 – Aspen Monday, March 30, 2015, 5:30-7:30 – Aspen Monday, May 11, 2015, 6:30-8:30 – Aspen Monday, June 15, 2015, 5:30-7:30 – Aspen Tuesday, July 14, 2015, 5:30-7:30 – Aspen Tuesday, August 4, 2015, 5:30 -7:30 – Aspen Monday, August 17, 2015, 5:30-7:30 – Aspen Monday, August 31, 2015, 4:00-6:00 – Aspen Monday, November 2, 2015, 5:00-8:00 - GFHS 1. Increasing Enrollment & Overcrowded Classrooms: Enrollment projections estimate another 413 students (188 in K-6, 164 in 7-8, and 61 in 9-12). Birth rates as determining factors. It does not take into account economic growth in Great Falls that might bring in additional families/students. As of October 6, 2015 65 out of 260 (25%) K-6 classrooms overloaded according to accreditation standards. 50 out of 124 (40%) K-2 classrooms classified as overloaded according to accreditation standards. 2. Aging Facilities The buildings are aged and are in need of upgrades and repairs. Upgrade Infrastructure in All K-8 Buildings (except LF & Roosevelt), Skyline Center and Paris Gibson Education Center 2. Build a New School to Replace Roosevelt Elementary School 3. Build a New School to Replace Longfellow Elementary School 4. Open Skyline as a 16th Elementary School 5. Move the Preschool Program to the Paris Gibson Education Center West Wing 6. Upgrade Memorial Stadium 7. Upgrade CMR Infrastructure 8. Construct CMR Multipurpose Space & Track/Field Improvements 9. Upgrade GFHS Infrastructure 10. Upgrade GFHS Classrooms 11. Upgrade GFHS Career & Technical Education (CTE) Facilities 12. Upgrade GFHS Technology Infrastructure 13. Construct Additional GFHS Parking Spaces 14. Study the Feasibility of Constructing a Connector Building Between the GFHS Main Campus and South Campus 1. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Upgrade Infrastructure New Roosevelt New Longfellow Skyline as a 16th Elementary School Preschool to PGEC Memorial Stadium CMR Infrastructure CMR Multipurpose & Track/Field GFHS Infrastructure GFHS Classrooms GFHS CTE Facilities GFHS Technology Infrastructure GFHS Parking Spaces GFHS Hub Total $12.9M $16.2M $15M $3.4M $450K $705K $2.9M $6M $13M $13M $5.2M $3.5M $975K $ ? $93M+ Assist GFPS with the final stages of Plan development: Viability of the concepts Feasibility of the concepts Reasonability of the preliminary cost estimates created by others and provide modified cost estimates, if necessary. Assist the Owner with securing funds to fulfill the Plan Develop in conjunction with the Owner, final cost estimates and possible funding sources (existing, bond levy, building reserve levy, private donations, etc.). Assist in developing an election timeline. Assist in developing recommendations for Board action for funding. Develop a public information strategy and campaign after Board action. After securing funds, assist the Owner with the Plan implementation Selection of Design and Construction Teams Owners’ Representative Analysis Board Action Website: www.gfps.k12.mt.us Facebook: Great Falls Public Schools Twitter: @TammyLLacey @GFPublicSchools Questions and/or Comments