FOREST FOCUS (EC regulation n° 2152/2003) INTENTION : BIOSOILS to broaden the scope of the monitoring scheme to new environmental issues such as soils and forest biodiversity (Article 6: demonstration projects) 1 Demonstration Project Further development of soil and biodiversity monitoring (Standing Forestry Committee – 22/10/2004) Soil Module Comes close to a new survey Will be used to test the recently updated ICP Forests manual 22/10/2004 85th Standing Forestry Committee 2 Background 1st Forest Soil Condition Database 1985-1998 5,289 Level I plots in 28 Countries Limitations: 58 % overlap with Crown Condition dbase Only limited number of plots with complete mandatory dataset No possibilities for element pools calculation (limited depths and bulk densities missing) 3 Background Soil data quality: Transnational comparability of data limited Missing pedological information (soil and site description) to allow for integrity checks First step : Update of ICP Forest Manual on ‘Sampling and Analysis of Soil’ Part IIIa (2003) Level II soil condition: soil chemistry Characterised from 1995 onwards 4 Major Objectives Complete and Improve the quality of Forest Soil Condition Database (Level I and II) Improve overlay with Crown Condition database on 4635 plots within EU25 (2003) – 5915 plots (30 countries) Complete (updated) set of mandatory parameters on all Level I plots – optional parameters desirable Create data compatibility important for other European objectives (e.g. EU Thematic Soil Strategy) Monitor changes in soil chemistry after 10 years Testing of updated manual and other QA/QC efforts 5 Time schedule Phase I 2005 Phase II Phase III Preparation of survey: develop QA/QC strategy, planning meetings, ring test 2006Soil survey and soil analysis in the 2007 MS and central laboratory by end Central database completed 2008 2009 - Data evaluation, interpretation and ? reporting, writing of Forest Soil Condition Report 6 Actors Co-ordination by Forest Soil Coordinating Centre in close co-operation with JRC Survey and soil analyses by MS’s Subset of samples and parameters analysed by central laboratory After completion database => JRC and DG ENV 7 Cost estimate per plot: sampling and analyses Level I: Mandatory parameters € 1000 Level I: Mandatory and optional parameters Level II: Mandatory parameters € 2200 Level II: Mandatory and optional parameters Soil profile description € 7600 € 5200 € 2000 8 Cost estimates Costs partly depend on: Level I and/or Level II plots? about 4800 Level I and 750 Level II All plots or subset? Mandatory or mandatory and optional parameters (see ICP Forests manual)? Include soil profile descriptions and related laboratory analyses? 9 Scenario 1: Mandatory param. all level I and II plots Costs/ # point Plots FSCC preparation FSCC co-ordination survey FSCC data evaluation, interpretation and reporting Soil survey Level I: :all plots mand. param. Soil survey Level II: all plots mand. param. Data management for plots Transport of subset samples Central laboratory Total Total € 333,305 513,600 EU contr. % € 100 333,305 100 513,600 366,475 100 366,475 1000 4700 4,700,000 75 3,525,000 5200 750 3,900,000 75 2,925,000 100 15 600 5450 545,000 1200 18,000 1200 720,000 75 408,750 75 13,500 100 720,000 8,805,630 10 Scenario 2: Level I: Mand. param. all, Optional subset Level II: Mand. & Option. subset Cost # / plot Plots Total € EU contr. % € 333,305 100 513,600 100 366,475 100 75 4,605,000 FSCC preparation of survey 333,305 FSCC co-ordination of survey 513,600 FSCC data evaluation, 366,475 interpretation & reporting Soil survey Level I mand.: 1000 3500 3,500,000 Mand. & optional parameters: 2200 1200 2,640,000 Soil survey Level II: subset of 7600 250 1,900,000 plots, Mand. & opt. param. 75 Data management of plots 100 4950 495,000 75 Transport of subset samples 15 1200 18,000 75 Central laboratory 600 1200 100 Total 1,425,000 371,250 13,500 720,000 8,348,130 11 Planning FSEP workshop on QA/QC 29-30 November 2004 initially meant for limited N° experts New invitation, new programme: Monday 29/11 FSEP workshop on QA/QC Tuesday 30/11 FSEP meeting on demonstration project 12 Monday 29 Nov ‘04 8:30 – 12:30: QA/QC in the field 14:00 – 17:30: QA/QC in the laboratory Tuesday 30 Nov ‘04 Proposal of demonstration project: • Content: What and how? Which scenario? • Timing: When? • Role of the MS, JRC, FSCC: Who? • Structure of national programmes 13