ONGC’s Feedback for POSC P.K. Mittal GM-Head EPINET Project Oil & Natural Gas Corporation Ltd India P.Mittal, Head EPINET, ONGC EPINET • Exploration and Production Information Networking project • Distributed databases involving 18 servers • A 3-Tier database approach for data flow: – Field level : Asset/Forward Base Database – Regional level : Basin Database – Corporate level : Corporate Database • Covers Well, Production, Drilling, Seismic, Logging & Physical Asset data utilizing – Online Master Database – Log Archival Database – Seismic Archival Database P.Mittal, Head EPINET, ONGC Softwares • • • • • • • • FINDER LOGDB SEISDB DRILLDB ASSETDB GEOFRAME GEOLOGY GEOFRAME PETROPHYSICS DECISION POINT DATA ACCESS P.Mittal, Head EPINET, ONGC Databases & Their Integration 1. Corporate Server Dehradun •KDMIPE, IDT, GEOPIC, E&D Dte & Frontier Basin 2. Regional Server Panvel 3. Regional Server Baroda •Western Offshore Basin •IOGPT •Western Onshore Basin 4. Regional Server Jorhat •A&AA Basin 5. Regional Server Chennai 7. Regional Server Kolkata •Cauvery Basin •CBM-BPM Basin 9. Ahmedabad Site Server •IRS •A’Bad Asset 10.Mehsana Site Server 14. Nazira Site Server •Assam Asset 6. Rajahmundry Site Server •KG Basin •Rajahmundry Asset •Mehsana Asset 8. Vasudhara Site Server •Mumbai High Asset •Neelam Asset •Bassein Asset •Uran plant •Hazira plant 11.Ankleshwar Site Server •Ankleshwar Asset 12. Cambay Site Server •Cambay FB 13. Jodhpur P.Mittal, Head EPINET, ONGC Site Server •Jodhpur FB 15. Agartala Site Server •Tripura Asset 16. Silchar Site Server •Cachar FB 17 Karaikal Site Server •Karaikal Asset ONGC’s UWI Policy • Maximum Character size is 20. – 2 characters are reserved for the Region Code – 5 characters are reserved for the Field/Structure Code – 13 characters are reserved for the Well_No and the Well_Type_Code. • Some of the examples of the UWI generated are: – W-AMBD-20 (Western Region, Ahmedabad , Well no 20) – M-B-126-5 (Field code=’M-B-126’, Well no=’5’) P.Mittal, Head EPINET, ONGC UWI- Well Type Codes • Well Type Code codes are – – – – – – – – – Horizontal………………..(H) Drain Hole……………….(DH) Sub sea Completion …...(SS) 1st SideTrack……….…. (Z) 2nd Side Track……….….(Y) 3rd Side track ……….…..(X) Multilateral ………. (ML) First Multilateral……... (ML1) Second Multilateral….…..(ML2) • Examples: M-B173A-A6-H (Horizontal well A6 of B173A Structure) P.Mittal, Head EPINET, ONGC Seismic Data Management Issues • Location data & trace data stored separately • Viewing data is through different S/W applications • Near line storage • Aggregation/Merging • Reloading (?) • Need for a separate SIG (?) P.Mittal, Head EPINET, ONGC On land Seismic Survey Name • • • • • • • • • • • • • • • Survey name will be of max 20 characters as shown below :Basin Code –Four Characters as followed in Finder For Onshore-Two Characters i.e. ON Separator-One Character Block Code-Three characters 2D or 3D-Two characters Separator-One Character State Code-Max two Characters (As mentioned in Annexure-II) Investigation No-Max five characters Example-CMBYON-MEH2D-G401 CMBYON-ANK3D-G423 CMBYON-ANK3D-MERGE1 MERGE1 should indicate the seismic investigation numbers considered for the merging, the details of which should be given in C19 of Annexure IV. P.Mittal, Head EPINET, ONGC 2D Seismic EBCDIC Header • • • • • • • • • • • • • • • • • • • • • • • • • • • • C 1 CLIENT: OIL AND NATURAL GAS CORPORATION LIMITED. 2D SEISMIC DATA C 2 LINE: M125-02 SURVEY: xxxxxxxxxxxxxxxx AREA:xxxxxxxxxxxxxxxxxx C 3 SPHEROID: EVEREST75 PROJECTION:UTM-44 CM : 81 CP2: XX C 4 FSP: 74 IS AT LAT: 11 12 18.12 N LON: 79 30 29.01 E C 5 LSP: 1088 IS AT LAT: 11 01 26.84 N LON: 79 20 42.52 E C 6 FCDP: 1 SP ON FCDP: 1 LCDP: 1088 SP ON LCDP: 1088 C 7 ADDITIONAL SP CDP RELATION PAIRS FOR CROOKED PROFILE (OTHERWISE BLANK) C 8 ADDITIONAL SP CDP RELATION PAIRS FOR CROOKED PROFILE (OTHERWISE BLANK) C 9 BLANK C10 ACQUISITION PARAMETERS C11 RECORDING YEAR: 2004 AGENCY:ONGC VESSEL/PARTY:GP-29 C12 SYSTEM:DFS-IV REC FORMAT:SEG-B LOW/HIGHCUT: 8/128 HZ C13 NO OF CHANNELS: 96 FOLD: 48 SOURCE: VIBROSEIS C14 SAMPLE INTERVAL: 2MS REC LENGTH: 5000 MS REC START TIME: 0MS C15 SHOT INTERVAL: 100 M GROUP INTERVAL: 100 M NEAR OFFSET: 200 M C16 LAYOUT:SPLITSPREAD BACK CHANNELS: 72 FORWARD CHANNELS: 24 C17- C18 ENTER ADDITIONAL INFORMATION HERE C19 BLANK C20 PROCESSING PARAMETERS AGENCY: RCC, CHENNAI, ONGC BASIC/REPROCESSING C21 to C35 PROCESSING STEPS C36 PROCESSED OUTPUT STORED IN THIS TAPE:DMOSTK/MISTK/PSTM/PSDM C37 DOMAIN:TIME/DEPTH REC LENGTH: 4000 MS SAMPLE INTERVAL: 4 MS C38 ADDITIONAL INFORMATION C39 BLANK C40 END EBCDIC REMARKS: 1.All textHead fieldsEPINET, are left justified P.Mittal, ONGCand numeric values are right justified as shown 2.C1 TO C6,( also C7 & C8 for Crooked Lines ) & C36 AND 37 ARE MANDATORY FOR LOADING OLD DATA Issues for DBAs • Multiple accounts for single user – Unix Accounts – Application wise Accounts – Finder & DPDA • LogDB, Geoframe • SeisDB • AssetDB – Remote Login accounts • Assigning privileges – Over 300 tables – Role based or Oracle based – Dynamic assignment P.Mittal, Head EPINET, ONGC – Remote Users Data Flow Issues • Online replication/Synchronization yet to be achieved • Insert, Update, Delete Transactions Management • Time series data (Nlist Files) merging/Reloading (?) P.Mittal, Head EPINET, ONGC Challenges • Data aggregation • Merging of Seismic Trace Data from Basin servers to Corporate server • Interface between SAP and EPINET for transfer of Drilling and Production data P.Mittal, Head EPINET, ONGC Thank You P.Mittal, Head EPINET, ONGC