Document

advertisement
JSC INVESTMENT FUND OF KAZAKHSTAN
PRESENTATION OF THE PROJECTS WITHIN THE
FRAMEWORK OF PRIVATIZATION
www.ifk.kz
IFK assets for privatization
№
Name of the project
ype of activity
IFK’s share, %
Assets, 31.12.2014,
mln KZT
Liabilities,
31.12.2014, mln
KZT
Profit/Loss,
31.12.2014, mln KZT
12 201,7
29 944,2
-2 553
1
JSC «Doszhan Temir Zholy»
Railway Operation
48,94
2
JSC «White Fish of Kazakhstan»
Growing, processing and
packaging of fish products
42,34
Does not operate
3
JSC «Ural steel production and Production of hot-dip galvanized
zinc-coating plant»
steel building structures
29,77
Does not operate
4
JSC «Myrzabek Altyn Tas Group»
Mining of decorative and building
stones, limestones, gypsum, chalk.
Production of prefabricated
reinforced concrete structures.
39
963,2
543,5
-34,2
5
JSC «Rannila Kazakhstan»
Production of sandwich panels,
design, sales of building profiles,
building systems, modules and
components
44
274,6
51,9
-32,5
6
JSC «Irtysh chemical and
metallurgy plant»
Production of rare metals and
their alloys
44,57
464,4
254,2
-16,8
7
JSC «PampsPipe»
Organization of production of
anti-corrosion coatings of steel
pipes
100
Does not operate
8
LTD «A-KBK»
Processing fish
100
Operates from 2015
3
1. JSC «Doszhan Temir Zholy»
GENERAL DESCRIPTION OF THE COMPANY:
Operation of the new vehicle in the direction of the
East Kazakhstan region, excluding a double crossing
of the state border and customs procedures.
Length: 148 km
Cargo turnover: 6.2 mln.tons (for 9 months of 2015),
the maximum turnover of the project - 10
million.tons/year.
Share ownership:
- JSC «IFK» – 48,94%;
- JSC «NC «Kazakhstan Temir Zholy» – 46%;
- JSC «Kazzhol-Invest» - 2,85%;
- JSC «Corporation-ABE» - 2,18%.
BENEFITS OF THE PROJECT:
The number of jobs: 401
• The project was implemented in order to avoid double
Current situation:
crossing of Kazakh-Russian border to the corresponding
Project is operating.
customs procedures, as well as reducing transport costs
According to the results of the 3rd quarter 2015 the
for the region's population.
company came to a positive net profit of the
activities. The profit amounted to - 255.3 million
tenge.
Аstana 2015
4
2. JSC «White Fish of Kazakhstan» - Production of fish products
GENERAL DESCRIPTION OF THE PROJECT:
Plant for the production of fish products. The
company is located in Almaty and East Kazakhstan
Project capacity: 2000 tons per year
Share ownership:
- JSC «IFK» – 42,34%;
- LTD «Lime Group» - 57,66%,
Sales market: Kazakhstan
The number of jobs: 190
BENEFITS OF THE PROJECT:
Current situation: project does not operate.
•
The growing demand for fish products;
•
In Almaty region pond culture was more developed than in
other regions, due to the warm climate, the presence of
rivers and reservoirs, the need to ensure fish farms in fresh
Assets of the company:
water. Water supply in the economy is carried out in a
• Plants of closed-loop water delivery system
for fish farming.
natural way without the cost of energy;
• Equipment for open pondfish systems
• Equipment for filleting, glazing, freezing and
packing fish products.
•
Almaty region refer to the sixth aquaculture zone, where the
number of days with temperatures above 15 ° C on average
150 days.
Аstana, 2015
5
3. АО «JSC «Ural steel production and zinc-coating plant»
GENERAL DESCRIPTION OF THE PROJECT:
Production of hot-dip zinc-coating steel building
structures in Uralsk. Galvanized steel structures of various
configurations are widely used in the construction and oil
industries.
Project capacity : 13 200 tons/year
Share ownership:
- JSC «IFK» – 29,77%;
- LTD «SPP Metaloizdeliya» – 29,53%
- JSC «RITZ Gradient» –40,70%
Sales markets: Kazakhstan, CIS
The number of jobs: 125
Current situation: Manufacture is not running due to
incomplete construction and installation work
Assets of the company:
 Производственная база с земельным участком,
включающая арматурно-формовочный цех,
производственный корпус, бетонированную
площадку (склад металлоконструкций), мостовой
кран, рядом проходят подъездные ж/д пути
 Линия горячего оцинкования «G.M.Gruppo
Maccabeo» (Италия), обеспечивающая законченный
производственный цикл антикоррозийной обработки.
BENEFITS OF THE PROJECT:
 Hot-dip galvanizing is considered
effective
way
to
protect
the most
products
against
corrosion and is recognized as an international
standard;
 The main segment of consumption of materials
Астана, 2015
and products with anti-corrosion protection in the
form of hot-dip galvanizing is the construction
industry, in particular, companies carrying out the
construction work for the oil and gas sector.
6
4. JSC «Myrzabek Altyn Tas Group» - Manufacture of cube-shaped stones
GENERAL DESCRIPTION OF THE PROJECT:
The company is engaged in manufacturing cubeshaped stones in the Mangistau region.
Produced rubble:
- most liquid - fraction "of 5-10 mm," "5-20 mm," "10-20
mm"
- average liquidity - the faction "20-40 mm", "20-65
BENEFITS OF THE PROJECT:
mm"
-
soft rock and sifting - the faction "0-5 mm", "0-20
mm".
 The favorable geographical position. The field of
the enterprise is 165 km from the city of Aktau. The
Project capacity: 1 578 thousands of tones per year.
port of Bautino and Fort Shevchenko - 120 km of
Share ownership:
road. Before Aktau seaport - 120 km on the w / e
-
JSC «IFK» – 39%;
and the highway;
- LTD «Myrzabek» - 61%
 Availability of production infrastructure;
Sales markets: Kazakstan
 A license for drilling and blasting works.
The number of jobs: planned - 300, fact - 5
Current situation: the company operates partially.
Аstana, 2015
7
5. JSC «Rannila Kazakhstan» - Organization of production of sandwich panels
GENERAL DESCRIPTION OF THE PROJECT:
Production of wall sandwich panels - layered
assembly is of the two-way metal cladding and
mineral wool thermal insulation core in Almaty.
Project capacity: 800 000 sq.meters per year
Share ownership:
-
JSC «IFK» – 44,00%;
-
LTD «Rannila Kazakhstan» – 56,00%
Sales markets: Kazakhstan
The number of jobs: 11
BENEFITS OF THE PROJECTS:
Current situation: Operating enterprise.
Partner failed to perform the contractual obligations
since 2012. IFK is looking for potential investors.
 Modern equipment;
 Thermal performance is 15 times higher;
 The load on the foundation is less than 80 times;
 Low construction costs;
 Cost savings in buildings, long life;
Assets of the company:
 Equipment of Samshin machinery (South
Korean production line for production of
sandwich panels)
 High heat and sound insulation properties;
 Low water absorption of mineral wool.
Аstana, 2015
8
6. JSC «Irtysh chemical and metallurgy plant»
GENERAL DESCRIPTION OF THE PROJECT:
Organization of the process of deep processing of rare
metals with the expansion of the range of marketable
products and access to the international market of high
technologies in the East Kazakhstan region.
The plant became the base and the only one in the
country to obtain niobium, lanthanum, neodymium,
praseodymium, samarium, gadolinium, cerium, etc.
Project capacity: niobium metal ingots - 150 tons / year,
ferronioby - 645 tons / year
BENEFITS OF THE PROJECT:
Share ownership:
 Stability and steady growth of consumption of
-
JSC «IFK» – 44,57%;
LTD «КазНиобий ИХМЗ – 55,43%
products on the world market;
 Distance from the city - environmental security;
Sales markets: China, Japan, CIS, Europe.
The number of jobs: when plant was operating - 430
 High-tech.
Current situation:
The plant is on conservation since 2008.
Assets of the company:
• Property complex, land, buildings and structures.
Аstana, 2015
9
7. JSC «Pams Pipe» - Production of anti-corrosive coating of steel pipes
GENERAL DESCRIPTION OF THE PROJECT:
Plant for production of anti-corrosive three-layer
coating of steel pipes with diametr from 60 to
1120 mm in Almaty oblast.
IFK’s share in the project: 100%
Sales markets: Kazakhstan, CIS, Europe
Current situation: The plant is on conservation.
Assets of the company:
•
BENEFITS OF THE PROJECT:
Technology equipment in a complete set
 Proximity to the market realization;
on
 The proximity to rail and road Republic;
corrosion-resistant,
3-layer
(epoxy,
adezivny, polymer layers) The coating of
steel pipes with a diameter of 60 to 1120
mm «Hyundai Metal Indonesia Ltd»
•
Production base with a land facility for
maintenance (the main building, unloading
 High-quality anti-corrosion coating according to
international standards for the entire life of the
tubes used in all industries, especially in the
utilities and water management, oil and gas
industry.
 The availability of cheap electricity, water, etc.
platform)
Астана, 2015
10
8. LTD «А-КBК» -Deep processing of fishery products
GENERAL
DESCRIPTION
OF
THE
PROJECT:
The project on the organization of production on deep
processing of fishery products inKapshagay, Almaty
region.
Project capacity:
•
Processing of fish products - 2 000 tonnes / year;
•
Capacity of industrial refrigerator - 4000 tons.
IFK’s share in the project: 100%
Sales markets: Kazakhstan, CIS
BENEFITS OF THE PROJECT:
The number of jobs: 75
 The growing demand for fish products in
Current situation: Manufacture was put into operation in
June 2009.
 Proximity to major metropolitan areas of the
Currently, the production is idle.
country, the city of Almaty;
 The
Assets of the company:
•
Fish processing equipment BOGO E & I CO, LTD
Technological equipment for the processing
plant
and
latest
equipment
of
Norwegian
and
Korean production was installed, the project
meets all the quality standards adopted in the
(South Korea)
•
Kazakhstan;
the
refrigeration
terminal
EU.
HUURRE
(Norway)
Аstana, 2015
11
Download