MONTHLY REPORT TO THE COMMUNITY NOVEMBER/DECEMBER 2014 Monthly Report November/December 2014 The Monthly Report to the Community summarises, for the information of the community and other interested stakeholders, all of the many activities of the Shire for the preceding month, ranging from policy development and implementation through to service delivery, the provision of infrastructure, and the Shire’s financial position. Given the scope of the Shire’s wide ranging activities, there is a great deal to report. Every effort is made to provide information in a readily understandable, easy-to-read form. Any resident, ratepayer or other stakeholder seeking further information should contact the relevant Shire manager or director, or in the first instance can contact: Todd Trimble Manager Communications Ph. 5950 1200 Monthly Report November/December 2014 TABLE OF CONTENTS Performance Executive Summary - Strategic Planning - Statutory Planning - Environment Protection and Community Safety - Economic Development - Director Sustainable Environment - Infrastructure Strategy - Infrastructure Maintenance - Infrastructure Project Management - Renewable Resources - Director Sustainable Infrastructure - Child, Youth and Family Care - Aged and Disability Services - Recreation and Leisure - Libraries, Arts and Culture - Social Planning and Community Development - Director Sustainable Communities - Corporate Planning and Projects - Communications - Team Support and Development - Governance and Corporate Support - Property & Valuation - Information Services - Finance - Director Sustainable Organisation Allan Cowley Bruce Rendall 1 4 7 11 14 16 19 22 25 31 32 33 35 38 40 43 44 46 48 49 52 54 56 57 Capital Works Overview Craig Cinquegrana 58 Priority Works Overview Various 69 Priority Projects Overview Various 72 Asset Conversion Program Yasmin Woods 80 Financial Statements - Standard Statement of Financial Performance (Income Statement) - Net Cost Statement - Standard Statement of Cash Flows - Standard Statement of Financial Position (Balance Sheet) - Standard Statement of Capital Works - Corporate Performance Statement Geoff Emberson Key Financial Status Indicators - Borrowings Geoff Emberson Monthly Report November/December 2014 Niall Sheehy Claire Smith Shane Murphy Stephen Chapple Davey Smith Niall McDonagh Craig Cinquegrana Sophia Schyschow Alison Leighton Robin Adams Jenny Van Riel Peter Gore Geoff Carson Jenny Macaffer Rob Macindoe Tracey Limpens Todd Trimble John Rankine Tony Beynon Yasmin Woods Mike Foreshew Geoff Emberson 87 88 90 93 94 95 97 Monthly Report November/December 2014 STRATEGIC PLANNING NOVEMBER STRATEGIC LAND USE PLANNING • Housing and Settlement Strategy – Council’s demographic consultant firm id. Consultants have recently provided further information on population growth and on this basis the housing projections are being reviewed. • Implementation of the new Residential Zones – the scope of this project is being reviewed having regard to the report by the (former) Minister’s Standing Advisory Committee on this subject. COASTAL PLANNING • Mornington Harbour Precinct Plan – Council adopted this Plan on 24 November 2014. Council also adopted the related plan for the Mornington Pier Forecourt redevelopment. Tendering of the Forecourt Plan works is due to occur February/March 2015 with construction starting in April 2015. • Safety Beach Coastal Management Plan - a Draft Plan has been prepared. A report recommending exhibition and further consultation is envisaged to be presented to Council in February/March 2015. • Rye Foreshore Landscape Master Plan - Consultants have been appointed to prepare the Plan. A comprehensive community consultation program will commence in mid-January. • Mornington Football Disaster Memorial Park – improvement works have been halted due to the discovery of items of potential Aboriginal Cultural Heritage significance. This matter is under review by Aboriginal Affairs Victoria. • Mills Beach Landscape Master Plan – construction plans for area upgrade and beach access have been finalised. Stage 1 works are expected to commence in March 2015. NATURAL SYSTEMS PLANNING • Tootgarook Wetland Management Strategy - Draft Consultant Report on Wetland Values and Ecological Character Description (feasibility of RAMSAR listing) has been received and is under review as an input into the Strategy. • Tootgarook Wetland Environmental Monitoring Project - Melbourne Water and Council have jointly commissioned the consultant firm Jacobs SKM to undertake this project. • Port Phillip and Western Port Biosphere Foundation - Annual General Meeting - officer input provided for a new project on water management, utilising Watsons Creek as a case study. • Mornington Peninsula Biodiversity Conservation Plan - the brief for this project was completed in consultation with the Natural Systems Team. URBAN DESIGN • Mornington Laneways Strategy – the consultant firm Hansen Partnership has completed a report in consultation with the Chamber of Commerce and other stakeholders, officers and the Design Advisory Panel. This report is to be presented to Council for consideration in February 2015. HERITAGE • Mornington Peninsula Heritage Study Review – Stage 2 (Dromana, Rosebud and Rye) – heritage consultancy firm Context has been appointed for this project. The identification of sites for further heritage assessment has commenced. • Rosebud Sound Shell – preliminary investigations for the preparation of a Conservation Management Plan have been completed in consultation with the National Trust. Information is being sought about Council’s duty of care in preventing access to the roof of the sound shell prior to planning modifications to restore it to a more original and attractive state. Monthly Report November/December 2014 1 • Collins Settlement Site Management Plan (2002) - a review of the management plan has been commenced in conjunction with Parks Victoria and other relevant community stakeholder groups. • Police Point cottages - design and advisory work continues in support of re-modelling, refurbishing and conservation works on the various cottages. AMENDMENTS, PLANNING SCHEME REVIEW AND STATUTORY PLANNING REFERRALS • Amendment C174 (part 3): Heritage items (completion of the Heritage Review for Area 1 – Mt Eliza, Mornington and Mt Martha) - Council adopted this amendment on 24 November for submission to the Minister for Planning for approval. • Amendment C161: Yaringa Boat Harbour - documents have been submitted to the Department of Planning to commence exhibition process in early January. Panel hearing scheduled for May 2015. • Amendment C184: various items – this amendment has been placed on exhibition with closing date of 9 January 2015. The items include: a rezoning of South East Water owned land in Kanya Road, Mount Eliza, for residential development and a change to the Design and Development Overlay controls for land on the north side of Bungower Road, Mornington, to facilitate a low density residential development proposal. • Referrals from statutory planning – 18 referrals were received and 13 were completed. • Demolition requests – 30 requests were received and 28 were completed in terms of heritage assessment. No heritage issues were raised by the applications received. DECEMBER STRATEGIC LAND USE PLANNING • Hastings Town Centre Structure Plan – Council adopted this Plan on 8 December. • Dromana Township Plan – the consultant firm Hansen Partnership has been appointed for this project. As a first step an Issues Paper for community consultation is to be completed. This is anticipated to be completed in February/March 2015. • Rosebud Activity Centre Structure Plan, Rosebud Activity Centre Urban Design Framework and Rosebud Coastal Management Plan – these adopted policy documents are being reviewed for Council’s consideration, having regard to recent Council resolutions in relation to the Southern Peninsula Aquatic Centre. COASTAL PLANNING • Hastings South Coastal Management Plan - Council adopted this Plan on 8 December and has referred the document to DEPI for approval. • Jetty Road (Rosebud) Precinct Master Plan – the exhibition period for public comment closed on 22 December. Submissions are being reviewed and will be reported to Council early in 2015. • Foreshore Advisory Groups – a combined meeting of the three Foreshore Advisory Groups in the Briars Ward was held to discuss issues of common interest. • Carraar Creek Lane coastal path – a Public Meeting was held regarding current issues and investigations in relation to the path, which has been closed due to a landslip. • Mornington Harbour Precinct – plans are being prepared for replacement of the bluestone toilets in conjunction with the Pier Forecourt redevelopment project. • Hastings boat ramp extension and deepening – Expressions of Interest have been invited from suitably qualified consultants to undertake a feasibility study for this project. NATURAL SYSTEMS PLANNING • Mornington Peninsula Biodiversity Conservation Plan – Expressions of Interest have been invited from suitably qualified consultants. The closing date is 29 January 2015. • Tootgarook Wetland Management Strategy – a combined Government, Agency and Community Stakeholders meeting was held on Friday 12 December. This forum included two key presentations, the first by Ms Cassie Price, from WetlandCare Australia (Regional Manager, Monthly Report November/December 2014 2 Ballina Region, NSW), and the second, led by Co-design Studio and Hands On Learning, with the Rosebud Secondary College and Eastbourne Primary School students presenting on the Rosebud West Wetlands Reserve Upgrade project: Engaging local young people. • Planning Permit P06/2870 for 1225 Nepean Highway, Mt Eliza (Norman Lodge) Implementation of Permit Conditions for the creation of two Coastal Reserves and the transfer of these to Council has been finalised, including arrangements for receipt of land titles and transfer of $250K from permit holder to Council for management of reserves for 10 years. URBAN DESIGN • Beleura Hill Neighbourhood Character Study and Design Guidelines – Council adopted the Beleura Hill Design Guidelines (developed with assistance from planning consultant firm Tract) on 8 December 2014. • Streetscape Design Framework for High Street in Hastings – the landscape architecture firm Aspect Studios have undertaken an initial round of community engagement and are now preparing a Draft Design Framework for further consultation. • A Design Advisory Panel workshop was held on 9 December 2015 to review and discuss a proposal for an aged care facility at 1497 -1505 Point Nepean Road, Rosebud. The DAP report has been completed. HERITAGE • Mornington Peninsula Heritage Study Review – Stage 2 (Dromana, Rosebud and Rye) - officers have completed a report on a street by street heritage survey of the study area, (excluding three smaller areas to be surveyed by consultants). Context Consultants are continuing preliminary identification of sites for further assessment. • The next round of heritage grant applications have been received and assessed. Most applicants have been asked to provide additional information about the scope and detail of works proposed, so that funds can be allocated most fairly and with optimal heritage benefit. • Sorrento (Heritage) Design Guidelines - officers are pursuing finalisation of the guidelines for consideration by Council. PLANNING SCHEME REVIEW AND STATUTORY PLANNING REFERRALS • Amendment C176 Part 2: general items including re- zoning of land at 70 Mountain View Road, Mount Eliza – Council adopted the Amendment on 8 December for submission to the Minister for Planning for approval. • Amendment C188: including Bittern Design and Development Overlay (to recognise the low density residential edge of the Bittern township) and Tootgarook Wetland Environmental Significance Overlay. Council resolved to seek authorisation to exhibit the amendment on 15 December. • Quadrennial Mornington Peninsula Planning Scheme Review - Council adopted the Review on 15 December for submission to the Minister for Planning for approval. • Referrals from statutory planning – 19 referrals were received and 25 were completed. • Demolition requests – 33 requests were received and 44 were completed in terms of heritage assessment. No heritage issues were raised by the applications received. Financially, there is a positive variance primarily resulting from vacant positions, staff leave and lower than projected consultant costs. $'000 Operating Surplus / (Deficit) Forecast Month (150) Monthly Report November/December 2014 Actual Variance Forecast Month Month Y.T.D (155) (5) (952) 3 Actual Variance Y.T.D. Y.T.D (847) 105 Budget Forecast Variance Y.E. Y.E. Y.E. (1,920) (1,911) 9 STATUTORY PLANNING NOVEMBER 2014 Planning Applications Council received 180 planning applications in November and decided 193 planning applications. As of the end of the month, 712 planning applications remain in hand. Of the applications decided, 73% of applications were decided within the statutory timeframe, exceeding the Unit’s monthly target of 65% of applications to be decided in time and exceeding the State average of 64%. The statutory planning unit operates with 4 planning teams and a planning support team. Team North Team East Team South Team Central (Fast Track) Applications received 34 32 30 77 Applications determined 35 39 17 71 % within time 60 63 70 76 % within 60 and 80 days 20 13 7 - Planning Support: The Planning Support team received a total of 3552 telephone calls in the month of November. Of these, 88% (target is 80%) of calls were answered within twenty seconds and 99% (target is 95%) of calls were answered within two minutes. The team also serviced approximately 647 counter enquiries this month. During November, the Planning Support team completed 94% (target is 85%) of the workload in time for the month. Planning S72 Amendment Applications Council received 32 applications under Section 72 of the Planning and Environment Act to amend planning permits in November and decided 31 planning amendment applications. 105 planning amendment applications remain in hand. Secondary Consent Applications Council received 26 planning amendment applications in November and decided 33 planning amendment applications. 40 secondary consent applications remain in hand. Significant Applications P14/0951: 785 - 786 Esplanade, Mornington - 3 commercial premises on the ground floor, with 9 apartments above including basement car parking. The application has concluded advertising with 1 objection received. P04/2936: 1254 Nepean Highway, Mt Eliza - The amendment application seeks approval for a 34 bed increase to the existing 90 bed aged care facility at the site (George Vowell Aged Care Facility). Advertising concluded. No objections have been received. P14/1925: 16 Graf Road, Somerville - Use and develop the land for a retirement village. The application proposes 11 separate buildings (a mix of 2 and 3 storey buildings) comprising a total of 233 living units. Further information has been requested. Monthly Report November/December 2014 4 Proposed Development Plan – RACV Cape Schanck Resort - This is a request for approval of the Development Plan, which will facilitate the proposed redevelopment of the clubhouse and accommodation rooms at the RACV Cape Schanck Resort. The proposed Development Plan is currently being exhibited. VCAT P13/1992: Arthurs Seat State Park, Purves Road, Arthurs Seat - The Tribunal determined to uphold Council’s original decision to grant a permit, but with varied conditions stemming from the various expert evidence presented to the Tribunal during the course of the hearing. These primarily related to conditions around emergency management and operation of the facility during times of high fire risk, vegetation offsets, noise, and reduced hours of operation in the evening period. DECEMBER 2014 Planning Applications Council received 202 planning applications in December and decided 205 planning applications. As of the end of the month, 651 planning applications remain in hand. Of the applications decided, 70% of applications were decided within the statutory timeframe, exceeding the Unit’s monthly target of 65% of applications to be decided in time and exceeding the State average of 64%. The statutory planning unit operates with 4 planning teams and a planning support team. Team North Team East Team South Team Central (Fast Track) Applications received 58 40 44 55 Applications determined 43 35 38 72 % within time 70 46 63 79 % within 60 and 80 days 12 31 11 7 Planning Support: The Planning Support team received a total of 2941 telephone calls in the month of December. Of these, 92% (target is 80%) of calls were answered within twenty seconds and 99% (target is 95%) of calls were answered within two minutes. The team also serviced approximately 598 counter enquiries this month. During December the Planning Support team completed 95% of tasks within timeframe (target is 85%). This team target was achieved 10 of the 12 months in 2014. Planning S72 Amendment Applications Council received 33 applications under Section 72 of the Planning and Environment Act to amend planning permits in December and decided 41 planning amendment applications. 108 planning amendment applications remain in hand. Secondary Consent Applications Council received 29 planning amendment applications in December and decided 31 planning amendment applications. 36 secondary consent applications remain in hand. Significant Applications Monthly Report November/December 2014 5 P14/0951: 785 - 786 Esplanade, Mornington The application proposes the re-development of the “Harba” restaurant site on the Esplanade. The application is for the development of 9 apartments, 3 commercial premises on the ground floor and basement car parking. The application has concluded advertising and 1 objection has been received. P14/1654 - 428 & 430 Racecourse Road, Mornington The application seeks approval for the development of a residential village comprising 32 dwellings (for people with disabilities) and a ‘wellbeing’ centre located to the front of the site. The wellbeing centre will service the existing retirement village on the opposite side of Racecourse Road and the wider community. The application is on advertising until 7 January 2015. P14/1931 – 120 Nepean Highway, Dromana The application seeks approval for the construction of a supermarket (ALDI), associated advertising signage and alteration of access to Nepean Highway. The application is on advertising until 6 January 2015 and two (2) objections have been received. Referrals have also been undertaken for the application. VCAT P13/1969: 57-59 Ocean Beach Road, Sorrento This is an application for review against Council’s decision to refuse to grant a permit for the development of a shop and six (6) dwellings, together with carparking variation and vegetation removal. No hearing has been set at the time of this report. P13/1830: 3080 Point Nepean Road, Sorrento This is an application for review against conditions for the development of the land for a dwelling, vegetation removal and associated works. One of the key matters in dispute involves how the viewing cone from the Eastern Sisters lookout is to be defined. The resolution of this issue may necessitate a Practice Day hearing before a legal member of the Tribunal. No hearing date has been set at the time of this report. VCAT's new approach in the Planning and Environment List VCAT is changing its approach to listing matters in the Planning and Environment List. The main change is that parties will get a date for their hearing and a date for any compulsory conference or mediation at the outset of their proceeding, giving them certainty about timelines and more time to prepare. On 2 February 2015, VCAT will introduce new initiating orders for all matters in the Planning and Environment List. The orders will specify the dates for hearing and any compulsory conference. The orders will also make it clear what each party or agency needs to do, and by what date. Currently, parties are not advised of these dates and processes until further down the track. Parties will have more time to prepare for hearings, organise for witnesses or experts to attend, engage advocates, and amend plans. Financially, the year to date favourable variance of $190k is largely a result of less legal expenses ($135k) and external consultants ($28k) spent than forecast. These forecasts will be reviewed and adjusted as part of the Mid Year Review. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (304) (220) 84 (2,178) Monthly Report November/December 2014 6 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,988) 190 (4,145) (4,108) 36 ENVIRONMENT PROTECTION AND COMMUNITY SAFETY November/December FIRE PREVENTION AND EMERGENCY MANAGEMENT November • Fire Prevention Officers and Shire Rangers inspected over 5,000 properties and issued over 1,600 Fire Prevention Notices directing property owners to undertake fire hazard works. • The team delivered Emergency Relief Centre (ERC) training at the new Mornington Civic Reserve Recreation Centre. Familiarisation of the new ERC trailer was undertaken; this trailer allows the Shire to set up a relief centre at any location. • Shire Officers attended a regional workshop in November hosted by Emergency Management Victoria (EMV) to discuss capability and development across different agencies involved in emergency management. December • Fire Restrictions are now in force and it is expected that the fire danger period will run from Monday 8 December 2014 until Friday 1 May 2015. The lighting of fires is prohibited without a permit and extreme caution is necessary throughout the Fire Danger Period. • The Mayor, Councillor Bev Colomb, officially handed over a new 105,000 litre water tank for fire-fighting purposes to the Country Fire Authority (CFA) brigades of Red Hill and Main Ridge. The Shire funded water tank, located on Arthurs Seat Road Red Hill, provides the hinterland brigades with an accessible, strategically positioned source of water in an area where reticulated water is not available. The Shire has also upgraded facilities at existing strategic water points at Pindara Road Arthurs Seat and Old Main Creek Road Main Ridge. • The Mornington Peninsula Shire in partnership with the CFA, Parks Victoria, VicRoads and Victoria Police hosted a multi-agency community fire engagement day on Saturday 6 December 2014 at the Rye Civic Hall from 10am until 2pm. • On Monday 15 December 2014 the Mornington Peninsula Shire Council adopted its Roadsides Fire Management Plan. This plan is a five year scheduled program of additional roadside fire management works for Shire managed roads and categorises the roads for fire management purposes. ENVIRONMENTAL HEALTH November • The renewal of registration for the Shire’s 2015 food and health businesses is almost complete. 1566 invitations to renew were issued and 85% have been returned to date. All premises must renew their registration before 31 December 2014. Final reminders will be sent out on 15 December 2014. • The Environmental Health Team undertook 80 Food Safety Assessments of fixed food businesses and 20 assessments of temporary food businesses. The team processed 16 applications and 237 Statements of Trade via the online registering system known as Streatrader. • Best Bites is a Mornington Peninsula Shire program that recognises the most outstanding local food businesses in the area of food safety, healthy eating, sustainability and access for all. The winner of this award was the Hummingbird Eco Retreat, Red Hill for its excellence in nutrition and healthy eating, tobacco and liquor compliance, waste and recycling, energy and water efficiency, and access for all. Winners were presented with their awards at the 24 November Council meeting. Monthly Report November/December 2014 7 • The Shire was successful in obtaining funding from Department of Environment and Primary Industries (DEPI) for a boat wastewater pump station to be installed on the pier near Mornington Yacht Club in 2015. • In conjunction with the Environment Protection Authority, the Environmental Health Team is commencing a risk assessment of Rye beach to determine possible sources of bacterial contamination detected last summer. December • The Environmental Health Team undertook 152 Food Safety Assessments of fixed food businesses and 42 assessments of temporary food businesses. The team processed 61 applications and 394 Statements of Trade via the online registering system known as Streatrader. • The Environmental Health Team have assisted the Department Of Health and Human Services and Consumer Affairs in contacting all business that we are aware of that sell bath milk (unpasteurised milk) and provided the current information on its danger and reminding them that it is illegal to sell unpasteurised milk for human consumption. • The Environment Protection Authority’s Victoria summer time water quality forecasting service, ‘Beach Report’ and ‘Yarra Watch’, began on Monday 1 December 2014. Forecasts are updated twice a day on the Victorian government’s http://www.cleaneryarrabay.vic.gov.au/ website. The results are based on beach monitoring data, predicted weather conditions, weekly samples, pollution and other events such as algal blooms and fish deaths. Poor water quality can affect health and become a safety issue for swimmers and this service provides timely and accurate water quality alerts and information to the general public. STATUTORY BUILDING November • The Municipal Building Surveyor attended four structural fires and three vehicle impacts into building incidents out of work hours. All of the buildings suffered significant structural damage, but thankfully no serious injuries were sustained. • The team received 76 new complaints of illegally constructed buildings during November, the investigations have commenced with a number of formal notices served on property owners to remedy these breaches. December • On Monday 5 December 2014 the Statutory Building Team were called to an early morning emergency in Blairgowrie where a 20 tonne garbage truck had accidently rolled into the rear of a café. Once onsite, officers assessed the damage and managed the immediate installation of temporary propping to ensure the side brick wall and roof of the building remained stable, while carefully directing the removal of the damaged rear wall with an excavator. SHIRE RANGERS November • The Shire Ranger Team dealt with 861 reactive cases over the past month. In addition to this, the proactive fire prevention program commenced this month where the Shire Ranger Team undertook 5,000 inspections of private land to assess the need to issue a Fire Prevention Notice. Monthly Report November/December 2014 8 December • The Shire Ranger Team dealt with 1042 reactive cases over the past month. In addition to this, the proactive fire prevention program continues with re-inspections of notices issued last month. • The traffic management program has multiple teams of officers working across the Peninsula seven days a week focusing on the busiest areas. With the increasing amount of traffic leadiing into the holiday period, the aim of the program is to ensure traffic turnover within the timed areas of the central business districts, as well as ensuring safety is not compromised by drivers parking in no stopping areas. • A proactive beach patrol program commenced this month. The aim of the program is to visit foreshores and reserves under Shire management to educate and engage with the community who are walking their dogs along beaches with regard to animal regulations. COMMUNITY ANIMAL SHELTER November • 132 dogs were impounded and 111 of these dogs were reunited with their owners due to being microchipped. Five dogs went to our rescue group’s partners who will now arrange for the appropriate vet care and seek a permanent home for them. 42 cats were impounded and unfortunately only five of these cats were returned to their owners. Eighteen cats were taken to our rescue group partners for rehoming. • Special Project (DRIP initiative) Two Shire Rangers ran an educational training program to Community Care Workers that focused on animal behaviour traits. The aim is to help staff prevent and reduce the risk of dog bite incidents for the Shire’s Home and Community Care (HACC) Team. This is a great example of cross team unity and internal training at minimal cost. December • A typically busy Shelter becomes even busier during December with 130 dogs impounded. Pleasingly 92 of these dogs were reunited with their owners due to either being Council registered and/or microchipped. Twenty dogs went to our rescue group partners who will now arrange for the appropriate vet care and seek a permanent home for them; a fantastic result with only one dog having to be euthanized. Ninety-one cats were impounded and unfortunately only 14 of these cats were returned to their owners. An amazing 23 cats were taken to our rescue group partners for rehoming and it was disappointing that 19 cats had to be euthanised due to very poor health. Special recognition to our rescue group partners this month, Forever Friends; Pointer Rescue; Labrador Rescue; Homeless Hounds; Staffords in Need; Down Under Dog Rescue; Australian Working Dog Rescue; Australian Animal Protection Society at Keysborough; Peninsula Cat Rescue; Sweet Shepherd Rescue; Rescue A Cat and Peninsula Vet Care at Dromana. PLANNING COMPLIANCE November • Local traders were concerned when a food vendor set up 4-5 mobile food vans on vacant land in the Commercial 1 zone in Rye. The Planning Compliance Team and Environmental Health Team investigated and found that the vendor is complying with the Food Act and advised the operator what was permitted on site without a planning permit whilst advising him to remove the non-compliant items. Three teams from Sustainable Environment (Planning Compliance, Environment Health and Economic Development) held a public meeting to provide information to the traders and hear their concerns. • The Planning Compliance Team tackled an ongoing issue of vegetation removal along the foreshore in the Rye East area. Information was mailed out to residents and advisory signage Monthly Report November/December 2014 9 was installed in the affected areas. Officers have also had productive conversations with some nearby campers about this issue. • Real Estate signage remains an ongoing compliance issue across the Mornington Peninsula. The Planning Compliance Team continue to issue $1,444 fines to various real estate companies who fail to comply with the allowances under the Mornington Peninsula Planning Scheme. December • The Planning Compliance Team communicated with residents and business operators in relation to the Rye Food Truck Park and the use of this site. The site can be used for the purpose of selling ‘food and drink’ without the need for a planning permit as it is within the Commercial 1 Zone. Council has been closely monitoring the site for any amenity impacts. The site has been well kept and there have not been any amenity impacts found so far. • • Two unpaid infringement notices for illegal real estate signs led to two prominent real estate agencies facing charges in the Dromana Magistrates Court. Neither agency appeared at their respective proceeding and the matters were heard in their absence. Both agencies were found guilty and fined, one $2,500 and the other $4,500. Both parties have applied to the court for a re-hearing. Unfortunately some agencies continue to breach the signage allowance, which causes unfair competition and amenity issues for the affected areas. A local tree lopper pleaded guilty in the Dromana Magistrates Court to multiple charges relating to the illegal removal of several trees on a private property in the Balnarring area. The individual was fined and convicted for the offence and was ordered to pay fines and costs of $11,000. The landowner involved also faced separate enforcement action and has been ordered to remediate the land. SCHOOL CROSSINGS November and December • The school year is coming to a close. The Shire’s Children’s Crossing Supervisors are enjoying the final year celebrations with many of them being an integral part of the students’ end of year celebrations. Many of the supervisors have participated in the orientation programs for the 2015 prep classes, helping to teach them to safely cross the road. EPaCS ADMINISTRATION November and December • The administration Team are taking about 1,000 calls per week mainly related to the fire prevention season, food and health business registrations and statutory building processes. At this time of year there is a pre-Christmas rush on building permit processes as the community attempt to finalise projects and to coincide with the major house selling season on the Peninsula. Financially, the favourable variance is due to greater than predicted income from infringements and statutory building income. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (182) (413) (231) (2,352) Monthly Report November/December 2014 10 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (2,097) 256 (5,339) (5,259) 80 ECONOMIC DEVELOPMENT NOVEMBER Dromana Visitor Information Centre (DVIC) relocation The Tourism Team relocated back into their Dromana building following the roof repairs and refurbishment of the interior to meet OH&S requirements as well as Disability Access standards. Industry Update 110 businesses attended the annual tourism industry update address provided by Tracey Cooper and the Board members of the MP Regional Tourism Board. Tracey outlined the past 12 months achievements and future marketing directions. Trip Planner As part of the tourism industry new initiatives, a Trip Planner has been installed on the visitmorningtonpeninsula.org website with animated characters in the ‘Findyourway’ campaign. MP Conference Bureau [MPCB] Representatives of the MPCB attended the Executive Assistant Network Congress in Melbourne and promoted our region for the business events market to 120 delegates. These delegates are key contacts for business events/conferences, a market segment our industry is keen to tap. Small Rural Landholder Network [SRLN] Our Rural Business Officer, Gillian Stewart, arranged two workshops for the network over the past six weeks. 70 farmers/landholders attended the workshops on weed management and an on farm/demonstration site field walk. These workshops assist our landholders to manage their land sustainably. Food Industry Advisory Body [FIAB] FIAB has now endorsed the industry supported Certified Trade Mark [CTM] for the regional provenance food branding project. The rules applying to the CTM are also finalised and the CTM will be lodged with the ACCC prior to Christmas. Frankston MP Business Breakfast 160 business people attended the breakfast to hear Carolyn Creswell, owner of Carman’s Foods, tell the remarkable success story of her company. Rye Business Association EDU is continuing to support the development of a Rye Business Association. There have been two trader meetings to date and EDU are confident of the group eventually forming an incorporated business association to represent all traders on relevant issues in the town. Basketball Tournament EDU supported the 28th Southern Peninsula Junior Basketball Tournament. 340 teams competed with 3,400 players and a further 4,000 parents and friends attending the three day event. 75% of the teams come from outside the region, providing a great economic stimulus in the ‘off peak’ period of tourism. Monthly Report November/December 2014 11 DECEMBER TOURISM Visitor Services Visitor Centre Activities The team welcomed and trained six new volunteers to provide customer service in the Visitor Centre. Visitation Statistics The Regional Booking Service saw an increase of 7% on bookings made against December last year, with the value of accommodation increasing 20.5% to $54.5k. Walk in visitors decreased by 34% to 3783 whilst phone calls for assistance have increased slightly by 2% from 1,216 to 1,240. Industry Workshops Fire Ready Workshop Series The Mornington Peninsula Tourism Fire Ready workshop series was awarded the 2014 Victorian CFA Industry and Service Award at a ceremony held on 4 December 2014. Regional Social Media Integration Two workshops were held on 11 December 2014 with 45 attendees from the tourism industry, integrating the regional tourism website with Facebook, Twitter and Instagram. P&O Cruises A December briefing with 100 people was run by P&O Cruises and Abercrombie & Kent to inform businesses and emergency service personnel of the arrival of the cruise liners on 24 February. EDU has met with the Western Port Harbour Master to prepare back up plans in the event stormy weather makes berthing at Mornington too risky. Stony Point will be the backup location. Business Events The Mornington Peninsula Conference Bureau has been rebranded as ‘Business Events Mornington Peninsula’ to better align with industry standards and market demand. A new logo and Meeting Planners Guide have been developed and will be launched at the Asia Pacific Incentives and Meetings Expo (AIME) in February 2015. BUSINESS DEVELOPMENT Marine Precincts Strategy Public submissions have been collated and analysed. The final version of the strategy will be presented to Council in February or March 2015 for adoption. Hastings Fish Shed The shed has been stripped and renovations are underway for the establishment of a Visitor Information Centre. Small Rural Landholder Network (SRLN) The final MP Farmer Discussion group for 2014 was held at ‘Ke Warra’, Moorooduc with 35 people. Technical discussions focused on cattle husbandry, pasture production with alternative fertilisers, as well as cattle herd genetics. Food Industry Advisory Body (FIAB) The Certified Trade Mark (CTM) application for Mornington Peninsula Produce was lodged prior to Christmas which is a major milestone for Action 1 of the Local Food Strategy. Monthly Report November/December 2014 12 Technical Fact Sheet series A rural land use focused fact sheet series is currently being scoped and will commence production in early 2015. A number of local agribusiness technical advisers will provide local content for the fact sheet series, which will target both new and established landholders. Themes for the publication include: • Soils • Water • Pastures • Rural land management • Strategic land use planning • Matching landscape and land use capability • On-Farm business diversification, and • Niche enterprises Nursery Industry Audit Scoping work for this project will continue in January 2015 to identify a key stakeholder engagement strategy to be undertaken in February. Timeline for completion of the audit is 30 April 2015. Small Business Mentoring Sessions 17 SBMS clinics have been scheduled for 2015 with the first sessions on 10 March and last session on 20 October. These free clinics offer local businesses a 45 minute 1:1 session with a professional business mentor. Digital Enterprise workshops Nine Digital Enterprise workshops have been booked for 2015 between March and November. These free workshops will help get our businesses ready to participate fully in the Digital Economy. In addition, 1 on 1 business mentoring will be offered to participants. Financially, there are no issues and the EOY position will be as forecast. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (128) (141) (13) (817) Monthly Report November/December 2014 13 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (807) 10 (1,690) (1,674) 16 DIRECTOR - SUSTAINABLE ENVIRONMENT NOVEMBER The Minister for Planning has approved Amendment C180 RACV Resort Cape Schanck. The next step includes formal public notice of the proposed revised Developer Plans, including proposals for the provision of reticulated sewerage infrastructure, and subsequent review of any submissions received. Council adopted both the Mornington Harbour Precinct Plan and the Mornington Pier Forecourt Plan. With further funding support from Parks Victoria, Council will upgrade the access and forecourt area with the pier redevelopment project. Construction is expected to take place in April 2015. More than 4000 properties have been inspected as part of Council’s Fire Prevention Inspection Program during this month, supported by the Shire Rangers and Emergency Management teams. Congratulations to all those businesses who have partaken in the 2014 Best Bites program. This program recognises the most outstanding local food businesses in the area of food safety, healthy eating, sustainability and access for all. Council received 180 planning applications and decided 193 planning applications this month. Of the applications decided, 73% were decided in the statutory timeframe for November 2014, exceeding the unit’s monthly target of 65% of applications to be decided in time for the eighth consecutive month. 12% of applications were decided in 61 - 80 days, 4% of applications decided in 81-100 days and 11% of applications decided in 101 days plus. Council received 32 planning amendment applications this month and decided 31 planning amendment applications. The planning support team received a total of 3552 telephone calls and 647 counter enquiries this month. The Shire Ranger team dealt with 861 reactive cases during this month. At the Mornington Peninsula Regional Tourism Board annual Industry Update, the recently completed Destination Management Plan was presented to the industry. The new and innovative ‘Find Your Way’ trip planner was officially launched. For further details please visit: www.visitmorningtonpeninsula.org DECEMBER Council adopted the Beleura Hill Neighbourhood Character Study and Design Guidelines, Hastings Town Centre Structure Plan and the Hastings South Coastal Management Plan. Council received 202 planning applications and decided 205 planning applications this month. Of the applications decided, 70% were decided in the statutory timeframe. This represents 11 out of the 12 consecutive months where we exceeded the 65% target. From February 2015 VCAT will introduce new orders for all matters in the Planning and Environment List, specifying the dates for hearings and any compulsory conference. Several tourism industry workshops were held during December, including preparing the industry for the first P&O cruise ship visiting Mornington on 24 February 2015. Fire restrictions are in force until Friday 1 May 2015. Council adopted its Roadsides Fire Management Plan, a five year scheduled program of additional roadside fire management works for Shire managed roads. Monthly Report November/December 2014 14 The Shire Ranger team responded to 1042 cases during December 2014. Collectively, the Shire’s Fire Prevention and Emergency Management officers and the Ranger team inspected over 5000 properties and issued over 1600 Fire Prevention Notices. Financially, the Sustainable Environment Group budget is tracking to forecast. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (37) (29) 8 (237) Monthly Report November/December 2014 15 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (225) 12 (471) (471) 0 INFRASTRUCTURE STRATEGY NOVEMBER REPORT SUSTAINABLE TRANSPORT Peninsula Transport Assist Incorporated Peninsula Transport Assist Inc., (PTA) has recently received a welcome cash boost of $30k from Brotherhood of St. Laurence to continue its valuable role in the community of providing all inclusive volunteer assisted transport and community bus access. FOOTPATH AND UNSEALED ROADS CONSTRUCTION STRATEGY Path Works Besgrove Street/ Hinton Street Path, Rosebud – 1,610m Exposed Aggregate Concrete Works and associated retaining wall works have progressed this month. Street Construction Special Charge Schemes McLeod Road Group Special Charge Scheme, Mt Martha Works are ongoing with much of the kerb and channel installed, drainage pipes and pits constructed and first asphalt layer in place. TRAFFIC AND ROAD SAFETY Bus Stop Works - Adshel Shelters The Traffic and Road Safety Team have been working with representatives from PTV and AdShel over the past two months to manage the installation of new bus shelter infrastructure in suitable locations around the Shire. AdShel, under contract with Public Transport Victoria, has recently completed the construction of 10 new AdShel Shelters for the Peninsula. Mornington Pier Forecourt & Boat Ramp Access Improvements - Joint Project with Parks Victoria Council has approved the contribution of $250k from the current Capital Works program towards the proposed improvement to access for the Mornington boat ramp and Mornington Pier Forecourt works that are being developed in conjunction with Parks Victoria pier reconstruction works. Designs are now being finalised for the proposed improvement to access for the Mornington boat ramp and Mornington Pier Forecourt works. Works on forecourt area will begin following completion of the pier and wave wall works which have been delayed due to inclement weather. ASSET MANAGEMENT Condition Assessment Manuals To assist the Shire’s service providers to undertake effective condition assessments of Shire owned assets, the Asset Management Team is working with the service providers to develop detailed “condition assessment manuals”. Safer Local Roads – Pavement Condition Index (PCI) Quality Plan The PCI is used to determine the pavement performance of the sealed road network over a three year cyclical measurement period. Methodologies and improvement plans for future consideration have now been documented in a ‘PCI Quality Plan’ for future user’s and stakeholder reference. Monthly Report November/December 2014 16 DECEMBER REPORT SUSTAINABLE TRANSPORT PenBus The service has now ceased for the 2014 academic year with applications still being received for travel in 2015. The bus will begin operations again on the 23rd February 2015 during ‘O’ week. The Infrastructure Planning and Policy team are currently advocating to State Government Members for continued funding for this service beyond June 2015. In response to an article published in the Leader Newspaper on the 15th December the Shire has received feedback from over a dozen users on what it means to them and their ability to continue their further studies if the service did not continue. FOOTPATH AND UNSEALED ROADS CONSTRUCTION STRATEGY Path Works Besgrove Street/ Hinton Street Path, Rosebud – 1,610m Exposed Aggregate Concrete Works and associated retaining wall works have continues to progress this month with the remainder to be completed during January. Street Construction Special Charge Schemes Cowley Street Special Charge Scheme, McCrae The construction of Cowley Street and the car park to the front of the shops is well under way. Drainage systems as well as kerb and channel have been installed, plus sections of footpath for improved shop access. TRAFFIC AND ROAD SAFETY Bus Stop Works - Community/School In December works have been undertaken to upgrade two bus stops. One of these is located near the corner of Truemans Road and Sandy Road in Rye. This stop is utilised by both school buses and the new Peninsula Explorer. This stop has been upgraded to include a designated bus bay and a concrete hard stand to improve the safety of the stop. Mornington North Community Project – Place Making & Peninsula SaferSpeeds The Shire has been successful in receiving a $25k grant for the Mornington North Community project from the TAC program aimed at local area traffic management and 40 Area speed limits. On Saturday 13th December, the Briars Ward Councillors; Councillor Shaw and Councillor Colomb, and Shire officers met with key stakeholders and members of the community at Mornington Park primary School to celebrate Christmas and to discuss the action plan that has been developed for the Mornington North area. Hastings Wallaroo Rejuvenation Project The Shire and the Wallaroo Residents Action Group are continuing to work through the planned projects in the Wallaroo Reserve area. A community BBQ to celebrate the end of the year was held in the Reserve on the evening of 10th December at the new BBQ area alongside the refurbished playground in Wallaroo Reserve. About 250 people from the local community came along to catch up and enjoy some Christmas cheer. The BBQ was followed by the school concert. Monthly Report November/December 2014 17 Shoreham Common Development Project The Traffic and Road Safety Team have been working with the Shoreham Community Association to develop the Shoreham Common Area into a more family friendly area. The Shoreham Common Development Project works have included new park furniture, new playground equipment, the sealing of the reserve driveway, construction of a pathway, the installation of a disabled access handrail and also providing a temporary disabled access ramp to the Hall. In December the access ramp and handrail were installed to provide disabled access to the hall. The footpath from the hall to the toilet block was also constructed in December. ASSET MANAGEMENT EPaCS Team Enhance their Capabilities with GeoMedia Smart Client The GMSC (GeoMedia Smart Client) team are working with EPaCS to give them control over the definition and location of areas and assets that support a number of community services. The EPaCS group now enjoy an increased efficiency and timeliness in performing some of their key functions. Undergraduate Engineering Program The Asset Management team has once again taken the opportunity to be part of the summer undergraduate engineering program run by the Infrastructure Directorate. This program has been a huge success in the past; it not only offers young engineers the chance to experience working life within a Council environment, but also provide them with the opportunity to collaborate and work closely with various professionals, such as Surveyors, Assessment Management, Construction & Design and Traffic & Road Safety Engineers. Financially, a reallocation of salary budget to Asset Management will correct the reported variance in December. This change will be reported in the January report, with no bottom line effect on the year. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (188) (115) 73 (1,239) . Monthly Report November/December 2014 18 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,294) (55) (2,470) (2,527) (57) INFRASTRUCTURE MAINTENANCE December in infrastructure maintenance saw a focus on preparing for the holiday season especially at the Shire foreshore camping sites but also in the commercial areas with street cleaning, in bushland reserves with fire management works, and on our roads with maintenance of the large network of unmade roads. FERAL ANIMAL CONTROL Rangers at The Briars are working with the Sporting Shooters Association to control rabbits within the Wildlife Sanctuary. A firearms safety management plan has been approved by Police and a Populous Places Permit obtained. After two nights shooting 25 rabbits have been removed. Complete rabbit control within the feral proof fence is essential if we are to successfully participate breeding programs for rare species such as the Southern Brown Bandicoot. Rabbits are direct competition for native mammals of about the same size such as bettongs, potoroos and bandicoots. GREEN ARMY MOUNT ELIZA LINEAR RESERVES PROJECT The Green Army Linear Reserves and Access and Fuel Management Project began in Mount Eliza Regional Park this month. The team have been very productive cleaning up a central area in the park, removing lots of woody weeds alongside our bushland management service provider. Although focussed primarily on weed control and fuel management, the Green Army team will be involved in range of activities over the next six months including fauna and flora surveys, historical research and interpretation, garden design and construction and erosion control in several Mount Eliza Bushland Reserves. The team’s motto is “Leaf it to us” and Shire officers are looking forward to a strong contribution from this fun, bright and enthusiastic bunch. FORESHORE CAMPING PRE-SEASON PREPARATION Much preparation by the Health and Recreation Team, Buildings Team and Parks and Roadsides Team goes into making it a successful camping season. Last season saw a 25% increase in campers satisfaction rating after pre-season works and a heavy reduction in the number of reactive works completed at Camp sites. This year’s preparation is no different and the amount and type of work has increased to further improve on the great work done in previous seasons. Preparation works were greatly appreciated by the Camper Liaison group - dedicated campers who represent campers in each of the sites. This initiative of Camper Liaisons has proven to be Monthly Report November/December 2014 19 very successful as the Campers are playing an active role in making service improvements. The pre-season works consisted of: • • • • • • • Servicing of all hot water systems, water supply services and drainage to all amenity blocks Upgrade to vanity areas to toilet facilities, e.g. Sorrento toilets Graffiti removal and cyclic painting renewal works to toilet blocks Power supply upgrades to reduce potential power outages, replacement of 25 power heads to camper locations Tree inspections to manage potential risks presented All amenities blocks are receiving two cleans per day and one high pressure clean monthly. This proactive pre-season work has led to over 200 corrective actions taking place, that’s over 200 potential complaints or service requests avoided. INDIGENOUS CULTURAL HERITAGE TRAINING DAY During the month of December the key participants of the Parks and Roadsides team, Furniture and Signs team and Buildings team attended an Indigenous Cultural Heritage Training Day. The Shire has a rich and extensive indigenous history and this was an opportunity to expand and educate the team on this and how we deliver Service to the Shire around this. There was an initial slide show on the background and history followed by a discussion on the Shire’s Cultural Heritage Plan. Then the participants visited indigenous cultural heritage sensitive sites, one of which was a good example where the Shire has implemented works very successfully and respectfully. CLEANSING AND DRAINAGE Beach Cleaning: We are now full swing into the peak period and as such we currently have 2 beach sweepers cleaning our beaches on an increased frequency. Some early challenges have been the end of school crowds predominantly in the Rye area. Litter bin emptying frequencies in townships all increase to cater for the rubbish generated by our seasonal visitors. Extra shifts and new staff are hired to deliver this service. We have also started our bin clean program on cycle and have installed 15 new bin surrounds in Mornington and Mt Eliza. We have replaced 120L bin surrounds and bin stands that were in the main streets with new 240L surrounds. Many Public Amenities, especially those located along / near the foreshore precincts receive increased servicing. We have also just started our second clean in the high priority toilet blocks for the peak period. Other activities such as street sweeping also increase over the tourist season. Street Presence has received some very good customer feedback. The peak season Street Presence has increased in some larger townships to 16 hours per day. We have also introduced a walk behind footpath sweeper that runs along Main St Mornington most mornings of the week. Crushed rock - an important commodity to maintain our roads In December, 2014 we applied 1,478 tonnes of crushed rock to unsealed roads at a rate of $30.18 per cubic metre. So far this financial year we have applied 13,334 tonnes of crushed rock at a cost of $375,037 at $28.13 per tonne to assist with grading of the unsealed road, shoulder, and car park network. This equates to 51% consumption of the $728,910 crushed rock budget allocation for the current financial year. Safer Local Roads has completed 1010 tasks in December 2014, of which 493 of those items were sealed road potholes with the following breakdown: Monthly Report November/December 2014 20 • • • • 147 repairs on A-Classification Roads; 71 repairs on B-Classification Roads; 236 repairs on combined C and D-Classification Roads; and 39 repairs in car parks. In addition, we completed the following: • 74 Sealed Road Edge Break Repairs; • 70 Pit Lid / Surround Repairs; • 33 Make Safe Treatments; • 34 Unsealed Road Repairs; and • 118 Sealed Footpath Repairs. SINKHOLE REPAIR MORNINGTON A sink hole in the road reserve was caused by a storm water pipeline which had been damaged due to other underground services being installed. The appropriate repairs have now taken place. FINANCIALLY, the year to date variance which is minor is due mainly to the timing of payments and the budget phasing. At this time there are no significant bottom line issue to discuss. Growth and contract indexation will be reported in January. Contract supervisors are working towards there approved budgets. $'000 Operating Surplus / (Deficit) Forecast Month (3,922) Monthly Report November/December 2014 Actual Variance Forecast Month Month Y.T.D (5,858) (1,936) (19,915) 21 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (19,570) 345 (42,834) (42,821) 12 INFRASTRUCTURE PROJECT MANAGEMENT NOVEMBER 2014 Capital Works Program delivery Please refer to the CWP section of the Monthly report for a full list of all of the capital projects the Unit is delivering through November December. Staff Development There was good representation from our engineers at the recent Engineers Australia Convention with a special emphasis on the sessions dedicated to managing complex projects. Some valuable lessons were learned through others’ experiences with public private partnerships, alliance contracting and other innovative alternative procurement methods. Melbourne Water Floodplain Management Strategy Our Drainage Engineers have been working very closely with Melbourne Water on their strategy and took the opportunity in the most recent consultative phase to provide some productive input to the process. South East Metro Procurement Forum At the most recent meeting the Unit had staff representation and gained some useful insights into the challenges of procuring CCTV projects as well as an update on the latest Contract Management techniques. Alfred Street Plaza Opening With the recent completing of this streetscape project the community and the traders have jumped in the get maximum use out of this wonderful new facility. In addition to the opening pop up festival there are many more events, both formal and informal planned. Opening pop up festival Monthly Report November/December 2014 22 Alfred Street by night December Aboriginal Cultural Heritage The Unit has had a number of opportunities on recent works for working closely with the state’s Office of Aboriginal Affairs Victoria and is building a strong relationship. The knowledge exchange of cultural issues and the legislative requirements has been very valuable and is being shared with the Shire’s civil works contractors. Civic Reserve Leisure Centre Opening It was pleasing to see the attendance and recognition of the architectural, building and project management contractors at the official opening. It was also heartening to see the facility so well used with many community groups and members of the public passing in and out of the building at the time. Caraar Creek Lane path, Mornington Further geotechnical investigations have been undertaken this month to determine the most effective method of securing this path which is vulnerable to land slip. The trials have included processes such as soil nailing and will provide valuable information into the development of a durable design. Consultation with effected locals will continue over the summer period. Building program With the recent awarding of the last two building contracts just prior to Christmas the Unit now has the whole building program underway. Works on this multi-million dollar element of the Capital Works Program will continue after the summer period and preparations for the following year’s projects are now underway. Monthly Report November/December 2014 23 Financially, most of the variances during this period relate to salaries and casual staff where permanent staff taking long service leave are being backfilled by casual support and there is a little lag before these savings and costs balance out. There has also been some advance payments on software and software subscriptions which will not impact on year end. Legal fees are slightly down so far but there are a number of issues arising that will see this budget fully expended by the end of the financial year. On a year to date basis the team is on target. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (91) (146) (55) (677) Monthly Report November/December 2014 24 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (676) 1 (1,374) (1,365) 9 RENEWABLE RESOURCES NOVEMBER 2014 ‘THINK LESS WASTE’ COOKBOOK Mornington Peninsula residents contributed recipes, ideas, hints and tips which were collated into a cookbook with the aim of reducing waste and sending less to landfill. The launch was held at St Joseph’s Primary School, Crib Point. A lunch was prepared with recipes from the cookbook and served by the students to the people attending the launch. The event also featured a tour of the school and their achievements in establishing a kitchen garden café. CLIMATE READY - Climate change adaption website and community engagement program The Mornington Peninsula Shire, in conjunction with Kingston and Bayside City Councils have been successful in receiving a $200,000 grant from the Department of Environment and Primary Industries (DEPI) to develop a climate change adaption website and community engagement program. This month the progress on the Climate ready project included: • Promotion of the Climate Ready survey to seek community input to the development of the website. At the end of November the survey had been completed by 255 people, well over the target of 200 (the number required for statistic viability). The survey closes on 12th December and the findings will then be collated; and • Continued development of the content for the Climate Ready website. ECO LIVING DISPLAY CENTRE Workshop On Saturday 8th November, thirty residents attended the Beyond Organics workshops at the Centre presented by Jarrod Ruch, Senior Ranger at The Briars. Monthly Report November/December 2014 25 South East Councils Climate Change Alliance (SECCCA) The Mornington Peninsula Shire has been an active member of the South East Councils Climate Change Alliance (SECCCA) since its inception in 2006. The Alliance has continued to go from strength to strength, currently over $5million worth of projects that benefit our local communities. SECCCA was recently successful in winning the 2014 Australia Supply Chain and Logistics Environmental Excellence Award for the EcoDriver Fleet Efficiency program that was designed and delivered by SECCCA. Pictured left: SECCCA Eco Driver Project Officer Rick Wakelin and Climate Change Projects Coordinator, Dan Pleiter. SECCCA – Financial Risk Assessment Project SECCCA was successful in its application to the Victorian Adaptation and Sustainability Partnership Program to support a financial risk assessment on key climate change risks for its member councils. Mornington Peninsula Shire has attended several planning workshops and have nominated fire risk as a key strategic risk for inclusion in the project. Eight case studies will be developed on different risks such that each council will be able to adapt the lessons learnt from the project to climate change risk management in their municipalities. ENERGY MANAGEMENT Hastings Library Energy Audit An energy audit has been commissioned and will completed in the first week of December to determine the most cost effective strategies to reduce energy use and achieve energy cost savings at the Hastings Library. WATER MANAGEMENT National Stormwater Australia Awards Following Mornington Peninsula Shire’s success at the Stormwater Victoria awards in October, finalists were entered into the National Awards, presented as part of the National Stormwater Association Conference in Adelaide. Mornington Peninsula Shire was successful in winning the award in the Education and Policy category for the “Melbourne Water’s 10,000 Raingardens program: working Monthly Report November/December 2014 26 with the Mornington Peninsula Shire Council and community to raise stormwater awareness and drive community action” The award recognised the project as an excellent community based project that saw over 600 downpipe diverters hand delivered and installed throughout the Mornington Peninsula. WASTE MANAGEMENT No Charge Green Waste Weekend A no-charge green waste weekend was held on the 15th and 16th November 2014. Residents made good use of the no-charge green waste weekend. Approximately 4,120 cubic metres of domestic green waste was disposed at waste disposal centres across the peninsula (a decrease of 260 cubic metres from the same time last year) with around 3,350 residents using this opportunity to clean up their properties. Site visit to waste management centres across the metropolitan area Some team members participated in a tour of waste facilities in the metropolitan area which featured transfer stations, landfills and in-vessel composting for green waste. The team were able to observe the operation of the green waste processing facility which will have capacity to process food waste in the future. Free Household Chemical Collection - Mornington A free household chemical collection event was held at the Mornington resource recovery centre on the 29 November 2014. The event provided residents with the opportunity to dispose of common household chemicals without harming their health or the environment. Residents were required to register and provide information on the quantity and type of chemicals. Sustainability Victoria has indicated that the event was a success and that they will provide further detail quantity of chemicals received. Monthly Report November/December 2014 27 DECEMBER 2014 ECO LIVING DISPLAY CENTRE Upcoming workshops at the Eco Centre The summer workshop program for the Eco Centre has been designed and promotional posters and brochures distributed throughout the Shire. Training The ‘Arts About’ Group ran a Natural Dyes workshop at the Centre on 14th December for fifteen local residents. Energy Efficiency Homes Consultations This month our volunteers conducted one energy efficiency homes consultations at the Eco Centre. Community Meeting and Regular Groups The Eco Centre Carers Group continues to use the Centre on a weekly basis as a central hub for creative activities for their disabled adult children and carers. The Collaborative Garden Group, a group of disabled clients from Konnections and Kankama, met at the Centre on 10th December for their annual Christmas party. Climate Change Adaptation Staff attended the Climate Change Adaptation for Local Government & Public Sector Conference earlier this month. The conference showcased case studies and leading research on climate change adaptation, to assist councils in the planning and implementation of adaptation strategies including embedding activities within Council processes. ENERGY MANAGEMENT Appliance Timer Project An energy saving project is underway where mains power timers are to be installed on appliances such as hot water boilers. An estimated 500 kg of greenhouse gas emissions can be saved annually by turning a 3 – 5L boiler off for 8 hours overnight. Implementation has begun and will carry on throughout January. Monthly Report November/December 2014 28 Electricity Contracts The Shire’s current electricity contracts for large market sites and street lighting are to end on 31 December 2014 with new contracts commencing from 1 January 2015. The contracts were procured through MAV Procurement earlier in 2014 and offer more favourable rates than the previous contract. Meeting with Powershop A meeting was held with Powershop, an on-line electricity retailer to discuss their business model. The company representatives outlined their business model and outlined how they provide carbon offsets for the purchase of power for all of their customers. Offsets are purchased based on international carbon credits. Customers can choose to support renewables in Australia by paying an additional cost. There was further discussion about the Shire’s procurement requirements and how this model could be encouraged in the tender assessment process. WATER MANAGEMENT Water Conservation The Shire is working with South East Water to develop a sustainable water management plan for the staged upgrades of the facilities at Emil Masden Reserve in Mount Eliza. The site currently uses recycled water from the treatment plant for irrigation and with the development of new playing fields, a greater capacity system is required. The Shire is also looking at the option of accessing Class A water for the site to ensure greater flexibility for irrigation and water management. Stormwater Quality A new project has commenced to proactively engage the business community around the management of their waste water. This project aims to educate businesses on best practice and prevent pollution to stormwater. The 12 month project, a prototype for the Shire, will focus on three areas on the peninsula identified to have contaminants of concern in the stormwater – Mt Eliza, Mornington and Rosebud West. Business engagement will begin from February 2014. WASTE MANAGEMENT Review of Municipal Waste Management Strategy During November and December the Renewable Resources Unit continued to review the Shire’s Municipal Waste Management Strategy and to work on the business case which is being independently reviewed. Meeting with Metropolitan Waste and Resource Recovery Group (MWRRG) Shire officers met with the Executive of the MWRRG to discuss key priorities for the year ahead. There was also discussion about progress with major contracts for organics in the south east of Melbourne, waste resource recovery implementation, waste education, and the development of the Shire’s waste strategy. Metropolitan Local Government Waste Forum Councillors Pittock, Dixon and Gibb attended the waste forum with an officer from Renewable Resources. The forum heard from an industry representative about the e-waste recycling program – closing the loop on television and computer recycling. The forum also discussed progress with the establishment of an organics treatment facility in the south east of Melbourne which should be operational at the end of 2016. Monthly Report November/December 2014 29 Financially, the year to date variance is favourable and is due to increased income from tipping fees and charges, and increased income from green waste bins. This favourable result has been reviewed in the mid year review process and will be reported in the January. In addition there are some contract payments which are have not yet been paid. Overall the team is on target, without significant issues to report in December $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Actual Variance Budget Forecast Variance Month Month Month Y.T.D Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,625) (1,407) 218 (3,737) (3,078) 658 (14,862) (14,854) 8 Monthly Report November/December 2014 30 DIRECTOR – SUSTAINABLE INFRASTRUCTURE The November and December period has been a very busy month for the Infrastructure Directorate. It is during this time of the year that the delivery of infrastructure services and demands on the Shire’s resources increases in advance of the peak summer period. Preparing for the holiday season is a key focus for infrastructure and includes infrastructure works and services at our foreshore camping locations, beaches, commercial areas, bushland reserves and on many of our roads. As an example, this year the pre-season works for our foreshore camping areas included: • • • • • • • Servicing of all hot water systems, water supply services and drainage to all amenity blocks Upgrade to vanity areas to toilet facilities, e.g. Sorrento toilets Graffiti removal and cyclic painting renewal works to toilet blocks Power supply upgrades to reduce potential power outages, replacement of 25 power heads to camper locations Tree inspections to manage potential risks presented All amenities blocks are receiving two cleans per day and one high pressure clean monthly. This proactive pre-season work has led to over 200 corrective actions taking place, that’s over 200 potential complaints or service requests avoided. November and December also saw progress in many of Council’s capital works projects. Of particular interest is the development of several community infrastructure projects including in Shoreham village, Wallaroo Reserve, Hastings and in Mornington North. These projects, which are being led by the Infrastructure Strategy Unit, have involved significant community engagement whereby Shire Officers have spent time meeting and engaging with community representatives to understand the issues and priorities from the community’s point of view. The Shire has received very positive feedback about this approach and of the infrastructure works that have resulted. Financially, the year to date variance is due to salary, resulting from the transition of director. Offset funding will be provided in the mid year review forecast $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (44) (66) (22) (285) Monthly Report November/December 2014 31 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (355) (70) (566) (564) 2 CHILD, YOUTH AND FAMILY CARE NOVEMBER AND DECEMBER Education and Care Services The Unit continues to streamline all services to cement a strong and robust approach to provide best outcomes for families and children. All staff are increasing their competencies working across services which is maximising efficiencies and direct responsiveness for the community. All service policies are currently under review and consultation with all users is taking place. Kindergarten Central Registration The review of the registration process is well underway with the closing date of the survey that went out to all families who registered for kindergarten in 2015 extended to 12 December. Four meetings were held to provide kindergartens the opportunity to explore the current process and to examine what worked well and what could be improved and to look at ways of moving forward with the process into 2015 and beyond. The Baxter and Bentons Square kindergarten capital projects are in the final stages of completion with both services looking forward to commencing the 2015 kindergarten year in their newly completed buildings. Child and Family Health Maternal and Child Health (MCH) in collaboration with Frankston Mornington Peninsula Medicare Local have been meeting with General Practitioners (GP’s) and Practice Nurses across the Peninsula. This month we have met (at different venues with 13 GP’s and five Practice Nurses to promote the MCH Service. Making linkages and networking for the betterment in providing services to our mutual families. Youth Services The Freeza Events Committee provided young people of the Mornington Peninsula a fun night out on Halloween. This event brought out some of the leadership skills in our Committee members as they were responsible for undertaking many of the event organising tasks using their own initiative. By delivering Freeza events we are addressing risk factor(s) as identified through CTC 2012 Healthy Neighbourhoods Schools Survey: Mornington Peninsula Shire such as “Laws and Norms Favourable to Drug Use” and therefore, addressing protective factor(s) like rewards for pro-social involvement which are known to buffer against the development of health and social problems among young people. Our events are a drug, smoke and alcohol free environment. By providing activities that do not encourage/condone the use of such substances and promoting publicly that we do not allow such usage can allow a young person to chose to participate in a celebration or recreation activity without the perceived or actual pressure to use substance and ultimately leading to increased health choices and outcomes. Youth Strategic Issues All six Local CTC Groups (LCTC), have now completed their audit of services within their communities. When the audit results were viewed against Depressive Symptoms, (the common behaviour being targeted by all LCTC) and Key Risk Factors – family conflict, poor family management, family history of anti-social behaviour, low school commitment, sensation seeking and mobility and transition; significant gaps have appeared. The central Protective Factor – Community Rewards for Pro-Social Involvement will require creative and significant implementation over the coming years to drive change. Financially, payments of community grants will commence in January 2015 after ratification at 15 December Council Meeting. $'000 Operating Surplus / (Deficit) Forecast Month (333) Monthly Report November/December 2014 Actual Variance Forecast Month Month Y.T.D (346) (13) (2,977) 32 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (2,867) 110 (5,358) (5,478) (120) AGED & DISABILITY SERVICES NOVEMBER Preparing for Summer In the lead up to summer, we take some time to prepare our team and our clients for the challenges that summer can bring; heatwaves and bushfires. Older people and people with a disability are generally more at risk of heat related illness and surviving a bushfire so a number of actions are taken during the year and immediately preceding the summer season to support our 5,000 clients living in their own homes to plan and prepare for extreme weather events, including: • • • • • • • Clients are screened for vulnerability (indicators include physical and/or cognitive impairment, living in high fire risk areas and/or in homes that are not well adapted for extreme heat, social and geographical isolation) and vulnerable clients are provided with additional support to assist them to develop personal emergency management plans. All clients receive a Summer Season Kit, with information on how to stay safe and healthy in extreme heat and, if they live in high fire risk areas, encouraging them to relocate on High Fire Danger Days (also providing assistance with transport and other support if required). Staying healthy in the heat messages are reiterated by Community Care Workers on days of extreme heat. We check on some of our more vulnerable clients (particularly those without family or support networks) on days of extreme heat to check they are ok and don’t require medical attention. In some instances we will transport clients to a cooler place (e.g., shopping centre, library) for the worst heat of the day. We provide assistance to clients to improve the heat resistance of their home (e.g., installation of external blinds and draught-proofing). Articles in the Aged & Disability Services (A&DS) client newsletter, Peninsula Wide and local newspapers, reiterating “staying healthy in the heat” messages for the broader community. Whilst working to support our clients to stay safe over summer, we also aim to minimise the risk for our 264 employees and 160 volunteers who spend their days travelling around the Peninsula to provide in-home support services and deliver Meals on Wheels. Team members receive training on bushfire awareness and have clear work instructions to modify their duties on high fire danger and extreme heat days. We endeavour to continue providing services wherever possible, but may alter the way we deliver, such as changing services to the morning before the worst heat and fire danger of the day. Team members are advised via group SMS of extreme weather events and areas to avoid travelling through. Audit Time Again In addition to Commonwealth mandated National Home Care Standards Accreditation, the A&DS team maintains a Quality Management System, based on the ISO 9001:2008 standards, which is externally audited on an annual basis. During November, the A&DS team was proud to achieve, for the fourth consecutive year, outstanding results with zero non-conformities or opportunities for improvement identified in the annual audit. Monthly Report November/December 2014 33 DECEMBER Positive Ageing Presentation The A&DS Unit and PACE (Peninsula Advisory Committee for Elders) hosted Victoria’s first ever Commissioner for Senior Victorians, Gerard Mansour at Safety Beach Community Centre. The global trend in ageing populations is reflected in Victoria with people living much longer than in previous generations. Here on the Mornington Peninsula we have the second highest older population in the State, with 29% aged over 60, compared to an average of 18% in metropolitan Melbourne. This figure is expected to increase significantly by 2030. In response to this Council recently adopted the Positive Ageing Strategy 2013 – 2018: “A Community for All Ages”. The strategy utilises our local knowledge, principles of active and socially engaged ageing, and the World Health Organisation’s (WHO) framework on facilitating age-friendly communities. The role of the Commissioner for Senior Victorians is to promote an age-friendly society, to enhance community participation for senior Victorians and to provide advice to the Minister and Government more broadly on key issues that impact on senior Victorians. As Commissioner, Gerard Mansour heads a new Ministerial Advisory Committee for Senior Victorians (MACSV) and reports directly to the Minister for Ageing. The MACSV has prepared a whole-of-government older persons action plan to promote community participation of older people and coordinate plans across Government. The Peninsula was honoured to welcome Commissioner Mansour and to hear his reflections on his experiences across his first year as Commissioner for Senior Victorians, and his thoughts for the future, including the very recently signed Victorian Government and Municipal Association of Victoria’s (MAV), Age-Friendly Victoria Partnership and Leadership Declaration. Financially, the unfavourable year to date variance is primarily due to increasing demand for General Home Care services from an ageing and much older than average population. HACC growth funding is anticipated to be received early 2015, which will partially offset a projected unfavourable year end variance. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (397) (415) (19) (3,134) Monthly Report November/December 2014 34 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (3,369) (235) (5,562) (5,562) (0) RECREATION AND LEISURE NOVEMBER RECREATION COMMUNITY PARTNERSHIPS Government Grants - Local Facilities for Local Clubs Grant Program This new Program was announced in late September 2014 by the previous Liberal Government providing funds to clubs (up to $50K) for projects that were “spade ready” where clubs had contributory funding. These projects are important for keeping the older members of our community active and significant as these types of sports have difficulty in raising funds or getting state government funding. The Shire applied for two projects and both were funded: • • Red Hill Petanque Club – to build a competition grade piste at Main Ridge Bowls club and they received $21,100 towards the cost of the project which will be completed in February 2015. Mount Eliza Bowls Club – to install sports lighting on one of their greens and they received $25,000 towards the cost of the project, this will be completed in March 2015. RECREATION PLANNING Bunguyan Reserve Master Plan Works Works have begun on the implementation of the Bunguyan Reserve Master Plan in Tyabb. The construction tender has been awarded to local company All Waste Solutions. The works form part of the Shire’s $1million Long Term Recreation Master Plan Implementation Program and are anticipated to be completed in late January 2015. The $300K works include: • • • • • • Upgrade roadway drainage culvert. New vehicle crossing bridge. Pedestrian access bridge. Walking paths (from Frankston Flinders Road to the Pavilion). Drainage works. Car park works near the Pavilion. The Reserve is the home of the Tyabb Football (Senior and Junior), Cricket and Tennis Clubs along with the Tyabb Pre-School. Flinders Park and Cook Street Open Space, Flinders Master Plan implementation works including a new path to the redeveloped playspace are underway. Installation of new seating and picnic tables is currently taking place in the Cook Street Open Space and Flinders Park and vegetation trimming is scheduled for early December. A planning permit for vegetation removal of exotic species in Flinders Park is pending. Citation and Ferrero Reserve Master Plans, Mount Martha New Pavilion and bushfire management issues have now been resolved and the draft plans will be updated to reflect changes required. The plans will now be updated and presented to Council for public exhibition in the new year. Police Point Shire Park Recreation and Conservation Plan Implementation The Cultural Heritage Management Plan is in progress. Maintenance works are almost complete on Cottages 2 to 5. Quotes are being sought for garden, fencing and stump grinding and further asbestos removal works. Roadside Mountain Bike and Equestrian Trails Strategy Horse hitching rails and a picnic table have been installed at the Greens Road roundabout. Hitching rails have also been installed in Red Hill Station Reserve. Letters have been drafted for Monthly Report November/December 2014 35 removal of encroachments in road reserves along key trails. Design work continues for priority bridges and trail hot spot works. Drainage works on a section of the Tubbarubba Road trail will take place in December. DECEMBER SPORT AND LEISURE Pelican Park Recreation Centre Awarded Platinum Pool Status! Pelican Park Recreation Centre (PPRC) has again been awarded Platinum Pool Status, one of only two centres in Victoria to achieve accreditation! The Platinum Pool Program was introduced by Life Saving Victoria to highlight aquatic facilities that have achieved the highest standards in the provision of aquatic safety and risk management. The receipt of Platinum Pool accreditation is recognised as a sign of excellence within the industry. The Platinum Pool program provides acknowledgement to stakeholders, including facility users, rate payers and Councillors that the facility has a strong emphasis on safety. Civic Reserve Recreation Centre Mornington Peninsula Shire Mayor, Councillor Bev Colomb, officially opened the $8.5 million Civic Reserve Recreation Centre at Dunns Road, Mornington in December. The official opening was an opportunity for key stakeholders and club representatives to tour the facility and understand how each user group worked together to deliver health and fitness opportunities for the community. At the opening Councillor Colomb thanked the members of the Civic Reserve Advisory Group that played an important part in providing direction and community input to the project which incorporates David Collings Stadium, Mornington Peninsula Table Tennis Association, Mornington Youth Club Gymnastics and Mornington Tennis Centre. RECREATION PLANNING Playspace Strategy Implementation Program Draft Playspace Strategy The eight week public exhibition period closed for community comment on the draft Playspace Strategy with 25 positive feedback/submissions received. The Strategy has now been updated and will be workshopped with Council in February. RECREATION COMMUNITY PARTNERSHIPS Foreshore Camping Foreshore camping has welcomed the 6,000-8,000 peak season campers, with all 1,150 sites occupied until the end of January. While the campers have been busy settling in, the Foreshore Camping team has continued to work closely with contractors to ensure everything is operational and to allow the campers to enjoy the experience. Pavilion Strategy Update • Fruitgrowers Recreation Reserve Pavilion (Somerville) Construction has commenced and is progressing well with installation of the roof and cladding of building commenced. • Mount Martha Tennis Club Pavilion Detailed design is completed. Tender for the building works now be being reviewed by infrastructure. Monthly Report November/December 2014 36 • • • • • • • Balnarring Recreation Reserve Pavilion Detailed design is progressing. Construction expected in 2015/16 year pending capital works approvals. Citation Reserve Pavilion Detailed design is progressing to completion. Construction is scheduled to commence in the 2016/17 financial year. Somerville Netball Pavilion Initial discussions held with clubs. Architect has been appointed and concept designs are progressing. Will complete with clubs in 2015. Sorrento Tennis Pavilion Initial discussions held with clubs. Architect has been appointed and concept designs are progressing. Will complete with clubs in 2015. Mornington Peninsula Community Dog Club Pavilion Quotes for the concept design completed. Architect has been appointed and design works to commence early 2015. Emil Madsen Pavilion Concept designs will begin in 2015, once spatial plan has been completed. Portables Tender for toilets at Somerville Netball Club, change rooms at Hastings and Bunguyan Reserves have been received and are being assessed. In the interim, Hastings Junior Football Club has had portable toilets installed. Community and Special Events There were 25 events and 24 weddings held on the Peninsula during December, with an estimated 14,995 event participants in attendance. The Shire funded 13 events in December which included Christmas Carol events in Hastings, Mount Martha and Sorrento. Community Christmas Carol events, which are held across the Municipality, offer local townships with an opportunity to celebrate the holiday season with fellow residents and visitors. Financially, the positive variance for the month is largely due to timing of utility payments (water, gas and electricity $160K); expected popularity of the pre-season Foreshore Camping package ($69K); timing of contract payments ($95k); and plant expenses ($56k). Phasing of payments will be reviewed at the Mid Year Review and adjusted as required. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Actual Variance Budget Forecast Variance Month Month Month Y.T.D Y.T.D. Y.T.D Y.E. Y.E. Y.E. (418) (322) 96 (1,692) (1,362) 330 (5,439) (5,420) 19 Monthly Report November/December 2014 37 LIBRARIES, ARTS AND CULTURE NOVEMBER Library Services Sunday opening came to an end this month, with many visitors utilising our extended hours and facilities and enjoying our programs. The total number of visitors to our libraries was 11,456 and 17,538 items were loaned over the 12 week period from 14 September to 30 November. Our Sunday program for November included visits from authors Penny Woodward and Doug Ackerly. Our successful Ready Set Read early literacy outreach program continued this year from February to November and focused on parents and carers of children aged 0-5 years in the Mornington and Southern Peninsula areas. The Ready Set Read team distributed library bags and books, promoted literacy and our library service, and read stories to children and adults at kindergartens, play groups, childcare and immunisation centres. In total, 6,046 adults and children were reached and 441 new library members joined Our Library. Arts and Culture The Spring into Sundays library program youth and arts backdrop painting project was held on 23 and 30 November at the Mornington library, with artists Judi Singleton & Amanda Nelson. Local History Mayor Bev Colomb officially handed over a PDF of their scanned archives to the Mornington CFA, with a copy also held at the Mornington & District Historical Society. The digitisation project involved 120 hours’ work and comprised 3697 pages and 10 PDF (electronic book) files spanning the years 1917-2009. The project not only saved the archives and made them accessible, but also helped strengthen community partnership between two prominent local organisations. Mornington Peninsula Regional Gallery The Archibald Prize 2014 concluded in mid-November after a successful six-week run. Over the two years (2013 and 2014) there was strong community support and volunteer involvement including over 300 Friends, other regular volunteers, the Mornington Peninsula Rotary cluster who raised nearly $7,500 for the Mornington Peninsula Shire Charity Trust, Lions Club and Oak Hill Gallery. 86,500 people visited the Archibald Prize exhibition over the two years, equating to nearly filling all the seats at the MCG! Surplus income from the two Archies supported construction of two new car parks for the community and Gallery climate control works. There was also a sizeable economic flow on to the region estimated at approximately $5 million. DECEMBER Library Services The Summer Read program is back to give Victorians the chance to relax and recharge with a good book over Summer. The program is presented by the State Library of Victoria and other Victorian public libraries, from 1 December 2014 to 15 February 2015. Our Library is once again rewarding young readers aged 5-16 with our annual Summer Reading Club. Monthly Report November/December 2014 38 Arts and Culture The Mornington Library Foyer Exhibition Space exhibited the oil paintings of Mt Eliza artist Terrance J Hadler from 19 December 2014 until 19 January 2015. The Shire’s Music Development Plan is now listed on the Shire’s website for community review. The Cultural Planner and Balnarring artist Amanda Nelson presented the pop-up arts tent at the Wallaroo Community Fair in Hastings on 10 December. Local History Oral Historian, Jill Barnard, from Living Histories has been officially engaged to undertake the Oral History Preservation project. The Local History Co-ordinator and Digitsation Officer visited over 18 sites across the Peninsula assisting historical societies with cataloguing, collections management issues and scanning of collections. Mornington Peninsula Regional Gallery On 6 December, following the official welcome by Councillor Hugh Fraser, the summer trifecta of exhibitions were launched. Arthur Boyd: an active witness, a Bundanon Trust touring exhibition, was officially opened by Bundanon CEO Deborah Ely who travelled from NSW to do the honours. Richard and Famous, with its first ever showing in Victoria, and Ken Smith: Walking by Water, were launched by MPRG Director Jane Alexander. Both Richard Simpkin (of Richard and Famous) and Ken Smith briefly spoke at the event. STATISTICS AND REPORTING KPI Library Membership Library Loans eBook Loans eTalking Book Loans eMagazine Loans Home Library Service Loans Library Visits Public PC Usage Hours Library Website Visits Library Website Unique Visitors Library Enquiries Community Engagement Events Community Engagement Attendance Gallery Attendance Nov 2014 78,222* 103,898 1,681 525 1,649 1,432 61,253 5,379 16,731 10,026 3,885 75 1,582 Dec 2014 78,222* 104,626 1,810 580 1,825 1,517 49,275 5,271 16,881 10,099 3,511 46 923 Nov 2013 75,198 112,585 NA NA NA 1,108 54,400 NA NA NA 4,403 105 1,116 Dec 2013 79,012 102,812 1,229 355 NA 863 47,950 5,233 16,099 7,818 3,280 62 631 18,492 1,050 622 1,500 *Static figure as at Oct 2014– membership database currently undergoing audit and review Financially, the favourable variance of $73K is mainly due to vacant position. Major items of income and expenditure continue to track closely to budget and accordingly we are confident of achieving a balanced year end result. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (501) (467) 34 (2,298) Monthly Report November/December 2014 39 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (2,225) 73 (5,548) (5,588) (40) SOCIAL PLANNING AND COMMUNITY DEVELOPMENT NOVEMBER “Rhythm of the Land” Weekend Camp Aboriginal Health and Well Being Camp at the Briars – 28 to 30 November A spiritual and physical health and well being weekend camp was held at the Briars in Mount Martha. It was coordinated by the Boonwurrung Foundation and the Shire’s Aboriginal Support and Development Team and included healthy exercise, nutrition, bush food, creating art and language, music, storytelling and dance. Thirty-two people, including elders, participated. Funding was provided by the Department of Health and support from the Shire. Aboriginal Cultural Heritage The Aboriginal Cultural Heritage Officer (ACHO) has been in the field conducting site inspections of some of the Shire’s infrastructure works and facilitating cultural heritage inductions to contractors. The ACHO has also facilitated cultural heritage workshops involving Hastings Preschool, Dromana Foreshore Committee of Management &Shoreham Foreshore Committee of Management Willum Warrain – Aboriginal Gathering Place Willum Warrain has had a makeover with art from the iconnect program; membership has grown to 120; and it was successful in a bid through Melbourne Catchment authority in receiving two $5,000 progress grants. Access and Equity Policy Review Consultation Consultations including three workshops were held around the Peninsula and around 100 surveys completed by people responding to the Access and Equity Policy review. Posters were also located at all Shire offices and key locations across the Peninsula and articles in the local papers. The workshops enabled the community to discuss access and equity to Shire services and possible opportunities improvements services and facilities for people with access issues. The results will feed into the review that will be available in the New Year. International Day of People with a Disability This year was the first time International Day of People with Disability was celebrated in partnership with Neighbourhood Houses across the Peninsula, with seven events on offer in Hastings, Mount Eliza, Mornington, Dromana, Rosebud and Rye. Over 250 people participated – 100 more than in 2013. Monthly Report November/December 2014 40 DECEMBER Mornington Peninsula Human Rights Oration - 4th December 2014 Andrew Jackomos, Commissioner for Aboriginal Children and Young People 150 people celebrated International Human Rights Day with the Mornington Peninsula Shire and the Mornington Peninsula Human Rights Group. Andrew Jackomos - Commissioner for Aboriginal Children and Young People spoke at this year's annual human rights Oration. Pictured from left to right: Tony Coburn, Mornington Peninsula Human Rights Chairperson; Andrew Jackomos, Commissioner for Aboriginal Children and Young People; Xiaoli Ma, Community Access Planner; Elder and traditional owner Aunty Carolyn Briggs, Boon wurrung Foundation; Councillor Hugh Fraser; Councillor Tim Rodgers; Djarrin Wilson Blow on the didge West Park Reserve Community Participation More than 120 people including parents and children participated in the West Park Christmas Party on 10 December at Wallaroo Reserve. The event included a barbeque, face painting, jumping castle, miniature animal farm, art and group activities and lots of opportunities to chat and meet people. Mornington Park (Tanti) Place Making The Community Activity Working group of the Mornington North Place Making Project has progressed negotiations with the primary school, the kindergarten and Mornington Community Contact to initiate a community logo competition and mural project. Permission has been granted from a local business owner to utilise a wall space that is currently the target of graffiti for the mural. Local professional artists will be used to develop the images collected from the children into a mural that reflect the community character. Men’s Sheds Policy Project The Men’s Shed Policy Focus Group was attended by 30 participants and facilitated by the consultant appointed to develop the Men’s Shed Policy and Information Kit. The Peninsula Men’s Shed Cluster was formed and established priorities for into the future. Somerville Tyabb Men’s Shed was finally completed. Inside the newly completed Somerville Tyabb Men’s Shed, (Baxter Hall) Prevention of Family Violence The Mornington Peninsula Shire Statement of Commitment for the Prevention of Family Violence was adopted by council on 24 November. The statement aims to clearly state Council’s zero tolerance with regard to Family Violence. The Shire supported the white ribbon day breakfast which included key note speaker ‘Phil Cleary’ as well as support for the White Ribbon Hastings Luncheon. Monthly Report November/December 2014 41 Police Point Respite Housing Signing of Police Point Agreements Seated: Tony Sheer (Sorrento Rotary), Carl Cowie (CEO), Sonia Berton (Karingal) Back row: Neil Briggs (President, Rotary), Bev Colomb (Mayor), Councillors Hugh Fraser, Tim Rodgers, and Antonella Celi, Ken Dyson (SPCD) The Police Point Twilight preview was held at Police Point on 16 December. Despite adverse weather the event was highly successful in its aims of demonstrating the progress on the site and cottages and approximately 65 people attended The Mayor, CEO and five Councillors attended along with officers and members of the community who have contributed to the site. Karingal signed an MOU with the Shire and Rotary outlining respective roles in the management of the Respite Accommodation project. Rooming Houses The Rooming House project has seen a 50% reduction in Police callouts to Pine Cottage, construction of Community Garden, Cooking classes and 12 tenants linked into health services – this is a significant change and enormous social benefit to our community. This Project review was definitely a highlight with tenants, SalvoCare Eastern, RDNS, MPS and others identifying the many positive outcomes of this project. Electronic Gaming Machines (EGMs) on the Peninsula The Shire has undertaken a street survey and survey monkey on line seeking input into its submission to the Victorian Commission for Gaming & Liquor Regulation (VCGLR) for the increase of 9 gaming machines at the Dromana Hotel. 29 January has been set to hear the case at the VCGLR. The Shire’s Responsible Gaming Policy is currently under review and a planning scheme amendment is being developed to identify areas of priority for local caps. Monthly Report November/December 2014 42 DIRECTOR – SUSTAINABLE COMMUNITIES NOVEMBER The Archibald Prize 2014 concluded in mid-November after a very successful six week run. Over the two year Archibald Project there has been very strong community support and involvement, including over 300 volunteers from the Friends of the Gallery, regular volunteers and the Mornington Peninsula Rotary Cluster who raised nearly $7,500 for the Mornington Peninsula Shire Charity Trust, Lions Club and Oak Hill Gallery. During the two year period over 86,500 people have visited the Archibald Prize. Surplus income from the two years supported construction of two new car parks for the community and the MPRG climate control works. Summer exhibitions at MPRG will include, Arthur Boyd: An Active Witness, Richard and Famous – the First Selfie and Walking by Water – Ken Smith. Sunday openings of Libraries culminated this month. We had many visitors utilising the extended hours and facilities and enjoying many of the programs on offer. It is now 13 years since the Shire pioneered Communities That Care (CTC) in Australia. The success of the Shire program over a sustained period of time has now fostered a wave of CTC programs commencing across Victoria and Western Australia. The Mornington Peninsula Shire Statement of Commitment for the Prevention of Family Violence was adopted by Council on 24 November 2014. The statement aims to clearly state Council’s zero tolerance with regard to family violence. The Shire also supported the White Ribbon Day breakfast which included Phil Cleary as a keynote speaker. Also, the White Ribbon Hastings Luncheon was supported by the Shire. DECEMBER The Aged and Disability Services Unit and PACE (Peninsula Advisory Committee for Elders) hosted Victoria’s first ever Commissioner for Senior Victorians, Gerard Mansour, at Safety Beach Community Centre. His role is to promote an age-friendly society and to provide advice to the Minister and Government more broadly on key issues that impact on senior Victorians. He reports directly to the Minister for Ageing. Gerard talked about his reflections on his experiences during his first year as Commissioner and on his thoughts about the future. The Foreshore Camping team has welcomed peak season campers (6,000 to 8,000 people) with all 1,150 sites occupied until the end of January. The Mornington Peninsula Human Rights Oration was held on 4 December 2014. The speaker was Andrew Jackomos, Commissioner for Aboriginal Children and Young Children. This event is arranged by the Shire and the Mornington Peninsula Human Rights Group. The event was successful and 150 people attended. Financially, the unfavourable amount is due to timing of income and expenditure for Rosebud West Community Renewal relating to last year; combined with less cost recovery received for Aboriginal Cultural Heritage. The mid-year forecast will be adjusted accordingly. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (119) (139) (20) (727) Monthly Report November/December 2014 43 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (972) (245) (1,529) (1,550) (22) CORPORATE PLANNING AND PROJECTS November Shire Strategic Plan – Operational Review The Shire Strategic Plan (SSP) expresses Council’s vision, goals and priorities for the Mornington Peninsula Shire over a four year period (2013-2017). The SSP contains a series of major initiatives (formerly known as Key Strategic Activities) that were identified at the time to contribute to the achievement of the Strategic Objective. Council may review and update the SSP at any time and can consider whether any adjustments need to be made with respect to the remaining period of the plan. Currently, all unit business activities are mapped back to the strategies, outcomes and goals listed in the SSP, and from this perspective, it is important that the SSP remains a live, up to date and relevant strategic plan. Quarterly reporting on the SPP is provided to Council via the CEO’s quarterly performance report. The internal review did not revisit or modify the strategic direction set by Council (ie goals, strategies and outcomes); rather focused on the operational plan to implement Councils strategic direction. The team engaged each directorate to revisit our major initiatives from an operational perspective. Local Government Performance Reporting Framework (LGPRF) The Victorian Government has introduced a mandatory system of performance reporting to improve the transparency and availability of performance information about councils. The LGPRF became mandatory on 1 July 2014 through the Local Government (Planning and Reporting) Regulations 2014. The framework is made up of 70 quantitative measures and 24 qualitative checklist measures and includes four indicator sets: service performance, financial performance, sustainable capacity, and governance & management. In November, the team established an Interface Councils data sharing protocol for the remainder of the financial year. Demographic forecast update The Corporate Planning and Projects team have worked with units to analyse forecast assumptions recommended by external demographic specialists. Local assumptions are applied to the latest Census ABS data and figures to create the most accurate picture of future population growth and composition in key areas. Community Satisfaction Survey Each year Local Government Victoria (LGV) coordinates and auspices the State-wide Local Government Community Satisfaction Survey (CSS) throughout Victorian local government areas. The Shire participates in the CSS every year. Generally, a coordinated procurement approach allows for a more cost effective survey than would be possible if Councils commissioned surveys individually. Importantly, core elements of the CSS form part of Council’s legislated reporting requirements - Local Government Indicators and the LGPRF. In this regard, the LGV CSS methodology meets the audit requirements set by the Victorian Auditor General’s Office. In November, the team reviewed the Shire’s participation in the full survey. Monthly Report Review In November the team coordinated an internal review of the existing Monthly Report. The working group will make a clear recommendation on a proposed management financial and corporate performance reporting framework that will deliver significant benefit to the organisation. To ensure that the Shire retains a high level of transparency and accountability to the community, a series of options to report meaningfully to the community will be suggested. Monthly Report November/December 2014 44 December Shire Strategic Plan – Operational Review The review was presented to Exec on 16 December and will be discussed with Council in February 2015. Local Government Performance Reporting Framework (LGPRF) The Shire participated in LGV Trial 1 (2014/2015) data analysis program. 66 of 79 councils participated in the Q1 trial. Importantly, the Q1 reporting trial was not about benchmarking or comparing council results, rather it was an exercise to assist councils establish data collection processes and procedures that enable them to successfully and accurately report at the end of the financial year. Overall, LGV recognised Mornington Peninsula Shire has a strong capacity to report against the framework. The sharing of LGPRF data from Q1 with other Interface Councils has continued to identify efficiencies and variations in data collection methods. Q2 LGPRF data from teams is due 9 January, with the results to be provided to Exec soon thereafter. Demographic forecast update Exec considered the revised forecast on 2 December. Further work will take place in early 2015 to explore the implications of the revised population forecasts on our current and future services. Community Satisfaction Survey Exec approved in December to participate in core survey questions. Financially, the unfavourable variance is due to timing of expenditure. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (45) (18) 27 (323) Monthly Report November/December 2014 45 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (333) (10) (657) (637) 21 COMMUNICATIONS NOVEMBER/DECEMBER Publications The summer magazine edition of Peninsula Wide was delivered in December, and features a range of information about events and activities on the Peninsula over the peak summer period. This edition also contains important information to assist residents to deal with the threat of heatwave and bushfire. Work has commenced on planning for the February edition. Media The team had a busy November/December handling a range of local, state and national media inquiries. The three issues which received the most media attention where: • Council’s nature strip policy: The Mayor was interviewed on Channel 7’s Sunrise, Channel 9 News, ABC Radio and 3AW to talk about the draft Nature Strip Policy which opens up the possibility for people to plant vegetable and fruit trees on their nature strips. • Rye food vans: The Communications Team worked with Environment Protection and Community Safety to respond to a number of local and state media inquiries regarding the food vans in Rye. Information was regularly updated on the website to keep the community up-to-date with Shire investigations on the issue. • Raw milk deaths: A Peninsula child died after consuming raw, unpasteurised milk, resulting in national media attention. While the Shire did not have a direct role to play in investigating the incident, it will assist the Department of Health in reminding stores stocking raw milk that it must be clearly marked “not for human consumption.” • No Entertainment/No Nonsense New Year’s Eve – The Mayor was interviewed on 3AW on New Year’s Eve, and spoke with both The Age and The Herald Sun regarding the Shire’s No Entertainment/No Nonsense New Year’s Eve strategy. The team also prepared a range of media releases including: Mayor welcomes new CEO; No entertainment, No nonsense New Year’s Eve; Fire danger period commences; Alfred St Plaza Lights Up; Summer Library activities; Australia Day Awards and Celebrations; Have Your Say on the Shire Budget; Best Bites Award Winners; and 2014 Urban Wellbeing Survey. Events/Mayor and Councillor Support The Communications Team, together with Community Events and Mayor and Councillor Support, organised the official opening of the $8.5m Civic Reserve Recreation Centre in early December. A community open day will be held on March 15. Speeches and assistance were provided for a range of other events, including: Mornington Tennis Centre opening; Human Rights Oration; Police Point Shire Park at Twilight; Communities That Care end of year celebration; Meals on Wheels volunteer lunch; MPRG exhibition opening; White Ribbon Day breakfast; Off the Kuff business launch; and the closing of Archibald Prize exhibition. Challenges The peak summer period always presents a range of challenges for the Mornington Peninsula as the population more than doubles. For the communications team, the challenge is ensuring that information about activities and events that have the potential to impact on residents and visitors is clearly and consistently communicated. Monthly Report November/December 2014 46 The Communications team also works closely with local emergency service providers (police, CFA and SES) to keep the community informed of any potential risks (eg. bushfire and storm events). As an extremely popular holiday destination, the Peninsula is often in the news during the summer period. Last summer, for example, the communications team handled inquiries on a range of issues including the ‘one-punch’ death of a teenager in Rye, a major fire on the Mornington Peninsula Freeway and a light plane crash in Sorrento. Another challenge is the amount of traffic we receive on our Shire website, which is up to fourtimes the usual monthly amount. We have adjusted our bandwidth to cope with the increase in traffic, and recent enhancements by Telstra have improved the reliability and coverage of the network. Financially, there are no major issues. Monthly variances reflect a timing issue with the delivery of Peninsula Wide and will not impact on year end forecasts. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (55) (162) (107) (526) Monthly Report November/December 2014 47 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (612) (86) (1,154) (1,148) 6 TEAM SUPPORT AND DEVELOPMENT Traineeships and Work Experience The 2014 Wal Morrison program is now complete with trainees attending their final workshop and their fourth and final work rotation. Well done to our 4 trainees for completing all the administrative requirements of the traineeship. The total number of traineeships within the Shire for the calendar year amounts to 18. With schools being totally immersed in exams during November and early December, only two work experience placements were hosted within the Statutory Planning Unit and The Briars in December. Learning and Development (including OH&S training) Training delivered included a Workplace Behaviour Refresher, Charter of Human Rights, Integrity in Local Government, Managing Contractor Safety, a five day Health and Safety Representative training program, Chief Fire Warden Training, First Aid and Manual Handling programs. There were a total of 441 attendances at the 21 training courses conducted over this two month period. One of the Shire’s commitments is to continually develop its Team Leaders/Outcome Facilitators and those aspiring to such roles. This commitment will be supported in 2015 with the Shire’s participation in the Local Government Management Association (LGMA) Challenge, providing an opportunity for our team to match their skills against other local government teams from across Victoria then Australia. 2014 saw the end of studies for approximately 30 team members who have been working towards formal qualifications in their respective professions. Planning has commenced for the Shire’s annual graduation ceremony to be conducted in February 2015, which will formally recognise and celebrate the achievement of those 30 team members. These hard working team members will receive qualifications ranging from Certificate III level to Masters degrees. Recruitment A total of 643 applications were received in November and December for 25 positions advertised. Total applications received in the calendar year amounts to 2,481 and is an indicator of the strong pool of candidates the Shire attracts for nearly all positions. As one of the largest employers on the Peninsula, the Shire’s recruitment campaigns provide valuable opportunities for prospective job candidates to obtain employment with the Shire. Best Practice The Shire is committed to continuous improvement and throughout November reviews of several different cross-organisational processes were undertaken. December saw the completion of work to clarify a competency framework for Leadership as well as development of a training program. Financially, the YTD variance of $88K is due to under expenditure in staff training of $51K, paid parental leave of $34K, long term sick leave of $26K and traineeships of $30K. This is offset by over expenditure in staff support of $32K. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (155) (160) (5) (599) Monthly Report November/December 2014 48 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (511) 88 (1,766) (1,710) 55 GOVERNANCE AND CORPORATE SUPPORT NOVEMBER 2014 GOVERNANCE Annual Council Meeting Held on 10 November where Cr Bev Colomb was elected Mayor and Cr Graham Pittock elected Deputy Mayor for the next twelve months. Correspondence Commitment Policy Correspondence Commitment Policy formally adopted by Council. The policy formalises current practices and will assist the community to communicate with the Shire by understanding the Shire’s expectations and standards. 2015 Council Meeting Timetable Council meeting schedule and timetable for 2015 adopted including the appointment of Chairpersons for the various Special Committees established by Council. Meeting timetable generally provides for Council meetings to be held on Mondays during the 2nd week (held at Rosebud Office) and 4th week (held at community locations) of each calendar month. Meetings of the Development Assessments Committee and Forward Planning Committee will be convened as required. Appointment of Council Representatives Council Representatives were appointed to various community committees, peak industry bodies and regional organisations at the 24 November Council meeting. Appointment of Chief Executive Officer A Special Council meeting was held on 26 November to formally appoint Mr Carl Cowie as Chief Executive Officer in accordance with Section 94 of the Local Government Act 1989. Freedom of Information Requests in progress at the start of the month New requests during the month Withdrawn Requests Non valid requests Requests resolved Requests in progress at the end of month 8 5 1 1 5 6 MAYOR AND COUNCILLOR SUPPORT Events and Functions Cr Celi hosted Grade 3 students from Balcombe Grammar and attended Victorian Local Governance Association (VLGA) – 100 Years of Women in Local Government. Mayor & Councillors involved in Remembrance Day activities across the Peninsula. Mayor Cr Colomb, Cr Wood and Cr Gibb attended opening of Main Ridge Fire Station. Governor General Peter Cosgrove, Minister for Emergency Services and Martin Dixon MP in attendance. Mayor, Cr Gibb and Cr Celi attended White Ribbon Breakfast. Cr Garnock attended Hastings Police Senior Citizens Annual BBQ and Concert. Monthly Report November/December 2014 49 CUSTOMER SERVICE November saw the commencement of the Summer Camping/Holiday Season. Customer Service Staff are gearing up for its busiest time of the Year. New Garbage Collection Contract with Solo has commenced and is being closely monitored. Calls received during November totalled 21,755 compared to October of 25,876, a decrease of 4,121. Service Requests raised during November numbered 6,475 compared with 7,238 in October. Overdue requests at the end of November numbered 461, a n increase of 2 when compared with October. COMMUNITY ENGAGEMENT ACTIVITIES Citizenship Ceremony A Citizenship Ceremony was held at the Peninsula Community Theatre on 19 November where 79 local residents became Australian citizens. Community Council Meeting Local township Council Meeting was held at the Mount Eliza Community Hall on 24 November. Public briefings were provided by the following community groups: • Ms Ann Scholes, Co-ordinator of the Friends of William Road Beach, provided Council and the public with an overview of bushland restoration for Mount Eliza Foreshore; • Mr Andrew Swaine, President of Mornington Railway Preservation Society, presented an overview of the Mornington Railway Preservation Society and how it intends to increase and improve communications with Council and the community; and • Mr Don Reeves, President of Mount Eliza Neighbourhood Centre, explained how the Neighbourhood Centre is involved in the community and provided an update on the Mount Eliza Men’s Shed. DECEMBER GOVERNANCE Instrument of Delegation to CEO Following the recent appointment of the new CEO, Council reviewed and formally approved the Instrument of Delegation to the CEO. There were no changes to the Instrument as previously adopted by Council in August. 2015 Australia Day Local Awards Council approved the recipients of the 2015 Australia Day Local Awards in the categories of Citizen of the Year, Young Citizen of the Year, and Community Event of the Year based on the recommendations of an independent Selection Panel. Winners will be announced on Australia Day. Freedom of Information Requests in progress at the start of the month New requests during the month Withdrawn Requests Non valid requests Requests resolved Requests in progress at the end of month Monthly Report November/December 2014 50 6 4 0 1 3 6 MAYOR AND COUNCILLOR SUPPORT Events and Functions Cr Bowden attended the Triple M Luke Batty Memorial Outside Broadcast and 20/20 cricket game at Bunguyan Reserve, Tyabb. Mayor Cr Colomb, Cr Garnock and Cr Celi attended the International Day of People with a Disability event. Cr Fraser performed a speech at the Human Rights Day Oration provided by Andrew Jackomos, Victorian Commissioner for Aboriginal Children and Young People, at the Peninsula Community Theatre. Mayor Cr Colomb, Cr Rodgers and Cr Fraser attended the Police Point Twilight Event at Police Point Shire Park, Portsea. CUSTOMER SERVICE December marks the start of the school holiday and Christmas/New Year peak period and the increase of visitors to the Peninsula is reflected in the volume of activity managed by the Customer Service Team. Calls received during December totalled 23,933 compared to November of 21,755, an increase of 2,178. Service Requests raised during December numbered 7,355 compared with 6,475 in November. Overdue requests at the end of December numbered 549, a n increase of 88 when compared with November. Financially, on a year to date basis, unfavourable variances in salaries have been offset with timing/saving differences in photocopier expenditure, and subscriptions memberships. The year end forecast result will be unfavourable which is due to long term sick leave issues. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (548) (514) 34 (3,397) Monthly Report November/December 2014 51 Actual Variance Y.T.D. Y.T.D (3,402) (5) Budget Forecast Variance Y.E. Y.E. Y.E. (5,353) (5,314) 38 PROPERTY AND VALUATIONS November 2014 PROPERTY McCrae Beach Asbestos Removal Property has been working with Infrastructure Maintenance, EPACS and SIMS Cleansing to remove asbestos debris from the McCrae Beach. The dispersal of the asbestos material is thought to have been due to maintenance works being undertaken by the licensee of a beach box. A clean up and monitoring program utilising a licensed asbestos removal contractor and an environmental consultant is currently in place to ensure there is no risk to the public. Planning Compliance is investigating the matter. Rosebud Motor Boat Squadron The Property team had previously finalised the lease for the Rosebud Motor Boat Squadron (RMBS) premises at Rosebud foreshore. The Department of Environment and Primary Industries has now issued Coastal Management Act (CMA) consent for RMBS to use the foreshore area adjoining the club premises for the launching and retrieval of vessels. This matter has been the subject of long deliberation and representation by Council. The CMA consent legitimises the RMBS use of the foreshore. The appropriate Crown land licence agreement incorporating the conditions for the launching and retrieval of vessels is currently being finalised. VALUATIONS Supplementary Valuations The valuation team has completed 815 supplementary valuations during November through to 16 December 2014. General Valuation 2016 Stage 1 of General Revaluation 2016 has commenced. The project plan is scheduled to have Stage 1 completed for lodgement with the Valuer Generals office 5 January 2015. Stage 2 (residential and rural) will commence from 5 January 2015. Part of Stage 1 is to review the 2014 revaluation and to prepare a project plan for the 2016 revaluation. Preparing this plan gives us an opportunity to review the sub market group structures (smgs). A number of smgs have been identified for consolidation. Further consolidation of smgs will continue throughout Stage 2. These consolidations will result in more efficient use of officer time, with less days being needed to complete reporting requirements as per Valuation Best Practice 2016. The Senior Valuer has reviewed the current smgs for commercial, industrial and specialist smgs. This reviewed structure will result in more efficient chart modelling on VM2020. We are working towards having all assessments being valued using computer modelling charts on VM2020 by the end of the 2016 revaluation. The higher the number of assessments that are valued using VM2020 will result in the revaluation being returned within a shorter time period than previous years. Mornington Peninsula Shire Valuation Objections For rating year 2014/2015, 129 formal valuation objections have been lodged. These include 13 objections from the Hastings Shopping Centre complex and 68 assessments from the Rosebud Plaza Shopping Centre. 30% of the objections received have been resolved. A total of 90 objections remain unresolved. This includes the 68 assessments from the Rosebud Plaza Shopping Centre. Monthly Report November/December 2014 52 December 2014 Peninsula Pistol Club, Mount Martha Portables buildings including an ablution block have been delivered to the site whilst the Club develop plans to rebuild their premises that were recently destroyed in a fire. Former Mornington Tennis Courts, 300 Main Street, Mornington Settlement of the sale to The Bays Hospital has taken place. A licence agreement was recently issued to the hospital to allow them to take possession of the property prior to settlement. Rosebud and Rye Foreshore Carnivals New licence agreements finalised for the Rosebud and Rye Foreshore Carnivals. The carnivals are currently setting up for operation during Christmas/New Year and Easter 2015. The carnival operator has relocated the ferris wheel from the Rosebud site to Rye foreshore. The area where the ferris wheel was sited in Rosebud Village Green Circus A new licence agreement has been finalised for Silvers Circus to operate on the Rosebud Village Green from 29 December 2014 to 11 January 2015. Once the circus has vacated, the site will be prepared for the Australia Day activities on 26 January 2015. VALUATIONS Supplementary Valuations The valuation team has completed 1,142 supplementary valuations during November and December 2014. At the time of this report there are no supplementary valuations more than 90 days old and there are 15 that are more than 60 days old that are yet to be completed. General Valuation 2016 Stage 1 of the 2016 General Revaluation has been lodged with the Valuer General. (residential and rural) will commence from 5 January 2015. Stage 2 Mornington Peninsula Shire Valuation Objections To date, 134 formal valuation objections have been lodged for the 2014/2015 rating year. This number includes 13 objections from Hastings Shopping Centre and 68 assessments from the Rosebud Plaza Shopping Centre. There are currently 95 objections to be resolved (including the 68 from Rosebud Plaza). All objectors have been contacted and officers are working with the ratepayers to resolve their objections. Shire Appeals To date there has only been one objection lodged as an Appeal with VCAT. The property is a residential assessment in Rosebud. Financially, the year to date unfavourable can be attributed to timing of the receipt of income for property rentals together with the need to purchase a portable ablution block for the Peninsula Pistol Club whose clubhouse was recently destroyed by fire. This unfavourable variance is not expected to affect the Unit’s year end forecast. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D 552 548 (4) 3,052 Monthly Report November/December 2014 53 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. 3,144 92 4,814 4,838 24 INFORMATION SERVICES INFORMATION TECHNOLOGY • Centaman database for the Visitors Information Centre has now been moved from a local copy to being hosted on a central server at Rosebud. This will provide for greater stability and regular backup of systems and data. • NEC has advised that current phone system will be no longer be officially supported from April 6th, 2015. IS has prepared a budget submission for 2015/16. Detailed options analysis is being prepared to manage the risk between support withdrawal and replacement with new phone system. • Request received to allow Council phone numbers to be displayed. Due to the age and type of technology, this is only possible for Rosebud phone numbers. The vendor completed this work in early December. • Discussions with VAGO on upcoming audit on Identity Management and Software Licensing policies. Detailed audit of these areas will be conducted in January/February 2015. VAGO will also follow up on progress of previously identified audit issues. • Completed upgrade to MPS internet connection. The upgraded internet connection provides for a dedicated link for internet traffic (email, systems access, etc.). The increase in performance and reliability was negotiated and implemented by IS with increase in cost. • IS is consolidating the commercial and technical support arrangements of the various smartphone apps that MPS has developed. The variety of apps and development approaches requires that a detailed approach to ensure MPS’ interests are preserved. • Preparing second tranche of IS policies for review and approval. These policies have been developed according to prevailing best practice and international standards. These are scheduled to be present in late January for approval and endorsement. • Developed new internal performance KPI’s for IS team. These KPI’s have been developed to monitor and measure IS performance against the needs of the organisation. Reporting against these KPI’s will commence from 1st January, 2015. GIS • Fauna Survey data display designed in M.A.P.S. for use by Planners and Natural Systems teams to help identify locations of particular species. Currently being tested prior to implementation. • Map created for proposed new ESO30 (overlay) for Tootgarook Swamp to be submitted to State Government for approval. • Acquisition and mapping of South East Water data in relation to Emergency Relief Structures for use in drainage analysis. • Evacuation Route maps finalised for the Emergency Coordinator. . Monthly Report November/December 2014 54 RECORDS MANAGEMENT • Developed plan and commenced implementation to sequentially scan existing hard copy records into corporate document management system. This also aligns our procedures with Public Record Office of Victoria (PROV) standards. Anticipated outcomes are a reduction in search times for documents and, over time reduce storage costs. • Continued development of destruction and digitisation. information management policies including document Financially, IS has delivered its allocation of P500 savings and this contributes the positive Year End variance. The main contributors to the variances have been the incurring of increased expenditure for upgraded telecommunications links to Rosebud Foreshore, Dromana VIC and Mornington Depot. These have been set up and the respective directorates will be re-charged. There are variations due to the status of the PC Replacement program. This is due to DELL seeking to increase prices by 7%. MPS is currently negotiating with Dell around this price increase and has placed on hold our upgrade program until it is resolved. This is expected to be finalised by end of January 2015. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (211) (260) (49) (1,671) Monthly Report November/December 2014 55 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,795) (124) (2,856) (2,784) 73 FINANCE REVENUE MANAGEMENT November/December Normal activities during November have been relatively routine, apart from an increase in the volume of notices of acquisitions processed (a 20% increase on the same time last year) as a result of settlements prior to the summer holidays. This increase in property movement has also been reflected in the number of land information certificates issued. The number of direct debit payments continues to increase with just over 3000 ratepayers now paying by this method (a significant increase in the last 12 months). Bpay view was available for the first time for the second instalment reminder notices and although the initial update was not quite 1% we have had a successful implementation. The number of direct debit payments continues to increase with just over 3000 ratepayers now paying by this method (a significant increase in the last 12 months). ACCOUNTING SERVICES November/December Having substantially completed the major aspects of the 2014/15 mid-year budget review, it is pleasing to report that we have been able to accommodate a range of adjustments while forecasting no major changes to our overall ‘bottom line’ result. The results of the mid-year budget review will be formally reported to Council in the January 2015 Monthly Report. As part of next year’s budget process the community has been invited to provide input into the development of the draft 2015/16 Annual Budget. Written submissions will be accepted for consideration prior to a community meeting to be held at the Shire’s Rosebud Office on Wednesday, 11 February 2015 commencing at 4pm. The meeting is an opportunity for interested persons to learn more about the budget process and for verbal presentation to be made in support of written submissions. Financially, the year to date variance is due to the timing of employee overhead and plant expenses and will have no impact on the year-end result. No year-end forecasts are proposed at this stage. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (99) 671 771 (757) Monthly Report November/December 2014 56 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. 157 914 (2,440) (2,432) 8 DIRECTOR – SUSTAINABLE ORGANISATION The summer camping season, which runs from November through until January, is the busiest time of the year for the Shire’s Customer Services team. The influx of campers and holiday house occupants results in an increase in calls, particularly relating to animals and waste. We also see more interest in our information, with our website catering for up to four times more visits than normal. Information about events and activities is particularly popular. The increased activity also results in more attention by the media, With the Communications team busy responding to media enquiries. While customer facing units are busy, activity continues with our support departments. During November and December, the Finance team review performance to date as part of the preparation of a mid-year budget review. The Finance team also start work on preparing the next year’s budget, including calling for community ideas and inputs. Financially, the year to date variance is on target, with nothing significant to report. $'000 Operating Surplus / (Deficit) Forecast Actual Variance Forecast Month Month Month Y.T.D (41) (38) 3 (269) Monthly Report November/December 2014 57 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (270) (1) (533) (532) 1 CAPITAL WORKS OVERVIEW Baxter Preschool, Baxter Baxter Preschool can now use their two new playrooms (stage one new room construction and stage two refurbishment of existing playroom). Stage one works completed in August has significantly increased places available for preschool students in Baxter. To assist the preschool in keeping services operational on-site during the staged construction, a temporary portable building was ben provided. Stage two refurbishment were also recently completed. Stage two wet area Stage two playroom Elsie Dorrington Netball Pavilion, Mornington – Pavilion Strategy Building construction works have reached practical completion. The completed building includes time keepers/office, unisex change and toilet facilities, umpires change room, store rooms, bin store, internal disabled toilet, external public toilets, first aid room, disabled access, new kitchen and social areas. The new building will significantly assist the Mornington Netball Association in providing adequate facilities to cater for their existing seven playing courts. External view from car park (Public Toilets) Monthly Report November/December 2014 Internal view of social room 58 Fruit Growers Reserve, Somerville – Pavilion Strategy, Somerville Construction works for Fruitgrowers Sports Pavilion is underway. The new facility will include unisex change and toilet facilities, umpires change room, store rooms, internal disabled toilet, external public toilets, first aid room, disabled access, new kitchen, social areas, new energy efficient lighting, heating, ventilation and cooling systems, insulation, water saving fixtures and water tanks for capture of roof water for toilet flushing. Progress to date includes site cut, levelling, service rough concrete slab and footings. Construction over the next two weeks will include the erection of framing and block work. Works are anticipated to be completed by July 2015. Concrete slab construction Mount Martha Life Saving Club, Mount Martha Construction works continue to progress for the new Mount Martha Life Saving Club facility. The upper floor slab and framing has been completed, the roof is on and internal wall linings and fitoff are due to commence soon. Handover of the completed facility is anticipated for early to midFebruary. This facility is being upgraded to cater for significant growth in demand for lifesaving services and activities. The new building is being built to withstand the harsh coastal environment on the foreshore, including being designed to handle inundation. This project will also include a new public toilet facility for the community. Mount Martha Life Saving Club – view from carpark Monthly Report November/December 2014 59 Mount Martha Life Saving Club – Internal view from social room Bentons Square Pre-School additions, Mornington Construction and landscaping works for the new pre-school classroom at Benton’s Square have now reached practical completion. The additional to the existing pre-school facility provides a bright, vibrant space for children to play and learn. The classroom and landscaping features are interesting and stimulating. This project is on target ready for licensing and opening during January. Bentons Square pre-school additions – view of refurbished playground space Monthly Report November/December 2014 60 Bentons Square pre-school addition – view of new playground space Civic Reserve Recreation Centre, Mornington Civic Reserve Recreation Centre is now open, with major tenants Mornington Tennis Club, Mornington Youth Club Gymnastics and David Collins Stadium operating from the venue. Building additions to the table tennis stadium are continuing, along with landscape planting. Monthly Report November/December 2014 61 Mornington Park Playground Works to refurbish and revitalise the Mornington Park Playground reached practical completion 17 October 2014. The works consisted of minor works to the existing boat structure, replacement of old equipment, new swings and introduction of paths, trees, seating and sensory elements. This new play area will provide a place for families to meet and enjoy the outdoors. In the first few weeks many visitors have returned to the park to test out the new playground. New play structure and pirate ship in background Refurbished pirate ship New landscaping and paving New swings and path Monthly Report November/December 2014 62 Dromana Visitors Centre The main works within the building have been completed. Works included new outside paths, roof replacement, complete refurbishment of the front foyer, new meeting room, upgrade of the disabled toilet Front foyer Path and bridge to lift well at Safety Beach Works have now been completed for the link to the lift well underpass for Marina Cove The new path extends the path past the yacht Club to the new bridge into the lift and stairs New composite bridge Monthly Report November/December 2014 63 Financially, there are no changes to report to date. The mid year review will highlight these capital changes, to be reported in January Noting the year end forecast change of $16,262m represents the carry forward program from 2013/14. Standard Statement of Capital Works For the period ending December 2014 Forecast Actual Variance Forecast Month Month Month Y.T.D $'000 $'000 $'000 $'000 Actual Y.T.D. $'000 Variance Budget Forecast Variance Y.T.D Y.E. Y.E. Y.E. $'000 $'000 $'000 $'000 Capital Works Area Land Buildings Infrastructure - Roads Infrastructure - Drainage Infrastructure - Other Plant Furniture and Equipment Information Technology Artworks Library Bookstock 0 2,211 2,873 688 907 21 49 0 3 193 4 1,230 1,832 385 286 38 25 0 41 86 (4) 981 1,040 303 621 (18) 24 0 (37) 107 0 5,760 6,816 2,466 1,824 75 98 17 7 720 Total Capital Works 6,944 3,927 3,018 17,782 Monthly Report November/December 2014 64 92 6,786 6,644 2,434 1,453 76 77 39 38 622 18,261 (92) (1,026) 172 32 371 (1) 20 (22) (32) 98 (479) 350 10,128 12,872 3,760 3,845 268 195 0 13 1,300 32,731 350 14,575 21,110 4,707 5,970 474 273 17 13 1,504 48,993 0 (4,447) (8,237) (947) (2,125) (206) (78) (17) 0 (204) (16,262) Capital Works Forecast Y.T.D Program 17010. Plant & Equipment Replacement 17012. Acquisition (splays, easements & sm 17016. Oval Rehab - Drainage & Sprinklers 17027. Implementation of Toilet Strategy 17031. Provision of Library Books/Material 17032. Acquisitions - M'ton Pen Reg Galler 17038. Traffic Mgt Treatments 17050. Rehab - Walkways/bike paths/footpat 17053. Drainage Rehabilitation 17054. Drainage Upgrades 17062. Signage - Traffic/Parking Areas 17063. Signage - General 17082. Sale of Roads 17260. Playground developments 17263. Implementation of Recreation Master 17272. Hall Improvements Asset Replacement 17273. Reserve Improvements/ Asset Replace 17313. Equestrian Strategy Implementation 17362. Footpath Strategy - Impl 17363. Photocopier Replacement 17368. Sorrento Strategy - Boardwalk 17371. Portsea Strategy - Impl Stage 1 17400. BBQ Upgrade Program 17401. Building Renovations - Major Build 17402. Recreation Building Imp 17444. Hastings Com Area Parking & TMT Imp 17465. LT - Coastal Mgt/Master Plan Impl 17482. Safer Local Roads Program 17483. Signage Directional 17486. Southern Peninsula Aquatic Recreati Monthly Report November/December 2014 75,250 0 53,750 250,000 720,066 6,500 127,300 572,500 475,000 250,000 20,000 50,000 0 177,500 479,450 25,000 45,000 100,000 652,654 0 0 350,000 15,000 2,316,180 84,000 130,800 75,800 0 0 200,000 65 Actual Y.T.D. Variance Y.T.D 75,995 (745) 15,042 (15,042) 36,172 17,578 0 250,000 621,846 98,220 38,481 (31,981) 176,613 (49,313) 501,031 71,469 409,164 65,836 175,324 74,676 23,075 (3,075) 51,349 (1,349) 3,655 (3,655) 343,722 (166,222) 249,453 229,997 23,248 1,752 0 45,000 7,221 92,779 576,302 76,352 0 0 460 (460) 270,229 79,772 11,804 3,196 4,098,467 (1,782,287) 70,355 13,645 82,024 48,776 75,735 65 0 0 (900) 900 187,687 12,313 Budget Y.E. 268,000 350,000 135,000 1,000,000 1,300,000 13,000 150,000 1,210,000 700,000 500,000 40,000 100,000 0 300,000 1,020,000 50,000 90,000 200,000 956,215 0 0 0 30,000 1,693,000 120,000 0 0 4,000,000 0 1,600,000 Forecast Y.E. 474,000 350,000 202,000 1,000,000 1,504,000 13,000 203,100 1,263,800 700,000 500,000 40,000 100,000 0 505,500 1,852,300 50,000 90,000 200,000 2,897,635 20,000 0 350,000 30,000 3,972,680 178,000 130,800 75,800 4,000,000 0 1,600,000 Variance Y.E. (206,000) 0 (67,000) 0 (204,000) 0 (53,100) (53,800) 0 0 0 0 0 (205,500) (832,300) 0 0 0 (1,941,420) (20,000) 0 (350,000) 0 (2,279,680) (58,000) (130,800) (75,800) 0 0 0 Capital Works Forecast Y.T.D Program 17489. Rye Traffic Man Strategy Implementa 17522. Enterprise Content Management Syste 17549. Bicycle Strategy 17552. Blackspot Program (Council contribu 17554. Skate & BMX Strategy 17556. Soccer Strategy - Implementation 17558. Kerb and Channel - Rehabilitation 17584. Activity Centre Structure Plan - Im 17593. Integrated Flood Management and Dra 17606. B/Spot Tyabb Tooradin Rd Bungower 17622. R2R 3 Hodgins Road Frankston Flinde 17626. Foreshore Camping Areas - Amenity B 17629. Safety Beach CC - Path to Lift Acce 17630. Peninsula DriveSafe 17657. Former M'ton Sec.College Classrooms 17659. Urban Rd Contibutory Scheme Strateg 17660. Pavillion Strategy Implementation 17665. B/Spot Shands- Mton Flind Shoreham 17667. Sorrento Seawall 17668. Mount Martha Park Viewing Tower 17671. Sorrento Policemans Point Strategy 17672. Neighbourhood Activity Centre Struc 17673. Sporting Facilities Lighting Progra 17674. Ticketing System Foreshore B/Ramp 17675. Tennis Strategy 17676. Netball Strategy 17677. BSpot Melb Rd (Canterbury Jetty Rd) 17678. BSpot Browns Rd/Boneo Rd-Flders Rd 17679. BSpot Marine Pd/Western Port/Skinne 17681. Safety Beach - Buckley's Rest Monthly Report November/December 2014 0 17,000 220,000 112,500 110,000 0 160,000 330,000 1,725,996 50,000 517,200 175,000 0 0 0 1,248,850 859,500 170,000 30,000 0 72,500 179,750 50,000 0 50,000 100,000 0 0 577,500 0 66 Actual Y.T.D. 4,910 39,166 161,992 71,865 47,396 0 150,426 134,123 1,849,402 597,953 595,903 74,322 24,234 6,450 33,758 1,284,900 183,019 145,279 7,153 0 143,931 180,083 50,000 932 32,001 18,969 39,876 3,391 477,423 0 Variance Y.T.D (4,910) (22,166) 58,008 40,635 62,604 0 9,574 195,877 (123,406) (547,953) (78,703) 100,678 (24,234) (6,450) (33,758) (36,050) 676,481 24,721 22,848 0 (71,431) (333) 0 (932) 17,999 81,031 (39,876) (3,391) 100,077 0 Budget Y.E. 0 0 300,000 225,000 270,000 150,000 300,000 400,000 2,500,000 0 0 350,000 0 0 0 727,000 3,209,000 0 0 0 145,000 100,000 100,000 0 100,000 200,000 0 0 0 0 Forecast Y.E. 46,500 17,000 557,000 225,000 320,000 359,000 300,000 808,000 3,447,000 50,000 517,200 350,000 23,000 20,800 36,000 1,863,300 3,209,000 764,000 126,200 36,000 170,000 236,000 116,000 9,200 188,000 235,000 160,000 45,300 577,500 20,000 Variance Y.E. (46,500) (17,000) (257,000) 0 (50,000) (209,000) 0 (408,000) (947,000) (50,000) (517,200) 0 (23,000) (20,800) (36,000) (1,136,300) 0 (764,000) (126,200) (36,000) (25,000) (136,000) (16,000) (9,200) (88,000) (35,000) (160,000) (45,300) (577,500) (20,000) Capital Works Forecast Y.T.D Program 17684. Bay Trail Path 17686. SCS - Shire Road - Dromana 17690. Sorrento Early Leaning Facility 17692. Bentons Square Preschool Additions 17695. RTR - Bungower Rd / Tyabb-Tooradin 17696. Hastings Activity Centre Structure 17697. Rosebud Activity Centre Structure P 17699. Unmade Carpark Construction Strateg 17701. Active Sports Strategy - Impl 17705. Alfred Street Roundabout 17706. Alfred Street Streetscape Works 17708. BSpot Shands/Main Creek Roundabout 17709. BSpot Jetty/McDowell Signals 17710. BSpot Sandy Road Fingal 17712. West Park Open Space 17714. Mt Martha Life Saving Club 17715. Mens Shed Somerville 17716. Mens Shed Mornington 17718. Timber Structures Renewal 17719. Marine Structures Renewal 17720. Road/Bridges & Culvert Renewal 17721. Residential Dwellings 17722. Somerville Pedestrain Strategy 17723. Furniture and Equipment Replacement 17724. Public Transport Facility Imp 17725. Guardrail Renewal Program 17726. David Collings Lesirue Centre 17727. Storm Water Quality Program 17728. Mills Beach Master Plan Implementat 17730. B/spot - Mt Eliza Way Monthly Report November/December 2014 0 0 0 0 0 87,500 50,000 10,000 0 100,000 176,000 200,000 0 50,000 25,000 1,200,000 85,000 0 100,000 75,000 12,500 68,000 50,000 72,500 15,000 8,750 330,234 15,000 50,000 223,500 67 Actual Y.T.D. 85,175 0 74,457 588,797 4,246 3,970 9,670 19,329 0 149,370 444,362 372,077 3,460 22,693 47,800 1,331,042 99,966 0 90,241 80,972 6,080 66,674 10,001 53,806 11,060 0 0 0 1,915 33,819 Variance Y.T.D (85,175) 0 (74,457) (588,797) (4,246) 83,530 40,330 (9,329) 0 (49,370) (268,362) (172,077) (3,460) 27,307 (22,800) (131,042) (14,966) 0 9,759 (5,972) 6,420 1,326 39,999 18,694 3,940 8,750 330,234 15,000 48,085 189,681 Budget Y.E. 0 0 0 0 0 350,000 200,000 0 50,000 0 0 0 0 0 0 0 0 0 200,000 150,000 50,000 68,000 100,000 145,000 30,000 35,000 1,320,938 60,000 200,000 767,000 Forecast Y.E. 77,000 100,000 13,300 342,500 0 428,300 298,000 59,100 100,000 100,000 176,000 743,000 313,000 72,000 50,500 1,610,500 85,000 60,000 200,000 150,000 50,000 68,000 100,000 145,000 30,000 35,000 1,320,938 60,000 200,000 767,000 Variance Y.E. (77,000) (100,000) (13,300) (342,500) 0 (78,300) (98,000) (59,100) (50,000) (100,000) (176,000) (743,000) (313,000) (72,000) (50,500) (1,610,500) (85,000) (60,000) 0 0 0 0 0 0 0 0 0 0 0 0 Capital Works Forecast Y.T.D Program 17731. B/spot - Graydens road/Boes 17732. B/spot - Loders Road - Moorooduc 17733. B/spot - Browns Road - Rosebud 17734. B/spot - Eastbourne Road - Rosebud 17735. Somerville Tennis Club 17736. Red Hill Tennis Club 17737. Mornington Youth Hub 17742. Pedestrian Treatments 17743. Land Acq - 13 Ninth Avenue, Rosebud 30,000 303,000 40,000 149,000 16,500 15,000 191,750 25,000 0 Actual Y.T.D. 11,042 38,711 2,450 18,409 2,661 1,003 0 20,648 72,876 17,781,780 18,261,188 Monthly Report November/December 2014 68 Variance Y.T.D 18,958 264,289 37,550 130,591 13,839 13,997 191,750 4,352 (72,876) Budget Y.E. 1,480,000 1,046,000 400,000 298,000 33,000 30,000 767,000 50,000 0 Forecast Y.E. 1,480,000 1,046,000 400,000 298,000 33,000 30,000 767,000 50,000 0 Variance Y.E. 0 0 0 0 0 0 0 0 0 (479,408) 32,731,153 48,992,753 (16,261,600) PRIORITY WORKS OVERVIEW Financially, there are no changes to report in November/December report. The mid year changes will be reported in January report. Noting the year end forecast change of $1,688m represents the carry forward program from 2013/14. Program Forecast Y.T.D 2,997 Monthly Report November/December 2014 69 Actual Y.T.D. 1,245 Variance Y.T.D 1,753 Budget Y.E. 3,034 Forecast Y.E. 4,721 Variance Y.E. (1,688) Priority Works Forecast Y.T.D Program 56001. 56002. 56003. 56007. 56009. 56012. 56013. 56015. 56015. 56026. 56030. 56039. 56044. 56064. 56065. 56067. 56067. 56105. 56107. 56109. 56112. 56123. 56123. 56146. 56152. 56170. 56171. 56226. Installation of New Fire Plugs. Resurfacing of Cricket Pitches. Developer W ks - Drainage Upgrades. N/Ball Crt Resurf (Sport Club Fund) Conservation W orks-MPRG. Building Demolition. Street Lighting Improvements. Half Cost Fencing (Inc) Half Cost Fencing Sewerage Connection Council Buildin Implement Dog free & leash areas Disabled Facilities Council Buildin Dredging of Boatramp at Hastings Minor Streetscape Works- Commer Cnt Sewerage Connection- Council Buildi Coastal Reserves Biodiversity Cons. (Inc) Coastal Reserves Biodiversity Cons. Tree Removal Program Building Renovations Misc. Minor Traffic Improvements. Risk Mgt Initiatives former Landfil Sustainable Energy Funds Initiative (Inc) Sustainable Energy Funds Initiative Infrastructure Upgrades - Landfills Parks & Reserves (Passive) Rehab Pr Open Space Strategy - Implmentation IT Systems Upgrades and Development Landfill Cell Capping Provision Monthly Report November/December 2014 25,000 7,500 0 25,000 13,750 26,250 32,500 0 51,000 10,000 15,000 45,000 31,900 60,000 0 0 6,000 25,000 153,500 37,500 227,000 0 0 100,000 9,600 10,000 291,401 200,000 70 Actual Y.T.D. 1,638 12,354 23,429 33,481 17,207 86,797 15,366 (1,590) 23,205 0 0 10,299 3,550 36,584 23,200 (12,540) 58,416 25,000 111,729 38,935 101,806 (27,793) 23,487 12,602 25,000 44,088 138,523 200,000 Variance Y.T.D 23,363 (4,854) (23,429) (8,481) (3,457) (60,547) 17,134 1,590 27,795 10,000 15,000 34,701 28,350 23,416 (23,200) 12,540 (52,416) (0) 41,771 (1,435) 125,194 27,793 (23,487) 87,398 (15,400) (34,088) 152,878 0 Budget Y.E. 50,000 15,000 0 50,000 27,500 35,000 65,000 0 20,000 20,000 30,000 0 0 120,000 0 0 0 50,000 251,000 75,000 564,000 0 0 100,000 0 0 134,000 200,000 Forecast Y.E. 50,000 15,000 0 50,000 27,500 35,000 65,000 0 61,000 20,000 30,000 45,000 31,900 120,000 0 0 6,000 50,000 279,000 75,000 564,000 0 0 150,000 9,600 10,000 316,400 200,000 Variance Y.E. 0 0 0 0 0 0 0 0 (41,000) 0 0 (45,000) (31,900) 0 0 0 (6,000) 0 (28,000) 0 0 0 0 (50,000) (9,600) (10,000) (182,400) 0 Priority Works Forecast Y.T.D Program 56228. 56230. 56261. 56274. 56275. 56275. 56278. 56281. 56297. 56299. 58304. 58308. 58315. 58315. 58316. 58317. 58324. 58325. 58327. 58328. 58329. 58330. 58331. 58331. 58332. 58333. 58336. Corporate W ater Conservation Progra Rosebud Foreshore Camp Site Markers Telecommunications Tower Projects Net Gain-Bungower Rd/The Eyrei/Art Long Term Coastal Management Master (Inc) Long Term Coastal Management Master Investigation of catchments Hall W orks Somerville Township-Amentity W orks Tyabb Township - Amentity W ks St Mitchell Circuit Retarding Basin The Briars Fera Exlcusion Fence Somerville Cenotaph (Inc) Somerville Cenotaph Police Point Conservation & Rec Pla Marine Drive Safety Beach Place Making - Minor W orks Foreshore Facilites Rehab. - Boat Tyabb Cricket Club Somerville/Tyabb District Heritage Boundary Fence Repair SIMS2 ANZAC Centenary Mornington (Inc) CCTV Projects (Inc) CCTV Projects Mt Eliza Bowls Club - Lighting (Inc) Petanque Piste Red Hill Bowls (Inc) Bike Safe Investigations - Minor Monthly Report November/December 2014 71 Actual Y.T.D. Variance Y.T.D Budget Y.E. 515,100 9,700 0 41,176 0 401,400 260,000 0 6,400 10,400 0 19,600 0 13,900 54,700 70,000 50,000 15,000 10,000 15,000 45,000 0 0 56,955 0 0 0 39,195 0 10,450 85,110 (148,976) 42,754 298,465 5,240 0 0 (1,811) 6,632 (9,091) 2,100 12,907 11,570 3,272 0 20,000 1,808 0 (7,195) (200,000) 79,285 (22,500) (18,900) 9,539 475,905 9,700 (10,450) (43,934) 148,976 358,646 (38,465) (5,240) 6,400 10,400 1,811 12,968 9,091 11,800 41,794 58,430 46,728 15,000 (10,000) 13,193 45,000 7,195 200,000 (22,330) 22,500 18,900 (9,539) 100,000 0 0 82,350 0 475,000 300,000 0 0 0 0 0 0 0 0 0 100,000 30,000 20,000 30,000 90,000 0 0 0 0 0 0 2,997,232 1,244,625 1,752,607 3,033,850 Forecast Y.E. 624,100 9,700 0 82,350 0 732,400 300,000 0 6,400 10,400 0 19,600 0 13,900 54,700 321,000 100,000 30,000 20,000 30,000 90,000 0 0 66,500 0 0 0 Variance Y.E. (524,100) (9,700) 0 0 0 (257,400) 0 0 (6,400) (10,400) 0 (19,600) 0 (13,900) (54,700) (321,000) 0 0 0 0 0 0 0 (66,500) 0 0 0 4,721,450 (1,687,600) PRIORITY PROJECTS OVERVIEW Financially, first quarter changes are listed below. The midyear changes will be reported in January report Projects with New Funding • Mornington Peninsula Tourism - $275k – new funding received from Tourism Victoria. • Villages of the Mornington Peninsula - $5k – new funding received from Small Business Victoria. • Are You Ready? - $110k – new funding received from the Department of Environment and Primary Industries. There is no change to the bottom line with the additional funding as matched expenditure has been forecast. Funding transferred to/from Operating Budget • Tobacco Education - $20k – budget moved from operating to Priority Projects. • Community Grants - Arts Stream - $40k – part of Council’s new grant initiative restructure, funding has been moved to recurrent in operating accounts. • Community Partnerships - $65k - part of Council’s new grant initiative restructure, funding has been moved to recurrent in operating accounts. • Place Making Grants - $110k - part of Council’s new grant initiative restructure, funding has been moved to recurrent in operating accounts. There is no change to Council’s bottom line with the transfer of these funds. Noting the year end forecast changed by $2.186m, representing carry forward from 2013-14 and savings contributed in first quarter review. Forecast Y.T.D Priority Projects Monthly Report November/December 2014 1,417 72 Actual Y.T.D. 571 Variance Y.T.D 846 Budget Y.E. 2,319 Forecast Y.E. 4,505 Variance Y.E. (2,186) Priority Projects Forecast Y.T.D Program 6459. Hastings Promotional Fund (Inc) 6459. Hastings Promotional Fund 6482. Rosebud Activity Centre Struct Plan 6483. Hasting Activity Centre Struct Plan 6496. Business Development Plan for Morni 6502. Community Partnerships 6581. Events (Inc) 6581. Events 6615. Tobacco Education (Inc) 6615. Tobacco Education 6672. Responsible Gaming Strategy 6679. Rosebud Promotional Fund (Inc) 6679. Rosebud Promotional Fund 6680. Mt Eliza Promotional Fund (Inc) 6680. Mt Eliza Promotional Fund 6718. Green Wedge Action Plan 6736. Careers Expo (Inc) 6736. Careers Expo 6766. Geotechnical Investigations 6911. Somerville Community Needs Assessme 6915. Men's Shed 6923. Red Hill Character Assessment and D 6926. Parking Precinct Plans 6927. Port Phillip Urban Design Framework 6930. Stream Watch/Water Watch Program 6938. WOL Comty Arts-Metro Access Project 8603. Local Housing and Settlement Strate Monthly Report November/December 2014 0 0 12,975 16,500 0 0 0 65,000 0 9,446 5,000 0 0 0 0 0 0 0 5,900 4,000 10,000 20,500 18,250 17,350 4,750 2,000 40,100 73 Actual Y.T.D. (52,686) 11,540 0 43,950 0 0 (2,750) 43,545 0 0 1,048 434 65,571 (55,292) 38,096 0 (2,864) 2,630 23,235 0 6,672 0 0 0 852 922 22,263 Variance Y.T.D 52,686 (11,540) 12,975 (27,450) 0 0 2,750 21,455 0 9,446 3,952 (434) (65,571) 55,292 (38,096) 0 2,864 (2,630) (17,335) 4,000 3,328 20,500 18,250 17,350 3,898 1,078 17,837 Budget Y.E. 0 0 0 50,000 0 65,000 0 130,000 0 0 25,000 0 0 0 0 0 0 30,000 0 0 28,000 0 0 0 0 0 0 Forecast Y.E. 0 0 51,900 52,400 11,000 0 0 130,000 (20,000) 28,900 22,500 0 0 0 0 15,400 0 30,000 11,800 8,100 28,000 41,000 36,500 34,700 9,500 3,700 80,200 Variance Y.E. 0 0 (51,900) (2,400) (11,000) 65,000 0 0 20,000 (28,900) 2,500 0 0 0 0 (15,400) 0 0 (11,800) (8,100) 0 (41,000) (36,500) (34,700) (9,500) (3,700) (80,200) Forecast Y.T.D Program 8606. Character Assessment and Design Gui 8641. Road Safety Program Shire Wide (Inc) 8641. Road Safety Program Shire Wide 8642. Sorrento Promotional Fund SCS (Inc) 8642. Sorrento Promotional Fund SCS 8646. Provision - Matching Grant Applicat 8649. Parking Precinct Plan Mornington To 8654. Early Home Learning P'ship (PRC) 8669. Spatial Employment Strategy 8670. Mount Eliza Town Centre Plan 8671. Somerville Town Centre Plan 8674. Biodiversity Action Plan Modelling 8675. Stony Point Coastal Management/Fram 8676. Hastings Port Land Use and Transpor 8678. Township Design Guideline Brochures 8679. Heritage Review - Area 2 8706. Land Management Overlay Implementat 8724. Public Recreation Space Strategy 8726. Dromana Activity Centre Structure P 8731. Local Coastal Vulnerability Assessm 8732. Climate Change Community Engagement (Inc) 8732. Climate Change Community Engagement 8742. Community Engagement Policy & Guide 8751. WOL Rosebud West Family Access Proj 8755. Mornington S/Centre Promotional Sch 8757. WOL Iron Bar Project 8759. WOL Equipment Pilot 8760. Visitor Information Ctre Staffing 8761. M/ton Peninsula Branded Produce Monthly Report November/December 2014 23,700 0 2,600 0 0 75,000 13,000 3,250 20,000 0 1,000 26,000 5,000 0 7,500 30,000 0 0 25,000 5,000 0 7,000 2,500 80,000 0 1,900 7,200 30,000 1,000 74 Actual Y.T.D. 0 (2,000) 9,243 2,550 44,000 0 5,950 0 0 0 0 0 0 0 0 0 0 0 0 0 (138) 6,324 0 0 79,872 0 783 40,000 5,776 Variance Y.T.D 23,700 2,000 (6,643) (2,550) (44,000) 75,000 7,050 3,250 20,000 0 1,000 26,000 5,000 0 7,500 30,000 0 0 25,000 5,000 138 676 2,500 80,000 (79,872) 1,900 6,417 (10,000) (4,776) Budget Y.E. 0 0 0 0 0 150,000 0 0 0 0 0 30,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60,000 0 Forecast Y.E. 47,400 0 5,200 0 0 150,000 26,000 6,500 40,000 30,000 2,000 52,000 10,000 15,000 14,900 104,000 15,000 60,000 50,000 10,000 0 7,000 5,000 161,900 0 1,900 14,400 60,000 40,000 Variance Y.E. (47,400) 0 (5,200) 0 0 0 (26,000) (6,500) (40,000) (30,000) (2,000) (22,000) (10,000) (15,000) (14,900) (104,000) (15,000) (60,000) (50,000) (10,000) 0 (7,000) (5,000) (161,900) 0 (1,900) (14,400) 0 (40,000) Forecast Y.T.D Program 8762. Police Point Houses 8764. Mobility Maps 8767. Review Ticket Machines 8768. Implementation Positive Ageing 8777. Arts & Culture Strat Project 8778. Literacy Villages Project 8780. Local History Digitisation Project 8782. Reconciliation Action Plan 8783. Food Access Plan 8789. Biodiversity Action Plan 8790. Music Bursary Program 8793. Land Subject to Inundations Overlay 8795. Heart of R/Bud Precinct Plan 8799. Ranelagh Conservation Man Plan Impl 8802. External Website 8803. WOL FREEZA (D&A Free Entertainment) (Inc) 8803. WOL FREEZA (D&A Free Entertainment) 8805. Youth Services Replace Internet 8806. Community Grant-ArtsStream 8809. Marketing MPS to Nat Conference 8810. WOL Bushfire Planning Provision 8811. WOL Universal Access Planning & Cha 8818. WDF - Nepean - Cr H.Fraser 8822. WDF - Nepean - Cr T.Rodgers 8825. WOL Koories in the Kitchen 8828. Smart Phone App 8829. WOL Local Landcare Facil Initiative (Inc) 8829. WOL Local Landcare Facil Initiative 8842. Olympic Park Master Plan Monthly Report November/December 2014 33,000 11,500 9,900 43,500 9,834 16,935 14,211 6,075 10,500 30,000 12,500 0 0 0 10,000 0 18,500 3,450 0 14,700 0 6,250 0 0 2,000 9,000 0 5,750 5,000 75 Actual Y.T.D. 32,419 1,271 7,605 40,837 11,245 16,919 20,560 2,045 7,149 0 1,564 0 0 (37) 3,225 (15,031) 20,255 0 0 16,720 0 7,481 (1,500) (1,500) 940 14,000 (35,675) 32,840 780 Variance Y.T.D 581 10,229 2,295 2,663 (1,411) 16 (6,349) 4,030 3,351 30,000 10,936 0 0 37 6,775 15,031 (1,755) 3,450 0 (2,020) 0 (1,231) 1,500 1,500 1,060 (5,000) 35,675 (27,090) 4,220 Budget Y.E. 28,000 37,000 0 87,000 40,000 64,000 40,000 15,000 25,000 0 25,000 0 0 0 0 0 0 0 40,000 50,000 0 0 0 0 0 0 0 0 0 Forecast Y.E. 33,000 33,300 9,900 87,000 44,300 72,400 37,200 17,300 20,000 60,000 25,000 15,000 45,000 18,000 20,900 0 37,000 6,900 0 111,700 6,300 12,500 0 0 3,500 18,000 0 11,500 10,500 Variance Y.E. (5,000) 3,700 (9,900) 0 (4,300) (8,400) 2,800 (2,300) 5,000 (60,000) 0 (15,000) (45,000) (18,000) (20,900) 0 (37,000) (6,900) 40,000 (61,700) (6,300) (12,500) 0 0 (3,500) (18,000) 0 (11,500) (10,500) Forecast Y.T.D Program 8845. WOL History of Rosebud West 8847. Peninsula Planning Statement (Inc) 8847. Peninsula Planning Statement 8848. Port Strategy Implications Study 8849. Tootgarook Wetland Management Plan 8852. Coastal Geotechnical Risk Assessmen 8857. Bushland Contracts Review 8858. Tidy Town Awards - Gala Dinner 8860. Mayoral Sustainability Awards 8863. Climate Adaption Plan Priorities 8867. Ten Year Kindergarten Strategy 8869. Indigenous Artefacts Assessment Pro 8870. Human Rights Arts & Film Festival 8871. Sus Communities Planning Framework 8877. WOL Smalltalk Program (Inc) 8877. WOL Smalltalk Program 8878. WOL Willum Warrain (Inc) 8878. WOL Willum Warrain 8881. Packaged Liquor Licences Research 8882. Road Safety Initiative Research an (Inc) 8882. Road Safety Initiative Research an 8885. Archibald Prize Exhibition (Inc) 8885. Archibald Prize Exhibition 8886. Econ Benefits - Port of Hastings 8892. WOL Metro Access Inclusive Respite 8893. WOL Equine Industry Study 8894. WOL MP Food Industry Reference Grp 8895. WOL Indigenous Health and Wellbeing 8896. WOL - Mornington Beach Water Assess Monthly Report November/December 2014 5,000 (25,000) 25,800 0 44,900 3,000 26,400 3,000 5,000 42,250 2,000 4,300 5,000 3,500 0 2,000 (52,808) 64,000 5,000 0 25,000 0 0 2,200 1,550 1,600 900 7,500 6,350 76 Actual Y.T.D. 0 (15,000) 4,075 0 25,442 3,122 0 2,186 5,000 3,195 1,392 601 208 0 (5,260) 0 (90,616) 75,445 4,904 (500) 17,980 (428,664) 358,394 2,523 913 699 961 4,506 7,210 Variance Y.T.D 5,000 (10,000) 21,725 0 19,458 (122) 26,400 814 0 39,055 608 3,699 4,792 3,500 5,260 2,000 37,808 (11,445) 96 500 7,020 428,664 (358,394) (323) 637 901 (61) 2,994 (860) Budget Y.E. 0 0 0 0 50,000 0 0 0 0 40,000 0 0 10,000 0 0 0 0 0 10,000 0 50,000 0 0 0 0 0 0 0 0 Forecast Y.E. 16,200 (25,000) 51,600 27,800 89,800 40,000 52,800 3,000 5,000 84,500 4,000 14,300 10,000 10,700 0 4,600 (52,808) 180,808 10,000 0 50,000 0 0 2,200 3,100 1,600 13,900 15,000 12,700 Variance Y.E. (16,200) 25,000 (51,600) (27,800) (39,800) (40,000) (52,800) (3,000) (5,000) (44,500) (4,000) (14,300) 0 (10,700) 0 (4,600) 52,808 (180,808) 0 0 0 0 0 (2,200) (3,100) (1,600) (13,900) (15,000) (12,700) Forecast Y.T.D Program 8897. Climate Discussion Presentation 8899. WOL Schoolies Week Project (Inc) 8899. WOL Schoolies Week Project 8900. Oral History Preservation Project 8901. Mornington Structure Plan 8902. Tyabb Airfield Precinct Plan 8903. Heritage Review - Area 3 8905. David Collings LC Business Plan 8906. Slope Stability Inclinometers 8907. Management of Closed Landfills 8908. Green Innovations 8909. Bay Trail Missing Links 8910. Safety Beach CMP - Stage 2 8911. Relief & Recovery Centre Plan 8912. Mton Park Local Area Traffic Strate 8913. Prevention of Violence Charter & AP (Inc) 8913. Prevention of Violence Charter & AP 8914. Place Planning 8915. Let's Talk About Alcohol 8916. Heritage Postcards Travelling Exhib 8917. Emergency Management Training 8918. Community Playgroup Initiative 8919. Southern Peninsula Arts Project 8920. Access & Equity Policy Implementati 8921. ANZAC Commemorative Naming Project 8950. WOL Tourism Brochure Development (Inc) 8950. WOL Tourism Brochure Development 8951. WOL Tourism Public Relations (Inc) 8951. WOL Tourism Public Relations Monthly Report November/December 2014 10,376 0 2,000 5,000 0 7,500 0 4,000 0 0 5,200 24,999 12,500 18,000 9,850 0 2,000 41,500 2,000 1,609 11,000 6,800 30,955 6,000 950 (21,000) 9,000 (4,500) 20,000 77 Actual Y.T.D. 17,691 (11,400) 7,070 0 0 0 0 7,000 0 7,429 5,200 12,029 17,500 2,626 3,283 (1,545) 1,210 46,261 0 209 5,925 0 28,377 3,336 150 (20,830) 20,043 (4,500) 19,207 Variance Y.T.D (7,315) 11,400 (5,070) 5,000 0 7,500 0 (3,000) 0 (7,429) 0 12,970 (5,000) 15,374 6,567 1,545 790 (4,761) 2,000 1,400 5,075 6,800 2,578 2,664 800 (170) (11,043) (0) 793 Budget Y.E. 20,000 0 0 15,000 0 0 30,000 0 0 0 0 50,000 0 30,000 0 0 0 120,000 0 5,000 0 0 0 18,000 0 0 0 0 0 Forecast Y.E. 21,400 0 3,300 15,000 80,000 30,000 0 9,500 20,000 100,000 5,200 50,000 25,000 30,000 19,700 0 4,300 120,000 4,300 5,000 23,000 13,600 75,100 16,200 1,900 (21,000) 21,000 (4,500) 29,500 Variance Y.E. (1,400) 0 (3,300) 0 (80,000) (30,000) 30,000 (9,500) (20,000) (100,000) (5,200) 0 (25,000) 0 (19,700) 0 (4,300) 0 (4,300) 0 (23,000) (13,600) (75,100) 1,800 (1,900) 21,000 (21,000) 4,500 (29,500) Forecast Y.T.D Program 8952. WOL Tourism Exhibitions & TS (Inc) 8952. WOL Tourism Exhibitions & TS 8954. WOL Tourism Design & Artwork (Inc) 8954. WOL Tourism Design & Artwork 8955. WOL Tourism Advertising (Inc) 8955. WOL Tourism Advertising 8956. WOL MPT Industry (Inc) 8956. WOL MPT Industry 8957. WOL Tourism Directional Signage App (Inc) 8957. WOL Tourism Directional Signage App 8958. WOL Tourism Brochure Freight & Dist 8959. WOL Destination Mornington Peninsul (Inc) 8959. WOL Destination Mornington Peninsul 8960. Low Income Energy Efficiency Prgm (Inc) 8960. Low Income Energy Efficiency Prgm 8961. WOL Adopt A Hot Spot - Hastings (Inc) 8961. WOL Adopt A Hot Spot - Hastings 8962. WOL Walk To School 8964. WOL Smoking Bans Childrens Playgrou 8965. WOL Are You Ready? (Inc) 8965. WOL Are You Ready? 8966. WOL EPA Research Dumping (Inc) 8966. WOL EPA Research Dumping 8967. Forshore Community Engagement Revie 8968. Conservation Management Plans 8969. Road Asset Improvement Project 8970. Sustainability Festival at Briars 8971. F/shore Srvc & All Abilities Access 8972. Rye Foreshore Landscape Plan Monthly Report November/December 2014 (3,000) 14,720 (30,000) 27,000 0 46,000 (337,000) 45,000 0 8,000 8,000 0 50,000 (24,000) 16,000 0 2,900 6,000 2,750 (110,000) 133,750 0 8,000 0 10,000 0 30,000 0 20,000 78 Actual Y.T.D. (3,819) 5,863 (57,945) 33,026 (8,309) 54,071 (315,158) 42,874 (125) 0 15,546 (161,750) 132,526 (22,572) 22,988 3,984 1,848 4,713 0 (110,000) 136,000 (7,149) 830 0 0 0 0 0 3,250 Variance Y.T.D 819 8,857 27,945 (6,026) 8,309 (8,071) (21,842) 2,126 125 8,000 (7,546) 161,750 (82,526) (1,428) (6,988) (3,984) 1,052 1,287 2,750 0 (2,250) 7,149 7,170 0 10,000 0 30,000 0 16,750 Budget Y.E. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30,000 20,000 65,000 60,000 40,000 40,000 Forecast Y.E. (3,000) 28,000 (30,000) 69,000 0 92,000 (337,000) 339,005 0 16,000 16,045 0 52,000 (30,000) 30,000 0 5,800 12,100 5,500 (110,000) 133,750 0 16,000 30,000 20,000 0 60,000 40,000 40,000 Variance Y.E. 3,000 (28,000) 30,000 (69,000) 0 (92,000) 337,000 (339,005) 0 (16,000) (16,045) 0 (52,000) 30,000 (30,000) 0 (5,800) (12,100) (5,500) 110,000 (133,750) 0 (16,000) 0 0 65,000 0 0 0 Forecast Y.T.D Program 8973. Sthn Peninsula Arts Project 8974. C/Parks & Movable Dwellings Complia 8975. Training for CTC Groups & Committee 8976. L2P Vehicle for Briars Ward 8977. Community Harms Prevention Strategy 8978. Human Services Integrated Planning 8979. Aboriginal Cultural Heritage Dating 8980. Development of Events Strategy 8981. Chisholm SMP Connect Contribution 8982. Agricultural Land Use Fact Sheets 8983. Arts & Culture Strategy Facilitator 8984. Mobile Visitor Information Vehicle 8985. Intl. Festival of Tennis Tournament 8986. Peninsula Explorer Bus 8987. Infrastructure Strategy OHS Plan 8988. Community Capital Projects Assistan 8989. Election Red Hill Ward (Inc) 8989. Election Red Hill Ward 8990. Place Making Grants 8991. WOL Villages of the Mornington Peni (Inc) 8991. WOL Villages of the Mornington Peni 8992. WOL - A Place to Call Home (Inc) 8993. Tjaegan Wilson-Blow Reconcil Award (Inc) Monthly Report November/December 2014 79 Actual Y.T.D. Variance Y.T.D Budget Y.E. 15,000 10,000 5,000 5,000 11,875 5,000 6,000 5,000 12,500 15,000 8,457 10,000 0 25,000 12,500 12,500 0 43,462 0 (5,000) 10,000 0 0 0 0 0 0 1,061 0 0 0 25,000 1,014 2,144 0 0 22,727 0 3,563 (2,574) 86,528 11,755 (5,161) 7,189 (20,000) (1,856) 15,000 10,000 5,000 5,000 10,814 5,000 6,000 5,000 (12,500) 13,986 6,313 10,000 0 2,273 12,500 8,937 2,574 (43,066) (11,755) 161 2,811 20,000 1,856 60,000 40,000 10,000 10,000 25,000 10,000 12,000 10,000 25,000 30,000 43,000 20,000 30,000 25,000 25,000 25,000 0 86,923 110,000 0 0 0 0 1,416,621 570,553 846,068 2,318,923 Forecast Y.E. 0 40,000 10,000 10,000 22,500 10,000 12,000 10,000 25,000 30,000 40,000 20,000 30,000 25,000 25,000 25,000 0 86,923 0 (5,000) 10,000 0 0 Variance Y.E. 60,000 0 0 0 2,500 0 0 0 0 0 3,000 0 0 0 0 0 0 0 110,000 5,000 (10,000) 0 0 4,504,923 (2,186,000) ASSET CONVERSION PROGRAM 2014/2015 Approved Asset Sales Property 14a Robinson Place Portsea 275 Forest Drive Mount Martha- easement 1 Kerry Avenue Mount Martha -road reserve Total Monthly Report November/December 2014 Type of Sale Status Date of Sale Land Road Road Complete Complete Complete 05.11.2014 31.10.2014 30.12.2014 Net Sale Proceeds $'000 462 6 5 473 80 STANDARD FINANCIAL STATEMENTS INCOME STATEMENT COMMENTARY The year to date favourable variance is due to a number of variances across the organisation. The tables below list some larger items (generally over/under $50k) that have contributed to the year to date variances. REVENUE Rates and Charges • Year to date variance is favourable, by $883k primarily due to: Item Supplementary Valuations Green Waste Opt In Service YTD Varianc e Fav / Unf + $808k + $75k Fav Fav Reason Additional supplementary rates received. Additional bins supplied. Statutory Fees • Year to date variance is favourable, by $313k primarily due to: Item Shire Rangers - Infringements Environmental Health - Permits & Licences Building Surveyor - Permits & Licences Fav / Unf YTD Variance + $105k Fav + $91k Fav + $108k Fav Monthly Report November/December 2014 Reason Increased fines issued due to improved processes. Forecast to be adjusted at Mid Year Review. Increased fines issued due to improved processes. Forecast to be adjusted at Mid Year Review. Increased fines issued due to improved processes. Forecast to be adjusted at Mid Year Review. 81 User Fees • Year to date variance is favourable, by $2,508k primarily due to: Fav / Unf YTD Variance Item Parking & Launching Annual Permits Private Building W orks Waste Disposal Tipping Reason + $113k Fav Increase in boat ramp permits. + $50k + $427k Fav Fav Increased number of fees and user charges. Additional incomes received from tipping fees to be reviewed mid year. Cyclcial in nature. Pelican Park - $52k Unf Planning Compliance Plant Contributions + $68k - $34k Fav Unf Archibald Prize Exhibition + $429k Fav Destination Mornington Peninsula + $154k Fav Reduced memberships due to local competition. Legal recovery received - timing Reduced contributions received for plant operations Income from exhibition to be offset against related capital works - (net income to be transferred to capital) Income from advertising sales not forecast. + $1.652m Fav Property Rental Income - $48k Unf Special Charge Scheme: McCloud Group charge to residents (forecast income mid year review) Property income - timing/phasing School Holiday Program - $41k Unf School Holiday - timing/phasing Special Charge Schemes - $202k Unf Projects income remains outstanding on Baden Powell, Old Mton Rd, Boundary Rd and Elizabeth St - invoicing yet to occur Special Charge Schemes Contributions • Year to date variance is favourable, by $419k primarily due to: Item Fav / Unf YTD Variance Developers' Contributions + $97k Fav Implementation of Recreation Master Plans - Bunguyan Reserve Civic Reserve + $126k Fav + $76k Fav Bicycle Strategy + $40k Fav Prority Projects + $109k Fav Monthly Report November/December 2014 Reason Contributions received towards recreation land development. Developer contributions received/timing difference of forecast budget - on target Additional funding received Table Tennis Australia - Forecast additional expenditure mid year review Developer contributions towards path strategy works - timing Incomes received and not budgeted - forecast mid year 82 Contributed Assets • Year to date variance is unfavourable, by $1,099m primarily due to: Item Recreation Land Contribution Contributions : Roads/Infrastructure Assets Fav / Unf YTD Variance - $1.047m Unf - $52k Unf Reason Less contributions from subdivisions than expected - timing Timing differnence - no year end impact Grants - Recurrent • Year to date variance is favourable by $555k, primarily due to: Item Fav / Unf YTD Variance School Crossing Supervisors' subsidy CCTV Mornington - $117k Unf + $200k Fav Asset Identification Program Priority Project + 50k + 130k Fav Fav Reason Delay in receiving cash due to change of state government. Federal funding Mton - CCTV and Streetlighting program New funding received for project. Additional project funding towards an assortment of programs including Local Landcare Program and W illum W arrain Grants Capital • Year to date variance is favourable by $238k, primarily due to: Item Fav / Unf YTD Variance Roads to Recovery 3 Program - $529k Unf Mt Martha Life Saving Club + $450k Fav + $60k Fav + 64k Fav + $120k Fav + $23k + $21k Fav Fav Tyabb FNC Netball Clubs Moorooduc Primary School Balnarring Recreation Reserve Boneo Primary Schoo; Premiers Reading Program Monthly Report November/December 2014 Reason Timing difference between the receipt of funding and budgets phasing Timing difference between the receipt of funding and budgets phasing Funding received - Country and Football Program Funding received - Linking Melbourne Authority - traffic man/works Funded Received - Department of Transport and Planning Claim 1 - additional funding received Funded Received - TAC - funded path works Funded - Reading books for early learning/preschool age children 83 Interest • Year to date variance is unfavourable by $241k, primarily due to: Item Investment Interest Income Fav / Unf YTD Variance - $156k Unf Rates Interest Income - $59k Unf Special Charge Scheme - $29k Unf Reason Timing of investment interest received phasing to be adjusted at Mid Year Review. Corrections - Debtor/accounting entries timing. Corrections - Debtor raisings to be completed January, no bottom line effect. EXPENDITURE Salary • Year to date variance is unfavourable by $36k, primarily due to: Item Fav / Unf YTD Variance Reason Chief Executive - $89k Unf Overlap of CEO and Director for replacement. Customer Service - $73k Unf Employee Overheads Oncosts Employee Overheads Superannuation Employee Overheads Defined Benefits Statutory Planning - Normal Wages Statutory Planning - Casual Wages Shire Rangers + $417k Fav Additional backfill for long term sick leave/ and additional hours provided Timing difference. + $424k Fav Timing difference. + $94k Fav Timing difference. + $78k Fav Vacant positions. - $83k Unf Use of casuals to backfill vacant positions. + $54k Fav Strategic Planning Infrastructure Director Asset Management + $54k - $64k - $76k Fav Unf Unf Project Management Construction Project Management + $54k Fav - $83k Unf HACC General - Normal Wages HACC General - Travel Time - $136k Unf - $50k Unf Recreation Facilities Development - Employee Capital Recovery Capital Recovery - (transfer labour cost to capital/priority works) - $77k Unf Delay in recuitment/offset additional casual salary expenditure. Vacant positions. Transition of directorship Reallocation of personal - revised mid year/reported January 2015 Delayed recruitment - offseting additional casual labour employed Delayed recruitment - offseting additional casual labour employed More service delivery than budgeted due to demand. More service delivery than budgeted due to demand. Accounting entry to transfer cost in capital works projects. - timing - $385k Unf Monthly Report November/December 2014 Timing difference - Transfer of cost to capital works program/priority works program - no bottom line effect year end 84 Materials and Services • Year to date variance is favourable by $2,687k, primarily due to: Item Fav / Unf YTD Variance Reason IT Operations - Maintenance Computer Attraction and Retention $126k Unf Timing of expenditure - reprofile budget $83k Fav Timing of expenditure - reprofile budget Rates Management - Banks Charges Rates Management - Debt Property Planning Legal Fees $63k Fav Timing of expenditure - reprofile budget $107k $134k Fav Fav Timing of expenditure - reprofile budget Timing of expenditure - reprofile budget $150k $72k Fav Fav Timing of expenditure - reprofile budget Timing of expenditure - reprofile budget $45k $40k $37k $38k $40k $58k $30k $1,437k Fav Fav Fav Fav Fav Fav Fav Fav Timing of expenditure - reprofile budget Timing of expenditure - reprofile budget Timing of expenditure - reprofile budget Timing of expenditure - reprofile budget Timing of expenditure - reprofile budget Timing of expenditure - reprofile budget Timing of expenditure - reprofile budget Assorted minor works programs including Living Rivers, Intergrated Catchment, Strategic Plans, Martha Cove W orks - Review phasing mid year/no year end impact anticipated Street Lighting Property Strategy Fire Services Waste Disposal Mulching Governance - Photo Copier Governance - Subscriptions Plant and equipment Foreshore Utilities W ater Passive Recreaton W ater Foreshore camping utilities Priority W orks - Assorted Program Finance Costs • Year to date variance is favourable by $516k, primarily due to: Item Loan interest Fav / Unf YTD Variance + $515k Monthly Report November/December 2014 Fav Reason Accrued loan interest - year end accounting adjustments 2013-14 - timing. 85 Other Expenses • Year to date variance is unfavourable by $82k, primarily due to: Item YTD Fav / Unf Reason Variance Animal Registration Contributions Community Grants SES Community Renewal Program - $28k Unf Timing of registration payments - budget profile - $55k - $178k Unf Unf Timing of payments Funding received late 2013-14 Family Support Services subsidy paid Strategic Planning - Statutory + $20k Fav Phasing - issue, no bottom line effect + 50k Fav Phasing - issue, no bottom line effect Plant and Equipment Insurance Placemaking Grants Paid + 29k Fav Phasing - issue, no bottom line effect + 27k Fav Phasing - issue, no bottom line effect Monthly Report November/December 2014 86 Standard Statement of Financial Performance (Income Statement) For the period ending December 2014 Forecast Month $'000 Actual Month $'000 Variance Forecast Month Y.T.D $'000 $'000 Actual Y.T.D. $'000 Variance Y.T.D $'000 Budget Y.E. $'000 Forecast Y.E. $'000 Variance Y.E. $'000 Revenue from ordinary activities Rates and Charges Statutory Fees and Fines User Fees Contributions Contributed Assets Grants - Recurrent Grants - Capital Interest Other Income 72 440 2,283 534 17 905 529 59 0 123 506 2,477 814 64 1,140 515 38 0 51 66 193 279 48 235 (14) (21) 0 139,809 2,231 13,075 2,053 1,200 10,510 529 340 0 140,692 2,545 15,583 2,473 101 11,065 767 99 0 883 313 2,508 419 (1,099) 555 238 (241) 0 140,124 4,088 23,639 2,265 6,500 19,052 4,758 1,525 0 140,239 4,188 25,022 3,622 6,500 19,545 6,215 1,525 0 115 100 1,383 1,357 0 494 1,457 0 0 Total revenues 4,838 5,675 (837) 169,748 173,326 (3,578) 201,951 206,857 (4,906) 4,684 9,369 2,083 186 363 0 4,156 10,338 2,083 331 360 0 529 (969) 0 (144) 3 0 31,814 42,917 12,495 1,119 2,631 0 31,851 40,230 12,495 604 2,713 119 (36) 2,687 0 516 (82) (119) 63,756 88,384 25,000 2,239 4,865 0 63,806 93,220 25,000 2,239 5,026 0 (51) (4,836) 0 0 (161) 0 16,684 17,266 (582) 90,977 88,011 2,966 184,244 189,291 (5,048) 0 (0) (0) 0 15 15 0 0 0 11,846 11,591 255 78,771 85,329 6,558 17,707 17,566 (142) (11,846) (11,591) 255 78,771 85,329 6,558 17,707 17,566 (142) Expenses from ordinary activities Employee Costs Materials and Services Depreciation and Amortisation Finance Costs Other Expenses Asset Revaluations and Adjustments Total expenses Net Gain/(Loss) on Sale/Disp Assets Surplus/(deficit) for the year Other comprehensive income Other Total comprehensive income for the year Monthly Report November/December 2014 87 Income Statement (Net Cost) For the period ending December 2014 Unit Forecast Month $'000 Actual Month $'000 Variance Month $'000 Forecast Y.T.D $'000 Actual Y.T.D. $'000 Variance Y.T.D $'000 Budget Y.E. $'000 Forecast Y.E. $'000 Variance Y.E. $'000 Recurrent Strategic Planning (150) (155) (5) (952) (847) 105 (1,920) (1,911) 9 Statutory Planning (304) (220) 84 (2,178) (1,988) 190 (4,145) (4,108) 36 EPACS (182) (413) (231) (2,352) (2,097) 256 (5,339) (5,259) 80 Economic Development (128) (141) (13) (817) (807) 10 (1,690) (1,674) 16 (37) (29) 8 (237) (225) 12 (471) (471) 0 (188) (115) 73 (1,239) (1,294) (55) (2,470) (2,527) (57) (3,922) (6,046) (2,124) (19,915) (19,757) 158 (42,834) (42,821) 12 (91) (146) (55) (677) (676) 1 (1,374) (1,365) 9 (1,625) (1,407) 218 (3,737) (3,078) 658 (14,862) (14,854) 8 (44) (66) (22) (285) (355) (70) (566) (564) 2 Child Youth and Family Care (333) (346) (13) (2,977) (2,867) 110 (5,358) (5,478) (120) Aged and Disability Services (397) (415) (19) (3,134) (3,369) (235) (5,562) (5,562) (0) Recreation and Leisure (418) (322) 96 (1,692) (1,362) 330 (5,439) (5,420) 19 Libraries Arts and Culture (501) (467) 34 (2,298) (2,225) 73 (5,548) (5,588) (40) Director Sustainable Communities (119) (139) (20) (727) (972) (245) (1,529) (1,550) (22) Governance and Corporate Support (548) (514) 34 (3,397) (3,402) (5) (5,353) (5,314) 38 552 548 (4) 3,052 3,144 92 4,814 4,838 24 (211) (260) (49) (1,671) (1,795) (124) (2,856) (2,784) 73 Finance (99) 671 771 (757) 157 914 (2,440) (2,432) 8 Director Sustainable Organisation (41) (38) 3 (269) (270) (1) (533) (532) 1 Communications (55) (162) (107) (526) (612) (86) (1,154) (1,148) 6 (155) (160) (5) (599) (511) 88 (1,766) (1,710) 55 Corporate Planning & Projects (45) (18) 27 (323) (333) (10) (657) (637) 21 The CEO's Office (45) (46) (1) (294) (371) (77) (587) (587) 0 (9,086 ) (10,407 ) (1,321) (48,000 ) (45,911 ) 2,089 (109,637 ) (109,460 ) 178 72 99 27 137,169 137,977 808 137,599 137,599 0 0 0 0 3,258 3,279 21 6,516 6,516 0 (2,083) (2,083) 0 (12,495) (12,495) 0 (25,000) (25,000) 0 (500) Director Sustainable Environment Infrastructure Strategy Infrastructure Maintenance Infrastructure Project Management Renewable Resources Director Sustainable Infrastructure Property and Valuation Information Services Team Support and Development Unit Budgets Rates Grants Commission Depreciation Efficiency Savings Interest (Net) Recurrent Surplus / (Deficit) 0 0 0 0 0 0 500 0 (127) (293) (165) (779) (504) 275 (714) (714) 0 (11,224 ) (12,683 ) (1,459) 79,153 82,346 3,193 9,265 8,942 (322) 529 515 (14) 529 767 238 4,758 6,215 1,457 0 0 0 0 1,450 1,450 0 1,270 1,270 522 811 289 2,028 2,332 304 2,263 3,590 1,327 0 (0) (0) 0 15 15 0 0 0 (699) (472) 227 (1,417) (571) 846 (2,319) (4,505) (2,186) (1,688) Non-Recurrent Capital Grants Special Charge Schemes Contributions Profit/(Loss) on Sale of Assets Priority Projects (Net) Priority Works (Net) (1,264) (100) 1,164 (2,997) (1,244) 1,753 (3,034) (4,721) Asset Revaluations and Adjustments 0 0 0 0 (119) (119) 0 0 0 Other Income 0 0 0 0 0 0 0 0 0 (913 ) 753 (1,666 ) (1,857 ) 2,630 (4,487 ) 1,668 1,848 (181 ) (12,137 ) (11,930 ) 207 77,296 84,976 7,680 10,932 10,791 (142) Non-Recurrent Surplus / (Deficit) Surplus / (Deficit) before Adjustments New Subdivisions Transfers From / To Reserves (Net) Surplus / (Deficit) 17 64 48 1,200 101 (1,099) 6,500 6,500 0 275 275 0 275 252 23 275 275 0 (11,845 ) (11,591 ) 254 78,771 85,329 6,558 17,707 17,566 (142) Priority Projects (Net) and Priority Works (Net) include internal expenditure. Monthly Report November/December 2014 88 C ASH FLOW STATEMENT COMMENTARY In summary, the total cash used on a year to date basis for Operating Activities is $7.24M favourable to forecast. This is a result of favourable variations in net cash flows from operating activities, due to income received earlier than anticipated and lower expenditure payments to date than anticipated. Further detail can be found in the Standard Statement of Financial Performance Section (operating result) of this report. A number of variances between Year to Date forecast and actual have arisen as a result of: General Rates Year to date receipts of General Rates are $883K more than year to date target, primarily due to rate revenue being received earlier than anticipated. User Charges and Other Year to date user charges are favourable to forecast with a $2.82M variance primarily due to the timing of income received. Cash Contributions Year to date contributions is favourable to forecast with a $420K variance, primarily due to additional funding received for priority projects. Government Grants Year to date Government Grants is favourable to budget with a $793K variance due to additional grant funding received for funded projects. Interest on Receivables & Investments Year to date interest is unfavourable to forecast with a $241K variance due to much lower than anticipated cash investments held year to date compared to the equivalent period last year. Employee Costs Actual payments made to employees are $37K unfavourable to forecast. Materials and Contracts Payments to suppliers are less than anticipated by $2.69M mainly due to delays in priority works and priority projects programs. Other Expenses Payments to suppliers are more than anticipated by $82K. CASH FLOWS FROM INVESTING ACTIVITIES In summary, total cash used on a year to date basis for investing activities (purchase & sale of assets) is unfavourable $5M to forecast. Expenditure on some capital works projects has occurred as anticipated at this point in time. CASH FLOWS FROM FINANCING ACTIVITIES Year to date finance costs are $516K favourable to forecast. This is attributed to phasing of the budget. For the period ending 31st December 2014, the reported cash/investments balance was $12.86M. Refer to the Balance Sheet Section Commentary of this report for more detail. It is anticipated that at year end cash and investments will total $22.98m. Monthly Report November/December 2014 89 Standard Statement of Cash Flows for the period ending 31 December 2014 Forecast Dec $'000 Actual Dec $'000 Variance Dec $'000 Forecast Y.T.D. $'000 Actual Y.T.D. $'000 Variance Y.T.D. $'000 Budget Y.E. $'000 Forecast Y.E. $'000 Variance Y.E. $'000 140,124 27,727 140,124 27,727 - 2,265 23,809 1,525 8,200 203,650 2,265 23,809 1,525 8,200 203,650 - 63,756 96,584 4,865 165,205 - Cash Flows from Operating Activities Receipts (inclusive of GST, wherever applicable) General Rates User Charges and Other 11,183 2,842 11,234 3,101 51 259 52,167 16,779 53,050 19,600 Cash Contributions Government Grants Interest Net GST Refund 534 821 43 2,556 17,979 814 1,041 21 2,556 18,767 280 220 (22) 788 2,053 12,200 406 5,364 88,969 2,473 12,993 165 5,364 93,645 Payments(inclusive of GST, wherever applicable) Employee Costs 4,210 Materials and Contracts 3,729 Other Expenses 357 8,296 3,682 4,699 355 8,736 528 (970) 2 (440) 32,965 55,525 2,614 91,104 33,002 52,839 2,696 88,537 (37) 2,686 (82) 2,567 63,756 96,584 4,865 165,205 9,683 10,031 348 (2,135) 5,108 7,243 38,445 38,445 - 2,197 4,468 267 40 6,972 1,221 2,503 189 40 3,953 976 1,965 78 3,019 5,496 11,106 922 (19) 17,505 6,614 10,531 857 (19) 17,983 (1,118) 575 65 (478) 33,967 - 33,967 - - Net Cash Inflows / (Outflows) from Operating Activities 883 2,821 420 793 (241) 4,676 Cash Flows from Investing Activities Payments for Land and Buildings Infrastructure Assets Plant, Furniture and Equipment Sundry Payables Proceeds from Sale of Land and Buildings Sale of Plant, Furniture and Equipment Sundry Receivables Net Cash Inflows / (Outflows) from Investing Activities (4,626) - 399 (4,626) 399 5,025 5,025 (4,609) - 883 29 (4,609) 912 5,492 29 5,521 33,967 33,967 - - - - - (11,598) (3,554) 8,044 (22,114) (17,071) 5,043 (33,967) (33,967) - Finance Costs (187) (330) 143 (1,581) (1,065) 516 (2,239) (2,239) - Proceeds from Borrowings Repayment of Borrowings Repayment of Finance Leases Movement in Deposits and Bonds (264) (213) (264) (213) - (2,372) (73) (365) (2,372) (73) (365) - 2,000 (5,111) (75) - 2,000 (5,111) (75) - - (664) (807) (143) (4,391) (3,875) 516 (5,425) (5,425) - (28,640) (15,838) 12,802 (947) (947) - 28,698 28,698 - 23,927 23,927 - 58 12,860 22,980 22,980 Cash Flows from Financing Activities Net Cash Inflows / (Outflows) from Financing Activities Net Increase / (Decrease) in Cash Held (2,579) 5,670 8,249 Cash at Beginning of Period Cash at End of Period 12,802 Monthly Report November/December 2014 90 - BALANCE SHEET COMMENTARY Current Assets As at the end of December the balance of current assets was $138M including: • Cash/Investments $12.86M and includes: Item Balance Cash Investments $3.54M $9.32M Reason Cash $3.52M, Petty Cash $17K General $8.8M, Hillview $477K Total Cash/Investments has increased by $5.6M during December. • Receivables $117M and includes: Item Balance Rates Debtors Other Debtors $118M $3.05M Special Charge Schemes Sundry Debtors $1.39M $2.89M GST Land Sales $395K $4.63M Reason Rates Perin Court $977k less provision for doubtful debts $757K, and Pensioner Rates $2.51M Various Special Charge Schemes. Grants & Subsidies $1.11M, Tipping $474K, garbage bins $75K and Infrastructure Maintenance $113K. Net Goods & Services Tax refund. Total Receivables have decreased by $10.4M during December. • Other Current Assets $8.04M and includes: Item Balance Inventories $130K Other Assets Held for Sale $979K $6.93M Reason Delivered Meals $28K, Nursery $75K, Golf Course $27K. Accrued Income Properties ready for sale Total other assets have increased by $425K during December. Non-Current Assets As at the end of December the balance of Non-Current Assets was $1,988M Item Investments - Non-Cash Receivables Land and Buildings Plant Furniture and Equipment Reason $8K Shares in MAPS $2K and Rye Community Bank $5.5K Special Charge Schemes. Land and Buildings. Plant, furniture, library bookstock, Artworks and IT equipment. Roads, Drains and Other Infrastructure Assets. $535K $924M $6.52M Infrastructure $1,044M Intangibles Monthly Report November/December 2014 Balance $1.3M 91 Information Technology. Current Liabilities As at the end of December the balance of current liabilities was $40M including: Item Balance Payables $25.6M Interest - Bearing Liabilities Provisions $2.75M $11.7M Reason Employee Costs $870K, Creditors Control $7.14M, Fire Services Levy $17M, Deposits and Bonds $2.96M Borrowings Loans $2.75M Long Service Leave $6.87M, Annual Leave $4.41M and other Provisions $391K. Non-Current Liabilities As at the end of December the balance of non-current liabilities was $37.1M. This amount represents Council’s long term liabilities including borrowings leases and employee provisions that are not required to be repaid during 2014/2015. Item Balance Interest Bearing Liabilities Provisions $32.3M $4.79M Reason Borrowings $32.3M Long Service Leave $2.56M, Cell Capping $1.68M and Net Gain $550K Equity As at the end of December the balance of equity was $2.049M. This amount is represented by: Item Balance Accumulated Surplus Asset Revaluation Reserve Other Reserves Monthly Report November/December 2014 $995M $1,065M $861K 92 Reason Accumulated Surplus. Asset Revaluation Reserve. Sustainable Energy Fund $386K Recreation Land Reserve $350K and Municipal Emergency Fund $400K Standard Statement of Financial Position (Balance Sheet) as at 31st December 2014 as at Jun 12 $ '000 as at Jun 13 $ '000 as at Jun 14 $ '000 as at Nov 14 $ '000 as at Dec 14 $ '000 Month Movement $'000 Budget Y.E. $'000 Forecast Y.E. $'000 Current Assets Cash and Cash Equivalents 30,242 33,305 28,698 7,190 12,860 22,980 22,980 Trade and Other Receivables 11,824 12,840 14,157 127,919 117,480 10,439 11,038 11,038 146 122 130 130 130 - 162 162 1,348 1,348 Inventories (5,670) Other 1,684 1,399 1,565 555 980 Assets Held for sale 7,871 11,121 6,937 6,937 6,937 - - - 51,767 58,787 51,487 142,731 138,387 4,344 35,528 35,528 8 8 8 8 8 - 8 8 Total Current Assets (425) Non-Current Assets Other Financial Assets Receivables 1,318 887 535 535 535 - 970 970 937,693 945,422 926,162 930,105 926,548 3,557 981,562 981,562 7,395 7,086 6,547 6,581 6,618 (37) 7,320 7,320 974,320 1,021,850 1,050,288 1,052,793 1,053,199 (406) 1,034,690 1,034,690 1,263 1,333 1,352 1,349 1,347 2 1,200 1,200 Total Non-Current Assets 1,921,997 1,976,586 1,984,892 1,991,371 1,988,255 3,116 2,025,750 2,025,750 Total Assets 1,973,764 2,035,373 2,036,379 2,134,102 2,126,642 7,460 2,061,278 2,061,278 13,884 22,735 21,685 21,340 25,611 (4,271) 5,207 16,339 5,194 3,012 2,748 Provisions 11,527 12,469 12,408 11,699 Total Current Liabilities 30,618 51,543 39,287 36,051 42,991 26,060 32,348 32,348 3,092 3,599 3,748 4,645 Total Non-Current Liabilities 46,083 29,659 36,096 Total Liabilities 76,701 81,202 856,720 Property Plant, Furniture and Equipment Infrastructure Intangibles Current Liabilities Payables 16,114 16,114 264 4,969 4,969 11,672 27 12,322 12,322 40,031 (3,980) 33,405 33,405 32,348 - 29,384 29,384 4,796 (151) 2,882 2,882 36,993 37,144 (151) 32,266 32,266 75,383 73,044 77,175 (4,131) 65,671 65,671 874,333 895,163 995,249 983,383 11,866 915,769 915,769 1,038,830 1,079,087 1,064,949 1,064,948 1,064,948 - 1,079,838 1,079,838 1,513 751 884 1,136 (275) - - Total Equity 1,897,063 1,954,171 1,960,996 2,061,058 2,049,467 11,591 1,995,607 1,995,607 Total Liabilites and Equity 1,973,764 2,035,373 2,036,379 2,134,102 2,126,642 7,460 2,061,278 2,061,278 Interest-bearing Liabilities Non-Current Liabilities Interest-bearing Liabilities Provisions Equity Accumulated Surplus Asset Revaluation Reserve Other Reserves Monthly Report November/December 2014 93 861 Standard Statement of Capital Works For the period ending December 2014 Forecast Month $'000 Actual Month $'000 Variance Forecast Month Y.T.D $'000 $'000 Actual Y.T.D. $'000 Variance Y.T.D $'000 Budget Y.E. $'000 Forecast Variance Y.E. Y.E. $'000 $'000 Capital Works Area Land Buildings Infrastructure - Roads Infrastructure - Drainage Infrastructure - Other Plant Furniture and Equipment Information Technology Artworks Library Bookstock 0 2,211 2,873 688 907 21 49 0 3 193 4 1,230 1,832 385 286 38 25 0 41 86 (4) 981 1,040 303 621 (18) 24 0 (37) 107 0 5,760 6,816 2,466 1,824 75 98 17 7 720 92 6,786 6,644 2,434 1,453 76 77 39 38 622 (92) (1,026) 172 32 371 (1) 20 (22) (32) 98 350 10,128 12,872 3,760 3,845 268 195 0 13 1,300 350 14,575 21,110 4,707 5,970 474 273 17 13 1,504 0 (4,447) (8,237) (947) (2,125) (206) (78) (17) 0 (204) Total Capital Works 6,944 3,927 3,018 17,782 18,261 (479) 32,731 48,993 (16,262) 230 2,914 691 3,110 104 1,625 282 1,916 125 1,289 409 1,194 737 6,220 1,750 9,075 647 5,198 1,552 10,864 90 1,021 198 (1,788) 1,076 11,375 4,223 16,057 3,076 17,050 5,758 23,110 (1,999) (5,675) (1,535) (7,053) 6,944 3,927 3,018 17,782 18,261 (479) 32,731 48,993 (16,262) Types of Capital Works Expansion Upgrade New Renewal Total Capital Works Monthly Report November/December 2014 94 CORPORATE PERFORMANCE STATEMENT COMMENTARY The Corporate Performance Statement is a hybrid of the Standard Statement of Financial Performance and Standard Statement of Cash Flows. This statement is designed to assist in understanding the cash implications of budget decisions, and therefore, excludes non-cash items such as depreciation and income by way of new subdivision assets passed to Council. We stress that this reporting is our own ‘layman’s’ approach and is designed to assist those who may not totally understand accounting practice to come to generally understand our budget. For those more financially inclined, the budget according to Australian Accounting Standards is also included in this report. The results of the normal operations of Council are shown as Funds Available. The second quarter review is now being completed, and will be reported in January. As can be seen on the Corporate Performance Statement following, Council has a $6,452m favourable result to budget as a result of normal operations. This is primarily due to timing of expenditure across the Groups Capital expenditure is $479k unfavourable to date as projects are deferred or payments not made in line with budget phasing. As is usually the case at this time of the year, we are working through a range of variations in both revenue and expenses across unit budgets. It is proposed to present the formal mid year budget review to Council in January, and as such, no budget variations are reported in this report. Any variations will be managed within our broader financial framework, ensuring again an underlying surplus at year end, as is our long-established practice Monthly Report November/December 2014 95 Corporate Performance Statement For the period ending December 2014 Forecast Month $'000 Income Rates Grants and Subsidies User Charges Grants Commission Interest Income Other Income Expenses Sustainable Environment Sustainable Infrastructure Sustainable Communities Sustainable Organisation The CEO's Office Efficiency Savings Interest Expense Funds available Actual Month $'000 Variance Month $'000 Forecast Y.T.D $'000 Actual Y.T.D. $'000 Variance Y.T.D $'000 Budget Y.E. $'000 Forecast Y.E. $'000 Variance Y.E. $'000 72 893 2,723 0 59 0 123 1,010 2,972 0 38 0 51 117 248 0 (21) 0 139,809 6,784 15,187 3,258 340 0 140,692 6,769 15,965 3,279 99 0 883 (15) 778 21 (241) 0 140,124 12,535 27,730 6,516 1,525 0 140,239 12,541 27,822 6,516 1,525 0 115 6 93 0 0 0 3,747 4,142 395 165,379 166,805 1,426 188,431 188,644 213 1,301 6,630 2,749 1,637 385 0 186 1,408 9,025 2,793 724 470 0 331 (107) (2,395) (44) 913 (85) 0 (144) 8,648 32,213 18,925 10,568 2,258 0 1,119 8,455 32,311 19,020 9,274 2,374 0 604 193 (98) (95) 1,294 (116) 0 516 16,952 71,550 37,066 21,673 5,186 (500) 2,239 16,902 71,695 37,131 21,630 5,105 0 2,239 50 (145) (66) 44 82 (500) 0 12,889 14,752 (1,863) 73,731 72,038 1,692 154,166 154,702 (536) (9,142) (10,610) (1,468) 91,648 94,766 3,119 34,265 33,942 (322) 167 (426) (6) 0 (699) (1,264) (6,944) 529 522 0 0 0 0 (263) 0 0 (472) (91) (3,927) 515 811 0 0 0 (167) 162 6 0 227 1,174 3,018 (14) 289 0 0 0 1,000 (2,554) (37) 0 (1,417) (2,997) (17,782) 529 2,028 0 0 0 0 (2,372) (73) 0 (574) (1,190) (18,261) 767 2,332 1,450 0 23 (1,000) 183 (36) 0 843 1,808 (480) 238 304 1,450 0 23 2,000 (5,111) (75) 0 (2,319) (3,034) (32,731) 4,758 2,263 0 0 0 2,000 (5,111) (75) 0 (4,505) (4,721) (48,993) 6,215 3,590 1,270 0 311 0 0 0 0 (2,186) (1,688) (16,262) 1,457 1,327 1,270 0 311 (8,123) (3,428) 4,695 (21,231) (17,898) 3,333 (34,249) (50,018) (15,770) (17,265) (14,038) 3,227 70,417 76,869 6,452 16 (16,076) (16,092) 5,521 0 0 0 11,601 0 11,601 0 562 562 0 Capital and priority works and services New Borrowings Debt Servicing Principal Lease Payments Defined Benefits Superannuation Lia Priority Projects (Net) Priority Works (Net) Capital Expenditure Capital Grants Capital Contributions Special Charge Schemes Special Charge Schemes Transfers from reserves Operating Result Non-operating Asset Sales Transfer to land acquisition reserve 0 0 5,024 0 5,024 0 0 0 5,521 Projects funded in previous years Result (17,265) (9,014) 8,251 70,417 82,390 11,972 578 (3,914) (4,492) 0 0 0 0 0 (23) 23 0 0 (311) (311) 0 (17,265) (9,014) 8,251 70,417 82,366 11,949 578 (4,225) 4,803 Transfers from reserves Other non-cash adjustments Cash surplus/(deficit) Monthly Report November/December 2014 96 KEY FINANCIAL STATUS INDICATORS BORROWINGS Principal Debt Loan Financial Principal Debt New Paid Principal No. Institution 1 July 2014 Borrowings 2014/2015 30 June 2015 $'000 $'000 $'000 $'000 5 National Australia Bank 712 - 712 - 6 National Australia Bank 249 - 98 151 7 National Australia Bank 230 - 60 170 8 National Australia Bank 1,126 - - 1,126 9 National Australia Bank 974 - 146 828 10 Commonwealth Bank 1,213 - - 1,213 11 Commonwealth Bank 4,590 - 323 4,267 12 Commonwealth Bank 4,631 - 270 4,361 13 Commonwealth Bank 3,081 - 163 2,918 14 Commonwealth Bank 1,953 - 95 1,858 15 Bendigo Bank 2,220 - - 2,220 16 Bendigo Bank 2,380 - - 2,380 17 18 National Australia Bank Commonwealth Bank 2,634 11,465 - - 2,634 11,465 37,458 - 1,867 35,591 LEASES Principal Debt Lease Financial Principal Debt New Paid Principal No. Institution 1 July 2014 Leases 2014/2015 30 June 2015 $'000 $'000 $'000 $'000 North CBFC 17 - 17 - South1 CBFC 9 - 9 - South2 CBFC 18 - 18 - South3 CBFC 30 - 29 1 74 - 73 1 Monthly Report November/December 2014 97