Piping Foreman - TUEM International Manpower Corp.

advertisement
DIOSDADO B. HERMOSO JR.
Address : #44 Prk. 5 Roosevelt Dinalupihan, Bataan ,
Philippines
Cell No. +639279924989 , +639466659588 +639092924521
Email adds. hermosojrdiosdado@yahoo.com
Position Applied: Piping supervisor / Piping Foreman
Job Objective: - To work in a field where I can fully apply my knowledge and
Experience in (Mechanical) Piping and pipeline fabrication, erection
And Hydro testing to gain exposure in my field of profession within and
established company.
Work experience
M.I.S.A. Maritime Industrial Services K.S.A. March 10, 2012 up to present
Project; MA’ADEN MINE AND REFINERY 2500 DIGESTION JPU’S &
WASIT PROJECT SAUDI ARAMCO. OIL and GAS CONSTRUCTION
Position: Piping / Fabrication Foreman
Duties & Responsibilities
 Prepare shop drawing & isometric drawing with latest revision and stamp issue for
construction and control copy.
 Monitor the piping installation at pipe rack to minimized error and discrepancies.
 Prepare pipe and pipe fittings to be fit-up, beveling pipe end 37.5 degree, cleaning
grind pipe and fittings for butt weld joint pipe to elbow etc.
 Verified all spool dimension and as built and coordinate with the piping engineer
regarding new revision sheet number.
 Prepare daily progress report and other document required including (WPS)
welding procedure specification.
 Verified all complete fit-up dimensions, orientation of flange, sock let, squareness,
and straightness'.
 Ensure the safety and efficient of worker and as followed the safety rule and
regulation and always wear (PPE) personal protective equiptment.
Jal International Company, K.S.A. 2009 up to 2011
Project: (NCP) SOUTH PLOT PROJECT SAUDI POLYMERS Petro Chemical
construction.
Position: Piping Foreman
Duties & Responsibilities
 Supervised and managed piping erection and prepared all spools to be installed
including valves gate vales, pinch valve, butterfly valve diaphragm valve stud
bolt nuts and washer etc.
 Verified all pipe direction orientation as per drawing to eliminate discrepancies
and back jobs.
 Assist the planning and monitor the progress make sure the schedule of
completion is not delayed.
 Prepare all engineering drawing and document and conduct inspect on site
ensure the material and dimension are standard and followed.
 Coordinate my piping engineers regarding latest revision of drawing and some
modification.
 Motivate worker good productive and quality job to obtain high standard task.
 Motivate worker safety and efficiency working at site.
BELLELI ENERGY EXTERRAN SHARJA U.A.E. 2008 up to 2009
Project: Jebel Ali Power and Desalination Station M
Position: Piping Foreman
Duties & Responsibilities
 Supervise piping erection at pipe rack ensure the direction of pipe lines are
correct and appropriate to the drawing specification required.
 Monitor the daily progress and ensure the schedule of completion of project is
completed.
 Witness all piping construction verification; including hydro testing and
requirement of (JSA) job safety analyses are followed.
 Ensure that quality maintained and in accordance with inspection with
inspection and test plan.
 Ensure that implementation contractors comply with all aspects of HSE worksite
plans and policy, worksite regulations & client requirements.
 Prepare bill of material and isometric drawing, piping arrangement and other
reference drawing needed to site.
 Inspect all complete installation of pipe lines at the pipe rack to minimize the
discrepancy.
 Responsible for the safe efficient working environment.
 In charge for the fabrication for fabricate pipe supports as per isometric
drawing, specifications & standards.
 Ensure productivity, quality and safety in my assigned area of responsibilities.
COST CONTEMPORARY COMPANY LTD K.S.A.2006 up to 2008
Project: Upgrading of south (NGL) Equipment and Pipe lines
Position: Piping Foreman
Duties & Responsibilities
 Supervised and monitor piping fabrication to maintain quality and productivity
of piping jobs ensure material to be used are appropriated and corresponding to
the drawing specification.
 Assist the planning and program of work and see to it that the project was
observed and meet the schedule of completion.
 Verified all piping fabrication material specification, grade, heat number mrv
number, item code number etc.
DOHA Petroleum Construction Company (LTD) QATAR 2002 up to 2005
Project: OXY PS1-K ROJECT PS1A Pipe Rack Occidental Petroleum of Qatar
Position: Fabrication Foreman
Duties & Responsibilities
 Prepare all shop drawing, materials pipes, flange, piping fittings power tools
machine including hand tools right angle, spirit level, plumb valve etc.
Supervise and coordinate the working activities of the implementation
contractors.
 Progress monitoring & see to it that schedule is being observed.
 Monitor worker and motivate them productivity and work safety.
Gulf Marine Maintenance (GMMOS) DUBAI U.A.E 2000 up to 2002
Project: RIG’S FLATFORM, STRUCTURAL ANG PIPE LINES
Position: Pipe fitter / Fabricator
Duties & Responsibilities
 Lay-out 45 degree bend elbow 6’’ inches diameter schedule 120 & as dimension
and orientation of stamping plate and lugs.
 Cutting pipe by radial machine, beveling pipe by bevel machine and grinding
root face of pipe and fittings.
 Assembly loose spool at jigs fit-up elbow to flange and pipe spool.
 Fabricate pipe dummy support trunnion, bracket, and pipe support 10’’ & 8’’
pipe.
 Fabricate skid, column. Secondary support and vertical brazing of pipe rack.
 Fit-up nozzle flange, 10’’ 20’’ diameter schedule 120 smls A 106 GR.B
 Working with (PPE) personal protection equipment face shield, safety shoe
gloves and cover all.
JOHN HOLLAND JOINT VENTURE 1999 TO 2000
Project: MALAMPAYA CGS ALLIANCE
Position: PIPE FABRICATOR
Duties & Responsibilities




Install steam tracing and jacketed pipes.
Fabricate and install supports.
Install pipe work systems.
Prepare and assemble non-metallic pipe work.




Prepare and assemble small bore non-ferrous pipe work.
Fabricate and install supports.
Fabricate branches and bends.
Assembling and tightening bolted flange connections.
Subic Shipyard Mosones Enterprises 1992 up to1996
Project: SHIP REPAIR @ DRY DOCK’S
Fabricator)
(Position: Pipe Fitter /
Duties & Responsibilities
 Fabricate pipe fittings miter elbow 90 degree 3 pieces 45 degree elbow in
accordance to shop drawing required.
 Fabricate lateral tee 45 degree 32’’ inches diameter schedule 80 carbon steel.
 Fabricate nozzle 32’’ inches diameter to 16’’ inches diameter flange and pipe.
 Assembly pipe spool 20’’ inches diameter to 6’’ inches schedule xs to xxs pipe.
 Cutting pipe spool by cutting torch and beveling.
 Erection of pipe spool lifting alignment using chain block wire rope sling and
shackle.
 Fabricate dummy bottom line 20’’ inches diameter 90 degree elbow long radius
and 10’’ dummy pipe.
 Fabricate reinforcing pad and (NPT) ¾’’.
 Fit-up rolling off-set 90 degree elbow roll 30 degree north east direction.
Additional Skill





Computer literate
Instrument fitter
Marine Rigger
Structural fitter / Fabricator
Shift Fitter
Training & certificate
1. Jubail export refinery project package 2b completed and passed
the exam in behavioral basic safety.
2. for his outstanding performance and lasting contribution on
daelim industrial CO. LTD NCP south plot project Saudi polymers llc
jubail kingdom of Saudi Arabia.
3. GASOS consultants & technical training GLOBAL DEVELOPMENT
& TRAINING CENTRE (GDTC) general HSE awareness on 5th of
January 2009.
4. GMMOS safety department Dubai .U.A.E. breathing apparatus &
H2S training on 13th February.
5GMMOS safety department DUBAI U.A.E. BASIC FIREFIGHTING on
13th February 2002.
5. GMMOS safety department DUBAI U.A.E. BASIC FIRST AID on 14th
February 2002.
6HALLIBURTON PHILIPPINES HAZARD OBSERVATION CHECK (HOC)
on 28th January 2000.
7. MALAMPAYA C.G.S. PHILIPPINES CERTIFICATE OF MIRIT 10th
April 2000
8. EXECUTIVE TECHNICAL CONSULTANTS TRAINING CENTER
PHILIPPINES on 5th July 2004.
Nationality: Filipino
Date of birth: December 16, 1966
Marital Status: Married
Name of Spouse: Marilou M. Hermoso
Religion: Roman Catholic
No. of children: 3
Total Years of experience (local & abroad): 15 yrs.
Educational Attainment:
College Level: Columban College Meralco Foundation,
Institute Olongapo City, Philippines
Course : Bachelor of Science In Mechanical Engineering ( B.S.M.E)
Download