inspection activities related to Painting of Piping, structural and Tanks.

advertisement
Sr. QA/QC INSPECTOR
(Welding/Painting &Piping )
Sajeen S.R
Saroj Nivas
Veruvally Bhagom
Alappuzha (Dist)
Kerala, India.
Ph: +91 479 2430335, 2432233
Mob : + 966- 592623972&+91- 9447212346
Email : sajeenraman@gmail.com
Personal Brief
Nationality
Date of birth
Marital status
Languages known
:
:
:
:
Indian.
01/06/1978
Married
English, Hindi, Malayalam, Tamil, Kannada
Passport No
Date of Expiry
Place of Issue
:
:
:
E 0051105
23/10/2011
Cochin.
Driving license
License Number
Type of Vehicle
:
:
DL/231/96 (INDIAN)
Light & Heavy
Passport details
Qualifications
1. SSLC
2. ITI
3. DIPLOMA IN
MECHANICAL Eng.
1993
1997
2002
4. C S W I P 3.1 CRT. NO 37856
Board of Public Examination
National Council for Vocational Training
Board of Technical Education (Karnataka,India)
2009
The Welding Institute U. K
5. BGAS PAINTING INSPECTOR GR 3 CRT. NO BG596159 2010 The Welding Institute
U. K
6. API 570 PIPING INSPECTOR ( Awaiting the result )
5. ASNT Level-II
2007
Kalva institute.
RTFI
Radio graphic testing
Ultrasonic testing
Magnetic particle testing
Penetrating testing
Employment history
8.5 YEARS (02.5 years gulf) construction experience in Chemical, Oil and Gas field. Experienced in
all Inspection activities related to fabrication and erection of Piping (AG/UG),Storage Tanks Structural
and alignment inspection of Static & Rotating Equipments in various Chemical Petrochemical, LNG
and cryogenic plants.
Experienced in Welding &Painting inspection of Piping & Structural materials, Storage Tanks and
Insulation inspection of Piping and Tanks.
Experienced in Cross Country Pipe Welding, laying, Coating and Testing activities.
Familiar with materials like Carbon steel, Low Carbon steel, Alloy steel, Stainless steel, Duplex, CuproNichel, NACE, RTR, FRP & GRE materials. Also familiar with various NDT methods like Visual inspection,
Radiography testing, Ultrasonic testing, Magnetic particle testing, liquid penetrant testing, Ferrite testing,
Hardness testing, PMI and PWHT.
Conversant with International standards like AWS,ASME, ASTM,API(620,650 &653),
Computer Knowledge
Familiar with Microsoft Excel and Word & Primavera.
Equipment handled
PMI testing Machine
Hardness testing Machine
Ferrite testing Machine
AUTO UT
PWHT Machine.
DFT Testing
WFT Testing
Duties and responsibilities
 Capable to work as a Inspection engineer/ Supervisor in all inspection
activities of Mechanical/Welding/Painting/Insulation Jobs.
 Preparation of ITP,WPS, Qualification of PQR & conducting WQT.
 Fit-up and welding inspection of Storage Tanks, Piping, Pipe lines &
Structures.
 Receiving inspection of Welding consumables, Plates for Tanks, piping
materials, valves, Insulation materials, Painting materials and
Structural materials.
 Bending profile verification of shell plates (according to layout),Layout
confirmations of Annular plates, Roof plates and Bottom plates belongs
to Tanks.
 Witnessing Oil penetration test ,Vacuum tests, Peaking & Banding
inspection, Plumpness verification, Reinforcing pad leak test,
confirmation of nozzle orientation markings on shell & Roof,
Hydro- Pneumatic testing and
Settlement verification of Tanks.
 Alignment inspection of Rotary & Static Equipments.
 Verification of welding equipment calibration.
 Witnessing Torquing and tensioning of bolts.
 Verification & acceptance of PWHT Charts.
 Interpretation of Radiographic films.
 Repair Identification & witness rectification.
 Witnessing NDT methods like MT, PT, UT & PMI.
 Overall NDT coordination at site with subcontractor & client.
 Monitoring Welder performance.
 Identification and preparation of Pressure test packages.
 Inspection & punch list preparation as per pressure test packages.
 Witness hydro/pneumatic & leak testing of Piping, Pipe Lines.
 All inspection activities related to Painting of Piping, structural and Tanks.
 Inspection of underground pipe coating & witnessing Holiday test.
 Inspection of Insulation (Surface cleanliness, Confirmation of paint
Touch -up, Thickness verification of Cladding material, Insulation
thickness, Banding and Final Cladding inspection) of Piping and Tanks.
 Preparation of NCR & SOM for the construction deviation against the
relevant Specification and Code.
 preparation of all inspection QVDs and final documentation for
system turnover.
Experience
Period/ Project.
1.
Company/position/work description.
Jan. , 2010 to Present.
SABIC/ CTCI ARABIA LTD (AMINES)
SABIC
SENIOR QC INSPECTOR ( WELDING/PIPING)
Review of Pre Qualification Documents
Preparation of Welding procedures monitor the subcontractors
QC Activities
SAUDI KAYAN PETROCHEMICAL CO
AMINE FACILITIES PLANT ,JUBAIL K S A
2.
. Feb, 2009 to Aug.. 2009
ARAMCO KGP PROJECT
KHURSANIYAH .K S A
3.
Feb, 2008 to Nov 2008.
EQUATE
OL2K Ethylene project
KUWAIT
ARAMCO ,BECHTEL TECHNIP JV, CCC
SENIOR QC INSPECTOR ( WELDING/PIPING)
Inspection activities related to welding of cross country pipe line
20,24 “ Dia ,105 KM Length
EQUATE , FLUOR ,TECHNIP, CCC
QC INSPECTOR PIPING
Preparation of pressure test package, All piping inspection
System punch list clearing, witnessing of hydro/pneumatic test ,PMI
FERITE, HARDNESS , DPI , MPI test witnessing ,reinstatement ,
4.
Jan. 2007 to 2008 Jan.
Praxair India Pvt. Ltd
New Oxygen Plant SAIL Durgapur
STEEL AUTHORITY OF INDIA/ PRAXAIR INDIA L T D
QA/QC Engineer
Piping /Welding.
Inspection of cryogenic double walled storage tank shell erection,
fit up &welding, vacuum box testing , Radiographic film
interpretation. Welder qualification test also involved CS,SS,ALU
5.
Reliance Refinery Expansion Project/ Neo structo
Construction Ltd
.
July. 2005 to Nov. 2006
Reliance Petroleum
Amine plant
Jamnagar, Gujarat
QA/QC Engineer Piping /welding
Amine ,coker & sulpher recovery ,Replacement of cyclones,
FCCU Regenerator welding inspection activities related to
Petrochemical piping.
6.
Indian Oil Corporation Ltd Neostructo Construction Ltd
Dec 2003 to May 2005.
IOCL, Refinery Expansion Project
Guahaty
Piping /welding inspector.
Hydro treated project , field fabrication of stripper column
,fabrication of large storage tank
piping /welding/painting inspection activities
7.
.
Dec 2002 to Nov2003.
KMML, IOCL, VSSC
Kerala
.
Kerala Minerals & Metals Ltd&
Indian Oil Corporation Ltd (LPG Bottling
Plant) &
Vikram Sarabhai Spare Centre /Hind Erectors, Kollam
Trainee Engineer Pipeing & Structural. Fabrication & Erection of fire
water , cooling water pipe line
The statements above given are true and correct to best of my knowledge and belief.