Data Communications Program FAA Prototype & Validation Activities Presented to: Data Comm Implementation Team By: Craig Morris Date: January 2011 Federal Aviation Administration Agenda • • • • Validation of SC-214 / WG-78 services Data Comm Lab capabilities To be done / Work in progress Data Comm Lab working environment – – – – • • THALES avionics and ground test equipment Honeywell avionics Rockwell Collins avionics FAA Tech Center ground system Data Comm Lab Architecture Prototype and Validation Roadmap FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 2 Data Comm Lab – Validation of Services Lab Validation Capabilities WP 2 Services Services DLIC DLIC ACM ACM ACL ACL Complete by: June 2011 WP 1 Standards Validation AMC AMC Capabilities DCL DCL D-TAXI D-TAXI D-OTIS D-ATIS FLIPINT 4D-TRAD It is anticipated that such services will be validated by other validation projects as part of SESAR. This also holds true for the validation of D-OTIS. The time-frame for this validation will be 2013 ?? End system applications CM FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) CPDLC Federal Aviation Administration ADS-C FIS 3 FAA Data Comm / Industry Partnerships (OTAs) • Rockwell Collins – RTCA SC-214 / EUROCAE WG-78 WP-1 avionics • Honeywell – RTCA SC-214 / EUROCAE WG-78 WP-1 avionics • THALES – RTCA SC-214 / EUROCAE WG-78 WP-1 & 2 avionics – Ground System (WP-1 and WP-2) Data Comm LAB development @ Tech Center FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 4 Data Comm LAB capabilities to Date • Air / Ground VDL Mode 2 Infrastructure – – – – • Air / Ground Router with Park-Air radio interface Ground / Ground Router for routing and discovery RF radio cloud Addressing Plan for end to end connectivity (routing / discovery and forwarding) CMA (end system application) – Based on ICAO DOC 9880 end system requirements – Based on RTCA SC-214 ATS Interop Requirements • PM_CPDLC (end system application) – Based on ICAO DOC 9880 integrity algorithm – Based on RTCA SC-214 ATS Interop Requirements FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 5 Data Comm LAB capabilities to Date (cont..) • PM_CPDLC end system integration – Integrated Tech Center CPDLC end system with both Rockwell Collins, and Honeywell CPDLC end systems • – • Developed logging and tracking database for all message exchanges at all levels of the protocol stack Developed GUI – – • Via air / ground infrastructure Contains the entire RTCA SC-214 / EUROCAE WG-78 message set for generation / scripting, and display of messages Developed supportive test tools under the GUI to allow for greater flexibility in decoding and encoding of messages Installed and Integrated THALES Air FANS workstation with Ground FANS workstation – – As an initial delivery under the OTA Supports RTCA SC-214 / EUROCAE WG-78 DCL service FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 6 To be done / Work in progress • Develop common TEST procedures / cases (in progress) Target: Jan 21, 2010 – Addresses the Interoperability Requirements – Test procedures / cases must be common across all platforms • Develop Traceability Matrix Document (in progress) Target: Mar 24, 2011 – Traces the Test procedures / cases with Ground System requirements, and SC214 requirements • Develop PM_FIS (end system application) (in progress) Target: Apr 25, 2011 – Based on ICAO DOC 9880 for technical requirements – Based on RTCA SC-214 for SPR, and Interop requirements – D-OTIS service under FIS (will develop D-ATIS initially for validation) • Implement Link 2k+ backwards compatible requirements (in progress) – As part of the ATS interop for validation FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Target: Feb 11, 2011 Federal Aviation Administration 7 To be done / Work in progress (cont.) Implement FANS Accommodation (in progress) Target: Feb 18, 2011 – Based on Interop Requirements – FANS Interop for validation • Develop Data Comm Gateway (in progress) Target: Mar 31, 2011 – Supports integration of DESIREE for Data Comm outreach program – Provides interface to NIEC – Other interfaces (as necessary) • Develop LAB Access Point with external partners – – – – – Target: May 27, 2011 EUROCONTROL Experimental Center (EEC) Oak City IFCET lab Boeing Airbus Others (as necessary) FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 8 To be done / Work in progress (cont.) • Actual Validation Conduct and Reporting (WP-1) – Begin conduct January 2011 – Plan quick look reports / results March 2011 – Plan to submit Final report June 2011 FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 9 Thales Air and Ground System Initial delivery Included: • • • Ground System Simulation and Test Facility based on THALES Air Ground Data link Server (AGDS) and message test tools HMI Dual-Stack system ATN Baseline1 CM/CPDLC/ADS-C message set (DO-280/ED-110B) Planned deliveries Include: • • • • Ground WP-1 (March 2011) A/G DSP (March 2011) AIR WP-1 (DCL only, May 2011) AIR full WP-1 (June 2011) • Full WP-2 (Nov / Dec 2011) FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 10 Thales Air/Ground – system example Initial delivery: •CMU HMI • Ground System Simulation and Test Facility based on THALES Air Ground Data link Server (AGDS) and message test tools HMI • Dual-Stack system • ATN Baseline1 CM/CPDLC/ADS-C message set (DO-280/ED-110B) •Pre-production CMU •Air Ground Datalink Server •and •Ground Simulator Tool •VDL/2 radio • • • • • Ground WP-1 (March 2011) A/G DSP (March 2011) AIR WP-1 (DCL only, May 2011) AIR full WP-1 (June 2011) Full WP-2 (Nov / Dec 2011) •Airborne Simulator •RX/TX Planned deliveries: •Coax + Attenuators •Data • Service •Simulator Ground Segment Simulation and Test Facility •11 FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Airborne Segment Simulation and Test Facility Federal Aviation Administration Deliveries Included Honeywell Avionics Link 2000+ (July 2010) SC-214 WP-1 (Dec 2010) •CM •PM_CPDLC •Link 2000+ Services build •WP-1 Services build Ship-sets Include: Mark II CMUs MCDUs, VDRs APMs Cockpit Printers Gables Radio Tuning Panels I/O Junction Panels FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 12 Rockwell Collins Avionics Deliveries Included Link 2000+ (July 2010) SC-214 WP-1 (Dec 2010) •CM •PM_CPDLC •PM_FIS •Link 2000+ Services build •WP-1 Services build Ship-sets Include: CMU-900 VHF-2100 (VDRs) IDC 900 (CDU) APM-900 Junction and Tuning Panels FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 13 Available NOW Tech Center Ground System •CM •PM_CPDLC •WP-1 SC-214 Services Comm Infrastructure • G/G routers, A/G routers •VDL Mode 2 GS (park-air radios •RF cloud •GUI (text based) In Progress / Planning: Develop common TEST procedures / cases Develop Traceability Matrix Document Develop PM_FIS (end system application) Implement Link 2k+ backwards compatible reqs. Implement FANS Accommodation requirements Develop Data Comm Gateway (for DESIREE) Develop LAB Access Point with external partners FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 14 FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) Federal Aviation Administration 15 RTCA SC-214/EUROCAE WG-78 Prototype/Validation Roadmap 2009 2010 2011 2012 RTCA SC-214/EUROCAE WG-78 Green Cover FRAC process Nov 2010 Test Plan / Procedures Validation Phase – procedures and conduct WP-1, WP-2 Test Plan, procedures, scenarios Prototype & Validation Plan v1.0 (Sept 2009) Aug 2010 Test Syntax (all messages) Dec 2010 Test WP-1 June 2011 Test WP-2 Prototype & Valid Plan v2.0 (Dec 2010) Rockwell Avionics (WP-1) July 2010 (Blue Label # 1) Limited Services ASN.1 Syntax WP-1 services (avionics) Dec 2010 (Blue Label # 2) WP-1 Services Honeywell Avionics (WP-1) July 2010 (Build # 1) Limited Services ASN.1 syntax Thales Avionics (WP-1 & WP-2) May 2011 214/78 DCL ATN/FANS Thales Ground System (WP-1 & WP-2) Tech Center Ground system (WP-1 & WP-2) June 2011 Full WP-1 Services ATN/FANS Dec 2010 March 2011 214/78 DCL Full WP-1 ATN/FANS Services ATN/FANS Feb 2010 (Phase 1) Initial Lab Env. May 2010 (Phase 2) Lab tools/infra Aug 2010 (Phase 3) Dec 2010 Limited (Phase 4) Services ASN.1 Syntax WP-1 Services FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny)(January 27, 2011) WP-1 services (avionics) Dec 2010 (Build # 2) WP-1 Services Dec 2011 Full WP-2 Services ATN/FANS Nov 2011 Full WP-2 Services ATN/FANS WP-2 (avionics) WP-2 (ground system) …….Data Comm demos/trials…..2012 Sept 2011 (Phase 5) WP-2 Services + A/G Subnetwork Federal Aviation Administration WP-2 (ground system) 16