INFN GEM Front Tracker V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M. Lucentini, F. Mammoliti, F. Noto, S. Minutoli, P. Musico, R. Perrino, F. Santavenere ... INFN / Bari-Lecce, Catania, Genova, Roma-Sanità SBS Collaboration Meeting Oct 18-19 2012 JLab Readout Electronics development will be presented by Paolo Musico 2012 Oct 18 / SBS Coll. / JLab E. Cisbani 1 Front Chamber reqs and design • • • • • Hit spatial resolution ~ 70 mm Stand large background (g ~ 250 MHz/cm2, e/p 160 kHz/cm2) Transverse area at least 40x120 cm2 Event rate at the level of 20 kevents/s Reuse in different configurations 2012 Oct 18 / SBS Coll. / JLab E. Cisbani 2 2012 Oct 18 / SBS Coll. / JLab GEM base module 40x50 cm2 E. Cisbani • • • • • Large GEM module with small dead area Low material budget/Light Structure Modular design Flexible configuration Balanced weight • Segmented HVs and individual protection resistors • Spacers to keep gap • Thin PERMAGLAS frame 3 Service Frame / Detail • External service frame made of smaller segments in carbon fiber • Rigid structure, can correct small GEM module bending • Prototyping under production 2012 Oct 18 / SBS Coll. / JLab E. Cisbani 4 2012 Oct 18 / SBS Coll. / JLab Beam test @ DESY / Full Module Size 40x50 cm2 E. Cisbani DGEM = 400, 390, 350 V 3 mm drift gap Ar:CO2 70:30 4 GeV electron ionization: 28 pairs Gain: 17600 charge: 500 ke / 2000 ADC ch 5 2012 Oct 18 / SBS Coll. / JLab Parassitic beam test of new electronics/Jul-Aug 2012 E. Cisbani 6 Event Strip Plane HV=3750 V Signal > 1000 RMS ~ 50 2012 Oct 18 / SBS Coll. / JLab 2012/CERN Test – Event display E. Cisbani 7 2012 Oct 18 / SBS Coll. / JLab 2012/CERN Test – Signal development E. Cisbani • Signal saturated, and wrong clock phase both fixed • However, position information are available 8 • Left: normal signal • Bottom: «saturated» • «Saturation» depends on the baseline level 2012 Oct 18 / SBS Coll. / JLab Calibration pulse development E. Cisbani 9 • We would like to use differential pressure transmitters at gas inlet and outlet to evaluate pressure drop in the chamber and any potential problem • Negative Rad Hard Test 2012 Oct 18 / SBS Coll. / JLab Gas Component / Radiation test E. Cisbani 1 0 E. Cisbani • In lab test we use LNF/GEM-HV module with 7 independent HV levels and current feedback. • In operation we intend to use a voltage divider (based on Olympus/Abruzzio design); • Working on a simple spark CREMAT amp. is counter based on probably not standard pream RAD HARD components (CREMAT CR110) + some standard modules 2012 Oct 18 / SBS Coll. / JLab HV divider and Spark counter 1 1 DAQ Implemented on C++ • Run on Linux Main • MPD as independent library • One configuration file (text format) MPD Bus Interface Generic Model (virtual class) Wrapper Library Low Level High Level • Use open source libconfig++ • Self consistent output binary Initialize Trigger Configure ADC Discovery Other Read Module Structured text file for configuration Based on libconfig++ E. Cisbani raw data I2C DB 2012 Oct 18 / SBS Coll. / JLab DAQ Software Still some work on event readout library Tested on 3 VME platforms (Struck, CAEN USB and Optical) bug fixed: clock phase was not set properly. 1 2 • Clean room with gas system • HV probe box and accessories 2012 Oct 18 / SBS Coll. / JLab Catania Tools for assembling / READY to go • GEM foil Stretcher • Fiducial pin extractors • Consumables ... E. Cisbani 1 3 • Used spare/damaged parts of the previous design to get experience in gluing/assembling gems modules (2 dummy modules assembled) 2012 Oct 18 / SBS Coll. / JLab Catania Assembling Test and Training E. Cisbani 1 4 Frames Drift foils GEM foils Readout Honeycomb Service frame Required 18 18 54 18 18 6 Spare 4 4 14 22 22 (1) Procured 18 14 5 7 7 - Ordered 4 3 10 3 1 1 1 42 8 10 3 9 4 4 2 (+1) Budget 2012 Budget 2013 fiscal year, production can be delayed some months (if needed) – in E. Cisbani 1. We have to put a large foils production order before end of Italian 2012 Oct 18 / SBS Coll. / JLab Material for 6 chambers (18 GEM modules) addition to the CERN «natural» delay 2. We still have some margin for improvements, which will be considered after assembling and characterization 1 5 Short term plan GEM Chamber: – Assembling of the first 40x50 cm2 module will start the 22° of October (due to people previous committments) – Assembling expected to last 2 full weeks (at least) ● 2012 Oct 18 / SBS Coll. / JLab ● – characterize the module in lab (with rad. Sources) Mechanics: – Service frame prototype in production E. Cisbani ● – Test service frame on three modules (first proto, training module and first final module) Test – November: Chance to access the RD51 test beam (second week of November) or RICH-CLAS12 at the end of November – most likely ● Electronics Paolo Talk Expected to go into «mass» assembling early next year 1 6