TAS INFRA SharePoint 2010 SharePoint 2010 Overview What's

advertisement
TAS INFRA SharePoint 2010
SharePoint 2010 Overview
 What’s New SharePoint 2010?
 Installation & Upgrade
 UI changes and Service Applications
 Search
 External Content type and BCS
 SharePoint Workspace 2010
 Security
 Monitoring, Logging and Reporting
 Backup and Restore
 High Availability
SharePoint 2010 Business Continuity Planning
 What’s new SharePoint 2010 Backup and Restore?
 Backup and Restore
a. Backup from Central Administration Console
b. Backup from Command line (STSADM &
PowerShell)
c. Protecting using DPM 2010
 Availability within the farm
 Reducing Downtime
d. Read-only farm
e. Disaster Recovery Farm across farms
 Summary
Target audience:
IT Professionals/ Enterprise Administrators
Level: 200
Duration: 2 hours
Target audience:
IT Professionals/ Enterprise Administrators
Level: 200
Duration: 2 hours
SharePoint 2010 Enterprise Content Management
SharePoint 2010 Enterprise Content Management
 Requirement for Enterprise Content Management
 Document Management
 Record Management
 Web Content Management
 Workflow Improvements
SharePoint 2010 Upgrade
 Why upgrade to SharePoint Server 2010?
 Upgrade preparation tools
 Upgrade methods
a) Supported Scenarios
b) Unsupported Scenarios
 Upgrading MOSS 2007 SSP databases
 Visual Upgrade
 Upgrade Logging/Status Reporting
 What’s right for me?
 Upgrade Cycle
 Downtime Mitigation
Target audience:
IT Professionals/ Enterprise Administrators
Level: 200
Duration: 2 hours
Target audience:
IT Professionals/ Enterprise Administrators
Level: 200
Duration: 2 hours
SharePoint 2010 Extranet Deployment





Extranet Definitions and Descriptions
Common Implementation Scenarios
o Design Considerations and Business Requirements
SharePoint 2010 & Extranets
o Updated and New Features and Configuration
Options Authentication Scenarios
Upgrading Forms Based Authentication
Extranet Deployment Topologies
Forefront and SharePoint
Target audience:
IT Professionals/ Enterprise Administrators
Level: 200
Duration: 2Hrs
Charge Time: 5 hours
SharePoint 2010 High Availability



WFE high Availability using Windows NLB
o Intro
o Concept
o Installation and configuration (Demo)
o NLB for SharePoint WFEs (Demo)
SQL Server High Availability
o SQL Clustering
 Intro
 Concept
 Installation and Configuration (Demo)
 Windows Server 2008
 SQL Cluster (Demo)
 Stretched cluster concept (only)
SQL Database mirroring & log shipping
 Database Mirroring
 How it works
 How it works
 Transaction Safety & Operating modes
 Setting-up Mirroring
 Mirroring Considerations & Best
Practices
 Database Mirroring Maintenance and
operations
 Mirror vs. Cluster
 Database Log shipping
 How it works
 Setting-up log shipping
 Clustering Vs Mirroring Vs Log Shipping
o Application Server High Availability
Target audience:
IT Professionals/ Enterprise Administrators
Level: 200
Duration: 5 hours
Charge Time: 10 hours
TAS Dev. SharePoint 2010
Developing Custom Application for SharePoint 2010 on a Windows 7 Machine

Pre-Requisite to install SharePoint 2010

Improvements on Visual Studio 2010

Improvements on SharePoint Designer 2010

Improvements on Packaging and Deploying

Developing Sandboxed Solutions

Custom Workflow Continuum

Demonstrations
SharePoint 2010 - Sandbox Solution

What Are “Sandboxed” Solutions?

How “Sandboxed” Solutions Are Different from Full
Trust Solution

Sandbox Solution Deployment

Sandbox Solution Life Cycle

Sandbox Solutions Limitation
  Demonstrations
SharePoint 2010 - Workflow Enhancements

What's New in SharePoint 2010 Workflow

ASP.NET Workflow Forms

Site Workflows

Event Receivers for Workflow

External Data Exchange Using Local Services

Visio -> SharePoint Designer -> Visual Studio
Silverlight and Client Object Model in SharePoint 2010

Introduction to Client Object Model

High Level View of Client Object Model

Server Object Model vs. Client Object Model

.NET CLR Client Object Model

Silverlight Client Object Model

ECMAScript / JavaScript Client Object Model

Demonstrations
Data Technologies and Business Connectivity Services in SharePoint 2010







List Data Platform Capabilities
REST APIs
Client Object Model
LINQ to SharePoint Provider
BCS Overview and External Data in SharePoint
Types of BCS Solutions
Demonstrations
SQL Server 2008 R2
Upgrading and Migrating to SQL Server 2008 / R2
Prerequisites: Familiarity with SQL Server 2000/2005
Session Duration:
2:30 Hrs
Scope Time:
5:00 Hrs
Type:
1:1 LiveMeeting Consultation
When:
Scheduled on Request
 In-Place Upgrade
- Plan your upgrade
- Upgrade Considerations
- SQL Server Upgrade Advisor
 Migrating from SQL Server (Side-by-side Installation)
 Migration Consideration
 Migrate Step-by-step
- Moving the Databases
- Transfer logins/password
- Move Jobs, DTS Packages, Alerts etc.
 Migration Scenarios
After this Workshop, attendees would be able to understand and configure the following
 Plan for the migration
 Migrate from the older version of SQL Server to 2008R2
Reducing storage cost with Database Design Considerations
Prerequisites: Familiarity with Storage and SQL concepts
Session Duration:
1:30 Hrs
Scope Time:
4:00 Hrs
Type:
1:1 LiveMeeting Consultation
When:
Scheduled on Request
 Database Storage Designing Concepts
 Planning a Database Design
- Index – Monitor and Fix
- File/Filegroups
- Table Partitioning
 Data Compression
 Backup Compression
After this Workshop, attendees would be able to understand and configure the following

Better design the SQL Server and Databases for saving storage space and improve performance.
Managing SQL Server
Prerequisites: Familiarity with SQL Server basics
Session Duration:
Scope Time:
Type:
When:




2:00 Hrs
5:00 Hrs
1:1 LiveMeeting Consultation
Scheduled on Request
Working with Central Management Servers
Evaluating policies against CMS groups(PBM)
Auditing
Utility Explorer(R2)
After this Workshop, attendees would be able to understand and configure the following



Centrally manage multiple SQL Servers.
Create server wide policies.
Monitor multiple server performance.
Managing SQL Server Databases
Prerequisites: Familiarity with SQL Server basics
Session Duration:
Scope Time:
Type:
When:






2:00 Hrs
5:00 Hrs
1:1 LiveMeeting Consultation
Scheduled on Request
Database Maintenance Plans
Managing databases with Power Shell
Partitioning
Defining file groups
Automating Tasks with Jobs and Alerts
Backup/Recovery Strategies
After this Workshop, attendees would be able to understand and configure the following

Design a disaster recovery plan.



Maintain the SQL Server databases
Configure the databases for better manageability and performance.
Automate the maintenance jobs.
Proactively Monitoring Data
Prerequisites: Basics of SQL Server
Session Duration:
Scope Time:
Type:
When:


1:30 Hrs
4:00 Hrs
1:1 LiveMeeting Consultation
Scheduled on Request
Recording modifications
- Configuring Change Tracking
- Logging primary keys for rows that have changed
- Administering performance implications
Implementing Change Data Capture (CDC)
- Enabling CDC for history logging
- Tracking Data Manipulation Language (DML) and Data Definition Language (DDL) statements
After this Workshop, attendees would be able to understand and configure the following

Configure Change data capture for logging information.

Protecting SQL Server with System Center Data Protection Manager 2010
Prerequisites: Familiarity with DPM, SQL Server and concepts
Session Duration:
Scope Time:
Type:
When:





1:30 Hrs
5:00 Hrs
1:1 LiveMeeting Consultation
Scheduled on Request
Protecting Your Critical Business Data
Technical Obstacles to Effective Data Protection
Improving Protection with Data Protection Manager
Using Microsoft DPM to Protect Microsoft SQL Server
Recovering SQL Server Databases
After this Workshop, attendees would be able to understand and configure the following


Configuring DPM Server for protecting SQL Server data.
Take backups and restore on the same/alternate server.
SQL Server 2008 High Availability Solutions
Prerequisites: Familiarity with Windows clustering terms and concepts
Session Duration:
2:30 Hrs
Scope Time:
5:00 Hrs
Type:
1:1 LiveMeeting Consultation
When:
Scheduled on Request
 SQL Server Mirroring
- Transaction Safety & Operating modes
- Mirroring Considerations , Maintenance and operations




Cluster Topologies
- Cluster Setup & implementation
- Multi instance clusters
SQL Server 2005 Cluster to SQL Server 2008 Cluster
Geo-Cluster
Combining High Availability solutions
After this Workshop, attendees would be able to understand and configure the following





Differences between SQL 2005 and 2008 cluster
Configure new 2 node SQL cluster
Configure multi instance Active active cluster
Configure SQL mirror and combine Mirror and cluster to create Multi site SQL High availability solutions
Decide which is best; Mirror or cluster?

SQL Server Scale out scenarios & Replication
Prerequisites: Familiarity with Replication terms and concepts
Session Duration:
2:30 Hrs
Scope Time:
5:00 Hrs
Type:
1:1 LiveMeeting Consultation
When:
Scheduled on Request
 Replication terms and concepts
 Types of Replication





Scalability ,Database scale out for websites
Consolidating and distributing regional data
Offloading reporting and Data Warehousing
Server Client scenarios
Mapping scenarios & types
After this Workshop, attendees would be able to understand and configure the following



Decide the best replication type for any given scenario.
Configure replication.
Understand and identify if replication would be the solution.

SQL Server Performance Monitoring
Prerequisites: Familiarity with the monitoring tools like perfmon and SQL Server profiler.
Session Duration:
Scope Time:
Type:
When:




2:00 Hrs
5:00 Hrs
1:1 LiveMeeting Consultation
Scheduled on Request
SQL Performance Monitoring using
- Windows Performance Monitors
- SQL Server Profiler
- Dynamic Management Views
Monitoring Bottlenecks
- CPU Bottleneck
- Memory Bottleneck
- I/O Bottleneck
- Temp DB Bottleneck
Management Data Warehouse
Utility Control Point
After this Workshop, attendees would be able to understand the following

Diagnosing and troubleshooting SQL Server performance problems

Monitor the SQL Server for various types of resource bottlenecks.
SQL Server Performance Troubleshooting Concepts
Prerequisites: Session on SQL Server Performance Monitoring
Session Duration:
Scope Time:
Type:
When:
2:30 Hrs
5:00 Hrs
1:1 LiveMeeting Consultation
Scheduled on Request

Refreshing the concepts of SQL Monitoring

Query Processing and Tuning

- Performance Factors
- Query Tuning References
Improving Mirroring Performance

Improving Replication Performance

Connectivity Issues & Troubleshooting
After this Workshop, attendees would be able to understand the following:


Various query components.

Impacts of query components in performance.

Internals of query processing.

Understanding the query tuning approach.
Windows Server 2008
Upgrading existing domain to Windows 2008 R2
Delivery Time: 90 Minutes
Scope Time: 5 Hours
Initial 20-30 minutes discussion on best practices for the upgrade

Preparing forest to host 2008 R2 domain controller

Preparing domain to host 2008 R2 domain controller

Checking for replication for existing domain controllers

Promoting a windows 2008-R2 member server as a domain controller

Ensure proper replication is happening between the Dc’s

Transferring the FSMO over to the new R2 Dc

Decommissioning the old domain controller

Raising the domain and Forest functional level to windows 2008/R2

If required can also demonstrate Meta data clean up.
Migration – ADMT 3.0 (Migrating to Windows 2003) / ADMT 3.1 ( Migrating to Windows 2008 
Delivery Time: 2 hours (15 minutes Buffer)
Scope Time: 6 Hours
ADMT 3.0 & ADMT 3.1
 Active Directory Domain Restructure
 Developing / Planning a Migration Test Plan
 Creating a Migration Rollback Plan
 Establishing Trusts / Migration Accounts
 Configuring Source & Target Domains.
 Installing ADMT / Password Migration Tool
 Migrating Groups / Users / Profiles / Workstations / Member Server.
 Completing Post-Migration Plans & ADMT Documentation.
Demonstration
 Migration Using ADMT 3.0 – Migrating a Windows 2000/2003 domain to another Windows 2003
domain, including ADMT 3.0 setup.

Migration Using ADMT 3.1 – Migrating a Windows 2003 domain to a Windows 2008 domain
including ADMT 3.1 setup
Windows Server 2008 Backup, Restore & Group Policy
Delivery Time: 2 Hours 30 Minutes (15 minutes Buffer)
Scope Time: 6 Hours
 Platform Compatibility
 DSRM (Directory Services Restore Mode)
 Backup / Recover Scenarios
 Full Volume
 Full Server
 Files and Folders
 System State
 Critical Volume
 Demonstration:
- System State Backup
- Snapshot
Group Policy
 ADMX and ADML files
 File Locations / Central Store
 Searching for Group Policy Objects
 Filtering Group Policy Objects
 Overview of Group Policy Preferences
 Demonstrations
- Creating a FGPP
- Working with Starter GPO
- Restoring Starter GPO
Windows Server 2008-R2 Terminal Services
Delivery Time: 2 Hours 30 Minutes (15 Minutes Buffer)
Scope Time: 6 Hours



Terminal Services Overview
- TS Remote Programs
- TS Web Access
- TS Gateway
- TS Session Broker
- TS Easy Print
Other Improved Features
Demonstration:
-
Installing the roles
Configuring Farm, load balancing and configuring session broker
Configuring TS Remote Programs
Single Sign On
Configuring TS Web Access
Configuring TS Gateway
Windows Server 2008-R2 ADDS
Delivery Time: 2 Hours (15 Minutes Buffer)
Scope Time: 6 Hours







Read-only Domain Controller
- Admin Role Separation
Restartable Active Directory
Fine-Grained Password Policy
Enhanced Auditing Capabilities
AD DS Data Mining Tool
Other Improvements in Active Directory
Demonstration
- RODC
- Restartable AD DS
- Admin Role Separation
- Fine Grained Password Policy
- AD DS Data Mining Tool
Windows Server 2008-R2 ADDS
Delivery Time: 2 Hours (15 Minutes Buffer)
Scope Time: 6 Hours
Workshop Details:
 Overview
 Architecture and Concept
 Today’s Challenges and How Does Server Core Mitigate them?
 Deployment
 Administration
 Server Core Development
 Hardware on Server Core
 Server Core Facts
 Server Core Initial configuration Commands
 Adding Server Roles
 Changes to windows server 2008-R2
 Demonstrations
- Server Core Initial Configuration Tasks
- Promoting Server Core as a Domain controller
-
Managing Server Core
Installing Firewall
Working with some commands
Server Virtualization (Hyper –VR2)
Server Virtualization: Planning and Deployment
Session Duration: 2:00 Hours
Scope Time: 5:00 Hours
Type: Live Meeting Consultation
When: Schedules on Request










Selecting the Right Virtualization Technology
Advantage of Windows Server 2008 license.
Licensing scenario’s
Virtualization Calculator
Hardware consideration
Planning for Hyper-V Security with Authorization Manager
Calculate impact of Green IT initiatives
Access ROI for your virtualization project
DEMO
- Microsoft Assessment and Planning Tool 5.0
- Working with ROI Calculator
- Authorization Manager (AZMAN)
Question and Answers
Server Virtualization: Installation, Configuration & Management
Session Duration: 2:00 Hours
Scope Time: 5:00 Hours
Type: Live Meeting Consultation
When: Schedules on Request





Introduction to Hyper-V R2
Hyper-V R2 Architecture & Requirements
Installing and Configuring Hyper-V R2
Hyper-V R2 Management and Administration
DEMO
- Using the Hyper-V R2 Management Interface
- Configuring Hyper-V R2 Settings and Virtual
Networks
- Creating Virtual Machines and Virtual Hard


Drives
- Configure Virtual Machine Settings
- Working with Snapshots
- Exporting and Importing Virtual Machines
Best Practices
Question & Answers
Server Virtualization: High Availability & Clustering (LiveMigration)
Session Duration: 2:00 Hours
Scope Time: 5:00 Hours
Type: Live Meeting Consultation
When: Schedules on Request

 Storage Options for Hyper-V R2
 Microsoft Storage Solutions for Hyper-V R2
 Clustering Options & Scenarios using Hyper-V and
Hyper-V R2
 What’s new in Hyper-V R2
 Setting up a Cluster
 DEMO
- Setting up Storage
- Setting up LiveMigration
 Best Practices
 Question & Answers
Server Virtualization: Management Using SCVMM 2008 R2
Session Duration: 2:00 Hours
Scope Time: 5:00 Hours
Type: Live Meeting Consultation
When: Schedules on Request







What’s new in VMM 2008 R2
VMM 2008 R2 Architecture and Components
Prerequisites to install VMM 2008 R2
Managing Hyper-V R2 Hosts & Guests
P2V and V2V Migration
Managing Self Service Portal and Delegated
Administration
DEMO
- Configuring and Manage VMM 2008 R2
- Physical to Virtual Machine Migration
- Working with Self Service Portal
- Pro-Tips with SCOM


- OVMST with SCCM
Best Practices
Question & Answers
Workshops: Exchange 2007
Overview of Exchange Server 2007
Delivery Time: 2-2.5 hours
Scope Time: 6 hours







Introduction to x64 bit
System Requirements
What's new in Exchange Server 2007
Exchange Server 2007 Architecture
Exchange Server 2007 Server Roles
Unified Messaging: Integration with Telephony
Features Discontinuing and De-Emphasized
Administering & Recipient Management in Exchange Server 2007
Delivery Time: 2-2.5 hours
Scope Time: 6 hours







Overview of Exchange Server 2007 EMC and EMS
Administering Exchange Server 2007 Mailbox Servers
Administrative Permission Model
Recipient Management Core Concepts
Managing Recipients in Exchange Server 2007
Configuring Mailbox Servers
Configuring Recipients and Recipient Policies
Managing Message Routing in an Exchange Server 2007 Organization
Delivery Time: 2-2.5 hours
Scope Time: 6 hours







Understanding Message Routing in Exchange Server 2007
ADAM and Edge Subscription
Managing Message Routing
Changes in Routing principle
Configuring Message Routing for a Branch Office
Coexistence with Legacy
Demo
Securing Messages and Implementing Policies with Exchange Server 2007
Delivery Time: 2-2.5 hours
Scope Time: 6 hours






Implementing the Edge Transport Server Role
Securing Internet E-Mail with Active Messaging Protection
Configuring Message Routing for Internet E-Mail
Introducing Messaging Policies
Implementing Transport Rules
Implementing Messaging Records Management
Message Compliance and Retention in Exchange Server 2007
Delivery Time: 2-2.5 hours
Scope Time: 6 hours









Exchange Server 2007 compliance scenarios
Controls for regulatory compliance
Controls for corporate policy
Exchange Server 2007 compliance & policy features
Transport rules
Journaling
Message classifications
Exchange Server 2007 records management
Managed e-mail folders
Disaster Recovery in Exchange Server 2007
Delivery Time: 2-2.5 hours
Scope Time: 6 hours



Implementing Disaster Recovery in Exchange Server 2007
RSG
Standby Continuous Replication
High Availability in Exchange Server 2007
Delivery Time: 2-2.5 hours
Scope Time: 6 hours















Understanding High Availability in Exchange 2007
Clustering using the asynchronous Log shipping
Load Balancing
Deploying Clustered Continuous Replication [CCR] on the mailbox Role
Requirements
Creating File Share Witness
Creating cluster and adding nodes
Configuring the MNS Quorum
Installing Exchange Server 2007 on a cluster
Considerations
Single Copy Cluster [SCC]
Comparing SCC versus CCR
Understanding Local Continuous Replication
Introduction to SCR
Best Practices
Implementing Unified Messaging in Exchange Server 2007
Delivery Time: 2-2.5 hours
Scope Time: 6 hours









Introducing Unified Messaging
Installing Unified Messaging
Practice: Implementing Unified Messaging in Exchange Server 2007
Install the Unified Messaging server role
Create and configure a dial plan
Create an IP Gateway
Create a hunt group
Create a Unified Messaging mailbox policy
Enable a mailbox for Unified Messaging

Create an Automated Attendant
Migration Strategies in Exchange Server 2007
Delivery Time: 2-2.5 hours
Scope Time: 6 hours











Migration Challenges
E12 Transition map
Server Roles
System Requirements
Hardware Requirements
Windows Operating System Requirements
Interoperability Requirements
Transition and Migration
Supported Scenarios
Different Methods of transitioning mailboxes to Exchange Server 2007
Using Power shell and Move Mailbox Wizard
Workshops: Exchange 2010
Workshop: Exchange 2010 Overview
Delivery Time: 2-2.5 hours
Scope Time: 6 hours





What’s new in Exchange 2010
Exchange 2010 build themes
- Protection and Compliance
- Anywhere Access
- Flexible and Reliable
Exchange 2010 System Requirements
Exchange 2010 Prerequisites
Microsoft Exchange Roadmap
Workshop: Exchange 2010 High Availability and Storage
Delivery Time: 2-2.5 hours
Scope Time: 6 hours





Exchange 2010 High Availability Fundamentals
High Availability Management
Storage Improvements
End-to-End Availability Improvements
High Availability Design Examples
Workshop: Exchange 2010 Management
Delivery Time: 2-2.5 hours
Scope Time: 6 hours








New Exchange Management Console features
Exchange Control Panel (ECP)
- New and simplified web based management console
- Targeted for end users, hosted tenants, and specialists
Role Based Access Control (RBAC)
New authorization model
Easy to delegate and customize
All Exchange management clients (EMS, EMC, ECP) use RBAC
Remote PowerShell
Manage Exchange remotely using PowerShell v2.0
Workshop: Exchange 2010 Transition from Exchange 2003/2007
Delivery Time: 2-2.5 hours
Scope Time: 6 hours







Installing Exchange server 2010
Configuring the Exchange 2010 server for OWA, Active sync, POP and IMAP
Replicating Public folders from Exchange server 2003 to Exchange server 2010
Moving mailboxes to Exchange server 2010
Moving public folder contents to Exchange server 2010
Removing unwanted configuration settings from Exchange 2003/2007
Gracefully decommissioning the Exchange server 2003/2007
Live Deployment and Transition Assistance
Scope Time: 12 – 15 Hours

Live Deployment and Transition Assistance
Workshops: LYNC 2010
Planning For LYNC 2010
Delivery Time: 1 - 1.5 hours
Scope Time: 5 hours




Overview and Architecture
Setup and Deployment
Migration/Co-existence
Edge Server deployment
Enterprise Voice
Delivery Time: 1 - 1.5 hours
Scope Time: 5 hours




Voice Overview
Planning for Enterprise Voice Deployment
E911 and Location services
Conferencing
Managing LYNC 2010
Delivery Time: 1 - 1.5 hours
Scope Time: 5 hours




Admin. and Management
Troubleshooting and Monitoring
HA
Devices and Apps.
Download