Project Management BMCF BMCF Agenda – Oct. – Dec. 2011 Instructor Introduction Timetable and Syllabus Group Setup Session 1 : Projects in Contemporary Organizations; The Project Manager; Project Organization; Introduction; Defining the Project Session 2 : Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling; The Planning Process Session 3 : Resource Allocation; Monitoring and Information Systems; Project Control; Controlling the Project Session 4 : Risk Management; Project Auditing; Project Termination; Putting the Discipline to work Session 5 : Future of project Management Project/Oral Presentation Final Exam Eric Abhyankar - Instructor Page 2 BMCF Instructor Introduction – Eric Abhyankar Consultant in Prague – customers include DHL, CSOB, US Hedge Funds Teach at UNVA, VSFS, VSM, UJEP Investment Banker at Swiss Bank (UBS) 10 years progressive Management Consulting experience at AT&T, IBM, UBS, DHL PM experience in USA, Asia, Europe Masters in CS, Masters in PM, MBA Eric Abhyankar - Instructor Page 3 BMCF Overview of Course Activities Assignment and Credit Overview of Required Assignments Credit Class participation and full attendance 30% Project Presentation in Class 70% Eric Abhyankar - Instructor Page 4 BMCF Sessions Session 1 : Defining the Project Projects; The Project Manager; Project Organization; Introduction to Project Planning Session 2 : The Planning Process Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling; Session 3 : Controlling the Project Resource Allocation; Monitoring and Information Systems; Project Control Session 4 : Putting the Discipline to work Project Auditing; Project Termination Eric Abhyankar - Instructor Page 5 BMCF 1.1 Projects in Contemporary Organizations Why manage projects? Need for Management of ever expanding Knowledge Growing demand for customized solutions Globalization and global competition General direct objectives of any project – performance (scope), time (schedule), cost (under budget), quality Indirect objectives – client satisfaction (impact), project efficiency, organizational improvement, business development (sales opportunities) Eric Abhyankar - Instructor Page 6 BMCF 1.2 Project Stakeholders Project Manager Project Team Senior Management The Client The Client’s End Customers Others? Eric Abhyankar - Instructor Page 7 BMCF 1.3 Project Management defined PMI Definition of a Project: A project is a temporary endeavor undertaken to create a unique product or service. Temporary means that every project has a definite beginning and a definite end. Unique means that the product or service is different in some distinguishing way from all similar products or services. PMI definition of Project Management: Project Management is the application of knowledge, skills, tools and techniques to project activities in order to exceed or meet stakeholder needs and expectations from a project. Eric Abhyankar - Instructor Page 8 BMCF 1.4 Project Lifecycle All projects are divided into phases: A project phase is completed when a verifiable work product (deliverable) is completed. The completion of a project phase is marked by reviews to determine a) if project should continue and b) detect and correct errors cost effectively. Collectively, the project phases are known as the project lifecycle. Example : See power point slide Completion & Closure Build & Test System Design Project Start up Eric Abhyankar - Instructor Approve Plan Prototype Review Architecture and Design document Page 9 BMCF 1.4 Project Management Maturity Project Management Maturity models are used to allow organizations to benchmark the best practices of successful project management firms. Development of better project management practices is an evolutionary process involving a systematic commitment to continuous improvement. Example CMMI (Capability and Maturity Model) Level 5 Level 4 Level 3 Level 2 Level 1 Eric Abhyankar - Instructor Page 10 BMCF 1.5 Project Organization Pure Project The project is a self contained unit with its own technical staff, own administration tied to the parent firm by tenuous strands of periodic progress reports and oversight. Functional A hierarchy where each employee has one clear superior. Staff are grouped by specialty such as production, marketing, engineering etc. Matrix A pure project organization overlaid on the functional divisions of the parent firm. Pure functional, pure project and Matrix co-exist Mixed Eric Abhyankar - Instructor Page 11 BMCF 1.6 Group Exercise Student Introductions Project Experience/Background Identify some typical projects in your company/organization If you do not have typical projects in your organization think of a business you would like to do Who are the stakeholders? What is the Project Organization like? In what part of the Project Lifecycle are they in? Eric Abhyankar - Instructor Page 12 BMCF 1.7 Project Selection – What are the criteria for model selection? Realism Capability Flexibility Ease of Use Cost EXERCISE: What is your criteria in selecting a project? See Examples on Page 92, 93 Eric Abhyankar - Instructor Page 13 BMCF Sessions Session 1 : Defining the Project Projects in Contemporary Organizations; The Project Manager; Project Organization Session 2 : The Planning Process Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling Session 3 : Controlling the Project Resource Allocation; Monitoring and Information Systems; Project Control Session 4 : Putting the Discipline to work Risk Management; Project Auditing; Project Termination Eric Abhyankar - Instructor Page 14 BMCF 2.1 The Project Planning process Also known as Project Scope Management (PMI) Initiation or Initial Project Coordination – committing the organization to begin the next phase of the project. Scope planning – developing a written scope statement as the basis for future project decisions. Scope definition – subdividing the major project deliverables into smaller more manageable components Scope Verification – formalizing acceptance of the project scope Scope Change Control – controlling changes to project scope Eric Abhyankar - Instructor Page 15 BMCF 2.2 Work Breakdown Structure (WBS) ***** Definition – A WBS is a deliverable oriented grouping of project elements that organizes and defines the total scope of the project. WORK NOT IN THE WBS IS OUTSIDE THE SCOPE OF THE PROJECT. A WBS is presented in chart form (similar to a spreadsheet) where each descending level represents an increasingly detailed description of the project elements. Each item in the WBS is assigned a unique identifier; these identifiers collectively are known as code of accounts. The items at the lowest level of the WBS are referred to as work packages. In very complex projects, work element descriptions are often collected in a WBS dictionary. A WBS dictionary will typically include work package descriptions as well as other planning information such as schedule dates, cost budgets, staff assignments. EXERCISE: WBS Eric Abhyankar - Instructor Page 16 BMCF 2.3.1 Inputs to Initiation Product description Strategic plan Project selection criteria Historical information Eric Abhyankar - Instructor Page 17 BMCF 2.3.2 Inputs to Scope planning Product description Project charter Constraints Assumptions Eric Abhyankar - Instructor Page 18 BMCF 2.3.3 Inputs to Scope Definition Scope statement Constraints Assumptions Other planning outputs Historical information Eric Abhyankar - Instructor Page 19 BMCF 2.3.4 Inputs to Scope Verification Work results Product documentation Eric Abhyankar - Instructor Page 20 BMCF 2.3.5 Inputs to Scope Change Control Work breakdown structure Performance Reports Change Requests Scope Management plan Eric Abhyankar - Instructor Page 21 BMCF 2.4 Project Planning What is Project Integration Management? – includes the processes required to ensure that the various elements of the project are properly coordinated. Project plan development Project plan execution Overall Change control Eric Abhyankar - Instructor Page 22 BMCF 2.4.1 Elements of a Project Plan (PMI) Project Charter A description of the project management approach or strategy (a summary of the individual management plans from the other knowledge areas). Scope statement which includes project deliverables and the project objectives Cost estimates, scheduled start dates and responsibility assignments to the level of the WBS at which control will be exercised. Performance measurement baselines for schedule and cost Major milestones and target dates for each Key or required staff Key risks, including constraints and assumptions, planned responses for each management plans, including scope management plan, schedule management plan, etc. Open issues and pending decisions Eric Abhyankar - Instructor Page 23 BMCF 2.4.2 Group Exercise Each Group should pick one project from the list of typical projects in their organization or companies Write the Project Plan incorporating the elements of the project plan (Assume that the project has not yet started). Hint: Use the WBS you have prepared earlier Eric Abhyankar - Instructor Page 24 BMCF 2.4.3 Project Plan Execution What are the tools and techniques required for Project plan execution? General Management skills Product skills and knowledge Work authorization system Status review meetings Project Management information systems Organizational procedures QUESTION: What percentage of a project’s budget will be expended in Project Plan execution? Eric Abhyankar - Instructor Page 25 BMCF 2.4.4 Overall Change Control ***** Overall Change Control is concerned with (a) influencing the factors which create changes to ensure that changes are beneficial, (b) determining that a change has occurred and (c) managing the actual changes when and as they occur. Inputs to Overall Change control System: (a) Project Plan (b) Performance Reports (c) Change Requests Tools and Techniques for overall change control Change Control Systems Configuration Management Performance measurement Additional planning Project Management Information system Eric Abhyankar - Instructor Page 26 BMCF 2.5 Conflicts and Negotiation Under what circumstances do conflicts arise on projects? When should the PM use negotiation to resolve conflicts? Project Team conflicts Customer conflicts – Scope creep Change Control conflicts Vendor/Sub contractor conflicts Eric Abhyankar - Instructor Page 27 BMCF 2.5.1 Categories of Conflict Groups working on projects may have different goals and expectations There is considerable uncertainty about who has the authority to make decisions There are interpersonal conflicts between people who are parties-at-interest in the project Eric Abhyankar - Instructor Page 28 BMCF 2.5.2 Conflicts in the Project Team Dynamics of team formation Forming Storming Norming Performing Adjourning Eric Abhyankar - Instructor Page 29 BMCF 2.5.3 Principled Negotiation Separate the people from the problem Focus on interests, not positions Before trying to reach agreement, invent options for mutual gain Insist on objective criteria Eric Abhyankar - Instructor Page 30 BMCF 2.5.4 Why do Project Teams fail? Poorly developed or Unclear goals Poorly defined Project Team roles and interdependencies Lack of Project Team motivation Poor communication Poor Leadership Turnover Among Project Team Members Dysfunctional behavior Eric Abhyankar - Instructor Page 31 BMCF 2.5.4 Group Exercise Group A - Customer Group B – Project Team Group C – Sub contractor Identify areas of potential conflict. How will you use Principled Negotiation to resolve conflicts? Eric Abhyankar - Instructor Page 32 BMCF 2.6 Project Cost Estimation Project Cost Estimation and Management includes the processes required to ensure that the project is completed within the approved budget. Resource Planning – determining what resources (people, equipment, materials) and what quantities of each should be used to perform project activities. Cost Estimating – developing an approximation (estimate) of the costs of the resources needed to complete project activities. Cost Control – controlling changes to the project budget Eric Abhyankar - Instructor Page 33 BMCF 2.6.1 Inputs to Resource Planning Work breakdown structure Historical information Scope statement Resource pool description Organizational policies Eric Abhyankar - Instructor Page 34 BMCF 2.6.2 Inputs to Cost Estimating Work breakdown structure Resource Requirements Resource Rates Activity duration estimates Historical information Chart of accounts Eric Abhyankar - Instructor Page 35 BMCF 2.6.3 Inputs to Cost Budgeting Cost Estimates Work breakdown structure Project schedule Eric Abhyankar - Instructor Page 36 BMCF 2.6.4 Inputs to Cost Control Cost Baseline Performance Reports Change requests Cost management plan Eric Abhyankar - Instructor Page 37 BMCF 2.7 Scheduling Also known as Project Time Management. What does Scheduling consist of? Activity Definition – identifying the specific activities that must be performed to produce the various project deliverables Activity sequencing – identifying and documenting interactivity dependencies. Activity Duration Estimating – estimating the number of work periods which will be needed to complete individual activities Schedule Development – analyzing activity sequences, activity durations and resource requirements to create the project schedule Schedule control – controlling changes to the project schedule. Eric Abhyankar - Instructor Page 38 BMCF 2.7.1 Inputs to Activity Definition Work Breakdown structure Scope statement Historical information Constraints Assumptions Eric Abhyankar - Instructor Page 39 BMCF 2.7.2 Inputs to Activity Sequencing Activity List Product description Mandatory dependencies Discretionary dependencies External dependencies Constraints Assumptions Eric Abhyankar - Instructor Page 40 BMCF 2.7.3 Inputs to Activity Duration Estimating Activity List Constraints Assumptions Resource requirements Resource capabilities Historical information Eric Abhyankar - Instructor Page 41 BMCF 2.7.4 Project Network Diagrams - Homework Find the Network, expected activity time and critical path Modern PM software such as Microsoft Project can automatically generate CPM networks Eric Abhyankar - Instructor Page 42 BMCF 2.7.5 Inputs to Schedule Development Project Network Diagram Activity duration estimates Resource requirements Resource pool description Calendars Constraints Assumptions Eric Abhyankar - Instructor Page 43 BMCF 2.7.6 Inputs to Schedule Control Project Schedule Performance reports Change requests Schedule management plan Eric Abhyankar - Instructor Page 44 BMCF 2.7.7 Group Exercise Develop a project schedule and project network diagram for the Project you have chosen for earlier exercises. Develop a budget for your project keeping in mind the resource requirements and the Project schedule. Hint: Use the Project Plan and WBS you developed earlier Eric Abhyankar - Instructor Page 45 BMCF Sessions Session 1 : Defining the Project Projects in Contemporary Organizations; The Project Manager; Project Organization Session 2 : The Planning Process Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling; Session 3 : Controlling the Project Resource Allocation; Monitoring and Information Systems; Project Control Session 4 : Putting the Discipline to work Risk Management; Project Auditing; Project Termination Eric Abhyankar - Instructor Page 46 BMCF 3.1 Resource Allocation The Resource Allocation problem – The problem of managing the trade offs among time, performance and cost utilizing the available resources. The extreme points of relationship between time use and resource use are: – Time Limited – The project must be finished by a certain time, using as few resources as possible. It is time, not resource usage that is critical. – Resource limited – The project must be finished as soon as possible, but without exceeding some specific level of resource usage or some general resource constraint. The points between these two extremes represent time/resource use trade offs Eric Abhyankar - Instructor Page 47 BMCF 3.1.1 Critical Path Method - Definitions Crashing definition – Taking action to decrease the total project duration after analyzing a number of alternatives to determine how to get the maximum duration compression for the least cost. Critical Path definition – In a scheduling diagram, the series of activities which determines the earliest completion of projects. Critical Path method definition - A technique used to predict project duration by analyzing which sequence of activities (or path) has the least amount of scheduling flexibility. Early dates are calculated by means of a forward pass using a specified start date. Late dates are calculated by means of a backward pass starting from a specified completion date. Critical activities in real world projects typically constitute less than 10% of the total activities Eric Abhyankar - Instructor Page 48 BMCF 3.1.2 Resource loading and Resource levelling - definitions Resource loading describes the amounts of individual resources an existing schedule requires during specific time periods. It gives the demands a project or a set of projects will make on a firm’s resources. Resource levelling aims to minimize the period by period variations in resource loading by shifting tasks within allowances. Homework - Solved problem on Page 443 of the text Eric Abhyankar - Instructor Page 49 BMCF 3.2 Monitoring and Information Systems Planning, Monitoring, Controlling cycle – key things to be planned, monitored and controlled are time (schedule), cost (budget) and performance/quality (specifications) PM must examine the project plan in order to extract performance, time and cost goals These goals should relate in some fashion to each of the different levels of detail e.g. activities, tasks, work packages etc. Data must be identified that measure achievement against these goals and mechanisms designed that gather and store such data. Eric Abhyankar - Instructor Page 50 BMCF 3.2.1 How should Data be Collected? Frequency counts – For example, number of missed milestones (project is delayed), number of defects in the project per week etc. Reported as events per unit time or events as a percent of a standard number. Raw Numbers – Actual project data such as dates, dollars spent, hours worked on activities, physical amount of resources used etc. These numbers are reported in a wide variety of ways but often as direct comparisons with an expected or standard number. Variances are reported either as the difference between actual and standard or as ratio of actual to standard. Subjective numeric ratings – These numbers are subjective estimates usually of a quality such as risk made by knowledgeable individuals or groups. Indicators – When the PM cannot measure some aspect of system performance directly, it may be possible to find an indirect measure or indicator. For example, the speed with which change orders are processed and changes are incorporated into the project is an indicator of team efficiency. Verbal measures – Measures for such performance characteristics such as “quality of team member cooperation”, “morale of team members” or “quality of interaction with the client” take the form of verbal characterizations. They may sometimes be measured by surveys. Eric Abhyankar - Instructor Page 51 BMCF 3.2.2 Project Reporting Communications Planning – determining the information and communications needs of the stakeholders: who needs what information, when will they need it, and how will it be given to them. Information Distribution – making needed information available to project stakeholders in a timely manner. Performance Reporting – collecting and disseminating performance information. This includes status reporting, progress measurement and forecasting. Administrative Closure – generating, gathering and disseminating information to formalize phase or project completion. Eric Abhyankar - Instructor Page 52 BMCF 3.2.3 Common Reporting Problems Too much detail – Unnecessary and too much detail both in the reports themselves and in the input being solicited from workers usually results in the reports not being read. Poor interface between the Project information system and the parent system – The parent organization’s information system must serve as a definitional prototype for the project’s information system. Reports should be built from standard and system available data as much as possible. Poor correspondence between the planning and the monitoring systems – If the monitoring system is not tracking information directly related to the projects’ plans, control is meaningless. Eric Abhyankar - Instructor Page 53 BMCF 3.2.4 Earned Value Analysis An aggregate performance measure for measuring the overall performance of the project.Earned Value Analysis is important in PMI examinations but in actual practice used in highly technical organizations such as Airbus or Boeing. Formulae: EV – AC = CV (Cost Variance, Cost overrun is negative) EV – PV = SV (Schedule Variance, Behind Schedule is negative) ST – AT = TV (Time Variance, Delay is negative) EV = Earned Value AC = Actual Cost PV = Planned Value ST = Scheduled Time AT = Time Variance Eric Abhyankar - Instructor Page 54 BMCF 3.3 Project Control Fundamental objectives: – The regulation of results through the alteration of activities – The stewardship of organizational assets Physical Asset Control – Project assets must be controlled Human Resource Control - Controlling and maintaining the growth and development of project staff Financial Resource Control – Project budget and capital investment control Eric Abhyankar - Instructor Page 55 BMCF 3.3.1 Types of Project Control Processes Cybernetic Control – Automatic negative feedback system to prevent deviation from standard. Go/No-go control – To determine if next activity can be started based on current information. Often represented by Traffic Lights. Postcontrol - Also known as “lessons learned”. Also reported through project performance analysis of Milestones, checkpoints, budgets, Final report on project results and concludes with recommendations for performance and process improvement. Eric Abhyankar - Instructor Page 56 BMCF 3.3.2 Critical Ratio Control Charts The Critical Ratio is made up of two parts : Ratio of actual progress to scheduled progress and the ratio of budgeted cost to actual cost: Critical Ratio = (Actual Progress/Scheduled Progress) X (Budgeted Cost/Actual Cost) A Critical Ratio of > 1 usually indicates no problems but a Critical Ratio < 1 usually predicts trouble in the project Eric Abhyankar - Instructor Page 57 BMCF 3.3.3 Formal Change Control System To review all requested changes to the project (both content and procedures) Identify all task impacts Translate these impacts into project performance, cost and schedule Evaluate the benefits and costs of the requested changes Identify alternative changes that might accomplish the same ends Accept or reject the requested changes Communicate the changes to all concerned parties Ensure that the changes are implemented properly Prepare monthly reports that summarize all changes to date and their project impacts Eric Abhyankar - Instructor Page 58 BMCF 3.3.4 Implementation of Change Control Systems ***** All project contracts or agreements must include a description of how requests for a change in the project’s plan, budget, schedule, and/or deliverables will be introduced and processed. Once a project is approved, any change in the project will be in the form of a change order that will include a description of the agreed upon change together with any changes in the plan, budget, schedule and/or deliverables that result from the change. For any but the most minor changes, a risk identification and analysis study should be performed. In order to study the potential impact of change, a simulation study may be conducted. Changes must be approved in writing by the clients agent as well as by an appropriate representative of senior management of the firm responsible for carrying out the project. The project manager must be consulted on all desired changes prior to the preparation and approval of change order. The project manager’s approval is not required. Once the change order has been completed and approved, the project master plan should be amended to reflect the change, and change order becomes a part of the master plan. Eric Abhyankar - Instructor Page 59 BMCF 3.3.5 Group Discussion Homework – Airbus A380 – read up on what is the latest on Airbus A380 Each Group has developed the WBS, Project and Budget cost estimate Class discussion on: – How the Project Resources will be allocated – How will the Project be controlled – What type of Project Reports should be generated – How will Project Change Control be implement Eric Abhyankar - Instructor Page 60 BMCF Sessions Session 1 : Defining the Project Projects in Contemporary Organizations; The Project Manager; Project Organization Session 2 : The Planning Process Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling Session 3 : Controlling the Project Resource Allocation; Monitoring and Information Systems; Project Control Session 4 : Putting the Discipline to work Risk Management; Project Auditing; Project Termination Eric Abhyankar - Instructor Page 61 BMCF 4.0 Risk Management Projects have uncertainty regarding project funding, the availability of necessary resources, potential technical problems, etc. Project Risk can be defined as any possible event that can negatively affect the viability of a project. – Risk = (Probability of event) (Consequences of Event) Risk Management is the art and science of identifying, analyzing and responding to risk factors throughout the life of a project and in the best interest of its objectives. Risk management consists of anticipating at the beginning of the project, unexpected situations that may arise that are beyond the project manager’s control. Eric Abhyankar - Instructor Page 62 BMCF 4.0.1 Risk Management - Process Risk Management comprises of four distinct process: – Risk Identification – process of determining the specific risk factors that can reasonably be expected to affect your project. – Analysis of probability and consequences – the potential impact of these risk factors, determined by how likely they are to occur and the effect they would have on the project if they did occur. – Risk mitigation strategies – steps taken to minimize the potential impact of those risk factors deemed sufficiently threatening to the project. – Control and documentation – creating a knowledge base for future projects based on lessons learned. Eric Abhyankar - Instructor Page 63 BMCF 4.0.2 Risk Identification Financial risk Technical risk Commercial risk Execution risk Contractual or legal risk Eric Abhyankar - Instructor Page 64 BMCF 4.0.3 Analysis of probability and consequences Reasonable estimate of the likelihood of each of these risk events occurring Probability combined with consequences provides a sense of overall project risk Risks classified as having both high likelihood of occurring (probability) and high potential for harming the project (impact) are most relevant to project planning Risks that fall into this category require detailed contingency planning in order to adequately protect the project’s development cycle. Eric Abhyankar - Instructor Page 65 BMCF 4.0.4 Risk mitigation strategies Accept Risk – in situations where we either have no alternative or we consider the risk small enough to be acceptable. Minimize risk – lower exposure to risk through partnerships or joint ventures Share risk – with stakeholders or other organizations Transfer risk – to other project stakeholders Eric Abhyankar - Instructor Page 66 BMCF 4.1 Project Auditing The project audit is a thorough examination of the management of a project, its methodology and procedures, its records, its properties, its budgets and expenditures, and its degree of completion The minimum six parts of a Project Audit Report: – Current Status of the project: Does the work actually completed match the planned level of completion? – Future status: Are significant schedule changes likely? What are the likely changes? – Status of crucial tasks: What progress has been made on tasks that could decide the success or failure of the project? – Risk assessment: What is the potential for project failure or monetary loss? – Information pertinent to other projects: What lessons learned from the project being audited can be applied to other projects being undertaken by the organization? – Conclusion: What assumptions or limitations affect the data in the audit? Eric Abhyankar - Instructor Page 67 BMCF 4.2 The Project Audit Life Cycle Project Audit Initiation: Starting the audit process, defining the purpose and scope of the audit, gathering information to determine proper audit methodology. Project Baseline Definition: Identifying performance areas to be evaluated, determining standards for each area and determining management performance expectations. Establishing an Audit database: Note: The required database for project audits should be specified in the project plan. Preliminary Analysis of the project: The auditor must analyze the data and then present the analysis to Senior managers. The auditors duty is to brief the PM on all findings and judgments before releasing the audit reports. Audit Report Preparation: The audit report as discussed in last slide. Eric Abhyankar - Instructor Page 68 BMCF 4.3 Project Termination Why is Project Termination important? How are projects typically terminated? – Termination by Extinction – normal completion of the project – Termination by Addition – when projects are spun off as independent new sub projects – Termination by Integration – When projects are successfully completed, the resources and project output is returned to the parent organization. – Termination by Starvation – Project closes on its own due to lack of funding, disinterested Senior Management etc. Eric Abhyankar - Instructor Page 69 BMCF 4.4 How should Project Termination be handled? Ensure completion of the work, including tasks performed by subcontractors. Notify the client of project completion and ensure that delivery is accomplished. Acceptance of the project must be acknowledged by the client. Ensure that ALL documentation is complete including project Final Report. Clear for final billings and oversee preparation of final invoices sent to the client. Redistribute personnel, materials, equipment, and any other resources to the appropriate places. Clear project with legal counsel or consultant. File for patents and record NDAs. Ascertain product support requirements, decide how such support will be delivered and assign responsibility. Oversee the closing of the project’s books. Eric Abhyankar - Instructor Page 70 BMCF 4.5 Why do Projects fail? A Project based organization is not required. Insufficient support from Senior Management. Appointing the wrong person as Project Manager. Poor planning. Eric Abhyankar - Instructor Page 71 BMCF Sessions Session 5 : The Future of Project Management (Extra) Types of Roles; Portfolio Management; Knowledge Management; Oral Presentations Eric Abhyankar - Instructor Page 72 BMCF 5.1 Current Project Management methodologies Project Management Institute (PMI) – www.pmi.org PRINCE (PRojects IN Controlled Environments) www.prince2.org.uk . Eric Abhyankar - Instructor Page 73 BMCF 5.2 Tool Set What are some of the tools used in Project management? Microsoft Project (universal) Planview (Portfolio Management Tool) Project Work Bench (PWB) Eric Abhyankar - Instructor Page 74 BMCF 5.2 Project Portfolio Management **** Project portfolio management groups projects so they can be managed as a portfolio, much as an investor would manage his stocks, bonds and mutual funds It gives executives a bird's-eye view of projects so they can spot redundancies, spread resources appropriately and keep close tabs on progress Previously, projects were approved and then managed independently. They were evaluated as a whole at the executive level only when it came time to put together annual reports. A company needs that overall view so it can keep an eye on projects in real time to make sure that all of them are working together to meet core business goals Focus on projects as a portfolio of investments - how much a project will cost, its anticipated risks and returns in relation to other projects. This way, entire portfolios can be managed to produce the highest returns based on current conditions Managed by a Portfolio Manager or Program Manager Eric Abhyankar - Instructor Page 75 BMCF 5.3 Knowledge Management Anecdotes ”I call my field knowledge management but you can’t really manage knowledge. What a company can do is manage the environment that optimizes knowledge.” (Larry Prusak, Managing Partner, IBM Global Services) Eric Abhyankar - Instructor Page 76 BMCF 5.4 What is Knowledge Management? Knowledge is the information that adds value and helps make the right choices Knowledge Management is the management of this added value information. We define added value information as industry info, competitor info, IT-info, experience, individual and departmental specific information Wisdom Knowledge Information Data Eric Abhyankar - Instructor Add context Add understanding Add judgment (values) Page 77 BMCF 5.5 Types of Knowledge Explicit: Tacit: Formal and systematic Insights, intuitions, and hunches Knowledge of rationality (mind) Knowledge of experience Can be expressed in words and numbers Not easily visible and expressible numbers Easily communicated and shared in form of hard data, Highly personal, hard to formalize, difficult to communicate or share with others formula, codified procedures, or universal principles Rooted in individual’s actions and experiences, including ideals, values, or emotions Can be expressed in computer code, chemical formula, sets of general principles Managed by tools Eric Abhyankar - Instructor Managed by Mentoring, Q&A and practises Page 78 BMCF 5.6 Knowledge management implementation strategy Processes Are the implemented processes supporting the accumulation and preparation of data as well as the distribution and use of explicit knowledge? Culture Are the people in the organization enabled and motivated to share knowledge? Is the management exemplary in sharing knowledge? Do the experts have the feeling of transparent decisions? MGT systems What is measured? Does it really match to the managements expectations? How does the organization support their knowledge workers with IT-Infrastructure? TECHNOLOGY Eric Abhyankar - Instructor Page 79 BMCF Best Wishes Many thanks for your participation and Good Luck ! Eric Abhyankar - Instructor Page 80