SAP consults Acando AB

advertisement
Curriculum Vitae
Harriet Arndt Bark
Curriculum Vitae
Harriet Arndt Bark
Biskop Nils väg 36
17676 Järfälla
Mobile: +46 709 421016
Email:
harriet_arndtbark@hotmail.com
Website: http://www.arndtbarkt.com
Date of Birth: 16th April 1955
Personal Statement
Applications consult within my SAP, having long experience and focusing on the SAP modules MM and SD Practical assignments
working with international manufacturing companies where I have participated in several projects. Implementation projects,
upgrades as well as development projects. My role has stretched from being a project member, heading support to working with
SAP in a line organisation. Personal characteristics describing me is that I keeping things in order, accuracy and analytical ability
together with a systematic way of working and social skills.
Education/Training
2008 SD Internal coerce, Acando AB
2008 PROPS Introduction, Acando AB
2006 Variant Configuration on Ericsson, Ericsson, Kista
2006 SAP Solution Manager, Acando AB
2005 LSMW and SNOTE in SAP, Internally on Resco AB
1998 Microsoft Word, Excel, Power point and Word, Mitel Semiconductor AB
1998 Business Warehouse introduction training, SAP
1998 CA010 Authorization Concept, SAP
1995 Lotus Notes mail, Mitel Semiconductor AB
1995 Configured Material Management (Procurement, Inventory Management, invoicing), SAP
1995 MM02 - Material Management II, Procurement and Inventory Management, invoicing, SAP
1995 MM01 - Material Management II, Procurement and Inventory Management, invoicing, SAP
SAP Experience
SAP – Material Management, Sales & Distribution, Production Planning
Microsoft Office package
Lotus notes mail en SharePoint.
Software Experience
Microsoft office
SAP
Lotus notes
Personal Website
www.arndtbark.com
Hobbies & Other Interests.
Reading, gardening, music, films, theatre, sporting, travelling and much more
Current Employment
SAP Solution Manager
Maquet Critical Care
2012.08 – 2013.01
Work as an employee on the company. Involved in there upgrade/implementation for ECC 6.0. First Line support in MM
and SD.
Work History
SAP consults
CIBER AB
2011.08 – 2012.08
Assignment: Fujitsu Sweden
Upgrade project with focus on Sales tax and VAT process and End user training and support
I have been involved in several projects during my year on Acando AB
SAP consults
My own company
2009.11 – 2011.08
Today I work with two customers and helping them with the daily support of the SAP system. I help them to have the
master data updated, training, documentation and some configuration of SAP if needed. All this I do for MM, SD and
PP.
Customer: Gas Turbine Efficiency and Coop Sverige.
SAP consults
Acando AB
2001.05 – 2009.10
I have been involved in several projects during my year on Acando AB
List of projects on Acando AB:
2008 – ABB Estonia
Authorization concept
Assignment: Mapping Swedish roles to the roles for ABB employee. SOX control for all the roles against the ABB
rules. Documentation
Individual contribution: Authorization concept knowledge.
2008 – Coop Sweden AB
R/3 Administration and Development (KF002A)
Assignment: Administration and development of Coop Sweden SAP legal systems as a logistic consultant (SD, EBP
and Economy). Support and development
Individual contribution: An Internet sales solution and EBP. Daily support. Modules MM, SD, FI and EBP
2008 – Gas Turbine Efficiency
ARES SAP Implementation
Assignment: Create a new Company Code (USA) in the old SAP solution.
Individual contribution: Responsible for the configuration of the system in MM/SD/PP and documentation.
2007 – Gas Turbine Efficiency
GTE Maintenance of SAP solution
Assignment: Migration project to the new company code. Responsible for all master data- and transaction data
load with help of SAP/LSMW. Configuration of SD and MM. Analyzing system problem.
Individual contribution: My main effort in this project was my earlier knowledge of the company and I was
involved in the configuration of the new company code in the last project.
2007 – FLIR System
Global template and service
Assignment: Implementation of a global SAP template, including solutions for Economy (FI/CO), Logistics
(SD/MM), Production (PP/ECM) and Services (CS). Rollout of template in several countries.
Individual contribution: System support and development for MM. Roll-out for UK and Estonia. Responsible for MM
Configuration and Intercompany settings.
2007 – COOP Sweden AB
R/3 Administration and and Development (KF002A)
Assignment: Administration and development of Coop Sweden SAP legal systems as a logistic consultant (SD, EBP
and Economy). Problem analyzing.
Solution: An Internet sales solution and EBP. Daily support for the Non-Direct purchasing and master data of the
organisational and- store master. Responsible for the SAP configuration for OKQ8 project. Training of a new
employee on Coop IT.
2007 – Sound & Vision
Authorization in ECC and CRM
Assignment: Create roles and profiles for the user to the customer.
Individual contribution: Roles, Authorization and profiles.
2006 – Nässjö Tryckeri AB
Project Management SAP Implementation
Assignment: Responsible for the creating Acceptance test script with WM related topics
Individual contribution: Knowledge in Logistic area and Warehouse Management
2006 – Gas Turbine Efficiency
GTE Maintenance SAP solution
Assignment: Responsible for implementation of SD/MM/PP at GTE. Upload Master Data with LSMW
Individual contribution: Logistic process in SAP (MM, SD and PP)
2006 - PNL
Mapping of project situation today
Assignment: Mapping of project situation today. I was responsible for the technical specification of the
configuration settings in SAP. Create Process description for Purchasing Module. Troubleshooting between MM
and CO/PA.
Individual contribution: Troubleshooting role. Only documentation of the situation for the company
2005 – SAP Svenska AB
SAP Best Practice
Assignment: Final testing of the new my SAP version regarding Best Practice Nordic Baseline 5.0.
Individual contribution: Learning about Baseline.
2005 – Volvo IT Project Scope
Business Blueprint review
Assignment: Project with focus to handle transports services on Volvo Logistic. Main work for was together with
the project create the Business Blueprint and possible solutions. The work also includes planning, realization of
demonstration, training and workshops around SAP and the new solutions.
Individual contribution: How to work with SAP and transport industry process.
2004 - Falck Security
Improvement configuration sales
Assignment: Project with goal to carry out a process- and layout improvement regarding customer information in
SAP. With the new solution Falck got an automated contract flow and their customer centre better summarized
information regarding current customers. I take part as an application consultant within MM and SD configuring
the system
Individual contribution: Improvement of configuration of SD module
2004 - SAPA Industries
Project SAPA
Assignment: Participating in SAP upgrading project going from version 4.0 to 4.7. Acting as a MM/QM Consult.
Individual contribution: Long expediency in both MM and QM that SAPA could use.
2004 – Ericsson AB. Global Purchase organisation
Ericsson AB, Global Purchase organisation
Assignment: Planning and carrying out a customer specific training regarding basic SAP purchasing processes. The
training took off based on SAP standard training material, but was formed to suit the customer specific area of
interest.
Individual contribution: Knowledge of customer specific purchasing process
2004 – Ericsson AB. Global Purchase organisation
Ericsson AB
Assignment: Application consultant working for Ericsson configuring solutions for selling units - MUS (market unit
solution) and CBS (common business solution). The assignment included GAP analyses – comparing the local
solution to the generic within Ericsson MUS solution, with the goal to get an accepted generic solution. Solution
to identified gaps mainly involved making changes in master data in the production environment, but also making
configuration changes. Furthermore the assignment also included to see to that the solutions became
implemented in all participating countries. I also had communication with the “super user” in respective country
concerning error reports which I analysed and solved. Necessary competence for this assignment was experience
of SAP processes regarding SAP project- and order handling (PS and SD module) and to have communicative and
pedagogic skills.
Individual contribution: Knowledge in MM/SD and PS modules
2004 – Ericsson AB. Global Purchase organisation
Ericsson Process and Application Consulting (EPAC)
Assignment: Application consultant working with Ericsson’s preconfigured solutions, ECA (Ericsson Cables
Solution), MIC (Microelectronic), ONE (internal time reporting application) and MUS (Market Unit Solution). My
assignment was to analyse and solve incoming problems, to develop the solution according to the user demands
and continuously keeping the documentation up to date. The work involved international contacts, although the
development was managed centrally in Sweden. During a period of a year I had the role as team leader for the
ECA solution team, which involved working with time estimates, new demands and processes and to plan staffing
resources. She also had monthly meetings with the application owner to set the development strategy.
Individual contribution: New knowledge in Warehouse Management
2001 – 2002 Ericsson Global IT
Ericsson Process and Application Consulting (EPAC)
Assignment: Application consultant working with Ericsson’s preconfigured solutions, ECA (Ericsson Cables Solution),
MIC (Microelectronic), ONE (internal time reporting application) and MUS (Market Unit Solution). My assignment was
to analyse and solve incoming problems, to develop the solution according to the user demands and continuously
keeping the documentation up to date. The work involved international contacts, although the development was
managed centrally in Sweden. During a period of a year I had the role as team leader for the ECA solution team, which
involved working with time estimates, new demands and processes and to plan staffing resources. She also had
monthly meetings with the application owner to set the development strategy.
Individual contribution: New knowledge in Warehouse Management
Other employment
SAP consults
Jan 2000 – May 2001
Accenture AB
2000 – 2001 Ericsson Global IT
Ericsson Process and Application Consulting (EPAC)
The project I was working on was TTC (Time-To-Customer and TTM (Time-To-Market)
Two solution template that was rolled out in many countries. My role was to support the role out and master data
upload. Configuration of MM to fit in the specific country.
SAP consults
Mitel Semiconductor AB
Aug 1995 – Dec 2000
I start may career here with training in MM on SAP. I was involved in the implementation project on the company with
responsibility of all MM activities My roles vas to configure the system in MM, documentation of the Business Blueprint
and training all employees. After that I work a lot with support end development. I was also involved in the later project
regarding merging an upgrade to a new version in SAP. Most of this work was placed abroad.
Referee’s
Name
Mobile:
E-mail:
Name
Mobile:
E-mail:
Project leader on Maque MShape project
Per Honkanen (2012-2013)
per.honkanen@maquet.com
Former chief (2012-2013)
martin.tagstrom@maquet.com
Download