TG Fluid Systems, USA Corporation AME Annual Conference, 2010 Who is Toyoda Gosei? • 25,000 Employees • Four Business Units Int/Ext, Body Sealing, Safety Systems & Functional • $6 Billion Sales • 16 Countries • 45 Facilities – North America, 9 Manufacturing Divisions 2 Introduction to TGFSUS • 1996: Started Production as Eagle-Picher Fluid Systems. – Manufacturing Location: Green Oak Township, Michigan – Sales and Engineering: Green Oak Township, Michigan • 2000: Toyoda Gosei Acquired Eagle-Picher Fluid Systems • 2000: Changed name to TG Fluid Systems USA Corporation • 2004: Moved operation to Advance Street, Brighton 3 TG Fluid Systems, Summary • Plant Floor Space: 56,000 Sq. Ft. • Warehouse: 20,000 Sq. Ft. • Office Space: 14,000 Sq. Ft. • Team Members: 215 – Hourly: 173 – Salary: 42 4 TGFSUS Ownership Subsidiary of Toyoda Gosei North America – Directors of TGFSUS: • Hiromi Ikehata (Chairman) • Scott Maly Toyoda Gosei North America- subsidiary of Toyoda Gosei Company Ltd 5 What is our Purpose? • Rapidly respond to the needs of Fuel Tank manufactures. • Requires: – Product Technology – Design Support – Competitive Cost – Rapid Response 6 The Tank System We Support • Fuel Feed and Return • Fuel Fill – Canister Vent Systems – Recirculation – Fresh Air • Running Loss – Vent Line 7 Vision, Values and Mission • Vision: Through superior support to our customers, our customers advocate TGFSUS. • Values: Focus for growth; Innovative solutions; Passion to deliver; Enthusiastic leadership; Trustworthy and Loyal • Mission Statement: To provide globally innovative, dependable solutions that customer's value. 8 Fuel System Market, Tank Only 12M SAAR 9 Customer Base 2010 10 Revenue *Forecasted 11 TGFS Manufacturing System • Hoshin Kanri- Business Planning – – – – Vision, Values, Mission and Goals Key Initiatives Key Operating Indicators that support goals- 32 Daily, weekly and monthly review • Heijunka- Level manufacturing system – Kan Ban: extrusion, assembly and shopping • Root Cause and Countermeasures- 5 Why, Poka-yoke, Yoketen, 5S/2S1Y • Build and enforce culture- Culture Fit & PMT • Consistent Communication 12 Strength, Standard and Stable • Key Operating Indicators – Support the Business Plan – Managers – Team Leaders – Drive Standardize and Stabilize – Data Driven – Root Cause and Countermeasures – Drive accountability 13 32 Key Operating Indicators Review RC & CM Weekly with mgrs Review RC & CM Weekly with mgrs No Review RC & CM Weekly with mgrs 14 Strength, Process Improvement • Tube Forming – Fully Manual to Fully automated • 5 phases – Active interaction with machine & tool builder – ROI: 5-9 months – Reduces repetitive motion injuries by 80% – Banned: • “Can’t” • “Hope” 15 Tube Forming Technology (-)Ergo, (-)Quality, (-)Efficiency (-)Floor space, (+) Efficiency, (+)Quality Oven (-)Efficiency and (-)tooling cost B1 (-)Efficiency B2 B3 16 Forming Variation Oven B2 B3 Many tools, many people, few controls 2-4 tools, 1 person, few controls 1 tool, no people, many controls 17 TGFS Direct Labor Requirements 210 Direct Labor Savings 16 190 14 170 Sales Vol. 46 24 more if no improvement 150 12 19 10 61 B3 Formers 130 8 (started 2005) 39 110 6 9 Robotic Cells 3 - R1 4 - R2 2 - R3 (started 2007) 6 2006 2007 90 4 2008 2009 70 2 50 0 2006 2007 2008 2009 B3 Baseline level of staffing at 2006 rates (we had 0 Robotic Cells and 10 B3's in 2006). If no additional productivity improvements and no additional B3's and Robotic cells were added, assembly technician requirements would be 39 more (134 vs. 95) than what our current processes (9 Robotic Cells and 61 B3 Machines) require for today's volumes. FY2009 Manpower requirements are calculated from August 2009 revised sales volume forecast from TGNA Sales Planning Department (9.9m total NA vehicle volume; 1.3m Toyota NA vehicle volume). 18 R-Series B3 ROI = ~ 95.5% Average B3 cost is $67k. Average annual labor savings is $64k Robotics ROI = ~ 58.0% Average Robotic Cell cost is ~ $350k Average annual labor savings is ~ $205k (Tooling cost is approx. $60k per assembly) Productivity gains result from: 1. Improved material flow 2. Training 3. Increased seniority of assembly technicians. 4. Employee suggestions (EI program) Productivity Improvement Opportunity • Business Plan – Does not Include all Stake Holders – Lacks SWOT, PEST (political, economic, social, technical) – 12 month horizon – Slow to react to market and culture trends – Does not fully engage the team – Lacks prioritization for the Team 19 Hoshin Kanri, 2009 1. Weekly tracking 2. Ensure rhythmic work 3. Activities should drive results- Activities That drive Sustainable Results 1. Objectives 2. Dept KPI or KOI 3. Annual plan- April thru March 4. Recommend 2 Job Schedule or 13 week plan to provide evidence of Activities That Drive Results Idea Formation Objective Method Form 1. Reflection for current year per Policy Item 2. 5 Why drives this document 3. This is a key supporting document to Roles and Responsibilities and Policy Idea Sheet Policy Idea Sheet 1. Role and Responsibilities of department and impact on the Company policy 2. Sate current state and target for the next four years. Consider department priorities when setting target 3. Consider action to sustain 4 and 5 at that level Reflection, Standardization Roles and Responsibilities 20 2011 Vision Through superior support to our customers, our customers advocate TGFSUS Standardize and Stabilize Rhythm Throughout TGFSUS Continue Quality: .5/0/0 PPM (All customers/Toyota/Honda) Enhance Sales: $60 Million Re-Challenge Profit: 10% (EBIT) Evolve TPS Certified President 2010 Policy and Annual Key initiatives (KI) Mission: To provide globally innovative, dependable solutions that customer's value. Values: Focus for growth; Innovative solutions; Passion to deliver; Enthusiastic leadership; Trustworthy and Loyal Policy 1) Safety: Identify Potential Safety issues quickly and implement countermeasures plant wide Metric Evaluation 2009 Policy 2009 APP Policy 1. Improve Safety Safety Metric Results Frequency Results 2009 Rating Bearing Goal 2.9 6 All TGFS team members understand “reflection” and use it in the planning B Plan phase of PDCA. Approved Approved Approved The use of the 5-why tool is integral to improvement at TGFSUS. KOIs will clearly state the root cause- 5 why 2. Improve Development of Team Leaders: Self Team Members sufficient, zone or department leaders, manage their zone or department's SQCD metrics, Take corrective actions as required. Develop exceptional people and teams through Team Leader development Discipline introduced to all change points 5S MCCs are maintained and 3. Improve effective Quality Internal PPM Internal PPM Internal PPM Efficiency Internal PPM Internal PPM 2S1Y MCC Audit Efficiency Standardized tasks (Man Internal and or Method) PPM 4 3 1483 1000 2.5 1483 1000 2.5 1483 96.4 1000 100 2.5 1484 1003 Policy 2) Team Members: Development of our People never slows down with a focus on improvement and the 1483 83 1000 80 3 3 66 96.4 100 100 2.5 1482 1001 2.5 ManufacturingLabor cost with variance analysis for month and YTD based on the flex budget. Efficiency 96.4 100 2.5 Manufacturing- Scrap cost with variance analysis for month and YTD based on Internal the flex budget. PPM 1483 1000 2.5 Extrusion- Scrap cost with variance analysis for 4. Improve month and YTD based on Extrusion Financial Strength the flex budget. Scrap 62000 85000 5 68000 4 3.1 4 Efficiency Stop and fix problemsdon’t step over/don’t Internal work around any issues PPM 5. Improve Quality and Use Visual controls so that Financial Strength no problems are hidden 6. Improve Technology Policy 3) Quality: Do not make defects, Do not pass defects to our customer, customer first. 3.5 96.4 B3/R2&5 100 1481 1000 Efficiency 96.4 100 Internal PPM Efficiency 1483 1002 Use only reliable, thoroughly tested Internal technology PPM Tube Development Plan implemented that meets needs of Detroit 3 and JOEM customers through 2013 customer- TPS is our model Kl 2.1- Manufacturing/Extrusion: A. Develop A/T quality accountability plan. B. Completion of Team Leader level III training. C. Full participation & support of A/T training programs, visualize training status (TWI if applied). D. Team Leader development training. E. Basic skills training for Extrusion Backups. F. Training on trending software on Davis and Diamond lines for all Techs. KI 2.2- HR /Admin: Performance Management Fully integrated (Policy Initiative) A. TWI training implementation B. Employee's seeking their own feedback for advancement, growth & success. KI 2.3- MSI: A. Develop and roll out training plan for skilled trades. KI 2.4- Quality A. Develop Quality Personnel using syllabus for each new job area. B. Develop objective criteria or use other criteria to test Quality personnel progress. C. Standardize the training program for all future Quality Personnel. D. Expand knowledge through ASQ certifications. KI 2.5- Engineering: A. MS Project training for Marc/Justin B. TPS training for Deb C. Inventor Training for Doug Kl2.6- Finance A. Finance 101: Take - always for monthly financial reviews. B. Hand off monthly reporting preparation. KI2.7-PPP: A. Write procedures for HVPT's B. Develop process for identifying HVPT roadblocks. C. Assign someone to each HVPT roadblock and maintain open uses list. K1 2.8-EHST: A. EMP 001: Support for energy efficiency (PPP, Finance) i.e.; air leak detection. B. EMP 002: Support for waste reduction (Materials Dept.) i.e.; dunnage reduction use and storage. C. EMP 003: Support for Noise reduction (Eng. Dept.) i.e; checklist for external builders of machines. KI 2.9-Materials: A. SPWF for logistics outbound and outside logistics tech. B. Tracking of PC Impact Near Miss. C. Work with customers to increase ship frequency to reduce volatility. 3 Material Cost- Positively exceed TGNA Purchasing forecast for material Cost increase/decrease. Reductions 72000 Minimum- Achieve Flex Budget EBIT 5.3 All new processes better then NAFTA IRR hurdle Improve productivity by 20% Build self reliance. B3/R2&3 B3/R2&4 KI1.1-EHST: A. Lead safety/erg. checklist development for machine builders: TPS responsibility. B. Lead 5S Kaizens's for select projects with erg./safety issues. C. Communicate results via KOI countermeasure updates. KI 1.2- Engineering: A. EMP003: Support to achieve <85Db limit by addressing the B3 machines B. Ergo/Safety standards and PFMEA utilization to allow for Jidoka upfront, at the design phase. Kl 1.3-MSI: A. Develop and roll out 5S plan. B. Plan and execute safety walks for responsible areas. C. Identify safety training needs and request such training. Kl1.4- Manufacturing/Extrusion: A. Establish new 5S instructions & visual references at cells & T/L boards. B. Complete 5S monthly audits to confirm intended results. C. Schedule T/L & A/T participation in safety training during 2010. D. Dedicate locations for all dies, pins and adaptor tooling. Identify each tool and location with address labels. E. Eliminate hard wire connections on Davis line Extruders number 2 and 3, replace with gang plugs. Kl1.5-Finance: A. Upgrade cameras and security system. KI1.6-Materials: A. 5S Scan for safety. KI 1.7- HR: 5S Recognition Process/System (Policy Initiative) A. Increased hourly participation/engagement/support of a safety culture B. EMP 003: Support to achieve < 85 Db limit by addressing the B3 machines. 2.5 4 3.5 2.5 96.4 100 1484 1003 2 3.5 2010 Policy Development Situation; Environmental Factors Recovering Economy Oil Price increase JOEM and D3 recovering, US Sales- 10.8M, 2009; 12M, 2010 Supplier Bankruptcies Tight Credit for Personal and Business Currency Fluctuation Unemployment 10% most 2010 Consumer Sent. 80 by Jan(+10%) Foreclosure Rate still high Policy Initiatives KOI Accountability (All Dept) 5S Recognition Process/System (HR/Safety) Standardized Work (Quality) Zero PPM (All Dept) Value Added Focus (all) Performance Management Fully integrated (HR) 2010 Metrics Frequency: 4.3 Toyota PPM: 0 PPM All Customers: <1 EBIT ($46M sales): >5% Delivery: 100% 21 KI 3.1- Quality, Standardized Work (Policy Initiative) A. Clean up MCC's, add pokayokes, move responsibility for completion. B. Establish dummy samples for all MCC checks, standardize usage. C. Improve MAP's, simplify content and ensure use. D. Improve leak tester verification activity. E. Set standard 4M rules, publish and train. F. Review processes for input/output verification, close gaps found. G. Continue cell standardization, enhance visual management for all 4M's. H. Develop 4M boards for cells. I. Implement Change Point Check Sheet system to ensure readiness. J. Improve activity of recording change points for traceability. K. Focus on new employees as most demanding change point. L. Establish a multiple level visitation schedule for all customers (president, VP,QM & Customer Liaison). M. Establish KOI for measuring Customer Satisfaction. N. Refine & further define responsibility for communication/containment/actions when customer issues are detected. O. Establish firm rules about identification/marking/closure of certified parts (when not madated). KI 3.2- Engineering A. Updating and combining SO drawings (Family Style). B. Ergo/safety standards and PFMEA utilization to allow for Jidoka upfront, at the design phase. C. Tamazume Events to improve eff and reduce scrap. Kl3.3- Manufacturing /Extrusion: A. Develop A/T quality accountability plan in 2010. B. Full participation & support of A/T training programs, visualize training status (TWI if applied). C. Change Point Mgt. D. Mold flow analysis for head design for PA9T and ETFE. E. Dilute ink to reduce ink thickness on tubing. Document procedure/practice and train all Techs. F. Purchase Multiple parts cutter for GMII line. Reduce miscuts from "park-n-cut" style cutters. KI 3.4- MSI: A. Improve B3 quality through R & D. B. Jidoka and yokoten activity. C. Hire additional skilled trades resources and add flexible tooling PM activities. D. Develop and roll out training plan for skilled trades. KI 3.5-PPP: A. Combine Gateway task and sub-task lists into one and make charts more visual. KI3.5- EHST: A. Ergonomic Standards: Manuf. floor standards for machines and racks. KI3.6-Materials: A. In-sourcing of o-ring operation and impact to PA inventory levels. B. Review packaging specifications per customer to further reduce costs. Policy 4) Financial Strength: Continue to build a strong foundation and drive cost to be best in class KI 4.1- Finance: A. Break Even Point Management B. P & L Accountability Approval Improvement Opportunities • Business Plan Process – Hoshin Kanri to Hybrid…..One Page Plan • • • • • • • • • Hoshin One Page Plan 1PP Good to Great Interactive with manager conscientious Stake Holders 3-5 year Thrust, Business and Culture 18 month plan Focus Initiatives 90 Business review, re-budget 22 One Page Plan, 2011 23 Questions 24