Electrical Works
Student Services Area and Corridor










Remove all redundant lighting and power circuits, conduits and trunking fixed to the
ceiling and walls.
Remove all redundant data, phone, fire, security and CCTV cabling fixed to the
ceilings and walls.
Place the remaining data ,phone ,fire ,security ,CCTV, lighting and power cabling
in suitable trunking re- routing where necessary.
Replace the local Distribution Board located in the Kitchen and connect all new and
existing circuits to it.
Move the Data Panel from the Student Services Area to the Kitchen. Locate it
adjacent to the new Distribution Board and connect all new and existing data cables
to it.
Install circuits for LED lighting to be fitted in the new suspended ceiling grid in the
Student Services Area and Corridor. Allow for two-way switching in the Student
Services Area. Switches to be located by each entrance.
The type of Led fittings to be specified by the Interior Designer.
Allow a Provisional sum for 30 No. 600mm x 600mm LED panels. 27 to be located
in the Student Services Area and 3 in the Corridor. 5 of the 30 to be Emergency
light fittings.
Install 3 compartment skirting trunking plus power and data circuits around the
perimeter of the Student Services Area.
Allow for 42m of trunking and 30 -13A twin socket outlets and 30 data points.
Details of socket and data locations to be confirmed once the interior design is
complete.
Install one 13A cleaners socket in the corridor.
Replace the light fittings in the Kitchen and Exam room with 600mm x 600mm
LED panels.
Install 8 - 13A twin socket outlets and 4 twin data points at the foot of each of
the six columns in the Student Services Area. The circuits to be routed above the
suspended ceiling and down one face of each column using trunking or some other
suitable containment.
Reception Area



Reposition the Fire and Full Access Toilet Emergency Alert panels to suit the
location of the new reception desk.
The location to be determined by the Interior Designer.
Re-route power, data and telephone cables to suit the location of the new reception
desk.
Replace the light fittings with LED units.
The type of LED fitting to be specified by the Interior Designer.

Allocate Provisional sums for each of the Reception items allowing for 8 LED down
lighters 2 of which to be emergency units.
External Doors and Windows
Student Services Area and Corridor




Replace 6 high level wooden framed windows numbered – W3,W5,W6,W7,W8 and
W9 on Elevations drawing, with aluminium framed double glazed units.
Opening lights to be top hung and fitted with winder opening mechanisms.
Opening lights to be in the same locations as the existing units were possible.
Frame colour to match the buildings other aluminium framed double glazed units.
Replace existing wooden framed entry doors location W1 on Elevations drawing with
aluminium framed double glazed units with a double glazed side panel on the LH
side.
Note: Allow sufficient frame width between the door and glazed side panel for the
new corridor wall to fix to.
Frame colour as above.
Enlarge the openings of windows W2,W4 and W10 and install aluminium double
glazed windows with top hung opening lights.
Window size for W2 and W4 – 3m Wide x 2m High with 2 opening lights each
800mm wide.
Frame colour as above.
Window size for W10 – 2m Wide x 2m High with 1 opening light 800mm wide.
Replace wooden framed fire exit door D8 with a aluminium framed double glazed
entry door.
Frame colour as above.
Note: Door furniture to match existing. Euro cylinder locks to be supplied by the
College.
Internal Alterations
Student Services Area and Corridor




Remove high level window bars and security grills and place in the metals skip
provided by the College.
Replace wooden double doors from Student Services Area to Reception with fully
glazed units.
Install a double skinned plaster board partition wall to form an entrance lobby,
corridor and store room.
Install a pair of fully glazed double doors from the lobby into the Student Services
Area
Double Doors from Lobby to Corridor to be supplied by College
Store room door to be supplied by College.
Construct double skinned plasterboard and glazed partitions to form two adjacent
offices.


Install a suspended ceiling at 2.8m. Overall dimensions for the offices 3m x 5.2m.
Individual size 3m x 2.6m. Glazing panels on one wall of each office. Each panel
1m high x 1.2m wide fixed at 1.2m above floor level.
Office doors to be supplied by College.
The location of the two offices and full specification is to be provided by the Interior
Designer so allow a provisional sum based on the information above.
Construct 2.8m high partitions. Fully glazed to 2.1m with plaster board
over to form two adjacent Interview Rooms with glass doors. Install a 600 x 600 grid
suspended ceiling at 2.8m.
Overall dimensions for the Interview rooms 2.4m x 4.8m. Individual size 2.4m x
2.4m.
The dividing partition to be double skinned plaster board.
The location of the two offices and full specification to be provided by the Interior
Designer so allow a Provisional Sum based on the information above.
Install a 600mm x 600mm grid suspended ceiling throughout the rest of the Student
Services Area, lobby and corridor tailored to accommodate the ceiling mounted
heating panels.
Ceiling tile type to be specified by the interior designer.
Allocate a Provisional Sum for medium quality tiles.
FLOORING

Replace flooring in the lobby, corridor, Student Services Area,offices and interview
rooms.
Flooring materials to be specified by the Interior designer .
Allocate a Provisional Sum based on medium quality carpet tiles.
DECORATION

Re-paint the walls ,woodwork and ceiling mounted heating panels in the lobby,
corridor,Student Services Area, offices and interview rooms.
Colour scheme to be specified by the Interior Designer.
Allocate a provisional sum based on mixed paint colours.
Note:
Work to commence 13 July 2015. Completion by 14 August 2015.
Site visits by arrangement with :Jim Diston 0121 602 7749 ( on holiday until 15/6/15)