State of progress year 3

advertisement
RENAISSANCE
- LYON FRANCE
RENAISSANCE LYON
WP Progress and Plans - Year 3
(Oct 07- oct 08)
Béatrice COUTURIER
Job title, Greater Lyon
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
1
RENAISSANCE
- LYON FRANCE
WP 1: Research, Technical and Innovation
Development
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
2
WP 1.1: Energy policy, planning, research
RENAISSANCE
- LYON FRANCE
State of progress year 3: 6 first months
Summary of the work programme planned for
the period October 2007/March 2008
State of progress
-Experience feedback on the implementation of
the tertiary data repository for certain office
projects
-Generalization of the office environmental
management guide to all the urban projects led by
Greater Lyon
-Application as of 01/01/2009, of the conditional
grant principle (reduction if environmental
management instructions are not respected)
- Investigation of action plan about existing
housing based on the experience of Saragossa
partners.
Completed
Waiting for new
executive to be
designated
System approved in
October 2007
Launched with
members of the Lyon
consortium
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
3
WP 1.1: Energy policy, planning, research
RENAISSANCE
- LYON FRANCE
Analysis of progress
Strong / weak points:
Very positive experience feedback on office data repository
Few modifications need to be made to the document
 The data repository will be approved very shortly
Action plan on existing housing launched
-
Experimental site validated
Partners identified
Definition of the level of requirement
Exchange of experiences with co-owner associations in France
How to exploit collaboration / networking opportunities
- Examine to what extent the approach used in Valdesparterra can
be replicated in the French context
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
4
WP 1.1: Energy policy, planning, research
RENAISSANCE
- LYON FRANCE
Plans for the next 6 months
Concerning the office data repository:
Very widespread communication to the developers and
builders concerned (2nd and 3rd quarters 2008)
Concerning rehabilitation of existing housing:
Finding innovative tax and financial solutions (2nd and
3rd quarters 2008)
Developing a programme of work to be carried out on a
test sample of apartment blocks (2nd and 3rd quarters
2008)
Exchanges with the Saragossa partners on legal and
financial arrangements that could be duplicated in Lyon.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
5
WP 1.3 Wood-fuel supply chains
assessment and organisation
RENAISSANCE
- LYON FRANCE
State of progress year 3 - 6 first months:
Finalisation of the SRC study: to assess its
feasibility within the local surrounding
Launch of a technical and legal analysis on
contracts to manage (maintenance) wood-boilers
while reaching high energy performance
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
6
WP 1.3 Wood-fuel supply chains
assessment and organisation
RENAISSANCE
- LYON FRANCE
Analysis of progress
End of the SCR study (with economical and technical
indicators): presented to the different actors from the
wood resource and agriculture fields (who are not yet
mobilised)
Technical and legal work on contracts: not finished yet
(1st part about models of contracts done: but new
research still needed, depending on developers’ needs :
not known yet)
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
7
WP 1.3 Wood-fuel supply chains
assessment and organisation
RENAISSANCE
- LYON FRANCE
Plans for the next 6 months - end of year 3:
New items to be clarified between
developers and consultants
Consulting studies to be done,
proposal and synthesis: to be
followed (end of 2008)
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
8
WP 1.5: socio-economical aspects
RENAISSANCE
- LYON FRANCE
State of progress year 3 - 6 first months:
Election of the Concerto+ indicators: in concert with the
different local partners
Preparation of the action plan for inhabitants :
basis of the questionnaires :
election of the items
3 steps: “I buy my house” / “I prepare my arrival” / “I live in my
house”
methodology: indicators, persons to contact…
timing of the project
Concert’action program:
In abeyance since the refusal of financial in 2007
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
9
WP 1.5: socio-economical aspects
RENAISSANCE
- LYON FRANCE
Analysis of progress:
Plan for inhabitants:
Meeting with the Greater Lyon, developers, ALE, Hespul:
agreement on the 3 steps of the action plan
2nd step: “I prepare my arrival”: « livret d'accompagnement »
: to be realised in concert with SEM, developers and Greater
Lyon
Lack of concerted methodology between European
Concerto partners (to make a comparison possible)
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
10
WP 1.5: socio-economical aspects
RENAISSANCE
- LYON FRANCE
Plans for the next 6 months - end of year 3:
Questionnaires for the 1st step: “I buy my house”:
to find a date to realise them
to write the items more specifically
to define the investigators
to see the possibility of being helped by sociologists
To survey the realisation of the booklet accompanying in concert:
Different levels of information:
Presentation of the whole project of the Confluence area (SEM)
Presentation of the building (developers)
Presentation of the Concerto program (Greater Lyon/ALE)
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
11
WP 1.5: socio-economical aspects
RENAISSANCE
- LYON FRANCE
Plans for the next 6 months - end of year 3:
To exchange with the others European Concerto partners
about their methodology
Concert’action program: waiting for the nomination of the
new head of the PUCA. Training sessions in WP 5
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme
12
RENAISSANCE
- LYON FRANCE
Conclusions
ENERTECH
Contact
Malorie Clermont
Tel: 04 37 47 80 90
malorie.clermont@hespul.org