Project Narrative
Perkins+Will was commissioned to totally renovate and expand Long Middle School for the Atlanta Public
School system to accommodate 900 students. We reorganized the building to have a 6th grade cluster,
7th grade cluster, and 8th grade cluster. Each grade level has 9 general classrooms, 3 science rooms, a foreign language classroom, and a special education resource room as well as teacher workroom space and administrative areas.
To create the clusters we added a third floor on the main part of the building. Respecting the structural integrity of the original building, we posted up with new steel columns on the original building's exposed piers. Sun screens hang between the columns on the south side of the building.
Renovation of the kitchen, cafeteria, art and music rooms, gymnasium, and media center with new interactive labs is included in our design.
Building Exterior
Crawford Long Middle School is located at the end of a cul de sac. The building is sited below the entry drive. Prior to adding an additional floor, the view when approaching the school was of the roof. Now with a third floor, the school has a much improved scale and presence from the street.
Before
After
Building Exterior
The original school was a two story brick and concrete building with an exposed exterior structure. In order to respect the structural integrity of the original design, we added a third floor and posted up with new steel columns on the original exposed piers.
Addition Detail
Building Interior
Building Interior
Library Interior
Cafeteria Interior
Submitting Firm :
Project Role
Project Contact
Title
Address
City, State or Province, Country
Phone
Joint Partner Firm:
Project Role
Project Contact
Title
Address
City, State or Province, Country
Phone
Other Firm:
Project Role
Project Contact
Title
Address
City, State or Province, Country
Phone
Construction Firm:
Project Role
Project Contact
Title
Address
City, State or Province, Country
Phone
Architect
Barbara Crum
Principal
1382 Peachtree Street
Atlanta, GA
404-443-7613
C.D. Moody Construction
Joan Quinn-Cannon
Sr, Project Manager
6017 Redan Road
Lithonia, GA
770-482-7778
Project Name
City
State
District Name
Supt/President
Occupancy Date
Grades Housed
Capacity(Students)
Site Size (acres)
Gross Area (sq. ft.)
Per Occupant(pupil) gross/net please indicate
Design and Build?
If yes, Total Cost:
Includes:
If no,
Site Development:
Building Construction:
Fixed Equipment:
Other:
Total:
Crawford W. Long Middle School
Atlanta
GA
Atlanta Public Schools
Dr. Beverly Hall
January 2007
6 th -8th
936
16 acres
106,000
114
14.4 Million (Includes Site Development)
Owner Furnished
Building Exterior
The building was completely reglazed, restoring the original ribbon window design that had been compromised over the years by infill panels and exterior wall hung mechanical units. The north facing storefront in the cafeteria was also increased to create more views into the school and providing lots of natural light.
Crawford Long Middle School is located at the end of a cul de sac. The building is sited below the entry drive. Prior to adding an additional floor, the view when approaching the school was of the roof. Now with a third floor, the school has a much improved scale and presence from the street.
Before After