Autoflame sales semi..

advertisement
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Autoflame Australia
Autoflame Asia
Sales Quote
Autoflame Australia
Autoflame Asia
Autoflame Quote Sheet
World Leaders in Combustion Management
Solutions
Introduction
Autoflame Australia
Autoflame Asia
Sales Quote
Application
Retrofit
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Oz market- a slow start
Autoflame Australia
Autoflame Asia
Sales Quote
The AGA (Australian Gas Association)
- Autoflame approved globally with UL, cUL, CE, FM
- European codes (EN298)
- Paper work exercise (so claimed)
- Lost documents!!
- October 2008 – July 2009
- Mk6/mini Mk6 approved
- Mk7 and mini Mk7 unapproved
- October 2009 – September 2010
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Australian Code- AS2593
Autoflame Australia
Autoflame Asia
Sales Quote
- Single scanner is unacceptable for steam boilers above
1MW (100hp) and high temperature hot water boilers
(HTHW)
- Dual scanner requirement- either scanner fails then the
boiler shuts down
- Dual scanner requires UV or equivalent
- Currently using UV and IR
- Self-scanner required with maximum self-checking time of 5s
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Australian Code- AS2593
Autoflame Australia
Autoflame Asia
Sales Quote
- Dual low water level control required; primary and secondary
- Self-check operation required minimum every 10 minutes,
typically set to 5 minutes
- 100% of WL systems are PLC controlled for this reason
- Code requires conductivity probes
- Capacitance probes require special exemption from code
World Leaders in Combustion Management
Solutions
Introduction
Application
http://www.autoflame.com/
Retrofit
Return on Investment
Oz market- current and historical sales (systems)
Autoflame Australia
Autoflame Asia
20
Sales Quote
18
16
14
12
July 08 - June 09
10
July 09 - June 10
July 10 - June 11
8
July 11 - June 12
6
4
2
0
Mk7
Mk6
Mini
Mk7
evo
Mini
Mk5
EGA
DTI
WL
Total
Burner
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Oz market- current and historical sales (financials)
Autoflame Australia
Autoflame Asia
Sales Quote
80000
70000
60000
50000
Autoflame
40000
Limpsfield
30000
20000
10000
0
July 08 - June 09
July 09 - June 10
July 10 - June 11
July 11 - June 12
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Oz market- future sales (financials)
Autoflame Australia
Autoflame Asia
Sales Quote
350000
300000
250000
200000
Autoflame
Limpsfield
150000
100000
50000
0
July 08 - June 09 July 09 - June 10 July 10 - June 11 July 11 - June 12 July 12 - June 13
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Julia Gillard’s Carbon Tax
Autoflame Australia
Autoflame Asia
Sales Quote
The start of huge potential!
- Due to be enforced July 2012
- Cost per ton of carbon set at $23 (AUD)
- 500 companies set to be taxed initially with a further 500
within 2 years of the start
- Flyer to be sent to all prospective customers
Minor issue:
- Possible change in government
- Julia’s popularity lowest ever
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Oz market
Autoflame Australia
Autoflame Asia
Sales Quote
Completed projects:
- Goodman Fielder- bakery (2 MBtu *3)
- Star City Hotel & Casino (12.3 MBtu *4)
- Alice Springs hospital (7 MBtu *2)
- Steel River Brewery (5 MBtu *1)
- Weston Animal Foods (12.3 Mbtu *1)
- Tip Top
- Blush Tomatoes
- D’Vine Ripe
Upcoming projects
- Wagga Wagga laundry (2MW)
- Prysmian cables (2MW *2- Tamworth and PNG)
- Fletcher’s abattoir (10MW & 6MW)
- BE Campbell (6MW)
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Star City Casino
Autoflame Australia
Autoflame Asia
Sales Quote
Installed October-November 2008
Full Autoflame system plus EGA/DTI
First month- lowest gas consumption since 2003 (opening)
Second month- equally good
World Leaders in Combustion Management
Solutions
Introduction
Autoflame Australia
Autoflame Asia
Sales Quote
Application
Retrofit
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Application
http://www.autoflame.com/
Retrofit
Return on Investment
Autoflame Asia- overall financials
Autoflame Australia
Autoflame Asia
400000
Sales Quote
350000
300000
250000
GBP
GBP 200000
Autoflame
Limpsfield
150000
100000
50000
GBP
0
2004
2005
2006
2007
2008
Year
2009
2010
2011
World Leaders in Combustion Management
Solutions
Introduction
Application
http://www.autoflame.com/
Retrofit
Return on Investment
Autoflame Asia- financials by country
Autoflame Australia
300,000.000
Autoflame Asia
Sales Quote
250,000.000
200,000.000
Malaysia
Taiwan
China
GBP 150,000.000
Singapore
Thailand
Philippines
100,000.000
South Korea
Indonesia
50,000.000
0.000
2004
2005
2006
2007
2007
Year
2009
2010
2011
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Autoflame Asia- the players
Autoflame Australia
Autoflame Asia
Sales Quote
OEM’s (boiler)
- Mechmar (Malaysia)
- MacKenzie (Malaysia)
- Mechmar (Indonesia)
- Enertech (The Philippines)
- Cochran (China)
- Fulton (China)
Technology Centre’s
- Royalgem (China)
- Golden Flying Courser (Taiwan)
- International Combustion (Sinagpore)
- ESP Enersys (Malaysia)
- Innotech (Hong Kong)
- PT Cerna (The Philippines)/Cestra (The Philippines)
- PT Grand Kartech (Indonesia)
- Chung Woo (Korea)
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
China & Taiwan
Autoflame Australia
Autoflame Asia
Sales Quote
In the near future, all heavy oil burners need to be upgraded to
operate on natural gas as the primary fuel curve, so a huge
potential for Autoflame and Limpsfield
Royalgem
- Covering a large area (small company)
- Currently using 30-50 systems per year
- Language barriers have hindered progress in the market
- PetroChina looking to use 57 systems in the next year
GFC
- Numerous Autoflame systems in operation in Taiwan, and
Taiwanese companies in China
- Now looking at Limpsfield burners and several orders have
been placed in the past 3 months
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Autoflame Asia- working with the OEM’s
Autoflame Australia
Autoflame Asia
Sales Quote
Burner OEM’s
……
Boiler OEM’s
Most boiler OEM’s have used the Autoflame equipment through
a burner OEM, or have at least experienced the equipment in
the field
Boiler OEM’s looking for a burner option as well as controls
Combined Autoflame/Limpsfield presentation
- Sales/technical complete
- Basic sales- complete end of August
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Autoflame Quote Sheet
Autoflame Australia
Autoflame Asia
Sales Quote
Based on an audit from site (cost?), typically 5-15 pages
depending on site specific requirements and Technology Centre
offering
Formalised quotation typically is 4-8 pages, which is too long for
the customer and can be hard to comprehend
Aimed to show the customer all the different options that we
can offer in the most simple to read format
Looks at several solutions/options available for the client
Options to include MM, EGA, WL, DTI, new burner, e.t.c.
Savings are calculated using the Autoflame Emissions
Calculator primarily for fuel savings
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Autoflame Quote Sheet
Autoflame Australia
Autoflame Asia
Sales Quote
All formulas are made through excel
Allows us to input all anticipated costs for the project:
- Installation
- Sundries cost (cable, connectors, brackets, e.t.c.)
- Commissioning
- Optional service contract
And then review the actual costs post installation:
- Where did we lose money?
- Where did we make unexpected profits?
- What to change going forward?
World Leaders in Combustion Management
Solutions
Introduction
Autoflame Australia
Autoflame Asia
Sales Quote
Application
Retrofit
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
Emissions Calculator Savings
Autoflame Australia
Autoflame Asia
Sales Quote
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
Quantifying MM and EGA savings
Autoflame Australia
Autoflame Asia
Sales Quote
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Autoflame Australia
Autoflame Asia
Sales Quote
Application
Retrofit
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
Variable Speed Drive Savings
Autoflame Australia
Autoflame Asia
Sales Quote
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Autoflame Australia
Autoflame Asia
Sales Quote
Application
Retrofit
http://www.autoflame.com/
Return on Investment
Water and Utility Savings
- Improving feed water inlet temperature by temperature
controls
- Removing the Oxygen
- Correct pipe sizing
- DA tank flow and return pipes
- Reduce chemical dosing
- Measure TDS correctly
Maintenance Savings
- Correct PID control for changes in load demand (Autoflame)
- Autoflame built-in time clock
- Automatic cold start routine
- Lead/lag control and automatic changeover
Other Savings
- Reduced setpoint control
- Night setback
- Variable setpoint control based on plant operations
- Outdoor reset (outside temperature compensation)
World Leaders in Combustion Management
Solutions
Introduction
Autoflame Australia
Autoflame Asia
Sales Quote
Application
Retrofit
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Autoflame Australia
Autoflame Asia
Sales Quote
Application
Retrofit
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Autoflame Australia
Autoflame Asia
Sales Quote
Application
Retrofit
http://www.autoflame.com/
Return on Investment
World Leaders in Combustion Management
Solutions
Introduction
Application
Retrofit
Autoflame Australia
Autoflame Asia
Sales Quote
Thank you for your time
http://www.autoflame.com/
Return on Investment
Download