Powercor revised proposal unpublished documents

advertisement
POWERCOR REVISED REGULATORY PROPOSAL – JAN 2016
Attachments not published on AER website
Powercor provided further supporting information which we have not published on our
website due to the number of documents. However, if you wish to obtain a copy of this
material, please email VICElectricity2016@aer.gov.au.
We have listed the public documents submitted by Powercor but not published on our
website below:
PAL PUBLIC RRP ATT 2.2 Powercor Certificate of reasonableness of key assumptions
January 2016.pdf
PAL PUBLIC RRP ATT 3.1 SCER, RIS limited merits review of decision-making in the
electricity and gas reg frmwrks.pdf
PAL PUBLIC RRP ATT 3.1 HoustonKemp, Economic review of ERA's draft decision, 27
November 2014.pdf
PAL PUBLIC RRP ATT 3.11 Farrier Swier Consulting, Economic considerations for the
interpretation of the NGO, May 2014.pdf
PAL PUBLIC RRP ATT 3.12 Economic Insights, Regulation of suppliers of gas pipeline
services.pdf
PAL PUBLIC RRP ATT 3.13 Review of the limited merits review regime stage two report, 30
September 2012.pdf
PAL PUBLIC RRP ATT 3.14 AEMC, Review of the electricity transmission revenue and
pricing rules, February 2006.pdf
PAL PUBLIC RRP ATT 3.2 Application by Energex Limited (No 4) [2011] ACompT 4.pdf
PAL PUBLIC RRP ATT 3.3 Second reading speech for the National Electricity South
Australia New NEL Amendment Bill 2005.pdf
PAL PUBLIC RRP ATT 3.4 ReApplication by ElectraNet Pty Limited No 3 2008 ACompT
3.pdf
PAL PUBLIC RRP ATT 3.5 ReSeven Network Limited No 4 2004 ACompT 11.pdf
PAL PUBLIC RRP ATT 3.6 Application by Chime Communications Pty Ltd No 2 2009
ACompT 2.pdf
PAL PUBLIC RRP ATT 3.7 NERA, Economic interpretation, supplementary report, Ausgrid 8
May 2014.pdf
PAL PUBLIC RRP ATT 3.8 HoustonKemp, ActewAGL Distribution - preferable NEO
decision, 13 Feb 2015.pdf
PAL PUBLIC RRP ATT 3.9 HoustonKemp, Energex - contribution to NEO preferable
decision, 3 July 2015.pdf
PAL PUBLIC RRP ATT 4.1 AER, Final decision - appendices, Victorian distribution
determination 2011-2015, October 2010.pdf
1
PAL PUBLIC RRP ATT 4.1 United Energy Distribution, Regulatory proposal, 30 April
2015.pdf
PAL PUBLIC RRP ATT 4.11 Tenix and ETU power construction maintenance enterprise
agreement 2013GÇô2016, 15 October 2014.pdf
PAL PUBLIC RRP ATT 4.12 ZNX Pty Ltd - ETU Victorian electricity enterprise agreement
2013, 17 June 2014.pdf
PAL PUBLIC RRP ATT 4.13 ZNX Victorian staff enterprise agreement 2014, 3 February
2015.pdf
PAL PUBLIC RRP ATT 4.14 SPI PowerNet SPI Electricity - ASUAPESMA enterprise
agreement 2013, 14 October 2013.pdf
PAL PUBLIC RRP ATT 4.15 SPI PowerNet SPI Electricity - ETU enterprise agreement 2013,
30 October 2013.pdf
PAL PUBLIC RRP ATT 4.16 SPI PowerNet SPI Electricity - ETU enterprise agreement
2010-13, 8 November 2010.pdf
PAL PUBLIC RRP ATT 4.17 Jemena Asset Management enterprise agreement (VIC) 2013,
23 August 2013.pdf
PAL PUBLIC RRP ATT 4.18 Jemena Asset Management - ETU Victorian electricity
enterprise agreement 2013, 12 June 2014.pdf
PAL PUBLIC RRP ATT 4.19 Utilities Management Pty Ltd Enterprise Agreement 2014, 19
May 2014.pdf
PAL PUBLIC RRP ATT 4.2 Economic Insights, Economic benchmarking of electricity
network service providers, 25 June13.pdf
PAL PUBLIC RRP ATT 4.2 AER, Final decision Ausgrid 2015GÇô16 to 2018GÇô19, April
2015, Attachment 7.pdf
PAL PUBLIC RRP ATT 4.21 Frontier Economics, Review of AER's Preliminary Decision on
Labour Price Growth, December15.pdf
PAL PUBLIC RRP ATT 4.22 AER, Preliminary decision, AusNet Services 2016GÇô20,
October 2015, Attachment 7.pdf
PAL PUBLIC RRP ATT 4.23 AER, Preliminary decision, Jemena distribution determination
2016GÇô20, Oct 2015, Attachment 7.pdf
PAL PUBLIC RRP ATT 4.24 DAE, Forecast growth in labour costs in NEM regions of
Australia, 23 February 2015.pdf
PAL PUBLIC RRP ATT 4.25 MOU between CitiPower, Powercor and the
CEPU(undated).pdf
PAL PUBLIC RRP ATT 4.26 NERA (UK), Expert report on expected inflation in labour costs,
23 June 2015.pdf
PAL PUBLIC RRP ATT 4.27 AER, Final decision, SP AusNet transmission determination
2014-15 to 2016-17, January 2014.pdf
PAL PUBLIC RRP ATT 4.28 AER, Final decision, Powerlink transmission determination
2012-13 to 2016-17, April 2012.pdf
2
PAL PUBLIC RRP ATT 4.29 ASU, Log of Claims, June 2013.pdf
PAL PUBLIC RRP ATT 4.3 Frontier Economics, Review of AER's preliminary decision on
opex input weights, December 2015.pdf
PAL PUBLIC RRP ATT 4.3 APESMA, Log of claims (undated).pdf
PAL PUBLIC RRP ATT 4.31 NUW, Log of claims (undated).pdf
PAL PUBLIC RRP ATT 4.32 The Centre for International Economics, Labour price forecasts,
20 November 2015.pdf
PAL PUBLIC RRP ATT 4.34 Jacobs, Escalation indices forecast 2016GÇô2020, 17
November 2015.pdf
PAL PUBLIC RRP ATT 4.35 AER, Explanatory statement Capital expenditure incentive
guideline, November 2013.pdf
PAL PUBLIC RRP ATT 4.36 BIS Shrapnel, Real Labour Cost Escalation Forecasts to 2017,
October 2012.pdf
PAL PUBLIC RRP ATT 4.37 Access Economics, Forecast growth in labour costs, March
2010.pdf
PAL PUBLIC RRP ATT 4.38 Access Economics, Labour cost indices for the energy sector,
April 2007.pdf
PAL PUBLIC RRP ATT 4.39 AEMC, Distribution Network Pricing Arrangement, Rule
Change, November 2014.PDF
PAL PUBLIC RRP ATT 4.4 Pacific Economics Group, TFP research for Victoria's power
distribution industry, December04.pdf
PAL PUBLIC RRP ATT 4.4 AEMO, Detailed summary of 2015 electricity forecasts, 2015
NEFR, June 2015.pdf
PAL PUBLIC RRP ATT 4.41 AER explanatory statement, Efficiency benefit sharing scheme,
November 2013.pdf
PAL PUBLIC RRP ATT 4.42 Armstrong, Combining forecasts, June 2001.pdf
PAL PUBLIC RRP ATT 4.43 Borland, Recommendations for methodology for forecasts WPI,
October 2012.pdf
PAL PUBLIC RRP ATT 4.44 BIS Shrapnel, Real labour cost escalation forecasts to 2017,
November 2012.pdf
PAL PUBLIC RRP ATT 4.45 Deloitte, Forecast growth in labour costs, Victoria and South
Australia, February 2013.pdf
PAL PUBLIC RRP ATT 4.46 Deloitte, Forecast growth in labour costs in NEM regions of
Australia, June 2015.PDF
PAL PUBLIC RRP ATT 4.47 Deloitte, A response to submissions on AER preliminary
decision, September 2015.PDF
PAL PUBLIC RRP ATT 4.48 Deloitte, Forecast growth in labour costs in Victoria, June
2013.pdf
3
PAL PUBLIC RRP ATT 4.49 BIS Shrapnel, Real labour and material cost escalation
forecasts to 2020, November 2014.pdf
PAL PUBLIC RRP ATT 4.5 Powercor 2012-2014 Resources Agreement.pdf
PAL PUBLIC RRP ATT 4.5 AER, Economic benchmarking RIN for DNSP, Instructions and
Definitions, November 2013.pdf
PAL PUBLIC RRP ATT 4.51 AER, Final Decision Ausgrid distribution determination,
Attachment 7, April 2015.pdf
PAL PUBLIC RRP ATT 4.52 Economic Insights, Response to Ergon Energy on Economic
Benchmarking, October 2015.PDF
PAL PUBLIC RRP ATT 4.53 BIS Shrapnel, Outlook for SA Power Networks real cost
escalation forecasts, January 2014.pdf
PAL PUBLIC RRP ATT 4.6 AER, Final decision, SAPN distribution determination 2015-16 to
2019-20, Oct15, Attachment 7.pdf
PAL PUBLIC RRP ATT 4.7 DLA Piper, Legal Opinion, 16 December 2015.pdf
PAL PUBLIC RRP ATT 4.8 Deloitte Access Economics, NSW DNSP labour analysis, Final
addendum to 2014 report, April15.pdf
PAL PUBLIC RRP ATT 4.9 SAPower Networks - Revised regulatory Proposal 2015-20 , 3
July 2015.pdf
PAL PUBLIC RRP ATT 5.1 CEPA - Review of demand forecasting approaches, December
2015.pdf
PAL PUBLIC RRP ATT 5.1 AEMO email to CitiPower and Powercor regarding demand
forecasting, 17 November 2015.pdf
PAL PUBLIC RRP ATT 5.11 Minister for Energy and Resources, Distribution network pricing
arrangements, November 2015.pdf
PAL PUBLIC RRP ATT 5.12 AER, Preliminary decision, Jemena distribution determination,
Attachment 6, October 2015.pdf
PAL PUBLIC RRP ATT 5.13 AEMO, 2015 Transmission Connection Point Forecasting
Report for Victoria, September 2015.pdf
PAL PUBLIC RRP ATT 5.14 AEMO, 2015 NEFR forecasting methodology information
paper, July 2015.pdf
PAL PUBLIC RRP ATT 5.15 AEMO, 2014 Transmission connection point forecasting action
plan, October 2014.pdf
PAL PUBLIC RRP ATT 5.16 AEMO, Forecast Accuracy Report 2015 for 2015 NEFR,
November 2015.pdf
PAL PUBLIC RRP ATT 5.17 Forecasting long-term peak half-hourly electricity demand for
Victoria, June 2015.pdf
PAL PUBLIC RRP ATT 5.18 Fan, Hyndman, Monash University forecasting model, June
2015.pdf
4
PAL PUBLIC RRP ATT 5.19 AEMO, 2014 Transmission connection point forecasts for NSW
and ACT.csv
PAL PUBLIC RRP ATT 5.2 CIE, Maximum Demand Forecasting for CitiPower and Powercor
- 2015 update, July 2015.pdf
PAL PUBLIC RRP ATT 5.2 AEMO, 2015 Transmission connection point forecasts for
QLD.csv
PAL PUBLIC RRP ATT 5.21 AEMO, 2015 Transmission connection point forecasts for
VIC.csv
PAL PUBLIC RRP ATT 5.22 Ergon Energy, 2015-16 to 2019-20 Reset RIN.xlsm
PAL PUBLIC RRP ATT 5.23 Energex, 2015-16 to 2019-20 Reset RIN.xlsm
PAL PUBLIC RRP ATT 5.24 Essential Energy, 2014-15 to 2018-19 Reset RIN.xlsx
PAL PUBLIC RRP ATT 5.25 Endeavour Energy, 2014-15 to 2018-19 Reset RIN.xlsx
PAL PUBLIC RRP ATT 5.26 Ausgrid, 2014-15 to 2018-19 Reset RIN.XLSX
PAL PUBLIC RRP ATT 5.27 ActewAGL, 2014-15 to 2018-19 Reset RIN.xlsx
PAL PUBLIC RRP ATT 5.28 AER, Final Decision Ausgrid distribution determination,
Attachment 6, April 2015.pdf
PAL PUBLIC RRP ATT 5.29 AER, Final Decision Endeavour Energy distribution
determination, Attachment 6, April 2015.pdf
PAL PUBLIC RRP ATT 5.3 Oakley Greenwood, Metadata analysis of disruptive technologies
on demand forecasts, June 2015.pdf
PAL PUBLIC RRP ATT 5.3 AER, Final Decision Essential Energy distribution determination,
Attachment 6, April 2015.pdf
PAL PUBLIC RRP ATT 5.31 AER, Final decision Ergon Energy distribution determination,
Attachment 6, October 2015.pdf
PAL PUBLIC RRP ATT 5.32 AER, Final decision Energex distribution determination,
Attachment 6, October 2015.pdf
PAL PUBLIC RRP ATT 5.33 AER, Final Decision ActewAGL distribution determination,
Attachment 6, April 2015.pdf
PAL PUBLIC RRP ATT 5.34 CIE demand model code - Data preparation, adding cogen and
wind farms 2015 update.pdf
PAL PUBLIC RRP ATT 5.35 CIE demand model code - Data preparation, adding melbourne
water cogen.pdf
PAL PUBLIC RRP ATT 5.36 CIE demand model code - Data preparation, append old
electricity data.pdf
PAL PUBLIC RRP ATT 5.37 CIE demand model code - Data preparation, append old
electricty data to new.pdf
PAL PUBLIC RRP ATT 5.38 CIE demand model code - Data preparation, maximum actual
demand max cogen coincidence.pdf
5
PAL PUBLIC RRP ATT 5.39 CIE demand model code - Modelling, Average quartery
demand model.pdf
PAL PUBLIC RRP ATT 5.4 CIE, Review of Assessment of Forecasts by Darryl Biggar and
AER, December 2015.pdf
PAL PUBLIC RRP ATT 5.4 CIE demand model code - Modelling, max demand model.pdf
PAL PUBLIC RRP ATT 5.5 CIE, Review of 2015 AEMO Transmission Connection Point
Forecasts and Methodology, Dec 2015.pdf
PAL PUBLIC RRP ATT 5.6 Powercor Tariff Structure Statement 2017-2020, Overview
paper, September2015.pdf
PAL PUBLIC RRP ATT 5.7 Oakley Greenwood, Powercor pricing comparisons 1995-2014,
December 2014.pdf
PAL PUBLIC RRP ATT 5.8 GHD, AEMO Demand Forecast Review (2015 update),
December 2015.pdf
PAL PUBLIC RRP ATT 5.9 AEMO, NEFR September Feedback Workshops, October
2015.pdf
PAL PUBLIC RRP ATT 6.1 AER, Expenditure forecast assessment guideline distribution,
Nov 2013.pdf
PAL PUBLIC RRP ATT 6.1 Gartner, Attack on Sony Pictures is a digital business game
changer, 9 Feb 2015.pdf
PAL PUBLIC RRP ATT 6.11 ABC News report (online), Cyber attack on Bureau of
Meteorology computer, 2 Dec 2015.pdf
PAL PUBLIC RRP ATT 6.12 ABC News report (online), BOM report recommends computer
system overhaul, 3 Dec 2015.pdf
PAL PUBLIC RRP ATT 6.13 Gartner, Recommended life spans for mobile devices, 11 Sep
2015.pdf
PAL PUBLIC RRP ATT 6.14 AEMC, Distribution Network Pricing Arrangements Rule.pdf
PAL PUBLIC RRP ATT 6.15 Powercor, Tariff structure statement 2017-2020, 25 Sep
2015.pdf
PAL PUBLIC RRP ATT 6.16 CitiPower and Powercor, RIN reporting compliance, December
2015.pdf
PAL PUBLIC RRP ATT 6.17 AER, Final category analysis RIN for DNSPs, Mar 2014.pdf
PAL PUBLIC RRP ATT 6.18 AER, Final economic benchmarking RIN for DNSPs, Nov
2013.pdf
PAL PUBLIC RRP ATT 6.19 AER, Explanatory statement economic benchmarking RIN, Nov
2013.pdf
PAL PUBLIC RRP ATT 6.2 ESCV, Review of the Victorian electricity distributors' GSL
payment scheme, final decision.pdf
PAL PUBLIC RRP ATT 6.2 AASB, Auditing standard ASA 805, Oct 2009.pdf
6
PAL PUBLIC RRP ATT 6.21 AASB, Standard on review engagements ASRE 2405, Aug
2008.pdf
PAL PUBLIC RRP ATT 6.22 Minister for Energy and Resources, Letter regarding chapter
5A, 18 Sep 2015.pdf
PAL PUBLIC RRP ATT 6.23 National Electricity (Victoria) Further Amendment Bill.pdf
PAL PUBLIC RRP ATT 6.24 Explanatory Memorandum, National Electricity (Victoria)
Further Amendment Bill.pdf
PAL PUBLIC RRP ATT 6.25 Second reading, National Electricity (Victoria) Further
Amendment Bill.pdf
PAL PUBLIC RRP ATT 6.26 Electricity Safety (Electric Line Clearance) Regulations
(2015).pdf
PAL PUBLIC RRP ATT 6.27 Electricity Safety (Electric Line Clearance) Regulations
(2005).pdf
PAL PUBLIC RRP ATT 6.28 ESV, Exemption Electricity Safety (Electric Line Clearance)
Regulations 2010.pdf
PAL PUBLIC RRP ATT 6.29 ESV, Exemption, Electricity Safety (Electric Line Clearance)
Regulations 2010.pdf
PAL PUBLIC RRP ATT 6.3 CitiPower and Powercor, Submission on ESCV draft GSL
decision, 4 Dec 2015.pdf
PAL PUBLIC RRP ATT 6.3 ESCV, Review of the Victorian electricity distributors' GSL
payment scheme, draft decision.pdf
PAL PUBLIC RRP ATT 6.31 DEDJTR submission to Victorian electricity distribution pricing
review 2016 to 2020, Jul15.pdf
PAL PUBLIC RRP ATT 6.4 Powercor, 2014 Annual Reporting RIN, Appendix B (public).xlsm
PAL PUBLIC RRP ATT 6.5 Ofgem, Final determination for slow track electricity companies,
5 Nov 2014.pdf
PAL PUBLIC RRP ATT 6.6 CMA, Northern Powergrid v GEMA, final determination, 29 Sep
2015.pdf
PAL PUBLIC RRP ATT 6.7 AEMC, Rule Determination, Expanding competition in metering
and related services, 26 Nov 2015.pdf
PAL PUBLIC RRP ATT 6.8 AEMC, Expanding competition in metering and related
services.pdf
PAL PUBLIC RRP ATT 6.9 Australian Cyber Security Centre, 2015 Threat Report, Jul
2015.pdf
PAL PUBLIC RRP ATT 7.11 Powercor, New Torquay zone substation updated business
case, December 2015.pdf
PAL PUBLIC RRP ATT 7.2 Powercor, Proactive conductor replacement program - updated,
December 2015.pdf
PAL PUBLIC RRP ATT 7.3 Hon L D'Ambrosio MP, Letter to Powercor, 9 October 2015.pdf
7
PAL PUBLIC RRP ATT 7.4 -Mr Tim Rourke, Letter to Hon L. D'Ambrosio MP, 26 October
2015.pdf
PAL PUBLIC RRP ATT 7.5 -AusNet Services, Bushfire Mitigation Plan, Electricity
Distribution Network, 22 July 2014.pdf
PAL PUBLIC RRP ATT 7.6 -AusNet Services, Appendix 7A Network Capital Expenditure
Overview 2016-2020, April 2015.pdf
PAL PUBLIC RRP ATT 7.7 -Jacobs, Powercor Repex Other Support, December 2015.pdf
PAL PUBLIC RRP ATT 7.8 -R. Scott MP, ESC Inquiry into the true value of distributed
generation, 11 September 2015.pdf
PAL PUBLIC RRP ATT 7.9 -Powercor, Voltage compliance program, December 2015.pdf
PAL PUBLIC RRP ATT 8.1 AER, Preliminary decision, Jemena distribution determination
2016-20, attachment 6, Oct15.pdf
PAL PUBLIC RRP ATT 8.2 AER, Final decision, SA Power Networks determination 2015-16
to 2019-20, attachment 6, Oct15.pdf
PAL PUBLIC RRP ATT 8.3 CitiPower and Powercor, Submission to AER on draft regulatory
information notice, January 2014.pdf
PAL PUBLIC RRP ATT 8.4 AEMC, Information sheet, Competition in metering services, 26
November 2015.pdf
PAL PUBLIC RRP ATT 8.5 Accenture, Metering contestability - process and system
impacts, 23 October 2015.pdf
PAL PUBLIC RRP ATT 8.6 AEMO, B2B procedure, Service order process, version 2.2, 15
May 2015.pdf
PAL PUBLIC RRP ATT 8.7 CitiPower and Powercor, Metering contestability - pre-gate
approval, December 2015.pdf
PAL PUBLIC RRP ATT 9.1 AER, Final decision, Amendment, Electricity DNSP, Post-tax
revenue model handbook, 29 Jan15.pdf
PAL PUBLIC RRP ATT 9.2 AER, Electricity distribution network service providers, Roll
forward model handbook, June 20.pdf
PAL PUBLIC RRP ATT 9.3 Powercor, Pass through application response to 2009 VBRC as
incl in revised ESMS of 10 Aug11.pdf
PAL PUBLIC RRP ATT 9.4 Incenta, Calculation of straight line depreciation GÇô review of
the AER's approx calc, JuL15.pdf
PAL PUBLIC RRP ATT 9.5 The AER's Outline of Submissions on Indexation of the
Regulatory Asset Base, Mar11.pdf
PAL PUBLIC RRP ATT 9.6 Outline of Joint Submissions in Reply on RAB Escalation for
Inflation Ground for Review, Jun11.pdf
PAL PUBLIC RRP ATT 9.7 AER, Explanatory statement Proposed amendment Electricity
TNSP Roll forward model, July 2015.pdf
8
PAL PUBLIC RRP ATT 10.1 AER, Better Regulation, Explanatory Statement, Rate of Return
Guideline, December 2013.pdf
PAL PUBLIC RRP ATT 10.1 -Handley, Advice on return on equity, 16 October 2014.pdf
PAL PUBLIC RRP ATT 10.1 -McKenzie, Partington, Report to AER, Report on the market
risk premium, 22 Feb 2012.pdf
PAL PUBLIC RRP ATT 10.101 -NERA, The cost of equity for a regulated energy utility, a
report for multinet, Feb13.pdf
PAL PUBLIC RRP ATT 10.104 -Ernst and Young, Advice on aspects of the cost of equity,
Nov 2012.pdf
PAL PUBLIC RRP ATT 10.105 -Samuel, Independent experts report, pipeline partners offer,
3 August 2012.pdf
PAL PUBLIC RRP ATT 10.106 -Ernst and Young, Independent Experts Report and Financial
Services Guide, 14 January 2013.pdf
PAL PUBLIC RRP ATT 10.107 -Grant Thornton, Independent expert report for oOh!media
Group Limited, January 2012 .pdf
PAL PUBLIC RRP ATT 10.108 -Partington, Report to the AER return on equity (updated),
April 2015.pdf
PAL PUBLIC RRP ATT 10.109 -CEG, Measuring risk free rates and expected inflation, April
2015.pdf
PAL PUBLIC RRP ATT 10.11 -PwC, A cost of debt estimation methodology for businesses
regulated by the QCA, June 2013.pdf
PAL PUBLIC RRP ATT 10.111 -CEG, The Hybrid method for the transition to the trailing
average, July 2015.pdf
PAL PUBLIC RRP ATT 10.112 -CEG, WACC estimates, a report for NSW DNSPs, May
2014.pdf
PAL PUBLIC RRP ATT 10.113 -RBA, Statement on Monetary Policy, May 2014.pdf
PAL PUBLIC RRP ATT 10.114 -Chairmont, ERA Hedging costs in the cost of debt, 13 May
2015.PDF
PAL PUBLIC RRP ATT 10.115 -Frontier, Estimating the equity beta for the BEE, Jan
2016.pdf
PAL PUBLIC RRP ATT 10.116 -Frontier, the appropriate use of tax statistics when
estimating gamma, Jan 2016.pdf
PAL PUBLIC RRP ATT 10.117 -CEG, Critique of AER analysis of New Issue Premium, Dec
2015.pdf
PAL PUBLIC RRP ATT 10.118 -Henry (2009) Estimating beta, 2009.pdf
PAL PUBLIC RRP ATT 10.119 -SFG Consulting (2013) Regression based estimates - June
2013.pdf
PAL PUBLIC RRP ATT 10.12 -Skeskin (2003) Handbook of parametric ch13, 2003.pdf
9
PAL PUBLIC RRP ATT 10.121 -Vasicek,Note on Using Cross-Sectional Information in
Bayesian Est of Security Betas,1973.pdf
PAL PUBLIC RRP ATT 10.122 -Brooks et al (2013) Assessing the reliability of regressionbased est of risk, Jun13.pdf
PAL PUBLIC RRP ATT 10.123 -Brooks et al, Comparison of OLS and LAD regression
techniques for est beta, Jun13.pdf
PAL PUBLIC RRP ATT 10.124 -Brooks et al, The Vasicek adjustment to beta est in the
Capital Asset Pricing Model, 2013.pdf
PAL PUBLIC RRP ATT 10.125 -CEG (2013) Information on equity beta from US companies,
June 2013.pdf
PAL PUBLIC RRP ATT 10.126 -SFG (2013) Regression based estimates of risk parameters,
2013.pdf
PAL PUBLIC RRP ATT 10.127 -SFG (2014) Equity beta, May 2014.pdf
PAL PUBLIC RRP ATT 10.128 -SFG (2014) Fama French Model, May 2014.pdf
PAL PUBLIC RRP ATT 10.129 -SFG (2015) Beta and the Black Capital Asset Pricing Model,
Feb 2015.pdf
PAL PUBLIC RRP ATT 10.13 -SFG (2015) Required return on equity for benchmark efficient
entity, February 2015.pdf
PAL PUBLIC RRP ATT 10.131 -SFG (2015) Share Prices The Dividend Discount Model and
the Cost of Equity, February 2015.pdf
PAL PUBLIC RRP ATT 10.132 -SFG (2015) Using the Fama French model to estimate the
required return on equity, Feb 2015.pdf
PAL PUBLIC RRP ATT 10.133 -SFG Divident Discount Model, May 2014.pdf
PAL PUBLIC RRP ATT 10.134 -SFG, Required return on equity for regulated gas and
electricity network businesses, Jun14.pdf
PAL PUBLIC RRP ATT 10.135 -AEMC (2012) Final-Rule-Determination, 2012.pdf
PAL PUBLIC RRP ATT 10.136 -Alberta Utilities Commission, Generic Cost of Capital,
2011.pdf
PAL PUBLIC RRP ATT 10.137 -Brattle, The WACC for Dutch TSOs,DSOs, water companies
and the Dutch Pilotage Org, 2013.pdf
PAL PUBLIC RRP ATT 10.138 -CEG Beta Parameters, 2013.pdf
PAL PUBLIC RRP ATT 10.139 -FTI (2012) Cost of capital study, 2012.pdf
PAL PUBLIC RRP ATT 10.14 -Grant Samuel (2015) Response to AER decision, 2015.pdf
PAL PUBLIC RRP ATT 10.141 -Handley (2015) Advice on rate of return, 2015.pdf
PAL PUBLIC RRP ATT 10.142 -Henry (2014) Estimating beta update, 2014.pdf
PAL PUBLIC RRP ATT 10.143 -Lewellen Nagel Shanken (2010) Skeptical appraisal of asset
pricing, 2010.pdf
10
PAL PUBLIC RRP ATT 10.144 -NERA (2015) Empirical performance of Sharpe Lintner,
2015.pdf
PAL PUBLIC RRP ATT 10.145 -NERA (2015) Review of literature in suppoty of Sharpe
Lintner, 2015.pdf
PAL PUBLIC RRP ATT 10.146 -Nobel Prize Committee (2013) Understanding asset prices,
2013.pdf
PAL PUBLIC RRP ATT 10.147 -Ofgem (2012) RIIO-T1, 2012.pdf
PAL PUBLIC RRP ATT 10.148 -PWC (2014) Appreciating value New Zealand, 2014.pdf
PAL PUBLIC RRP ATT 10.149 -RBA (2015) Statement on monetary policy, Feb 2015.pdf
PAL PUBLIC RRP ATT 10.15 -Brailsford, Gaunt, Obrien (2012) AJM, 2012.pdf
PAL PUBLIC RRP ATT 10.151 -Gray, Hall, Klease, McCrystal (2009) Bias stability and
predictive ability, 2009.pdf
PAL PUBLIC RRP ATT 10.152 -NERA (2013) Payout Ratio, 2013.pdf
PAL PUBLIC RRP ATT 10.153 -NERA (2015) Estimating distribution and redemption rates
from taxation statistics, 2015.pdf
PAL PUBLIC RRP ATT 10.154 -Officer (1994) Cost of capital of a company, 1994.pdf
PAL PUBLIC RRP ATT 10.155 -SFG 2014 QCA gamma, 2014.pdf
PAL PUBLIC RRP ATT 10.156 -SFG Jemena gamma reply, Feb 2015.pdf
PAL PUBLIC RRP ATT 10.157 -SFG Jemena gamma submission, May 2014.pdf
PAL PUBLIC RRP ATT 10.158 -ACT, Application by Energex Ltd, 2010.pdf
PAL PUBLIC RRP ATT 10.159 -Handley (2015) Advice on the NERA report - taxation
statistics, 2015.pdf
PAL PUBLIC RRP ATT 10.16 -Handley 2014 Advice on the value of imputation credits,
2014.pdf
PAL PUBLIC RRP ATT 10.161 -Hathaway (2013) Franking credit redemption ATO data
1988-2011, 2013.pdf
PAL PUBLIC RRP ATT 10.162 -Hathaway (2014) Franking credit redemption ATO data
1988-2012, 2014.pdf
PAL PUBLIC RRP ATT 10.163 -Lally (2013) Estimation of gamma, 2013.pdf
PAL PUBLIC RRP ATT 10.164 -Lally (2014) Review of submissions to the QCA on MRP,
2014.pdf
PAL PUBLIC RRP ATT 10.165 -IPART WACC Update, August 2015.pdf
PAL PUBLIC RRP ATT 10.166 -Lonergan Edwards Stanmore Coal, 2012.pdf
PAL PUBLIC RRP ATT 10.167 -McKinsey - Dobbs, Koller, Lund, Quantative easing,
2014.pdf
11
PAL PUBLIC RRP ATT 10.168 -Partington and Satchell, Analysis of criticism of 2015
Determinations, Oct 2015.pdf
PAL PUBLIC RRP ATT 10.169 -RBA Stevens Speech, 2015.pdf
PAL PUBLIC RRP ATT 10.17 -SFG, The required return on equity for the benchmark
efficient entity, March 2015.pdf
PAL PUBLIC RRP ATT 10.171 -SFG, Required return on equity for regulated gas and
electricity network businesses, Jun14.pdf
PAL PUBLIC RRP ATT 10.172 -Wright Mason Miles, Cost of capital for regulated utilities in
the UK, 2003.pdf
PAL PUBLIC RRP ATT 10.173 -Wright Smithers, The Cost of Equity Capital for Regulated
Companies, 2015.pdf
PAL PUBLIC RRP ATT 10.174 -Zenner and Junak, Musings on low cost of debt, 2012.pdf
PAL PUBLIC RRP ATT 10.175 -AEMC (2012) Final-Rule-Determination, 2012.pdf
PAL PUBLIC RRP ATT 10.176 -Debelle 2015 low yields, 2015.pdf
PAL PUBLIC RRP ATT 10.177 -ERA ATCO Gas Final, 2015.pdf
PAL PUBLIC RRP ATT 10.178 -FERC Opinion 531, 2014.pdf
PAL PUBLIC RRP ATT 10.179 -Grant Thornton 2012, Independent expert report on
Oh!media Scheme, 2012.pdf
PAL PUBLIC RRP ATT 10.18 -Economic Sciences Prize Committee of the Royal Swedish
Academy of Sciences,Oct 2013.pdf
PAL PUBLIC RRP ATT 10.18 -Handley, Advice on the Return on Equity, Oct 2014.pdf
PAL PUBLIC RRP ATT 10.181 -IPART, Review of WACC Methodology, 2013.pdf
PAL PUBLIC RRP ATT 10.182 -Ernst and Young, Independent expert report for MacMahon
Holdings, 2013.pdf
PAL PUBLIC RRP ATT 10.19 -Statement of Dr J Robert Malko, 16 June 2015.pdf
PAL PUBLIC RRP ATT 10.2 CEG, Efficiency of Staggered Debt Issuance, February
2013.pdf
PAL PUBLIC RRP ATT 10.2 -ENA, Response to the Equity Beta Issues Paper of the AER,
28 October 2013.pdf
PAL PUBLIC RRP ATT 10.21 -Frontier, Review of the AERs conceptual analysis for equity
beta, June 2015.pdf
PAL PUBLIC RRP ATT 10.22 -HoustonKemp, The Cost of equity, Response to AER.pdf
PAL PUBLIC RRP ATT 10.23 -FERC, Order accpeting tariff filing subject to condition and
denying waiver, January 2014.pdf
PAL PUBLIC RRP ATT 10.24 -Ofgem, RIIO-T1 and GD1 financial issues, 2011.pdf
12
PAL PUBLIC RRP ATT 10.25 -Oxera, Agenda, Advancing economics in business, What
WACC for a crisis, February 2013.pdf
PAL PUBLIC RRP ATT 10.26 -Stevens, The world economy and Australia, 21 April 2015.pdf
PAL PUBLIC RRP ATT 10.27 -ERA, Final decision on proposed revisions to the access
arrangement, June 2015.pdf
PAL PUBLIC RRP ATT 10.28 -NERA, Further Assessment of the Historical MRP, June
2015.pdf
PAL PUBLIC RRP ATT 10.29 -Wright, Review of Risk Free Rate and Cost of Equity
Estimates, 25 October 2012.pdf
PAL PUBLIC RRP ATT 10.3 Chairmont, Financing practices under regulation, past and
transitional, October 2015.PDF
PAL PUBLIC RRP ATT 10.31 -SFG, Share prices, the DDM and the cost of equity for the
mkt and bmk energy network, Feb15.pdf
PAL PUBLIC RRP ATT 10.32 -Frontier, The required return on equity under a foundation
model approach, Jan 2016.pdf
PAL PUBLIC RRP ATT 10.33 -SFG, Regression based estimates of risk parameters for the
benchmark firm, 24 June 2013.pdf
PAL PUBLIC RRP ATT 10.34 -Henry, Estimating beta, an update, April 2014.pdf
PAL PUBLIC RRP ATT 10.35 -Brooks, Diamond, Gray, Hall, Assessing the reliability of
estimates of risk, June 2013.pdf
PAL PUBLIC RRP ATT 10.36 -ACCC, Public inquiry into final access determinations for
fixed line services, Oct 2015.pdf
PAL PUBLIC RRP ATT 10.37 -QCA, draft decision, aurizon network 2014 draft access
undertaking, September 2014.pdf
PAL PUBLIC RRP ATT 10.38 -Incenta, Review of reg capital structure and asset equity beta
for Aurizon Network, Dec 2013.pdf
PAL PUBLIC RRP ATT 10.39 -SFG, Equity beta, 12 May 2014.pdf
PAL PUBLIC RRP ATT 10.4 Yarrow, Egan, Tamblyn, Review of the limited merits review
regime, stage one report, Jun12.pdf
PAL PUBLIC RRP ATT 10.4 -Commerce Commission, Input methodologies, reasons paper,
Dec 2010.pdf
PAL PUBLIC RRP ATT 10.41 -Samuel, Financial Services Guide and Independent Experts
Report, 3 Mar 2014.pdf
PAL PUBLIC RRP ATT 10.42 -AER, Draft rate of return guideline, explanatory statement,
August 2013.pdf
PAL PUBLIC RRP ATT 10.43 -CEG, Estimating the cost of equity, equity beta and MRP,
January 2015.pdf
PAL PUBLIC RRP ATT 10.44 -Frontier, The relationship between government bond yields
and MRP, Jan 2016.pdf
13
PAL PUBLIC RRP ATT 10.45 -Chairmont, Cost of Debt, Transitional Analysis, April 2015.pdf
PAL PUBLIC RRP ATT 10.46 -UBS, UBS Response to the TransGrid Request following the
AER draft decision, undated.pdf
PAL PUBLIC RRP ATT 10.47 -Frontier, Cost of debt transition for NSW distribution
networks, January 2015.pdf
PAL PUBLIC RRP ATT 10.48 -Lally, Review of submissions on the cost of debt, April
2015.pdf
PAL PUBLIC RRP ATT 10.49 -SFG, Return on Debt Transition Arrangements under the
NGR and NER, 27 February 2015.pdf
PAL PUBLIC RRP ATT 10.5 Expert Panel on Energy Access Pricing, Report to the
Ministerial Council on Energy, Apr06.pdf
PAL PUBLIC RRP ATT 10.5 -Lally, Transitional arrangements for cost of debt, 24 November
2014.pdf
PAL PUBLIC RRP ATT 10.51 -CEG, Efficient use of interest rate swaps to manage interest
rate risk, June 2015.pdf
PAL PUBLIC RRP ATT 10.52 -Lally, Implementation issues for the cost of debt, November
2014.pdf
PAL PUBLIC RRP ATT 10.53 -CEG, Critique of AER's approach to transition, Jan 2016.pdf
PAL PUBLIC RRP ATT 10.54 -PwC, Benchmark term of debt assumption, June 2013.pdf
PAL PUBLIC RRP ATT 10.55 -Arsov, Brooks, Kosev, New Measures of Australian
Corporate Credit Spreads, December 2013.pdf
PAL PUBLIC RRP ATT 10.56 -AER, Return on debt, choice of third party data service
provider, issues paper, April 2014.pdf
PAL PUBLIC RRP ATT 10.57 -CEG, Criteria for assessing fair value curves, Jan 2016.pdf
PAL PUBLIC RRP ATT 10.58 -Hathaway, Imputation Credit Redemption ATO data 19882011, September 2013.pdf
PAL PUBLIC RRP ATT 10.59 -Application by Energex Limited (No 2) [2010] ACompT 7,
2010.pdf
PAL PUBLIC RRP ATT 10.6 Application by Envestra Ltd (No 2) [2012] A CompT 3, 2012.pdf
PAL PUBLIC RRP ATT 10.6 -RBA, Statement on Monetary Policy, November 2015.pdf
PAL PUBLIC RRP ATT 10.61 -CEG, Measuring expected inflation for the PTRM, June
15.pdf
PAL PUBLIC RRP ATT 10.62 -AER, Final Decision, AP AusNet transmission determination
2008-09 to 2013-14, January 2008.pdf
PAL PUBLIC RRP ATT 10.63 -Handley, Advice on AER energy network determination for
JGN, May 2015.pdf
PAL PUBLIC RRP ATT 10.64 -Alberta Utilities Commission, Generic Cost of Capital,
December 2011.pdf
14
PAL PUBLIC RRP ATT 10.65 -AER, Rate of return guideline, Equity beta issues paper,
October 2013.PDF
PAL PUBLIC RRP ATT 10.66 -Statement by Ronald Knecht, 19 June 2015.pdf
PAL PUBLIC RRP ATT 10.67 -Frontier, Key issues in estimating the return on equity for the
BEE, June 2015.pdf
PAL PUBLIC RRP ATT 10.68 -NERA, Cost of Equity, June 2015.pdf
PAL PUBLIC RRP ATT 10.69 -NERA, Dist and Redemp Rates Response to the AERs
decisions for the NSW and ACT, June 2015.pdf
PAL PUBLIC RRP ATT 10.7 House of Assembly Hansard, 9 February 2005.pdf
PAL PUBLIC RRP ATT 10.7 -Frontier, An appropriate regulatory estimate of gamma, June
2015.pdf
PAL PUBLIC RRP ATT 10.71 -Brattle Group, The WACC for the Dutch TSOs, DSOs, water
companies and the DPO, March 2013.pdf
PAL PUBLIC RRP ATT 10.72 -FTI, Cost of capital study for the RIIO-T1 and GD1 price
controls, July 2012.pdf
PAL PUBLIC RRP ATT 10.73 -Samuel, Grant Samuel response to AER draft decision,
January 2015.pdf
PAL PUBLIC RRP ATT 10.74 -Ofgem,RIIO-T1, 17 Dec 2012.pdf
PAL PUBLIC RRP ATT 10.75 -PwC, Appreciating Value New Zealand, June 2014.pdf
PAL PUBLIC RRP ATT 10.76 -CEG, Efficient Debt Financing Costs, 19 January 2015.pdf
PAL PUBLIC RRP ATT 10.77 -Lally, Review of the submissions on transition issues for the
cost of debt, October 2015.PDF
PAL PUBLIC RRP ATT 10.78 -Lally, cost of debt and the TAMRP for UCLL and UBA
services, June 2014.pdf
PAL PUBLIC RRP ATT 10.79 -RBA, Statement on the Conduct of Monetary Policy, 1996.pdf
PAL PUBLIC RRP ATT 10.8 ACCC, Estimating the Cost of Debt, A Possible Way Forward,
April 2013.pdf
PAL PUBLIC RRP ATT 10.8 -Rosenberg, Maurer, Signal or Noise, July 2008.pdf
PAL PUBLIC RRP ATT 10.81 -Statement of Sim Buck Khim, undated.pdf
PAL PUBLIC RRP ATT 10.82 -JIA, Submission on the explanatory statement. WACC
review, February 2009.pdf
PAL PUBLIC RRP ATT 10.83 -NERA, Hedging for regulated businesses, April 2007.pdf
PAL PUBLIC RRP ATT 10.84 -AER, draft decision, TransGrid transmission determination
2015-16 to 2017-18, Nov 2014.pdf
PAL PUBLIC RRP ATT 10.85 -Wright, Smithers, The cost of equity capital for regulated
companies, review of Ofgem, 2014.pdf
15
PAL PUBLIC RRP ATT 10.86 -Partington, Satchell, Report to the AER, October 2015.PDF
PAL PUBLIC RRP ATT 10.87 -Lonergan Edwards, Independent expert report for Stanmore
Coal Limited, October 2012.pdf
PAL PUBLIC RRP ATT 10.88 -Dobbs, Koller, Lund, What effect has quantitative easing had
on your share price, 2014.pdf
PAL PUBLIC RRP ATT 10.89 -NERA, The relation between the market risk premium and
risk-free rate.pdf
PAL PUBLIC RRP ATT 10.9 McKenzie, Partington, Report to the AER, Part A, Return on
Equity, October 2014.pdf
PAL PUBLIC RRP ATT 10.92 -Roll, A critique of the asset pricing theorys tests part I,
1977.pdf
PAL PUBLIC RRP ATT 10.93 -Partington, Satchell, Report to the AER, Return of equity,
May 2015.pdf
PAL PUBLIC RRP ATT 10.94 -Campbell, Vuolteenaho, Bad beta, good beta, 2003.pdf
PAL PUBLIC RRP ATT 10.96 -NERA, The market risk premium, Analysis in response to the
AERs guideline, Oct 2013.pdf
PAL PUBLIC RRP ATT 10.97 -NERA, Prevailing conditions and the market risk premium,
March 2012.pdf
PAL PUBLIC RRP ATT 10.98 -Lally, The cost of equity and the market risk premium, 25 July
2012.pdf
PAL PUBLIC RRP ATT 10.99 -McKenzie Partington, Report to Corrs Chambers Westgarth,
21 December 2011.pdf
PAL PUBLIC RRP ATT 11.1 AER, Better Regulation, Shared Asset Guideline, November
2013.pdf
PAL PUBLIC RRP ATT 12.1 AER, Errors in distribution determination for Powercor
regarding STPIS, November 2015.pdf
PAL PUBLIC RRP ATT 12.2 ACIL Allen, RIS Bushfire Mitigation Regulations, November
2015.pdf
PAL PUBLIC RRP ATT 12.3 Ofgem, Electricity Network Innovation Competition, December
2015.pdf
PAL PUBLIC RRP ATT 13.1 -Target area 21, basemap with feeders.jpg
PAL PUBLIC RRP ATT 13.11 -Target area 29, basemap with feeders.jpg
PAL PUBLIC RRP ATT 13.12 ô Powercor, Response to Regulatory Impact Statement, 30
December 2015.pdf
PAL PUBLIC RRP ATT 13.2 Target area 3, basemap with feeders.jpg
PAL PUBLIC RRP ATT 13.3 Target area 4, basemap with feeders.jpg
PAL PUBLIC RRP ATT 13.4 Target area 6, basemap with feeders.jpg
16
PAL PUBLIC RRP ATT 13.5 Target area 7, basemap with feeders.jpg
PAL PUBLIC RRP ATT 13.6 Target area 11, basemap with feeders.jpg
PAL PUBLIC RRP ATT 13.7 Target area 12, basemap with feeders.jpg
PAL PUBLIC RRP ATT 13.8 Target area 16, basemap with feeders.jpg
PAL PUBLIC RRP ATT 13.9 Target area 17, basemap with feeders.jpg
PAL PUBLIC RRP ATT 14.1 Secure, Proposal for supply of Smart Meters BAU to PNS,
August 2014.pdf
PAL PUBLIC RRP ATT 14.2 Landis and Gyr, Request for Quotation, November 2014.pdf
PAL PUBLIC RRP ATT 14.3 Energeia Review Review of VIC DNSP's AMI 2015 Charges
Revision Applications,November 2014.pdf
PAL PUBLIC RRP ATT 14.4 DEDJTR, Submission to Victorian electricity distribution pricing
review GÇô 2016 to 2020, July 2015.pdf
PAL PUBLIC RRP ATT 15.1 CitiPower and Powercor, RE Victorian public lighting
reclassification, 14 August 2015.pdf
PAL PUBLIC RRP ATT 13.1 -Email from A Cody (Powerline Replacement Fund - Project
Manager) to Powercor, 12 October 2015.pdf
PAL PUBLIC RRP ATT 7.1 -AER, Preliminary decision AusNet distribution determination,
Capital expenditure, October 2015.pdf
PAL PUBLIC RRP ATT 7.1 -Powercor, Distribution Annual Planning Report, December
2015.pdf
PAL PUBLIC RRP ATT 7.12 -Powercor, TNA third transformer updated business case,
December 2015.pdf
PAL PUBLIC RRP ATT 7.13 -Powercor, WETS to RVL reconductor business case,
December 2015.pdf
PAL PUBLIC RRP ATT 7.14 -Powercor, HV Feeder Expenditure Review, November
2015.pdf
PAL PUBLIC RRP ATT 7.15 -AusNet Services, Reset RIN templates, April 2015.xlsm
PAL PUBLIC RRP ATT 7.16 -AER, Preliminary decision Powercor Repex (historical unit
costs), October 2015.xlsm
PAL PUBLIC RRP ATT 7.17 -AER, Preliminary decision - AusNet Services Repex (forecast
unit costs), October 2015.xlsm
17
Download