Team Skill 3 – Defining the System

advertisement

Text Layout

Introduction (1-4)

Team Skill 1 – Analyzing the problem (5-7)

Team Skill 2 – Understanding User and Stakeholder

Needs (8-13)

Team Skill 3 – Defining the System (14-17)

Team Skill 4 – Managing Scope (18-19)

Team Skill 5 – Refining the System Definition ( 20-24)

Team Skill 6 – Building the Right System (25-31)

1

A Use Case Primer

Chapter 14

2

Benefits of Use Cases

Force developers to think through the problem from the user perspective

Give context for the requirements

Provides an ordering mechanism for requirements

Reduce the risk of transitioning form an expression of requirements to a differing implementation

Carry over directly into the testing process

Serve as inputs into user documentation

3

Definition

A use case describes sequences of actions a system performs that yield an observable result of value to a particular actor

Sequences of actions – an action is atomic; it is performed either entirely or not at all

System performs – system works for the actor

An observable result of value – the use case must be of value to the user

A particular actor – The actor initiates the use case

Use Case

4

Actors

An actor is someone or something that interacts with the system

Users

Homeowners are actors on HOLIS system

Authors are actors on a word processing system

Other systems or applications

 HOLIS Control Switch is an actor on the HOLIS Central Control

Unit

A device

Lights

Printer

Actor

5

Use Case Anatomy

Mandatory elements

Name – Unique and descriptive

Brief description – Paragraph describing purpose

Actors – List all actors that interact with this use case

Flow of events – Basic flow and Alternate flows

Optional elements

Pre-conditions – conditions that must be present in order for a use case to start

Post-condition – state of the system after a use case has run its course

System or subsystem – level of use case. System causes multiple subsystems to interact

Other stakeholder – non users

Special requirements – performance or throughput

6

Building a Use-Case Model

A use-case model is the complete set of use cases, actors, and their interactions

Five steps to build the Use-Case Model

1.

2.

Identify the describe the actors

Identify the use cases and write a brief description

3.

4.

5.

Identify the actor and use case relationships

Outline the individual use cases

Refine the use cases

7

Actors

Discussed in Chapter 7 – dividing the world into two classes, the system and things that interact with the system

Questions to consider

 Who uses the system?

Who gets information from this system?

Who provides information to the systems?

Where in the company is the system used?

Who supports and maintains the system?

What other systems use this system?

8

Identify the Use Cases

Questions to consider

What will the actor use the system for?

Will the actor create, store, change, remove, or read data in the system?

Will the actor need to inform the system about external events or changes?

Will the actor need to be informed about certain occurrences in the system?

Provide a brief description that elaborates the intent of the use case

Program Vacation Setting

Actor(s): Homeowner/programmer

Description: Homeowner/programmer sets lighting and alarm options for an extended stay away from home

9

Identify the Actor – Use-Case Relationships

 An actor can be involved in several use cases and a use cases can have more than one actor

Program

Vacation Settings

Homeowner/

Programmer

Set

Clock

Change

Password

10

Outline the Use Cases

Outline all the basic flows first

Basic flow is the most common path

What event starts the use case?

How does the use case end?

How does the use case repeat some behavior?

Outline alternate flows

Are there optional situations?

What odd cases might happen?

What variants might happen?

What may go wrong?

What may not happen?

What kind of resources can be blocked?

11

Refining the Use Cases

At a later point in time, analyze the use cases

Look for more alternative flows including exception conditions

Add pre and post conditions – make sure the use cases still are what was intended with the post conditions

Some experts believe on writing the pre and post conditions during step 4 and not in refinement

12

HOLIS Actors

Actor

Homeowner

Programmer

Resident

Description

Operator who programs various features using either optional PC Programmer or the CCU

Emergency

Receiver

Light Bank

Actor that interacts with system on a daily-usage basis

When an emergency signal is activated by a resident, a phone call is made to this actor

Set of light banks grouped together for common action

Wireless remote control device Wireless Remote

Controller

Lumenations

Services

Motion Sensor

A Lumenations service person who access the system remotely for maintenance purposes

Motion senor inputs

13

HOLIS with subsystem and actors

Lights and other

Note: new actor, Resident turns lights off and on. Homeowner can program the control switch

Resident

Control

Switch

Emergency

Receiver TBD

Central

Control Unit

PC

Programmer

(optional) HOLIS

Homeowner/ programmer

Luminations

Services

14

Portion of HOLIS Use-Case Model

Resident

Homeowner/ programmer

Turn light on/off

Activate

Scene

Light Banks (1-32)

Activate

Vacation Mode

Indicate

Emergency

Program

Scene

Program Vacation

Sequence

Motion Sensor (1-8)

Initiate Motion

Sequence

Emergency

Receiver

15

Key Points

Use cases carry the majority of the requirements for the system

The development team, with user involvement, writes the use cases

Use cases are built on a common, standard format

Use cases later drive test case development

16

Organizing Requirements

Information

Chapter 15

17

Systems Requirements Document(s)

 Reasons why one document may not be adequate

System may be complex and volume of documentation may be excessive

System may be a member of a family of related products …no one document contains all the specs

System may be a subsystem of a larger system and may satisfy only a subset of the requirements

Marketing and business goals need to be separated from product requirements

Other requirements, regulatory or legal, may be imposed on the system and documented elsewhere.

18

Complex Hardware and Software Systems

A system-level requirements set is created describing the system as a whole

 no reference to any subsystems

Requirements are developed for each subsystem

 No reference to any lower level subsystem

The resuls are a hierarchy of requirements

Requirements are allocated to the appropriate lowerlevel subsystem

The lowest level is usually comprised of hardware or software only

19

Product Families

A set of closely related products that have much functionality in common, yet each product contains some unique features

Organize requirements as follows:

 Develop a product-family vision documents

Develop a set of use cases show how users interact with various applications running together

Develop a common software requirements set

For each product, develop a vision document, supplementary specification, and use-case model that dines its specific functionality

20

HOLIS Case Study

Vision document for short and longer term visions for

HOLIS, including basic system-level requirements

System-level use-case model records use cases and the actors

Hardware requirements specification for the 3 subsystems (control switch, central control unit, and PC programmer)

A supplementary specification for each of the subsystems and a use-case model for how each subsystem interacts with its various actors

21

Key Points

For nontrivial applications, requirements must be captured and recorded in a document, database, model or tool

Different types of project require different requirements organization techniques

Complex systems require that requirements sets be developed for each subsystem

22

The Vision Document

Chapter 16

23

Vision Document

Short, well crafted, document capturing …

 the project ’s objective

 the needs of the user

 the features of the system

 other common requirements

A basis for discussion and agreement among …

Marketing and product management team

Project team

Management team

Similar to a project charter from PMI

Similar to SOW in Industry

24

Sample Vision Document Outline – pg 175

1. Introduction

1.1 Purpose of the Vision Document

1.2 Product Overview

1.3 References

2. User Description

2.1 User/Market Demographics

2.2 User Profiles

2.3 User Environment

2.4 Key User Needs

2.5 Alternatives and Competition

25

Sample Vision Document Outline – pg 175

3. Product Overview

3.1 Product Perspective

3.2 Product Position Statement

3.3 Summary of Capabilities

3.4 Assumptions and Dependencies

3.5 Cost and Pricing

4. Feature Attributes

5. Product Features

6. Exemplary Use Cases

26

Sample Vision Document Outline – pg 175

7. Other Product Requirements

7.1 Applicable Standards

7.2 System Requirements

7.3 Licensing, Security, and Installation

7.4 Performance Requirements

8. Documentation Requirements

8.1 User Manual

8.2 Online Help

8.3 Installation Guides, Configuration, and Read Me Files

8.4 Labeling and Packaging

9. Glossary

27

Key Points

Every software project will benefit from having a Vision document

The Vision document describes the application in general terms, including descriptions of the target market, the system users, and the application features

The Vision document defines, at a high level of abstractions, both the problem and the solution

The Delta Vision document focuses on what has changed

28

Product Management

Chapter 17

29

Product Champion

Also called – product manager, project manager, IT manager, project lead, engineering manager, etc.

The Champion must …

 Manage the elicitation process and determine when enough requirements are discovered

Manage the conflicting inputs

Make the trade-offs

Own the product vision and advocate for the product

Defend against feature creep

Maintain a “healthy tension” between what the customer desires and what the team can deliver

Manage expectations of customers and management

Communicate features to all stakeholders

Manage changing priorities

Review use cases and requirements to ensure they conform to the

Vision document

30

HOLIS Software Development Team

Emily

VP and GM

Tracy

Director of Engineering

Marcy

Software Development

Manager

Earl

Software Lead

Mark

Architect

Galvin

QA Lead

Test Team

Rick

Director of Marketing

Alyssa

Product Manager

Russ

Software Lead

Louise

Doc Lead

Developers

Gene

Software Lead

31

Product Road Map

 Graphical view of major release dates, and milestones for delivery, and other key events

32

Product Manager in a Software Product Company

Driving the Vision

Maintaining the Product Road Map

Defining the Whole Product Plan

 Including ancillaries like …available configurations, special hardware, secure access, licensing provisions, etc.

Sponsoring the Use-Case Model and Supplementary Requirements

Testing the Product Concept

Completing the User Experience

 User documentation, online help, tool tips, etc.

Defining Commercial Terms

Licensing

Pricing Policy

 Customer Support

Positioning and Messaging

Supporting Activities

 Branding and Product Labeling

End User Training

Product Demo

Sales and Marketing

33

Product Champion in an IS/IT Shop

Customers work with you and will be around

No marketing department

Your management may be your customer

Still need a product champion and still need to collect and manage requirements

34

35

36

Key Points

Every project needs an individual champion or a small champion team to advocate for the product

In a software products company, the product manager plays the role of the champion

The product manager drives the whole product solution : the application itself, support, user conveniences, documentation, and the relevant commercial factors

37