Key Performance Indicators for Facility Operations Roger Young FacilityMastersOnline.com roger@facilitymastersonline.com 978-886-6093 Simple Truths •High Expectations Internal/External • More with Less • Demonstrate Success • Be Credible How to Maintain Credibility • Demonstrate … quantitative measuring • Show … results • Develop standards and set expectations • Demonstrate effectiveness Strategy • Understand the Expectations • Know the Key Questions • Identify the Metrics • Collect Data as Part of the Process • Compare Metrics Over Time • Benchmark With Others Expectations • Properly Maintaining School Facilities • Energy Efficiency • Maximize Resources • Minimize Risk • Environmental Safety Properly Maintain School Facilities • Key Questions/Metrics – – What is being done? • Completed work orders by type (routine, PM, emergency), trade, system, use of PM templates, cost – How well is it being done? • Time to complete, run time, emergencies, staff survey – What needs to be done? • Deferred work orders, life cycle analysis, capital needs and renewal, facility audit Properly Maintain School Facilities • Collect Data (Timely, Comparable, Accurate) – – – – – Work order, date initiated, date completed Type of work (PM, emergency, routine), location Category (HVAC, roof, electrical, plumbing, grounds) Cost, labor time Type and condition of equipment • Part of Process – Maintenance Management System such as SchoolDude.com Maintenance Program Number of Work Orders Backlog Status of Budget Emergency Work Orders Days to Complete Work Orders PM Hours Quality Assurance Examples … Surveys… Energy Management … Consumption Conservation Accomplishments Data: • BTU’s • Sq Ft Buildings • Degree Days • Comparison Over Time • Types of Energy Convert all units to K BTU to benchmark/rank schools according to how much energy they use per square foot. Energy Conversion Factors 1 kWh = 3.412 kBtu 1 Gal Propane = 91.6 kBtu 1 CCF = 103 kBtu 1 Gal #2 Fuel Oil = 139 kBtu SchoolDude UtilityDirect Energy Cost/Sq Ft Report KPI: Custodial • • • • • SF / custodian Overall cost in $/SF Custodial materials cost in $/SF Overtime Satisfaction Survey KPI: Personnel • • • • • Turnover % of staff replaced Change in staff size Attendance rates Average cost of pay and benefits per person KPI: Overall • Square footage per student • Students per athletic field • Overall cost of custodial, utilities, maintenance in $/SF • Comparison metrics: – Overall cost / building age – Overall cost / enrollment – Overall cost / total • Percent of district square footage in portables KPI: Environmental Safety • • • • • • Student injuries Number of inspections Respiratory complaints with nurse State and federal reporting IPM complaints Life safety inspections Strategy • Understand the Expectations • Know the Key Questions • Identify the Metrics • Collect Data as Part of the Process • Compare Metrics Over Time • Benchmark With Others Thank You