16_Childers_David_Struct3

advertisement
David Childers
February 21, 2008
Structures Cost
Center of Mass
•Thanks to John Tsohas for the contacts
•Structures Group for research
AAE 450 Spring 2008
Big Change in Cost
 Previous Cost
Inclusions
•Major Change
•Tank cost
– Sheet Metal Rolling
– Raw Material
– Rivets
• Two Methods:
• ATK Satellite Tanks
• Spincraft
Manufacturing Costs
– Welding
AAE 450 Spring 2008
Structures
2<#>
Test Case: LG-CA-DA-DT (ATK Costs)
Cost Item
Stage 1 (Al)
Stage 2 (Al)
Stage 3 (Ti)
Tanks (Fuel &Ox)
$2.04 million
$690,000
$95,000
Material
$17,100
$820
$1,250
Welding
$8,400
$1,800
$1,750
Rivets
$310
$85
$50
Manufacturing
$29,400
$8,400
$46,200
Stage Sum
$2.09 million
$700,000
$145,000
Total
≈$3 million
Structures Costs Only
Tank Cost Equation:
y = 157169Ln(x) + 714253, where x=volume
AAE 450 Spring 2008
Structures
3<#>
Test Case: LG-CA-DA-DT (Spincraft Costs)
Cost Item
Stage 1 (Al)
Stage 2 (Al)
Stage 3 (Ti)
Material
$17,100
$820
$1,250
Welding
$8,400
$1,800
$1,750
Rivets
$623
$78
$50
Manufacturing
$475,000
$470,000
$948,000
Stage Sum
$502,000
$473,000
$951,000
Total
≈$1.93 million
Structures Costs Only
4<#>
Cost Breakdown
 Welding
– $150/hr
– Times:
• Al=0.6m/hr
• Stl=0.65m/hr
• Ti=0.325m/hr
 Rivets
–
–
–
–
1 rivet/6in (1r/0.152m)
$0.73/rivet
0.049 hr/rivet
$52/hr
Material
Rate:
Al=$13.23/kg (Space grade)
Stl=$0.23/kg
Ti=$88.91/kg
Manufacturing
With ATK Tanks
$70/hr for 5 hrs/sheet
Ti 5.5 times longer than Al or Stl
Performed for:
Nose cone, Skirts, Skin between
tanks
Spincraft
Labor=$150/hr
Al &Stl: 26 wks (40hrs/wk)
Ti: 52 wks
AAE 450 Spring 2008
Structures
5<#>
ATK Tank Costs
Volume (m3) [in3]
Cost ($)
(Existing Tanks)
Tank Shape
0.461 [28100]
600,000
Sphere
0.432 [26350]
400,000
Cylinder w/ Dome
Ends
0.229 [14000]
250,000
Cylinder w/ Dome
Ends
0.059 [3600]
250,000
Sphere
0.015 [890]
60,000
Sphere
Walter Tam, ATK
•Tank Notes
•Composites
•$2 mil for small volume tank & 2 yrs to build
AAE 450 Spring 2008
Structures
6<#>
Tank Costs
•Lower left plot used for cost
determination
$600,000
Tank cost per Volume
700,000
Cost ($)
$400,000
500,000
400,000
Cost ($)
y = 6E+07x3 - 4E+07x2 + 7E+06x - 31462
R² = 1
$500,000
y = 157169ln(x) + 714253
R² = 0.9966
600,000
Tank cost vs Volume
$700,000
$300,000
$200,000
$100,000
300,000
$0
0
200,000
0.1
0.2
0.3
0.4
Volume (m^3)
•Above plot scheme fails due to
dip between 0.15 and 0.4m3
100,000
0
0
0.1
0.2
0.3
0.4
0.5
Volume (m^3)
Plots by David Childers
AAE 450 Spring 2008
Structures
•Cost does not decrease
then increase again
7<#>
0.5
References
 Paul Morissette, Gilchrist Metalfab
 Walter Tam of ATK Space Systems, Inc. (PSI Operations),
http://www.psi-pci.com/.
 Mike Murphy, Spincraft
http://www.spincraft.net/aerospace.htm.
 Mark Sutton, G.E.
 COST CONSIDERATIONS IN USING TITANIUM, GREEN, E. A.,
COULON, J. F. Lockheed-California Company, Burbank, California
v AlAA Paper.
 http://www.metalprices.com/
 TitaniumJoe.com
 Youngstown Tool & Die Co.
 RobotMarketplace.com
AAE 450 Spring 2008
Structures
8<#>