Ravi-Tech Manufacturing (Pvt.) Ltd.
Karyal Road, Tibba PAJIAN, 1.4 KM off Raiwind Road, Lahore.
Contact Details: +92-300 9458077, +92-42-35013355
Email: mbz@ravi-tech.com; info@ravi-tech.com
Website: www.ravi-tech.com
descon.com
Ravi-Tech Manufacturing (Pvt.) Ltd.
Shop Cover Area
:
11,000 Sq F
Offices
:
2,500 Sq F
Store Area
:
1,320 Sq. F
Open Area
:
49,180 Sq. F
Total Area
:
64,000 Sq. F
Establishment
Established in
•
•
•
•
2013. . .
Engineering execution
Construction execution
Equipment manufacturing
Plant maintenance
descon.com
Company Information
(i)
Registered Factory Office:
Karyal Road, Tibba PAJIAN, 1.4 KM off Raiwind Road Lahore
(ii)
Contact Details: +92-300 9458077, +92-42-35013355 Fax +92-42-35978868
(iii)
Email: mbz@ravi-tech.com; info@ravi-tech.com
(iv)
Website: www.ravi-tech.com
(v)
NTN No. 4224988-7
(vi)
GST No. 0300422498812
(vii)
PST No. P4224988-7
(viii)
Pakistan Engineering Council Registration (In process of registration C4)
(ix)
Bankers
- Silk Bank
- ABL
Company Overview
M/S Ravi-Tech Manufacturing (Pvt.) Ltd. was Incorporated in the year 2013. The Company established a
Manufacturing works at total area of 64000 square feet which have a diversified fabrication shop at 11000
SFT and admin & engineering offices at 2,500 SFT, stores area 1320 SFT and open yard is 49,180 SFT. Shop
has a comprehensive range of machine tools and auxiliary equipments to undertake the manufacturing and
repairing of many diverse items of industrial units such as Pressure Vessels, LPG Storage Bullets, LPG Road
Bowsers, ASME Pressure Vessels, Heat Exchangers, Water Treatment Plants, Evaporators, Condensers, API
620 & 650 Storage Tanks, and Boilers etc.
The Company has capabilities to undertake Engineering and Construction services for industrial units like
Chemical & Petrochemical Plants, LPG facilities, Oilfields, Sugar Mills, Power Plants, Foods & Beverages
Industry etc.
The company aims continual growth and expanding its capabilities time to time to provide a full range of
services in fabrication, installation, commissioning and erection of mechanical and electrical construction
projects. The Company Management has vast experience in execution of many Petrochemical, Food, Sugar,
Cement, Fertilizer, Chemical, Pipe work, Oil Storage tanks, Structure Steel Fabrication and Installation,
Overhead Cranes, Firefighting Networks and LPG projects on a turnkey basis.
As an ISO 9001:2008 certified company, Ravi-Tech provides quality services in the areas of project
management, engineering, manufacturing and construction to domestic and overseas clients.
descon.com
Business Philosophy
Vision
M/S. Ravi-Tech Manufacturing (Pvt.) Limited aspires for a leading global market position by
delivering world-class engineering services, reinforcing world-wide corporate alliances,
and upholding top-tier quality and ethical standards as the firm’s backbone of progressive
growth.
descon.com
Business Philosophy
Mission Statement
Providing tradition of excellence services exceeding our clients' expectations and
recognized locally and abroad through:
 Building Robust Client Loyalty. Generate a loyal customer base via full integration with
client-driven alliances.
 Adopting Optimal Engineering Methodologies. Deliver superior value, flexible, costeffective, and integrated engineering solutions in compliance with the latest
design/construction international and local codes and standards across our extensive
project portfolio.
 Empowering Effective Corporate Communication. Develop collaborative
communication networking channels to inspire and mobilize all Ravi-Tech
Manufacturing (Pvt.)
Limited resources at hand to reach out for their full potential.
 Endorsing Proactive Planning. Design the blueprint for future development and secure
sustained strategic repositioning to effectively maneuver rapidly fluctuating global,
regional, and local market conditions.
descon.com
Business Philosophy
Our Values
Our guiding principle, simply stated, is to treat others with whom we come in contact - our
customers, colleagues, shareholders, suppliers, and communities, in the same way we would expect
to be treated in similar circumstances.
More specifically:
 Our Customers: To provide good value, to deliver fully on our commitments, to meet or exceed
service requirements, and to respond with innovativeness and personalized attention.
 Our Colleagues: To provide everyone, hourly and salaried, new and veteran, with opportunities;
and a safe, trusting and respectful environment to become a model for diversity, teamwork and
open communications throughout our Organization.
 Our Shareholders: To achieve long-term profitability and growth that yield returns that meet or
exceed those which our shareholders could achieve through alternative business investments.
 Our Suppliers: To treat our suppliers fairly and forthrightly, to live up fully to our agreements, and
to develop solid and stable long-term relationships.
 Our Communities: To be good corporate citizens, respected and admired as much for our
integrity, commitment, insight, and progressiveness as our financial success.
descon.com
Major Resources
Cont’d……..
Major Resources
BUSINESS SECTOR SERVED
 Oil & Gas
 Power Generation
 Petrochemical
 Fertilizers
 Cement
 Beverages & Dairies
 Sugar Industries
Products
 Pressure Vessels (Non Coded)
 API 650 Steel Storage Tanks
 Petrochemical Process Equipment
 Stainless Steel Fabrication Equipment
 LPG Storage Tanks/ Bullets
 LPG Road Bowser/Tankers
 Plant Piping & Steel Structures
Design & Engineering
 Process, Thermal Design
 Mechanical Design
 Codes & Standards:
ASME. TEMA, API, ANSI, BS,
 Piping Flexibility & Stress Analysis
 Piping Isometric Designs
 Design Software:
 Autocad
Inspection & Testing
 Non Destructive Testing
 Ultrasonic Testing
 Radiographic testing
 Dye Penetrant Test
 Magnetic Particle Testing
 Hydro Static Testing

Third Party Inspection
Certifications
Pakistan Engineering Council (C6)
Our Strategies
 Develop and implementation of Health, Safety and Environment Management System
(HSE-MS) and establish “Continual Improvement” methods in HSE-MS.
 Identification of hazards and sources of pollution in the working places and evaluation,
elimination or control of hazards.
 Establish a health, safety and environment management system set forth by the
requirements of international standards of ISO 14001:2004 and OHSAS 18001:2007.
 Provision of required training courses in order to promote and increase the knowledge of
all personnel and define their roles and responsibilities in relation to HSE-MS.
 Promote HSE culture and knowledge among personnel in the working places and whoever
is related in any circumstances to the organizational activities, and encourage them to play
effective roles in improvement of HSE-MS in the organization.
 Create an open atmosphere for a constructive communication among all interested parties
in organization activities such as mangers, personnel, clients and vendors.
 Optimum use of energy and resources and minimizing wastes and losses.
 Continuous assessment and audit of performances in order to review and continual
improvement of the policy, procedures and plans of HSE-MS.
QHSE Policy
 Our ‘Be There For Life! – Zero Accident Program’ has led to safety performance that is 5 to 10 times better than the national average of accident
rates, which is now half of what it was few years ago. In fact, many of our operations go months, even years, without any injuries. And the
reduced insurance rates, costs and project impact saved millions of rupees each year of our satisfied customers.
 At the same time, our Quality Assurance Program ensures that we meet all customers, statutory and regulatory requirements, support our Zero
Accident values, manage costs and risks and continuously improve our processes and methods for consistent, measurable and repeatable
quality in every project.
 These programs also play a significant role in our ongoing efforts to improve productivity. Through careful planning and a sound set up, we
have created a safe working environment. This program reduced risks significantly. Reduced risks lead to fewer accidents. Thereby, accidentfree projects turn out very productive. At Ravi-Tech, we believe that by integrating safety, quality and productivity, we can better support our
business and meet our customers’ expectations.
 By systematically considering clients’ concerns and developing innovative programs like these that influence our working style, we have
increased our ability to provide the fast, dependable and expert service. Our customers need to successfully address their day-to-day
challenges, while achieving their most vital business and strategic objectives. PLIC
 Ravi-Tech strongly commits itself to provide a timely quality service that, as a minimum, conforms to contractual requirements in all areas of
Construction, Operations and Maintenance to achieve customers’ full satisfaction.
 Ravi-Tech manages their business system in full compliance with the requirements of the current International Standard of Quality
Management System (ISO 9001:2008) and continually strives to improve its effectiveness and efficiency.
We believe in:

Becoming one of the leaders

Identifying areas for improvement

Training and developing the staff to improve personal competency

Establishing measurable quality objectives at each relevant function

Reviewing the policy and objectives periodically

Communicating the policy to all employees
Cont’d…
QHSE Policy
The key factors for a successful Health and Safety Management are:
 Effective Policy
 Organizing an effective management structure (for delivering the policy)
 Systematic planning (for implementing the policy)
 Self performance measurement
 Self auditing and reviewing performance
Having made the place and method of work safe, the Management still faces dangers caused by human factors. It has been proved that most
accidents occur as a result of human failure, both at individual and collective levels. In order to meet the objective of making significant
success in accident prevention, Ravi-Tech Accident Prevention Policy includes the following factors:
•
Selection of workers for specific task or type of employment will be based on:
-
•
Systems and procedures of work including:
Permit to work system
-
•
•
Safe working code of practice
Hazards control measures
Training and Safety education to ensure and update the knowledge of:
Ravi-Tech safety policy/rules and procedures
-
•
•
•
•
Educational and technical knowledge
Practical experience
Medical fitness
Hazards on site
Safe working techniques
Accident reporting
Supervision and monitoring to ensure the implementation of the Safety Policy:
All employees are given a 'Health and Safety Handbook'
Handbook will cover all the identified hazards in accordance with Ravi-Tech General Risk Assessment
In-house safety education will be provided which will cover subjects ranging from ‘Confined Space Entries’ to ‘Welding Operations’ and
‘First Aid on Site’
General safety group discussions will take place regularly
HSE Policy Statement
M/S. Ravi-Tech Manufacturing (Pvt.) Ltd has been incorporated with the
sole objective of having an active & comprehensive presence in the fields of
engineering services presentation, provision, construction & installation of
infrastructure and facilities, pertaining to oil, gas and petrochemical industry.
Encouragement and support of health, safety and mental welfare and comfort of
the organization personnel in the working places and whoever is related in any
circumstances to the organizational activities, prevention of the emission and
release of the pollutants in the environment, all are the pivotal and main
principles of our Organization.
List Of Equipments & Tools
Sr. No.
Description
Quantity
Power Generation Equipments:
1.
Diesel Generator set 220 KVA & 30 KVA
02 Nos.
Equipment/ Machinery:
2
Plate Rolling / Bending Machine Capacity 40 mm x 3000 mm (Hydraulic imported) with Pre
Bending Facility. German Origin
01 Nos.
3
Hydraulic Power Pipe bending machine Capacity up to NB 90mm with Numerical Control system.
01 Nos.
4
Pedestal Drill Machines
02 Nos.
5
Lathe Machines
01 No.
6
Plate Sheering Machine Capacity 6.4 mm x3000 mm wide
01 No.
7
Hydraulic Plate Bending Press Capacity 10mm x 3000mm wide
01 No.
8
Power Press capacity 25 Ton
01 No.
9
Welding Rectifier/Machines 450 Amp
15 Nos.
10
Welding rectifier/Machines 600 Amp
4 Nos.
11
AC/DC Converter Welding Machines for Copper & Aluminum, CS Argon & MIG welding machines
22 Nos.
Cont’d…
List Of Equipments & Tools
Sr. No.
12
13
14
Description
Stud & Spot Welding Machine 400 Amp
Pipe Thread cutting Machine
EOT Overhead Travelling Crane (Electronic control) Capacity 16 M. Tons SWF German Made
Quantity
01 No.
01 No.
01 No.
Mobile Equipment:
15
Certified Truck Mounted Hydraulic/Telescope KATO Crane with SLI system Capacity 25 Tons
01 No.
16
Certified Truck Mounted Hydraulic/Telescope KATO Crane with SLI system Capacity 20 Tons
01 No.
Store racks Container 40 Feet & 20 feet office Container
02 Nos.
17
18
Vehicles Auto mobiles
06 Nos.
Sandblasting/Painting and Insulation cladding Tools:
19
Compressor Air 650 PDS, 8 bar with (AIRMAN) complete accessories/automatic sand pots etc.
01 set
20
Air Less Painting Equipments & Guns
01 set
21
Air Compressor for painting
22
Sand Blasting Equipments (Nozzles etc.)
01 No.
01 Set
Cont’d…
List Of Equipments & Tools
Sr. No.
Description
Quantity
Insulation & Cladding Tools , Equipments
23
Groove Making / Gola Machines
01 Nos.
24
Sheet Rolling Machines
01 No.
Screw Tightness Machines
5 Nos.
Jig Saws for sheet cutting
01 Nos.
25
26
Rigging Tools and Tackles:
27
Riggers Equipment (steel wire rope, rope etc.)
28
Chain Block 2 ,3, 5 & 10 Tons capacity
10Nos.
29
Jacks Hydraulic capacity up to 30 Tons
10 Nos.
30
31
32
D – Shekels 2 Ton To 50 Tons
Lifting Belts 3 Tons, 5 Tons, 10 Tons
Sheep Foot Rollers capacity 80 Tons
For 20 Persons use
8 Set
04 Nos.
04 Nos. (one set)
Cont’d…
List Of Equipments & Tools
Sr. No.
Description
Quantity
Civil Work Machinery:
33
Concrete Mixing Machine Capacity 1 Bag
01 No.
34
Vibrators Road Rollers 3Ton, 12 Ton
02 Nos.
Total Station
01 No.
Telescope/Dumpy Level
01 Nos.
Compaction Testing Lab/Equipments
01 Set
35
36
37
Welding, Fabrication and Erection Equipments:
38
Auto Gas Cutting and Beveling Machines
39
Heating & Gas Cutters Set
40
Electric Disc Grinders
41
Electric Disc Grinders (Baby)
42
Cut off Grinders
43
Pencil Grinders
2 Nos.
4 Nos.
20 Nos.
20 Nos.
02 Nos.
6 Nos.
Cont’d…
List Of Equipments & Tools
Sr. No.
Description
Quantity
Civil Work Machinery:
44
Welding Electrode Baking Oven
45
Welding Electrode Desiccators Cap. 5 Kgs
46
Magnet Base Drill Machines
47
Hammer Drill Machines
02 Nos.
10 Nos.
02 Nos.
10 No.
Hydro testing equipments
48
Hydro testing Pressure Pump Capacity 150 Bars, along with Testing assemblies & calibrated
Gauges Made German
1 Set
In-hand Projects
Sr. No.
1.
2.
3.
4.
5.
Job Description
Client
Fluidized Bed For Dens Ash Plant,
Qty= 01 no
M/S ICI Pakistan Ltd.
Procurements, manufacturing, NDT & Hydro testing, Sand
Soda Ash Khewra.
Blasting & epoxy painting.
Piping Construction for Chilled Water at RBL-Pepsi Cola
Project.
Riaz Bottlers (Pvt.) Ltd
SS 304 Piping Fabrication, Installation, Testing, Pipe
32-N Gulberg, Lahore.
supports installation, Sand Blasting epoxy painting and
Insulation Cladding. Qty=5000 dia inches
Piping Construction for Cooling Water at Hubco Narowal
Project.
MAN Diesel & Turbo Pakistan (Pvt.) Ltd.
Piping Fabrication, Installation, Testing, Pipe supports
Lahore.
installation. Qty= for 3 cooling towers
LPG Road Bowzers Manufacturing & Supply Capacity 30
M. Tons, Qty= 10 Nos
M/S Cress LPG (Pvt.) Ltd.
Procurements of materials, Manufacturing, NDT, Hydro
Lahore.
Testing, Instrumentations and Painting etc.
Supper Heater Coils for CFB 50 Ton Capacities.
M/S ICI Pakistan Ltd.
Qty=01 set
Fabrication of Super Heater coils materials T-11,
Soda Ash Khewra.
Installation, Testing and commissioning at ICI Soda Ash.
Completion
March 31, 2015
April 15, 2015
March 31, 2015
July 10, 2015
May 30, 2015
Executed Projects
Sr. No.
1.
2.
3.
4.
5.
6.
7.
Job Description
Manufacturing Supply of Process Cyclone
Procurements of materials, Manufacturing, Sand
Blasting & painting.
Manufacturing & Supply of Steel Structures. Qty. 65
Tons
Procurements of materials, Mechanical constructions
(Fabrication, Welding), Sand Blasting & painting.
Manufacturing & Supply of Ladders Platforms and C.I
Cooping.
Procurements of materials, Mechanical constructions
(Fabrication, Welding), Hot Dip Galvanizing and Erection
at ICI Polyester HTM plant site.
Services for Epoxy Painting at HTM Stack at ICI Polyester
plant
Manufacturing Supply of Waste Bins & Carts.
Procurements of materials, Manufacturing & Painting
Manufacturing Supply of Waste Bins & Carts.
Procurements of materials, Manufacturing & Painting
Manufacturing Supply of Fire Brigade Lorry/Fire Tender
Procurements of materials, Manufacturing of fire tender
complete in all respects. Over hauling of client supplied
old Chases.
Client
Completion
M/S. Shaheen Grinding Mills
Raiwind Road Lahore
March , 2014
M/S. Arch Line Lahore
April , 2014
M/S. ICI Pakistan Limited
63- Mozang Lahore
May, 2014
M/S. ICI Pakistan Limited 63- Mozang
Lahore
Town Municipal Administration Sahiwal
Sargodha
Town Municipal Administration
Chichawatni
Town Municipal Administration
Chichawatni
May,2014
May, 2014
May, 2014
June 20 , 2014
Cont’d…
Executed Projects
Sr. No.
8.
9.
10.
11.
12.
Job Description
Client
Manufacturing, Supply & Installation of Lighting Poles
in all respects
Town Municipal Administration
Procurements of materials of steel poles, Lights, Cables,
Chichawatni.
Civil and Mechanical constructions (Fabrication,
Welding& Hot dip galvanizing) and Installation at TMA
Site.
Construction of Monuments at city major Chowks.
Procurements of materials, Civil Constructions at TMA
Town Municipal Administration
site.
Chichawatni.
LPG Road Bowzers Manufacturing & Supply Capacity
30 M. Tons, Qty= 4 Nos
M/S. Zam Zam Energy (Pvt.) Ltd. Lahore
Procurements of materials, Manufacturing, NDT, Hydro
Testing, Instrumentations and Painting etc.
Manufacturing Supply of Cable trays, Lighting Poles
M/S . Descon Engineering Ltd.
and Instrumentation supports & Earthing pipes.
18- Km Ferozepur Road Lahore .
Procurements of materials, Manufacturing & Hot dip
Galvanizing
Services for Installation of Equipments & Structures at
M/S. Descon Engineering Ltd.
Jotun Plant Defence Road, Lahore.
18- Km Ferozepur Road Lahore.
Completion
June 30 , 2014
June 30 , 2014
September 30, 2014
September 30, 2014
September 15, 2014
Cont’d…
Executed Projects
Sr. No.
13.
14.
15.
16.
17.
Job Description
Manufacturing & Supply of Ladders Platforms for Coal
Fired Boilers
Procurements of materials, Manufacturing (Fabrication,
Welding), Sand Blasting& Epoxy painting and supply at ICI
Polyester plant site.
Manufacturing & Supply of Steal Structure & Platforms
and Installation at RBL Pepsi cola Plant Lahore.
Procurements of materials, Manufacturing, Sand Blasting
and Epoxy painting and installation at plant
Manufacturing & Supply Over Head travelling crane and
Steal Structure, Platforms and Installation at RBL Pepsi
cola Plant Lahore.
Procurements of materials, Manufacturing, Sand Blasting
and Epoxy painting and installation at plant
API Tanks Constructions for RO Water Improvement
Project-ICI- Soda Ash Project.
SS 304 Tanks Fabrication, Installation, NDT & Water Fill
Testing. Qty=03 nos
Piping Construction for RO Water Improvement ProjectICI- Soda Ash Project.
SS 304 Piping Fabrication, Installation, Testing, Pipe
supports installation, Sand Blasting epoxy painting and
Insulation Cladding. Qty= 12,800 dia inches
Client
Completion
M/S. ICI Pakistan Limited.
Polyester plant Sheikhupura.
August 15, 2014
M/S. Riaz Bottlers (Pvt.) Limited .
32-N Gulberg Lahore.
July 30, 2014
M/S. Riaz Bottlers (Pvt.) Limited.
32-N Gulberg Lahore.
August 20, 2014
M/S. ICI Pakistan Ltd.
63- Mozang Lahore.
M/S. ICI Pakistan Ltd.
63- Mozang Lahore.
November 15, 2014
November 15, 2014
Cont’d…
Executed Projects
Sr. No.
Job Description
Client
18.
Equipment Installation of RO Water Improvement ProjectICI- Soda Ash Project.
Qty= 200 tons
M/S. ICI Pakistan Ltd.
63- Mozang Lahore.
19.
De aerators & Internals Installations
Procurements of materials, Manufacturing, NDT Testing and
Installation at Soda Ash Plant.
Completion
November 15, 2014
M/S. Zam Zam Energy (Pvt.) Ltd.
Lahore.
November 10, 2014
20.
Supper Heater for CFB 50 Ton Capacities.
Qty=02 set
Fabrication of Super Heater coils materials T-11, Installation,
Testing and commissioning at ICI Soda Ash.
M/S ICI Pakistan Ltd.
Soda Ash Khewra.
December 30, 2014
21.
Cold Insulation & SS Cladding
Procurements, Fabrication and Installation of Cold insulation
around Tanks & Piping at RBL Plant
Riaz Bottlers (Pvt.) Ltd
32-N Gulberg Lahore.
22.
Services for Dismantling & Re- Installation of Gas Turbines
5.5 MW. Qty=02 nos
Dismantling from Existing location, Handling, transportation
and Re-Installation at new location complete in all respect.
M/S ICI Pakistan Ltd.
Soda Ash Khewra.
23.
SS Piping Installations.
Procurements of materials, Fabrication, Installation, NDT,
Hydro Testing etc.
Riaz Bottlers (Pvt.) Ltd
32-N Gulberg Lahore.
December 15, 2014
24.
EXHAUST GAS STACKS. QTY= O3 NOS
Procurements of materials, Fabrication, Installation etc.
Riaz Bottlers (Pvt.) Ltd
32-N Gulberg Lahore.
December 15, 2014
October 31, 2014
December 30, 2014
LPG Bowser
Job Title
: LPG Bowser
Location
: Lahore
Client
: Lite Fuels
Scope
: Installation of Piping for LPG System
Completion Date : July-2015
Transformer Housing
Job Title
: Transforming Housing
Location
: Corrosion Control Center Kotlakpat, Lahore
Client
: SNGPL
Scope
: Manufacturing & Supply of 80 Nos. Transformer Housing .
Completion Date : June, 2015
Fluidized Bed
Job Title
: Manufacturing Of Fluidized Bed.
Client
: ICI Soda Ash, Khewra.
Scope
: Procurements of materials, Manufacturing, Testing, Assembling and Sand Blasting &
poxy Painting etc.
Completion Date
: March 30, 2015.
Gas Turbines Installation & Testing and Commissioning
Job Title
: Gas Turbine 5.25 MW.
Client
: ICI Pakistan Ltd. Soda Ash Business Khewra.
Scope
: Dismantling of Turbo Mach brand GT-2 from ICI Polyester Plant (Sheikhupura),
Handling, Shifting at ICI Soda Ash Business area Khewra. Dismantling of Existing
Gas Turbine 5.5 MW (Alstom Brand) from existing location and Shifted outside
Plant. Turbo Mach GT-2 Shifting from yard and Installation on Turbine Hall with
all Resources and arrangements and its piping fabrication, Installation & testing
and commissioning support.
Completion Date : Feb ruary, 2015
Plant & Equipment
Job Title
: RO Water Plant Capacity 120 Ton/hour, Equipment & Piping Installation &
Commissioning complete in all respect.
Client
: ICI Soda Ash Plant, Khewra.
Scope
: Installation of Plant & equipments, Construction of SS 304 Piping Fabrication,
Installation, Testing, Pipe Supports installation, Sand blasting epoxy painting and
insulation cladding etc.
Completion Date : January, 2105
Tanks
Job Title
: API Tanks Construction for RO Water
Storage
Client
: ICI Soda Ash Plant, Khewra.
Scope
: SS 304 Tanks Fabrication, Installation,
NDT, Vacuum & Hydro Testing.
Qty=03 Nos.
Completion Date : December, 2014
Super Heaters
Job Title:
Fabrication & Installation of Boiler Supper
heaters of CFB 50 Ton Boilers and
Dearator
and
manufacturing
&
Installation of Internals.
Client:
ICI Pakistan Ltd. Soda Ash Business
Khewra.
Scope:
Supply and Installation of Super Heaters
alloy steel and Internal for boiler
Dearators Qty=06 nos Material SS-304
and Dismantling of old dearators from
CFB boilers and
Re Installation of
Imported Dearators at their levels.
Qty=2 Sets
Completion Date: December, 2014
Centrifugal Pumps
Job Title
: Installation of Centrifugal Pumps.
Client
: ICI Soda Ash Plant, Khewra.
Scope
: Installation, Leveling and
Commissioning of Centrifugal
Pumps for RO Water
Improvement Project.
Completion Date
: December, 2014.
Generator Exhaust System
Job Title
: Generator Exhaust Extension.
Client
: Riaz Bottler (Pvt.) Ltd.
Scope
: Manufacturing & Supply, Painting and
Erection of Generator Exhaust system
including compensators
Completion Date
: December, 2014
Cable Trays
Job Title
: Manufacturing & Supply of Cable Trays.
Client
: M/S. Descon Engineering Ltd.
Scope
: Procurements of materials, Manufacturing
& Hot dip Galvanizing of Cable trays and
joints, accessories.
Completion Date : September, 2014.
LPG Bowser
Job Title
: LPG Road Bowsers/Tankers Capacity 31 M. Tons, Qty = 2 + 2 Nos.
Client
: M/S Basra Traders Lahore, M/S Zam Zam Energy LAHORE
Scope
: Design, Engineering, Procurements of materials, manufacturing, NDT,
Hydro Testing, Instrumentations and Painting complete in all respects.
Completion Date : September, 2104
Fire Brigade Lorry
Job Title
: Fire Brigade Lorry/Fire Tender.
Client
: TMA Chichawatni.
Scope
: Procurement, Manufacturing and Supply of Fire Brigade Lorry/Fire Tender.
Completion Date : June, 2014
Steel Structure
Job Title
: Steel Structures, Platforms, Ladders and Epoxy Painting.
Location
: ICI Polyester Plant Sheikhupura
Client
: ICI Pakistan Ltd.
Scope
: Procurements, Manufacturing & Supply and Installation of Ladders
Platforms, CI cooping and Epoxy painting on HTM Stack.
Completion Date : May, 2014
Sand Blasting & Painting
Job Title:
Sand Blasting & Epoxy Painting.
Client:
Riaz Bottlers Pepsi Cola (Pvt.) Ltd. Lahore.
Scope:
Sand blasting & painting of Misc Jobs, like as steel
structures equipments etc.
List of Major Clients