Ravi-Tech Manufacturing (Pvt.) Ltd. Karyal Road, Tibba PAJIAN, 1.4 KM off Raiwind Road, Lahore. Contact Details: +92-300 9458077, +92-42-35013355 Email: mbz@ravi-tech.com; info@ravi-tech.com Website: www.ravi-tech.com descon.com Ravi-Tech Manufacturing (Pvt.) Ltd. Shop Cover Area : 11,000 Sq F Offices : 2,500 Sq F Store Area : 1,320 Sq. F Open Area : 49,180 Sq. F Total Area : 64,000 Sq. F Establishment Established in • • • • 2013. . . Engineering execution Construction execution Equipment manufacturing Plant maintenance descon.com Company Information (i) Registered Factory Office: Karyal Road, Tibba PAJIAN, 1.4 KM off Raiwind Road Lahore (ii) Contact Details: +92-300 9458077, +92-42-35013355 Fax +92-42-35978868 (iii) Email: mbz@ravi-tech.com; info@ravi-tech.com (iv) Website: www.ravi-tech.com (v) NTN No. 4224988-7 (vi) GST No. 0300422498812 (vii) PST No. P4224988-7 (viii) Pakistan Engineering Council Registration (In process of registration C4) (ix) Bankers - Silk Bank - ABL Company Overview M/S Ravi-Tech Manufacturing (Pvt.) Ltd. was Incorporated in the year 2013. The Company established a Manufacturing works at total area of 64000 square feet which have a diversified fabrication shop at 11000 SFT and admin & engineering offices at 2,500 SFT, stores area 1320 SFT and open yard is 49,180 SFT. Shop has a comprehensive range of machine tools and auxiliary equipments to undertake the manufacturing and repairing of many diverse items of industrial units such as Pressure Vessels, LPG Storage Bullets, LPG Road Bowsers, ASME Pressure Vessels, Heat Exchangers, Water Treatment Plants, Evaporators, Condensers, API 620 & 650 Storage Tanks, and Boilers etc. The Company has capabilities to undertake Engineering and Construction services for industrial units like Chemical & Petrochemical Plants, LPG facilities, Oilfields, Sugar Mills, Power Plants, Foods & Beverages Industry etc. The company aims continual growth and expanding its capabilities time to time to provide a full range of services in fabrication, installation, commissioning and erection of mechanical and electrical construction projects. The Company Management has vast experience in execution of many Petrochemical, Food, Sugar, Cement, Fertilizer, Chemical, Pipe work, Oil Storage tanks, Structure Steel Fabrication and Installation, Overhead Cranes, Firefighting Networks and LPG projects on a turnkey basis. As an ISO 9001:2008 certified company, Ravi-Tech provides quality services in the areas of project management, engineering, manufacturing and construction to domestic and overseas clients. descon.com Business Philosophy Vision M/S. Ravi-Tech Manufacturing (Pvt.) Limited aspires for a leading global market position by delivering world-class engineering services, reinforcing world-wide corporate alliances, and upholding top-tier quality and ethical standards as the firm’s backbone of progressive growth. descon.com Business Philosophy Mission Statement Providing tradition of excellence services exceeding our clients' expectations and recognized locally and abroad through: Building Robust Client Loyalty. Generate a loyal customer base via full integration with client-driven alliances. Adopting Optimal Engineering Methodologies. Deliver superior value, flexible, costeffective, and integrated engineering solutions in compliance with the latest design/construction international and local codes and standards across our extensive project portfolio. Empowering Effective Corporate Communication. Develop collaborative communication networking channels to inspire and mobilize all Ravi-Tech Manufacturing (Pvt.) Limited resources at hand to reach out for their full potential. Endorsing Proactive Planning. Design the blueprint for future development and secure sustained strategic repositioning to effectively maneuver rapidly fluctuating global, regional, and local market conditions. descon.com Business Philosophy Our Values Our guiding principle, simply stated, is to treat others with whom we come in contact - our customers, colleagues, shareholders, suppliers, and communities, in the same way we would expect to be treated in similar circumstances. More specifically: Our Customers: To provide good value, to deliver fully on our commitments, to meet or exceed service requirements, and to respond with innovativeness and personalized attention. Our Colleagues: To provide everyone, hourly and salaried, new and veteran, with opportunities; and a safe, trusting and respectful environment to become a model for diversity, teamwork and open communications throughout our Organization. Our Shareholders: To achieve long-term profitability and growth that yield returns that meet or exceed those which our shareholders could achieve through alternative business investments. Our Suppliers: To treat our suppliers fairly and forthrightly, to live up fully to our agreements, and to develop solid and stable long-term relationships. Our Communities: To be good corporate citizens, respected and admired as much for our integrity, commitment, insight, and progressiveness as our financial success. descon.com Major Resources Cont’d…….. Major Resources BUSINESS SECTOR SERVED Oil & Gas Power Generation Petrochemical Fertilizers Cement Beverages & Dairies Sugar Industries Products Pressure Vessels (Non Coded) API 650 Steel Storage Tanks Petrochemical Process Equipment Stainless Steel Fabrication Equipment LPG Storage Tanks/ Bullets LPG Road Bowser/Tankers Plant Piping & Steel Structures Design & Engineering Process, Thermal Design Mechanical Design Codes & Standards: ASME. TEMA, API, ANSI, BS, Piping Flexibility & Stress Analysis Piping Isometric Designs Design Software: Autocad Inspection & Testing Non Destructive Testing Ultrasonic Testing Radiographic testing Dye Penetrant Test Magnetic Particle Testing Hydro Static Testing Third Party Inspection Certifications Pakistan Engineering Council (C6) Our Strategies Develop and implementation of Health, Safety and Environment Management System (HSE-MS) and establish “Continual Improvement” methods in HSE-MS. Identification of hazards and sources of pollution in the working places and evaluation, elimination or control of hazards. Establish a health, safety and environment management system set forth by the requirements of international standards of ISO 14001:2004 and OHSAS 18001:2007. Provision of required training courses in order to promote and increase the knowledge of all personnel and define their roles and responsibilities in relation to HSE-MS. Promote HSE culture and knowledge among personnel in the working places and whoever is related in any circumstances to the organizational activities, and encourage them to play effective roles in improvement of HSE-MS in the organization. Create an open atmosphere for a constructive communication among all interested parties in organization activities such as mangers, personnel, clients and vendors. Optimum use of energy and resources and minimizing wastes and losses. Continuous assessment and audit of performances in order to review and continual improvement of the policy, procedures and plans of HSE-MS. QHSE Policy Our ‘Be There For Life! – Zero Accident Program’ has led to safety performance that is 5 to 10 times better than the national average of accident rates, which is now half of what it was few years ago. In fact, many of our operations go months, even years, without any injuries. And the reduced insurance rates, costs and project impact saved millions of rupees each year of our satisfied customers. At the same time, our Quality Assurance Program ensures that we meet all customers, statutory and regulatory requirements, support our Zero Accident values, manage costs and risks and continuously improve our processes and methods for consistent, measurable and repeatable quality in every project. These programs also play a significant role in our ongoing efforts to improve productivity. Through careful planning and a sound set up, we have created a safe working environment. This program reduced risks significantly. Reduced risks lead to fewer accidents. Thereby, accidentfree projects turn out very productive. At Ravi-Tech, we believe that by integrating safety, quality and productivity, we can better support our business and meet our customers’ expectations. By systematically considering clients’ concerns and developing innovative programs like these that influence our working style, we have increased our ability to provide the fast, dependable and expert service. Our customers need to successfully address their day-to-day challenges, while achieving their most vital business and strategic objectives. PLIC Ravi-Tech strongly commits itself to provide a timely quality service that, as a minimum, conforms to contractual requirements in all areas of Construction, Operations and Maintenance to achieve customers’ full satisfaction. Ravi-Tech manages their business system in full compliance with the requirements of the current International Standard of Quality Management System (ISO 9001:2008) and continually strives to improve its effectiveness and efficiency. We believe in: Becoming one of the leaders Identifying areas for improvement Training and developing the staff to improve personal competency Establishing measurable quality objectives at each relevant function Reviewing the policy and objectives periodically Communicating the policy to all employees Cont’d… QHSE Policy The key factors for a successful Health and Safety Management are: Effective Policy Organizing an effective management structure (for delivering the policy) Systematic planning (for implementing the policy) Self performance measurement Self auditing and reviewing performance Having made the place and method of work safe, the Management still faces dangers caused by human factors. It has been proved that most accidents occur as a result of human failure, both at individual and collective levels. In order to meet the objective of making significant success in accident prevention, Ravi-Tech Accident Prevention Policy includes the following factors: • Selection of workers for specific task or type of employment will be based on: - • Systems and procedures of work including: Permit to work system - • • Safe working code of practice Hazards control measures Training and Safety education to ensure and update the knowledge of: Ravi-Tech safety policy/rules and procedures - • • • • Educational and technical knowledge Practical experience Medical fitness Hazards on site Safe working techniques Accident reporting Supervision and monitoring to ensure the implementation of the Safety Policy: All employees are given a 'Health and Safety Handbook' Handbook will cover all the identified hazards in accordance with Ravi-Tech General Risk Assessment In-house safety education will be provided which will cover subjects ranging from ‘Confined Space Entries’ to ‘Welding Operations’ and ‘First Aid on Site’ General safety group discussions will take place regularly HSE Policy Statement M/S. Ravi-Tech Manufacturing (Pvt.) Ltd has been incorporated with the sole objective of having an active & comprehensive presence in the fields of engineering services presentation, provision, construction & installation of infrastructure and facilities, pertaining to oil, gas and petrochemical industry. Encouragement and support of health, safety and mental welfare and comfort of the organization personnel in the working places and whoever is related in any circumstances to the organizational activities, prevention of the emission and release of the pollutants in the environment, all are the pivotal and main principles of our Organization. List Of Equipments & Tools Sr. No. Description Quantity Power Generation Equipments: 1. Diesel Generator set 220 KVA & 30 KVA 02 Nos. Equipment/ Machinery: 2 Plate Rolling / Bending Machine Capacity 40 mm x 3000 mm (Hydraulic imported) with Pre Bending Facility. German Origin 01 Nos. 3 Hydraulic Power Pipe bending machine Capacity up to NB 90mm with Numerical Control system. 01 Nos. 4 Pedestal Drill Machines 02 Nos. 5 Lathe Machines 01 No. 6 Plate Sheering Machine Capacity 6.4 mm x3000 mm wide 01 No. 7 Hydraulic Plate Bending Press Capacity 10mm x 3000mm wide 01 No. 8 Power Press capacity 25 Ton 01 No. 9 Welding Rectifier/Machines 450 Amp 15 Nos. 10 Welding rectifier/Machines 600 Amp 4 Nos. 11 AC/DC Converter Welding Machines for Copper & Aluminum, CS Argon & MIG welding machines 22 Nos. Cont’d… List Of Equipments & Tools Sr. No. 12 13 14 Description Stud & Spot Welding Machine 400 Amp Pipe Thread cutting Machine EOT Overhead Travelling Crane (Electronic control) Capacity 16 M. Tons SWF German Made Quantity 01 No. 01 No. 01 No. Mobile Equipment: 15 Certified Truck Mounted Hydraulic/Telescope KATO Crane with SLI system Capacity 25 Tons 01 No. 16 Certified Truck Mounted Hydraulic/Telescope KATO Crane with SLI system Capacity 20 Tons 01 No. Store racks Container 40 Feet & 20 feet office Container 02 Nos. 17 18 Vehicles Auto mobiles 06 Nos. Sandblasting/Painting and Insulation cladding Tools: 19 Compressor Air 650 PDS, 8 bar with (AIRMAN) complete accessories/automatic sand pots etc. 01 set 20 Air Less Painting Equipments & Guns 01 set 21 Air Compressor for painting 22 Sand Blasting Equipments (Nozzles etc.) 01 No. 01 Set Cont’d… List Of Equipments & Tools Sr. No. Description Quantity Insulation & Cladding Tools , Equipments 23 Groove Making / Gola Machines 01 Nos. 24 Sheet Rolling Machines 01 No. Screw Tightness Machines 5 Nos. Jig Saws for sheet cutting 01 Nos. 25 26 Rigging Tools and Tackles: 27 Riggers Equipment (steel wire rope, rope etc.) 28 Chain Block 2 ,3, 5 & 10 Tons capacity 10Nos. 29 Jacks Hydraulic capacity up to 30 Tons 10 Nos. 30 31 32 D – Shekels 2 Ton To 50 Tons Lifting Belts 3 Tons, 5 Tons, 10 Tons Sheep Foot Rollers capacity 80 Tons For 20 Persons use 8 Set 04 Nos. 04 Nos. (one set) Cont’d… List Of Equipments & Tools Sr. No. Description Quantity Civil Work Machinery: 33 Concrete Mixing Machine Capacity 1 Bag 01 No. 34 Vibrators Road Rollers 3Ton, 12 Ton 02 Nos. Total Station 01 No. Telescope/Dumpy Level 01 Nos. Compaction Testing Lab/Equipments 01 Set 35 36 37 Welding, Fabrication and Erection Equipments: 38 Auto Gas Cutting and Beveling Machines 39 Heating & Gas Cutters Set 40 Electric Disc Grinders 41 Electric Disc Grinders (Baby) 42 Cut off Grinders 43 Pencil Grinders 2 Nos. 4 Nos. 20 Nos. 20 Nos. 02 Nos. 6 Nos. Cont’d… List Of Equipments & Tools Sr. No. Description Quantity Civil Work Machinery: 44 Welding Electrode Baking Oven 45 Welding Electrode Desiccators Cap. 5 Kgs 46 Magnet Base Drill Machines 47 Hammer Drill Machines 02 Nos. 10 Nos. 02 Nos. 10 No. Hydro testing equipments 48 Hydro testing Pressure Pump Capacity 150 Bars, along with Testing assemblies & calibrated Gauges Made German 1 Set In-hand Projects Sr. No. 1. 2. 3. 4. 5. Job Description Client Fluidized Bed For Dens Ash Plant, Qty= 01 no M/S ICI Pakistan Ltd. Procurements, manufacturing, NDT & Hydro testing, Sand Soda Ash Khewra. Blasting & epoxy painting. Piping Construction for Chilled Water at RBL-Pepsi Cola Project. Riaz Bottlers (Pvt.) Ltd SS 304 Piping Fabrication, Installation, Testing, Pipe 32-N Gulberg, Lahore. supports installation, Sand Blasting epoxy painting and Insulation Cladding. Qty=5000 dia inches Piping Construction for Cooling Water at Hubco Narowal Project. MAN Diesel & Turbo Pakistan (Pvt.) Ltd. Piping Fabrication, Installation, Testing, Pipe supports Lahore. installation. Qty= for 3 cooling towers LPG Road Bowzers Manufacturing & Supply Capacity 30 M. Tons, Qty= 10 Nos M/S Cress LPG (Pvt.) Ltd. Procurements of materials, Manufacturing, NDT, Hydro Lahore. Testing, Instrumentations and Painting etc. Supper Heater Coils for CFB 50 Ton Capacities. M/S ICI Pakistan Ltd. Qty=01 set Fabrication of Super Heater coils materials T-11, Soda Ash Khewra. Installation, Testing and commissioning at ICI Soda Ash. Completion March 31, 2015 April 15, 2015 March 31, 2015 July 10, 2015 May 30, 2015 Executed Projects Sr. No. 1. 2. 3. 4. 5. 6. 7. Job Description Manufacturing Supply of Process Cyclone Procurements of materials, Manufacturing, Sand Blasting & painting. Manufacturing & Supply of Steel Structures. Qty. 65 Tons Procurements of materials, Mechanical constructions (Fabrication, Welding), Sand Blasting & painting. Manufacturing & Supply of Ladders Platforms and C.I Cooping. Procurements of materials, Mechanical constructions (Fabrication, Welding), Hot Dip Galvanizing and Erection at ICI Polyester HTM plant site. Services for Epoxy Painting at HTM Stack at ICI Polyester plant Manufacturing Supply of Waste Bins & Carts. Procurements of materials, Manufacturing & Painting Manufacturing Supply of Waste Bins & Carts. Procurements of materials, Manufacturing & Painting Manufacturing Supply of Fire Brigade Lorry/Fire Tender Procurements of materials, Manufacturing of fire tender complete in all respects. Over hauling of client supplied old Chases. Client Completion M/S. Shaheen Grinding Mills Raiwind Road Lahore March , 2014 M/S. Arch Line Lahore April , 2014 M/S. ICI Pakistan Limited 63- Mozang Lahore May, 2014 M/S. ICI Pakistan Limited 63- Mozang Lahore Town Municipal Administration Sahiwal Sargodha Town Municipal Administration Chichawatni Town Municipal Administration Chichawatni May,2014 May, 2014 May, 2014 June 20 , 2014 Cont’d… Executed Projects Sr. No. 8. 9. 10. 11. 12. Job Description Client Manufacturing, Supply & Installation of Lighting Poles in all respects Town Municipal Administration Procurements of materials of steel poles, Lights, Cables, Chichawatni. Civil and Mechanical constructions (Fabrication, Welding& Hot dip galvanizing) and Installation at TMA Site. Construction of Monuments at city major Chowks. Procurements of materials, Civil Constructions at TMA Town Municipal Administration site. Chichawatni. LPG Road Bowzers Manufacturing & Supply Capacity 30 M. Tons, Qty= 4 Nos M/S. Zam Zam Energy (Pvt.) Ltd. Lahore Procurements of materials, Manufacturing, NDT, Hydro Testing, Instrumentations and Painting etc. Manufacturing Supply of Cable trays, Lighting Poles M/S . Descon Engineering Ltd. and Instrumentation supports & Earthing pipes. 18- Km Ferozepur Road Lahore . Procurements of materials, Manufacturing & Hot dip Galvanizing Services for Installation of Equipments & Structures at M/S. Descon Engineering Ltd. Jotun Plant Defence Road, Lahore. 18- Km Ferozepur Road Lahore. Completion June 30 , 2014 June 30 , 2014 September 30, 2014 September 30, 2014 September 15, 2014 Cont’d… Executed Projects Sr. No. 13. 14. 15. 16. 17. Job Description Manufacturing & Supply of Ladders Platforms for Coal Fired Boilers Procurements of materials, Manufacturing (Fabrication, Welding), Sand Blasting& Epoxy painting and supply at ICI Polyester plant site. Manufacturing & Supply of Steal Structure & Platforms and Installation at RBL Pepsi cola Plant Lahore. Procurements of materials, Manufacturing, Sand Blasting and Epoxy painting and installation at plant Manufacturing & Supply Over Head travelling crane and Steal Structure, Platforms and Installation at RBL Pepsi cola Plant Lahore. Procurements of materials, Manufacturing, Sand Blasting and Epoxy painting and installation at plant API Tanks Constructions for RO Water Improvement Project-ICI- Soda Ash Project. SS 304 Tanks Fabrication, Installation, NDT & Water Fill Testing. Qty=03 nos Piping Construction for RO Water Improvement ProjectICI- Soda Ash Project. SS 304 Piping Fabrication, Installation, Testing, Pipe supports installation, Sand Blasting epoxy painting and Insulation Cladding. Qty= 12,800 dia inches Client Completion M/S. ICI Pakistan Limited. Polyester plant Sheikhupura. August 15, 2014 M/S. Riaz Bottlers (Pvt.) Limited . 32-N Gulberg Lahore. July 30, 2014 M/S. Riaz Bottlers (Pvt.) Limited. 32-N Gulberg Lahore. August 20, 2014 M/S. ICI Pakistan Ltd. 63- Mozang Lahore. M/S. ICI Pakistan Ltd. 63- Mozang Lahore. November 15, 2014 November 15, 2014 Cont’d… Executed Projects Sr. No. Job Description Client 18. Equipment Installation of RO Water Improvement ProjectICI- Soda Ash Project. Qty= 200 tons M/S. ICI Pakistan Ltd. 63- Mozang Lahore. 19. De aerators & Internals Installations Procurements of materials, Manufacturing, NDT Testing and Installation at Soda Ash Plant. Completion November 15, 2014 M/S. Zam Zam Energy (Pvt.) Ltd. Lahore. November 10, 2014 20. Supper Heater for CFB 50 Ton Capacities. Qty=02 set Fabrication of Super Heater coils materials T-11, Installation, Testing and commissioning at ICI Soda Ash. M/S ICI Pakistan Ltd. Soda Ash Khewra. December 30, 2014 21. Cold Insulation & SS Cladding Procurements, Fabrication and Installation of Cold insulation around Tanks & Piping at RBL Plant Riaz Bottlers (Pvt.) Ltd 32-N Gulberg Lahore. 22. Services for Dismantling & Re- Installation of Gas Turbines 5.5 MW. Qty=02 nos Dismantling from Existing location, Handling, transportation and Re-Installation at new location complete in all respect. M/S ICI Pakistan Ltd. Soda Ash Khewra. 23. SS Piping Installations. Procurements of materials, Fabrication, Installation, NDT, Hydro Testing etc. Riaz Bottlers (Pvt.) Ltd 32-N Gulberg Lahore. December 15, 2014 24. EXHAUST GAS STACKS. QTY= O3 NOS Procurements of materials, Fabrication, Installation etc. Riaz Bottlers (Pvt.) Ltd 32-N Gulberg Lahore. December 15, 2014 October 31, 2014 December 30, 2014 LPG Bowser Job Title : LPG Bowser Location : Lahore Client : Lite Fuels Scope : Installation of Piping for LPG System Completion Date : July-2015 Transformer Housing Job Title : Transforming Housing Location : Corrosion Control Center Kotlakpat, Lahore Client : SNGPL Scope : Manufacturing & Supply of 80 Nos. Transformer Housing . Completion Date : June, 2015 Fluidized Bed Job Title : Manufacturing Of Fluidized Bed. Client : ICI Soda Ash, Khewra. Scope : Procurements of materials, Manufacturing, Testing, Assembling and Sand Blasting & poxy Painting etc. Completion Date : March 30, 2015. Gas Turbines Installation & Testing and Commissioning Job Title : Gas Turbine 5.25 MW. Client : ICI Pakistan Ltd. Soda Ash Business Khewra. Scope : Dismantling of Turbo Mach brand GT-2 from ICI Polyester Plant (Sheikhupura), Handling, Shifting at ICI Soda Ash Business area Khewra. Dismantling of Existing Gas Turbine 5.5 MW (Alstom Brand) from existing location and Shifted outside Plant. Turbo Mach GT-2 Shifting from yard and Installation on Turbine Hall with all Resources and arrangements and its piping fabrication, Installation & testing and commissioning support. Completion Date : Feb ruary, 2015 Plant & Equipment Job Title : RO Water Plant Capacity 120 Ton/hour, Equipment & Piping Installation & Commissioning complete in all respect. Client : ICI Soda Ash Plant, Khewra. Scope : Installation of Plant & equipments, Construction of SS 304 Piping Fabrication, Installation, Testing, Pipe Supports installation, Sand blasting epoxy painting and insulation cladding etc. Completion Date : January, 2105 Tanks Job Title : API Tanks Construction for RO Water Storage Client : ICI Soda Ash Plant, Khewra. Scope : SS 304 Tanks Fabrication, Installation, NDT, Vacuum & Hydro Testing. Qty=03 Nos. Completion Date : December, 2014 Super Heaters Job Title: Fabrication & Installation of Boiler Supper heaters of CFB 50 Ton Boilers and Dearator and manufacturing & Installation of Internals. Client: ICI Pakistan Ltd. Soda Ash Business Khewra. Scope: Supply and Installation of Super Heaters alloy steel and Internal for boiler Dearators Qty=06 nos Material SS-304 and Dismantling of old dearators from CFB boilers and Re Installation of Imported Dearators at their levels. Qty=2 Sets Completion Date: December, 2014 Centrifugal Pumps Job Title : Installation of Centrifugal Pumps. Client : ICI Soda Ash Plant, Khewra. Scope : Installation, Leveling and Commissioning of Centrifugal Pumps for RO Water Improvement Project. Completion Date : December, 2014. Generator Exhaust System Job Title : Generator Exhaust Extension. Client : Riaz Bottler (Pvt.) Ltd. Scope : Manufacturing & Supply, Painting and Erection of Generator Exhaust system including compensators Completion Date : December, 2014 Cable Trays Job Title : Manufacturing & Supply of Cable Trays. Client : M/S. Descon Engineering Ltd. Scope : Procurements of materials, Manufacturing & Hot dip Galvanizing of Cable trays and joints, accessories. Completion Date : September, 2014. LPG Bowser Job Title : LPG Road Bowsers/Tankers Capacity 31 M. Tons, Qty = 2 + 2 Nos. Client : M/S Basra Traders Lahore, M/S Zam Zam Energy LAHORE Scope : Design, Engineering, Procurements of materials, manufacturing, NDT, Hydro Testing, Instrumentations and Painting complete in all respects. Completion Date : September, 2104 Fire Brigade Lorry Job Title : Fire Brigade Lorry/Fire Tender. Client : TMA Chichawatni. Scope : Procurement, Manufacturing and Supply of Fire Brigade Lorry/Fire Tender. Completion Date : June, 2014 Steel Structure Job Title : Steel Structures, Platforms, Ladders and Epoxy Painting. Location : ICI Polyester Plant Sheikhupura Client : ICI Pakistan Ltd. Scope : Procurements, Manufacturing & Supply and Installation of Ladders Platforms, CI cooping and Epoxy painting on HTM Stack. Completion Date : May, 2014 Sand Blasting & Painting Job Title: Sand Blasting & Epoxy Painting. Client: Riaz Bottlers Pepsi Cola (Pvt.) Ltd. Lahore. Scope: Sand blasting & painting of Misc Jobs, like as steel structures equipments etc. List of Major Clients Thank you!