Time & Expense Forms

MRC Consulting

Project Goals

 Provide an automated web based Time

& Expense reporting system for MRC

Consulting and its clients.

 Reduce the amount of time spent manually processing paper based forms.

 Improve timeliness and reduce errors.

 Improve client satisfaction.

Description

 A Time & Expense web portal will be created for processing weekly reports.

 There will be two main data entry pages, one for Time and a second for Expenses.

 The web portal will be linked to a database back end.

 The database will automatically record information and calculate witholdings.

 There will be both intranet and internet portals

Competitive Analysis

 Competitors

– It is hoped that reducing the man hours required for payroll and billing will provide

MRC Consulting with a competitive advantage.

 Strengths

– MRC Consulting has always prided itself on its good client relations and the value it provides to its clients.

Competitive Analysis

 Strengths cont.

– MRC’s consultants average more industry experience and certerfications than any other consulting firm.

 Weaknesses

– Our current paper based billing system leads to longer billing cycles than our competitors due to our smaller HR department.

Competitive Analysis, cont.

 Competitors

– DRC Consulting

– SRC Consulting

 Strengths

– Each of our competitors are able to service a larger client base due to their larger clerical and

HR staff.

 Weaknesses

– Our competitors account executives are overworked which leaves them out of touch with their clients needs.

Technology

 The consultant billing application is going to be a

Web application running Microsoft software using IIS,

SQL Server as the database engine, and ASP .Net using VB or C# as the application language. The hardware used can be underutilized existing hardware that the consulting company is already using, or new hardware need to will be purchased.

 The client’s preference is to have the site hosted by an independent service provider.

Team/Resources

 Assumptions about resources allocated to this project

– MRC’s staff of consultants will be employed for this project.

– The solution will be hosted offsite.

– Developmental and operational support will be provided by MRC consultants.

Project Teams

 Project team 3 will be tasked with developing the new web based Time &

Expense reporting system. Other project teams are already occupied with other internal projects.

Project Team 3 Members

Roles and Responsibilities

Role Name Organization/ Contact Information

Project

Sponsor

System

Analyst

System

Analyst

Barnes,

David

Position

MRC

Consulting

Managing

Partner

Group 3

Member

Harback,

Jason

Hatlestad,

Peter

Group 3

Member

Higgs,

Dewayne

Group 3

Member

Web Master /

Testing

Analyst

Project

Manager

Database

Administrator

Jackman,

Trevor

Johnson,

Eric

Group 3

Member

Group 3

Member

(605) 232-2000 ext 33022 david.barnes@earthlink.net

(507) 763-3823 jharback@pluto.dsu.edu

(605) 359-5701

(806) 676-1128 hatlestadp@pluto.dsu.edu djhiggs1@buffs.wtamu.edu

(712) 389-2211 jackmtre@gmail.com

712-240-9086 emjohnson10499@pluto.dsu.edu

Procedures

 Since this project is an internal project MRC consultants will need to bill their hours to MRC directly.

 Planning will need to accommodate consultants client work schedule and the work performed will need to be segregated from clients billable hours.

 All documents will need to be reviewed by the project manager and subject to project sponsors approval.

 Regular status meetings will be held to review progess.

Milestones pt.1

 Determine the Project manager

 Draft Schedule

 Maintain Project

Notebook

 Write Team Contract

 Create a Web sit

 Detailed Scope

Statement (Functional

Specifications)

 Maintain Project Web

Site

 Write the Project

Charter

 A detailed Gantt Chart

 Create Work

Breakdown Structure

 Preliminary Scope

Document

 Feasibility Study

Milestones pt.2

 Break Even Analysis

 Create Issues / Risk

Log

 Maintain Risk Log

 Week 1 Status Report

 Technical

Requirements:

– Network

Infrastructure, Server

Hardware and

Software

– Database Structure

– Acceptance of

Functional

Requirements

– Project sponsor acceptance of

Technical

Requirements

 Build:

– Create Database

Objects

Milestones pt.3

 Build:

– Create Programming

Code

 Build:

– Test Database Objects

 Build:

– Test Programming Code

 Week 2 Status Repot

 Week 3 Status Report

 Week 4 Status Report

 Week 5 Status Report

 User Acceptance

Testing

 Week 6 Status Report

 Implementation

 Post Implementation

Support

 Week 7 Status Report

 Week 8 Status Report

Sneak Peak at the Time & Expense Reports

Timesheet column features

– Day of the week.

Dates are automatically populated from calendar.

– Regular hours

– Overtime hours

– Sick leave hours

– Vacation hours

– Holiday hours

– Unpaid leave hours

– Other

– Total hours are automatically calculated for row and column

– Expense report field

(Yes/No) linked to expense report.

Timesheet row features

– Company contact information

– Employee name

– Employee ID. Used to populate pay rate and calculate withholdings.

– Supervisor name

– Week field. Dates are automatically populated from calendar.

– Total hours field that is automatically calculated from input.

Timesheet row features cont.

– Rate/Hour field populated from employee login minus withholdings

– Total pay calculated from rate and hours

– Total hours reported calculated from hours

– Total pay calculated from hours and rate minus withholdings

– Employee signature and date

– Supervisor signature and date

– Submit button for completed timesheet

Expense report column features

– Day of the week.

Dates are automatically populated from a calendar.

– Description of expenses

– Air and transport expenses

– Lodging expenses

– Calculated

Fuel/Mileage expenses.

– Phone expenses

– Meals and tips

– Entertainment expenses

– Other

– Total is automatically calculated by row and column

Expense report row features

– Company information

– Employee name

– Employee ID.

– Supervisor name

– Week field.

– Subtotal

– Advances

– Fuel/Mileage reimbursement rate

– Total Reimbursement

– Employee signature and date

– Supervisor signature and date

– Submit button for completed expense report

Related Documents

 Group 3 would like to thank www.vertex42.com for providing the

Time and Expense templates

– http://www.vertex42.com/ExcelTemplates/excel-expensereport.html

– http://www.vertex42.com/ExcelTemplates/exceltimesheet.html

Our Website

http://www.ama3d.com/infs724/

Download