MRC Consulting
Provide an automated web based Time
& Expense reporting system for MRC
Consulting and its clients.
Reduce the amount of time spent manually processing paper based forms.
Improve timeliness and reduce errors.
Improve client satisfaction.
A Time & Expense web portal will be created for processing weekly reports.
There will be two main data entry pages, one for Time and a second for Expenses.
The web portal will be linked to a database back end.
The database will automatically record information and calculate witholdings.
There will be both intranet and internet portals
Competitors
– It is hoped that reducing the man hours required for payroll and billing will provide
MRC Consulting with a competitive advantage.
Strengths
– MRC Consulting has always prided itself on its good client relations and the value it provides to its clients.
Strengths cont.
– MRC’s consultants average more industry experience and certerfications than any other consulting firm.
Weaknesses
– Our current paper based billing system leads to longer billing cycles than our competitors due to our smaller HR department.
Competitors
– DRC Consulting
– SRC Consulting
Strengths
– Each of our competitors are able to service a larger client base due to their larger clerical and
HR staff.
Weaknesses
– Our competitors account executives are overworked which leaves them out of touch with their clients needs.
The consultant billing application is going to be a
Web application running Microsoft software using IIS,
SQL Server as the database engine, and ASP .Net using VB or C# as the application language. The hardware used can be underutilized existing hardware that the consulting company is already using, or new hardware need to will be purchased.
The client’s preference is to have the site hosted by an independent service provider.
Assumptions about resources allocated to this project
– MRC’s staff of consultants will be employed for this project.
– The solution will be hosted offsite.
– Developmental and operational support will be provided by MRC consultants.
Project team 3 will be tasked with developing the new web based Time &
Expense reporting system. Other project teams are already occupied with other internal projects.
Roles and Responsibilities
Role Name Organization/ Contact Information
Project
Sponsor
System
Analyst
System
Analyst
Barnes,
David
Position
MRC
Consulting
Managing
Partner
Group 3
Member
Harback,
Jason
Hatlestad,
Peter
Group 3
Member
Higgs,
Dewayne
Group 3
Member
Web Master /
Testing
Analyst
Project
Manager
Database
Administrator
Jackman,
Trevor
Johnson,
Eric
Group 3
Member
Group 3
Member
(605) 232-2000 ext 33022 david.barnes@earthlink.net
(507) 763-3823 jharback@pluto.dsu.edu
(605) 359-5701
(806) 676-1128 hatlestadp@pluto.dsu.edu djhiggs1@buffs.wtamu.edu
(712) 389-2211 jackmtre@gmail.com
712-240-9086 emjohnson10499@pluto.dsu.edu
Since this project is an internal project MRC consultants will need to bill their hours to MRC directly.
Planning will need to accommodate consultants client work schedule and the work performed will need to be segregated from clients billable hours.
All documents will need to be reviewed by the project manager and subject to project sponsors approval.
Regular status meetings will be held to review progess.
Determine the Project manager
Draft Schedule
Maintain Project
Notebook
Write Team Contract
Create a Web sit
Detailed Scope
Statement (Functional
Specifications)
Maintain Project Web
Site
Write the Project
Charter
A detailed Gantt Chart
Create Work
Breakdown Structure
Preliminary Scope
Document
Feasibility Study
Break Even Analysis
Create Issues / Risk
Log
Maintain Risk Log
Week 1 Status Report
Technical
Requirements:
– Network
Infrastructure, Server
Hardware and
Software
– Database Structure
– Acceptance of
Functional
Requirements
– Project sponsor acceptance of
Technical
Requirements
Build:
– Create Database
Objects
Build:
– Create Programming
Code
Build:
– Test Database Objects
Build:
– Test Programming Code
Week 2 Status Repot
Week 3 Status Report
Week 4 Status Report
Week 5 Status Report
User Acceptance
Testing
Week 6 Status Report
Implementation
Post Implementation
Support
Week 7 Status Report
Week 8 Status Report
Sneak Peak at the Time & Expense Reports
– Day of the week.
Dates are automatically populated from calendar.
– Regular hours
– Overtime hours
– Sick leave hours
– Vacation hours
– Holiday hours
– Unpaid leave hours
– Other
– Total hours are automatically calculated for row and column
– Expense report field
(Yes/No) linked to expense report.
– Company contact information
– Employee name
– Employee ID. Used to populate pay rate and calculate withholdings.
– Supervisor name
– Week field. Dates are automatically populated from calendar.
– Total hours field that is automatically calculated from input.
– Rate/Hour field populated from employee login minus withholdings
– Total pay calculated from rate and hours
– Total hours reported calculated from hours
– Total pay calculated from hours and rate minus withholdings
– Employee signature and date
– Supervisor signature and date
– Submit button for completed timesheet
– Day of the week.
Dates are automatically populated from a calendar.
– Description of expenses
– Air and transport expenses
– Lodging expenses
– Calculated
Fuel/Mileage expenses.
– Phone expenses
– Meals and tips
– Entertainment expenses
– Other
– Total is automatically calculated by row and column
– Company information
– Employee name
– Employee ID.
– Supervisor name
– Week field.
– Subtotal
– Advances
– Fuel/Mileage reimbursement rate
– Total Reimbursement
– Employee signature and date
– Supervisor signature and date
– Submit button for completed expense report
Group 3 would like to thank www.vertex42.com for providing the
Time and Expense templates
– http://www.vertex42.com/ExcelTemplates/excel-expensereport.html
– http://www.vertex42.com/ExcelTemplates/exceltimesheet.html
http://www.ama3d.com/infs724/