EHP4 for SAP ERP 6.0 June 2010 English Create Semifinished Good (HALB) Material (155.26) Master Data Procedure SAP AG Dietmar-Hopp-Allee 16 69190 Walldorf Germany SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD Copyright © 2010 SAP AG. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation. IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries. Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries. Oracle is a registered trademark of Oracle Corporation. UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group. Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc. HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C ®, World Wide Web Consortium, Massachusetts Institute of Technology. Java is a registered trademark of Sun Microsystems, Inc. JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, Clear Enterprise, SAP BusinessObjects Explorer, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries. Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP France in the United States and in other countries. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary. These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty. © SAP AG Page 2 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD Icons Icon Meaning Caution Example Note Recommendation Syntax External process Business Process Alternative/Decision Choice Typographic Conventions Type Style Description Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options. Cross-references to other documentation. Example text Emphasized words or phrases in body text, titles of graphics and tables. EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE. Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools. EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key. Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation. <Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries. © SAP AG Page 3 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD Contents 1 Purpose ................................................................................................................................... 5 2 Prerequisites............................................................................................................................ 5 3 2.1 Business Conditions ......................................................................................................... 5 2.2 Roles ................................................................................................................................ 5 Process Steps ......................................................................................................................... 5 3.1 4 5 Creating Semi-finished (HALB) Material .......................................................................... 5 3.1.1 Basic Data ................................................................................................................. 7 3.1.2 Classification ............................................................................................................. 8 3.1.3 Sales Data ................................................................................................................ 8 3.1.4 Purchasing Data ..................................................................................................... 10 3.1.5 MRP Data ............................................................................................................... 10 3.1.6 Work Scheduling Data ............................................................................................ 12 3.1.7 General/Storage Data ............................................................................................. 12 3.1.8 Warehouse Data ..................................................................................................... 13 3.1.9 Accounting Data ...................................................................................................... 13 3.1.10 Costing Data ........................................................................................................... 13 Follow-Up Processes ............................................................................................................ 14 4.1 Material Extensions ........................................................................................................ 14 4.2 Bill of Materials ............................................................................................................... 14 4.3 Routing ........................................................................................................................... 14 4.4 Sales Price Condition ..................................................................................................... 14 4.5 Product Group ................................................................................................................ 15 4.6 Product Cost Planning ................................................................................................... 15 Appendix................................................................................................................................ 15 5.1 Reversal of Process Steps ............................................................................................. 15 © SAP AG Page 4 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD Create Semi finished Good (HALB) Material 1 Purpose With this document you create semi-finished material. 2 Prerequisites 2.1 Business Conditions The activities described in this document are part of a bigger chain of integrated business processes or scenarios. As a consequence, you must have fulfilled the following business conditions before you can start the activities described in this document: Business condition Scenario Create Batch Classification – optional if you want to use batch management functionality Create Batch Classification (155.62) 2.2 Roles Use The following roles must have been installed to test this scenario in the SAP NetWeaver Business Client (NWBC). The roles in this Business Process Documentation must be assigned to the user or users testing this scenario. You do not need these roles if you are not using the NWBC interface, but the standard SAP GUI. Prerequisites The business roles have been assigned to the user who is testing this scenario. Business role Technical name Process step Employee (Professional User) SAP_NBPR_EMPLOYEE-S Assignment of this role is necessary for basic functionality. Purchasing Administrator SAP_NBPR_PURCHASER-K Create Material 3 Process Steps 3.1 Creating Semi-finished (HALB) Material Use A new semi-finished material is needed for manufacturing / trading or service industry. Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) © SAP AG Page 5 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD SAP ECC menu Logistics Materials Management Material Master Material Create (General) Immediately Transaction code MM01 Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role Business role Purchasing Administrator (SAP_NBPR_PURCHASER-K) Business role Menu Purchasing Master Data Material Create Material 2. On the initial screen, enter the following values and choose Enter: Field name Description User action and values Comment Material <Semifinished material number> Leave empty for internal number assignment or enter your own number Industry sector M Mechanical Engineer For discrete manufacturing and services C Chemical Industry For process manufacturing HALB Semi finished products Material type 3. On the Select View(s) dialog box Select: View name Description User action and values Basic Data 1, Basic Data 2 required Classification Optional for manufacturing / trading Sales: Sales Org. Data 1, Sales Org. Data 2, General/Plant Data, Sales Text required Foreign Trade Export Comment Do not select for Services Only required if you want to use batch management Optional for manufacturing / trading Do not select for Services Only required if you want to sell the material abroad Purchasing, Purchase Order Text Select for manufacturing / trading Do not select for Services MRP1, MRP2, MRP3, MRP4 Select for manufacturing / trading Do not select for Services Work Scheduling Select for manufacturing / trading Do not select for Services General Plant Data / Storage 1, Storage 2 required © SAP AG Page 6 of 16 SAP Best Practices View name Create Semifinished Good (HALB) Material (155.26): MPD Description User action and values Warehouse management Select for manufacturing / trading Accounting 1 and 2 required Costing 1 and 2 Select for manufacturing / trading Comment Do not select for Services Do not select for Services 4. Choose Enter. Field name Description User action and values Comment Plant 1000 <your production plant> Stor. Location <leave empty> Sales Org. 1000 or Sales Organization domestic 1100 Sales Organization export Distr.Channel 10 <your distribution channel> Warehouse No. 100 <your warehouse number> Do not use in services. 5. Choose Enter: Materials are first created in the primary procurement/production plant. See Material Extension (155.63) – for extending materials to other plants. To view the material lists run the transaction MM60 or the menu path Logistics Materials Management Material Master Other Materials List. 6. Choose Back (F3) to the SAP Easy Access screen (SAP GUI) Or Choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client). 3.1.1 Basic Data 1. On the Basic Data 1 tab, enter the following values and choose Enter: Field name Description User action and values Description <enter description> Base Unit of Measure <enter Base Unit of measure> © SAP AG Comment Remark: Choose a discrete unit of measure to avoid problems in the Page 7 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD Field name Description User action and values Comment following steps. Material - Group <YB*> Choose appropriate material group starting with <YB> Old material number <enter the legacy material number if known> not mandatory Prod. hierarchy <see special instructions> Not used for services. Lab/Office <enter key of design office, lab, or lab worker responsible> relevant for scenario 146 (MTS Process Industry) Division 10 enter appropriate division GenItemCatGroup NORM Gross weight <enter gross weight> Weight unit <enter weight unit> Net weight <enter net weight> 2. On the Basic data 2 tab, choose Enter. For product hierarchy, use the drop-down selection tool. At each level, click once the appropriate level, and then click [Next Level]. When you reach the appropriate end, choose the Choose button. 3.1.2 Classification (Only required for materials subject to batch management) 1. On the Classification view tab, on the Classification screen, enter the following values and choose Enter: Field name Values FIFO Values Expiration Date Class Type 023 023 Class <enter class created for FIFO> <enter class created for Exp. Date) YB_BATCH YB_EXP_DATE_001 2. Choose Next screen (F8). Only assign one class depending how you want control the material master record. 3.1.3 Sales Data 1. On the Sales: sales org. 1 tab, enter the following values, and choose Enter: Field name Delivering plant © SAP AG Description User action and values Comment 1000 enter the primary plant for outbound deliveries Page 8 of 16 SAP Best Practices Field name Create Semifinished Good (HALB) Material (155.26): MPD Description Tax classification User action and values Comment 1 for taxable 2. On the Sales: sales org.2 tab, enter the following values, and choose Enter: Field name Description User action and values Comment Material statistics group 1 Acct assignment grp 02 Y1 Service Provider Item category group NORM Standard, Services YBNA Stock ord 3rd party 3. On the Sales: General/plant tab, enter the following values and choose Enter: Field name Description User action and values Comment Availability check 02 for Indiv.requirements Trans. Grp 0001 choose the appropriate transportation group LoadingGrp 0002 choose the appropriate loading group Profit Center YB<*> select profit center from baseline scope, for example, for controlling area 1000 For profit center, use the drop-down selection tool. YB<*> SerialNoProfiles Use for Services 4. Choose the Sales text tab, enter text that should appear on sales documents for this material. 5. Choose the Foreign Trade Export tab. 6. On the Foreign Trade export tab, enter the following values and choose Enter: Field name Description User action and values Comm./ import code <XXXXXXXX> for example, 22030010 Country of Origin AE Region of Origin <select from F4 help, if needed> © SAP AG Comment Page 9 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD Foreign trade data is only required if you want to sell the material in other countries (export) 7. Choose the Purchasing tab. 3.1.4 Purchasing Data 1. On the Purchasing tab, enter the following values and choose Enter: Field name Description Purchasing group User action and values Comment <enter purchasing group> enter your purchasing group number Similar to MRP controller 2. On the purchase order text screen, enter text that should appear on purchasing documents for this material. 3. Choose the MRP1 tab 3.1.5 MRP Data 1. On the MRP1 tab, enter the following values and choose Enter. Field name Description User action and values Comment MRP type PD MRP MRP controller <enter MRP controller> Enter your MRP controller number (plant-specific) Similar to purchasing group Lot size EX 2. On the MRP2 tab, enter the following values and choose Enter. Field name Description User action and values Comment Procurement type E or X scenario-specific Special procurement <blank> for primary plant (1000), plant-specific / scenario-specific 40 when material is transferred from another plant (1100) see also special instructions below Prod. Stor. Location <enter shop floor storage location> plant-specific Storage loc. for EP <enter storage location for raw materials storage> plant-specific In-house production <enter total production time for when material is produced on site> scenario-specific SchedMargin Key 001 Stock determination group 0001 © SAP AG scenario-specific Page 10 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD <enter planned delivery time> Planned Delivery Time scenario-specific 3. On the MRP3 tab, enter the following values and choose enter. Field name Description User action and values Comment Strategy group 40 or 10 choose appropriate strategy group depending on your business conditions Consumption mode see special instructions below Bwd consumption per enter number of days into past MRP will consume forecast requirements scenario-specific Fwd consumption per enter number of days into future MRP will consume forecast requirements scenario-specific 4. On the MRP4 tab, enter the following values and choose enter. Field name Description User action and values Comment Individual/coll. <blank>, 1, 2 Determines how dependent requirements are controlled Repetitive manufacturing <select if you want to use this material for repetitive manufacturing > scenario-specific REM profile Y002 scenario-specific. Only assign profile if you have selected the flag Repetitive manufacturing 5. Choose Enter. In this section you can find additional information how to maintain the special procurement key and how to maintain the consumption mode. External materials: Procurement type () X External procurement () 20 Subcontract materials: Procurement type () F Special procurement () 30 Stock transfer materials: Procurement type () F Special procurement () 40 or appropriate entry for plant transfer Phantom assembly © SAP AG Procurement type () E Phantom assembly () 50 Page 11 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD For Consumption mode, there are four possible entries: 1. Backwards only 2. Backwards/Forwards 3. Forwards only 4. Forwards/Backwards Based on the entry chosen, fill in Bwd consumption per. and Fwd consumption per. appropriately (leaving blank if necessary). 3.1.6 Work Scheduling Data 1. On the Work scheduling tab, enter the following values and choose Enter. Field name Description User action and values Comment Production scheduler Optional scenario-specific Production Scheduling Profile Optional Underdelivery tolerance optional scenario-specific Overdelivery tolerance optional scenario-specific Lot-size independent Inhouse production time <Any value> number of days for inhouse production Serial no. profile YBP1 YB<X> scenario-specific YB<XXXX> 3.1.7 General/Storage Data 1. Choose the Plant data/stor.1 tab. If your material is subject to batch management, choose Organizational levels. (If your material is not subject to batch management, you can skip to step 4). 2. On the Organizational levels screen delete any value in input field Plant and press Enter. Please note that the fields are on client level and not on plant level. 3. Enter the following values: Enter the following values: Field name Description Batch Management User action and values Comment Set indicator Only set if your material is subject to batch management Period Ind. For SLED Period indicator for shelf life expiration date D (days) Only required if material is subject to batch management with the expiration date search strategy Min. Rem. Shelf Life Minimum remaining shelf life Enter the minimum remaining shelf life Only required if material is subject to batch management with the expiration © SAP AG Page 12 of 16 SAP Best Practices Field name Create Semifinished Good (HALB) Material (155.26): MPD Description User action and values Comment date search strategy Total shelf life Enter the total shelf life Only required if material is subject to batch management with the expiration date search strategy Storage Condition 10 or 20 Use value 10 for services. 4. Choose Enter. 5. Choose the Plant data/stor. 2 tab, and choose Enter. 3.1.8 Warehouse Data Choose the Warehouse mgmt.1 tab, and choose Enter. All required data are defaulted into the warehouse view. 3.1.9 Accounting Data 1. On the Accounting 1 tab, make the following entries and choose enter. Field name Description User action and values Price unit <enter quantity basis for standard price (see special instructions below)> Price control S Standard price <enter standard cost of material> Valuation Class 7900 Comment 2. Choose the Accounting 2 tab, and choose Enter. Values for price unit, valuation class and price control default into the view. You may change price unit and price control if required for your data. 3.1.10 Costing Data Prerequisites For the SpecProcurem Costing field, if the standard cost should be copied from the same material in a different plant, and no value was entered in the Special Procurement field on MRP2, and then enter the appropriate value here. 1. On the Costing 1 tab, make the following entries and choose Enter. Field name Description User action and values Material origin select the checkbox With Qty Structure select the checkbox SpecProcurem Costing <optional (see special instructions above)> Variance key 000001 © SAP AG Comment Page 13 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD 2. On Costing 2 tab, choose Enter. 3. A Last data screen reached dialog box displays. 4. Choose Yes to save. Result The semi-finished material is created. 4 Follow-Up Processes 4.1 Material Extensions Use This activity will maintain any kind of material extension (for example, for plant and storage location) Procedure To execute this activity, run the Maintain Material Extension (155.63) scenario. 4.2 Bill of Materials Use This activity will create a bill of materials and assign the raw material to the BOM Procedure To execute this activity, run the Create Bill of Material (155.37) scenario. 4.3 Routing Use This activity will create routings. Procedure To execute this activity, run the– Create Routings (155.39) scenario. 4.4 Sales Price Condition Use © SAP AG Page 14 of 16 SAP Best Practices Create Semifinished Good (HALB) Material (155.26): MPD This activity will create a sales price condition. Procedure To execute this activity, run the Create Sales Price Condition (155.19) scenario. 4.5 Product Group Use This activity will create product groups. Procedure To execute this activity, run the Create Product Group (155.24) scenario. 4.6 Product Cost Planning Use This activity will create a product cost planning for an individual product. Procedure To execute this activity, run the Create Standard Cost for Individual Material (155.08) scenario. 5 Appendix 5.1 Reversal of Process Steps In the following section, you can find the most common reversal steps, which you can take to reverse some of the activities described in this document. Material Master – Flag for Deletion Transaction code (SAP GUI) MM06 Business role Engineering Specialist Business role menu Engineering Master Data Material Master Flag Material for Deletion Comment In transaction MM06 choose: Material flag for deletion Material master deletion requires data archiving (not part of the process scenarios), starting with flagging the material for deletion 1. On the screen make the following entries and choose Enter. © SAP AG Page 15 of 16 SAP Best Practices Field name Create Semifinished Good (HALB) Material (155.26): MPD Description User action and values Comment Material Material number Material to be deleted plant Plant number Relating plant Stor. location Storage location Relating storage location, if needed Sales Org. Sales org unit If needed Distr. Channel Distr. Channel If needed Warehouse no. Warehouse Number If needed Storage Type Storage Type 2. The Flag for Deletion: Data Screen appears. Select the material number s for deletion as listed. 3. Choose Save. Result The material is selected for deletion. © SAP AG Page 16 of 16