SCOPE OF WORK AND SCOPE OF SUPPLY DOCUMENT No. A062-114-50-46-SP-03 Rev.0 Page 1 of 7 ERECTION OF CAT COOLER NEW FCCU 10000294-HB-48009 SCOPE OF WORK AND SCOPE OF SUPPLY FOR CATALYST COOLER INSTALLATION AT HPCL-MUMBAI 0 06.01.2011 Issued with Tender RSR Page 1 of 7 SHAIL JKM S.RAINA SCOPE OF WORK AND SCOPE OF SUPPLY DOCUMENT No. A062-114-50-46-SP-03 Rev.0 Page 2 of 7 ERECTION OF CAT COOLER NEW FCCU Rev. No. Date Purpose Prepared By Page 2 of 7 10000294-HB-48009 Checked By Approved By SCOPE OF WORK AND SCOPE OF SUPPLY DOCUMENT No. A062-114-50-46-SP-03 Rev.0 Page 3 of 7 ERECTION OF CAT COOLER NEW FCCU 10000294-HB-48009 GENERAL This tender specification cover modification works required in Regenerator at the time of Catalyst Cooler installation in the Regenerator section at HPCL-Mumbai. Brief scope of modification work in each equipment is as follows (but not limited to the following): 1) FCC REGENERATOR (Item No 114-R-1002) a) b) c) d) e) f) g) Dismantling/ re-assembly of existing structure required for the erection of catalyst cooler. Cutting and removal of dished end of nozzle B41 & B45. Installation of mitre section of nozzle B41 Erection of Catalyst Cooler shell and welding of its top nozzle with nozzle B41 Erection/installation of 2 nos spring hangers for supporting catalyst cooler. Installation of debris screen assembly for nozzle B41. Installation of Cooled catalyst standpipe (comprising of slide valve & expansion joint) connected with nozzle B45 & H05. h) Installation of cooled catalyst deflector in nozzle B45. i) Installation of catalyst cooler tube bundle. Note: All above modification works are to be carried out in strict compliance to UOP drawings/ specification enclosed with tender specification The tender covers supply of all materials ( except those covered in Owner’s scope of supply), cutting all items requiring removal and other components as per drawing, supply of all materials for temporary supports, fabrication and installation of all temporary supports while dismantling/cutting/ removal of all items, transportation of the same to area indicated by Engineer-in-Charge, (Items which are to be reused shall be properly kept and care should be taken not to damage any component), supply of all new materials as per specification, erection of the same in position, welding and carrying out all NDT requirements, carrying out PWHT as per Code, hydro-testing, supply of all refractory materials, anchors, applying all refractories, curing, drying etc., surface preparation, application of primer/paint, dismantling of all insulation wherever required for carrying out site work, supply of new insulation material/cladding etc., and installation of insulation etc., completing all the work as per code, standards, specification, requirements of tender, instructions of Engineer-in-charge, including cleaning all debris, and making the area to the original condition. All modification works shall be carried out with adequate safety and barricading requirements for the operating refinery and agencies who have done similar job shall be employed . Owner’s Scope of Supply 1) 2) 3) 4) 5) Catalyst Cooler (Item No 114-E-1002) Mitre portion of nozzle B41 as per UOP/L&T drg., Debris screen assembly Catalyst deflector for nozzle B45 Expansion joint & Slide valve for Cooled catalyst standpipe Two number spring hanger support for Catalyst cooler Contractor’s scope of Supply Contractor’s scope shall include but not limited to the following items: 1) All metallic and non-metallic parts/items required for executing the job as per code, standards, specifications, drawings, requirements of tender document and instruction of Engineer-inCharge. 2) All crane(s) for erection of equipments (The capacity of crane(s) shall be decided by Contractor). Page 3 of 7 SCOPE OF WORK AND SCOPE OF SUPPLY DOCUMENT No. A062-114-50-46-SP-03 Rev.0 Page 4 of 7 ERECTION OF CAT COOLER NEW FCCU 10000294-HB-48009 3) All transportation equipments, handling equipments, all tools, tackles etc. for execution and completing the job. 4) All loading/unloading equipments. 5) All form/shuttering materials for application of lining. 6) All refractory mixing equipments, vibrators, application equipments, drying equipments etc. for carrying all works with respect to refractory. 7) All material for temporary supports/structures required while cutting and dismantling/removal. 8) All material and consumables for welding procedures, welder’s qualification and performance test, etc. 9) All Jigs, Fixtures and Trolley as per UOP specification required for bundle erection/removal and future maintenance as well. The same are required to be handed over to HPCL after erection of catalyst cooler assembly. 10) All refractory materials of approved specification, all anchors, edge bars, collars, punch tabs, ceramic fibre, paper, hex mesh, SS reinforcing needless, etc. as per specification, drawing from the suppliers indicated in the tender. 11) Blinds and tail blinds required are to be supplied by the contractor. 12) All materials for insulation work. 13) All equipments accessories etc. for gas cutting. 14) All items required for conducting non-destructive examination like radiographic examination, UT, DP/MP examination, hydro-test, etc. and any other tests a specified, PWHT etc. 15) All consumables, industrial gases such as Oxygen, acetylene argon etc. all types of electrodes, radiographic films etc. including all accessories for completing the job. 16) All tools, tackles, accessories, apparatus for shot blasting, application of primer/paint etc. 17) Providing all necessary safety equipments along with dedicated safety Engineer throughout the Contract period. 18) All equipment required for proper ventilation and proper lighting during execution of work. 19) All primer/paint and equipment required for surface preparation. 20) All materials for all temporary structure/supports wherever required for dismantling/erection etc. 21) All materials required for replacement of any item/ component damaged during execution due to contractor’s negligence, improper erection sequence/ erection method etc. 22) All drawings and documents as per Vendor Data Requirement. 23) All items (other than free issue items) covered in applicable EIL/ UOP specification, standards and drawings. 24) Spare gaskets (200%) of each size and 10% spare bolting (minimum 2 nos.) of each size for all blind flange connection, companion flange connection. Page 4 of 7 SCOPE OF WORK AND SCOPE OF SUPPLY DOCUMENT No. A062-114-50-46-SP-03 Rev.0 Page 5 of 7 ERECTION OF CAT COOLER NEW FCCU 10000294-HB-48009 25) All internal distributor, along with supports etc. as per specification called out in the drg./standard. 26) While welding new portion with the old portion dehydrogenation treatment (heating, upto 300 deg C for two hours) shall be carried out. 27) All personnel required to assist owner in making equipment and connected piping hydrocarbon free, fit for executing revamping. 28) Any other items not specifically covered but required for completing all work as per specifications, codes, standards and requirements of tender document/Instructions of Engineerin-charge. CONTRACTOR’S SCOPE OF WORK 1) Preparation of all detailed fabrication drawings/working drawings and getting the same reviewed/ approved by EIL/HPCL before start of work. 2) Preparation of dismantling and erection procedures/sequences including obtaining approval from EIL/HPCL before start of any dismantling / erection activity. 3) Construction of hardstand for movement of all crane(s) and other equipments. Contractor shall visit site, get familiarized with the site layout and check the adequacy of bearing strength of area of the erection site. In case strength of ground is not adequate, contractor shall carry out all strengthening activities and shall include the same in his scope and quoted price shall include for the same. 4) All hot works to be done in booth covered by asbestos cloth/GI sheets meeting safety requirements of the operating refinery and as per the instructions of Engineer-in- charge. 5) Temporary supports are to be provided wherever required while dismantling the dished ends of nozzles, structural members etc so as to remove safely these items that are to be dismantled and to keep the other items to be retained in position are not disturbed from its original position. 6) Carrying out necessary spading for ensuring positive isolation of the Regenerator as per the instructions of Engineer-in-charge. Making necessary hose connections for steaming out / draining activities. 7) Opening of man-ways and nozzles wherever required, blinding/de-blinding as case may be for the execution of the work, are to be done by the contractor. 8) Providing necessary assistance to HPCL/EIL for removal of loose catalyst from the Regenerator. 9) Removal of existing insulation to the extent required for modification works. 10) Erection, assembly and welding of new catalyst cooler with Regenerator nozzles, conducting all NDT examination, heat treatment etc. Chipping of refractory and hex-mesh to the extent required for the attachment of new catalyst cooler and preparing the edges for welding shall be included in the Contractor’s scope. 11) Contractor shall carry out all edge preparation and conduct 100% UT examination of prepared edges for all shop/site joints (All edge preparation shall be compatible to adjacent component). 12) Conducting all welding procedure, welder qualification, performance test, etc. Page 5 of 7 SCOPE OF WORK AND SCOPE OF SUPPLY DOCUMENT No. A062-114-50-46-SP-03 Rev.0 Page 6 of 7 ERECTION OF CAT COOLER NEW FCCU 10000294-HB-48009 13) Providing suitable ventilation and lighting arrangements for persons working inside the equipment meeting all safety requirements. 14) Reinstallation of new insulation at places from where insulation has been removed modification/revamping. Application of insulation on new equipment wherever required. for 15) Dismantling of any platforms ( in sections / as a whole) without damaging any component which are interfering with the erection scheme with prior approval of EIL/HPCL. After completion of erection, the same shall be re-installed to the original requirement. 16) Contractor shall provide complete procedure for site seam examination and method of application of refractory lining before start of work for review by HPCL/EIL. As a minimum all site joints shall be 100% RT, 100% UT & 100% WFMT (from outside and inside both wherever feasible) before and after PWHT (as applicable) are required. For all site joints 100% DP check for root run and all subsequent passes of weld shall be carried out (Contractor shall furnish all NDT examination requirement of shop/site fabrication for review by HPCL/EIL). 17) Transportation and erection of catalyst cooler assembly as per approved erection/handling scheme by HPCL/UOP/EIL. 18) Demonstration of tube bundle removal/insertion in catalyst cooler shell to HPCL/EIL as per instruction from Engineer –in-charge. 19) Transportation of spring hangers from stores and erection of the same in position for load condition specified in the tender elsewhere. 20) Conducting 100% UT examination of non-accessible joints and bevel edges of existing components. 21) Engaging the services of UOP approved refractory inspection agency, refractory application agency, refractory dry-out agency as called in the tender. 22) Application of refractory lining including cleaning of the surface by blast cleaning, installation of anchors / hex mesh, preparation of proper refractory mix, installation of lining by qualified personnel, proper curing and drying, inspection and testing of the lining as per specifications, standards and to the satisfaction of Engineer-in-charge. 23) Surface preparation required as per spec./drgs., application of primer / paint to new surfaces. 24) All items which are fabricated / completed at shop shall be transported to site/ Storage yard/stores duly packed. 25) Erection of temporary platform, scaffolding inside and outside of Regenerator/ Reactor riser required for the execution of stipulated work and removal of the same after completion of work. 26) Transportation of used or replaced items which are required to be stored as per instruction of Engineer-in-charge. 27) Adhering to safety and barricading requirement as instructed by the operation group of running refinery. 28) Contractor shall take hot and cold work permit from HPCL before start of site activities. Page 6 of 7 SCOPE OF WORK AND SCOPE OF SUPPLY DOCUMENT No. A062-114-50-46-SP-03 Rev.0 Page 7 of 7 ERECTION OF CAT COOLER NEW FCCU 10000294-HB-48009 29) After completion of all site activities, clearing the entire area as per requirement of Engineer-inIn-charge is the responsibility of the contractor. All personnel required for such activities shall be provided by the contractor. 30) After award of contract, detail of activities proposed to be carried out at shop, at site prior to shutdown and during shutdown along with the schedule must be submitted to HPCL/EIL for review. 31) Rectifying and bringing the same to original requirement of any component/refractory damaged during erection due to contractor’s negligence, wrong/improper method of execution shall be carried out by the contractor without time and cost implication on the part of client. 32) All relevant drawings, standards and specifications are attached as per document no. A062-11450-46-LL-02. Any other drawing/document required by contractor shall be furnished during prebid meeting. 33) Refer doc no A062-114-50-46-SR0003 for schedule of rates for Erection works of catalyst cooler. 34) Contractor shall visit the site and study the site conditions before quoting for the job. Page 7 of 7